SlideShare a Scribd company logo
1 of 5
Khaled Hbeisheh
Sr.Civil Engineer
1|
YEARS OF EXPERIENCE
Total Years: 23
Middle East: 23
With Parsons: 3+
EDUCATION
BSc. In Civil Engineering,
Faculty of Engineer, University
of Engineering & Technology
Lahore/Pakistan, 1992
PROFESSIONAL
MEMBERSHIP
Membership of the Jordan
Engineers Association (JEA)
(No.11444 / Civil)
Membership of Jordanian
Constructions Contractors
Association
(JCCA) since 2011
Membership of Saudi counsel of
Engineers (No.150485), Degree
Consultant CE
OTHERS
Nationality: Jordanian
Language: English, Arabic
Year of Birth: 1967
Office Based: Tabuk, Saudi
Arabia
RELEVANT PROJECT EXPERIENCE
Saudi Arabian Parsons Limited, Saudi Arabia
Senior Structural Engineer - Civil
Nov 2013 - Present
Project:
 Minsitry of Housing Project - Tabuk
Responsibilities:
A - Report and communicate with MOH Management in the
following aspects:
 Communicate with MOH Concerned Department
continuously regarding Project Progress and areas of concern
 Propose construction staff to comply with AGREEMENT
requirements and COMPANY procedures.
 Establish and maintain specific project procedures for
Construction Supervision Management.
 Advice MOH representative on any potential variation to
the CONTRACTOR's /Scope of work that may generate cost or
time impact and present RE assessment.
EXPERIENCE PROFILE
23 years of intensive experience in wide range of Structural
and Civil Engineering Projects in the areas of Roads and
Bridges Construction,Industrial and Commercial Buildings,
Irrigation and Drainage projects comprising of earth work and
Industrial Structures works on Irrigation flow, Strom water
system.
Having strong skills such as:
 Hands-on experience in contracts administration and
planning management such as allocation and monitoring of
resources, design criteria,scheduling,control estimate and
rate analysis.
 Thorough knowledge of materials and quality control.
 Review and assessment of Shop and as-built Drawings.
 Excellent analytical ability and ability to prepare technical
and Contract Statements and Reports.
 Excellent interpersonal and managerial skills,as
negotiating and advisory skills, to coordinate projects
implementation with projects owners, clients,consultant
and related municipal and government officials and
authorities.
Khaled Hbeisheh
Sr.Civil Engineer
2|
 Present approved staff mobilization,demobilization,leave and replacement plans for approval by
MOH ahead of time.
 Lead construction staff in assessing variation, claims and report, to MOH management the
technical position of the proposed variation.
 Advise MOH of any foreseen slippage of Progress and propose corrective actions.
 Present feed back to MOH internal auditing and any other third party auditing hired by MOH.
 Review and initial RE assessment of monthly progress invoices.
 Co-ordinate and review staff performance and ensure compliance with requirements and project
management good practice.
 Review weekly and monthly reports as presented by Contractor's
 Review/approved by RE and present to MOH comments of non-compliance , and I or of concern
and corrective action.
 Assess change request as submitted by Contractor after reviewed and recommended by RE
and prepare relevant reports and MOH with recommendations.
 Attend Executive meetings, weekly progress meeting, Quality meetings, Safety meetings and
make sure that weekly technical meetings are attended by all relevant parties.
 Facilitating PROJECTS audits carried out by MOH and/or company.
B - Supervise the construction team covering the following responsibilities:
 Make sure that the proposed staff already to all staff approved by Client with full compliance
with AGREEMENT requirements and COMPANY procedures .
 Carry out documents induction course to all staff to ensure their awareness of the project
requirements.
 Make sure that all staff is aware of the project approved procedures, scope of work and
drawings.
 Issue and/or comment Contractor proposed site organization, key personnel CV's after they
reviewed by RE.
 Review and monitor in timely manner, the Contractor's proposed construction equipments and
manpower histogram and advice MOH of any shortage.
 Establish documented procedures to Overview and comment on proposed Sub-contractor,
Vendors, material, shop drawings and any other transmittal by contractor, Any deviation from
project requirements shall be properly reported to MOH Management addressing any possible
Time and/or Cost Impact associated with it.
 Ensure contractors compliance with its contractual obligations concerning Design changes,
Tender Notices etc.
 Regular visit to Project site for monitoring of site activities in respect of Quality, Safety and
Progress and advice MOH representatives of finding , areas of concern and corrective action.
 Lead the supervision team to evaluate all request for information (RFI) as submitted by the
CONTRACTOR in timely manner. Then prepare the response to the CONTRACTOR without
delay .
 Ensure supervision staff involvement and implementation of field Quality Control Procedures,
Safety and Progress aspects.
Khaled Hbeisheh
Sr.Civil Engineer
3|
ACEPO Consultant & Engineers, Aqaba, Jordan
Senior Quality Engineer
July 2009 – Oct 2013
Projects:
 Saraya Aqaba Project:
Is one of the community sites at the South of Jordan our project scope includes all type of work
like Apartments (2000 Apt), Commercial centers, Parks Playfields marine walls around the
lagoon with water taxi & water cascade , apartments + resorts.Streets and Roads, Primary sub-
station Potable water Pump station, Sewage treatments plant,all utilities network etc...
Responsibilities:
 Operation and resources including liaison with other QC Inspector. Coordinate ensure efficiency
of the works and implementing.
 Responsible for all aspects related to quality control are planned, resourced, performed,
controlled, managed and documented. To stop and give immediate notifications/ report for any
works that is non-confirming.
 Ensuring projects are in compliance with policies and standards to meet all required guidelines
& regulations.
 Preparation of inspection and test plans also the checklist. Jointly with infrastructure works team
and QA/QC Manager.
 Routine site inspections and periodical off site inspections.
 Ensuring that inspection systems and controls are implemented.
 Ensuring that all test reports are verified to meet the contract requirements.
 Issue and administer Non Conformance Reports as necessary and ensure follow up.
 Preparation of QC Reports and Review of Weekly, Monthly Reports.
 Attending site progress and safety meeting.
 Verifying redlined drawing on site.
 Creating snag list of remaining item and following up to close it.
 Follow up the implementation and monitoring of the quality system procedures.
 Identify jointly with the inspection team the non-conformances and take preventive and
corrective actions.
 Assists as necessary the engineering department in the evaluation and correction of specific
quality control problems.
 Ensures the quality records, acceptance certificates, in accordance with project requirements.
 Ensuring that QMS documentation is up to date and promote necessary revisions with
Department Heads.
 Assist the operations team with method of statement, ITP, checklist.
Alfadil engineering & contracting ,Consultant ventures longdon Wilson International and
Sigma Consultant Engineering, Jordan
Senior Structural engineer
July 2008 – July 2009
Projects:
Khaled Hbeisheh
Sr.Civil Engineer
4|
 Aqaba New Military Hospital Project, Jordan
Responsibilities: Mr.Khaled with his extensive experience the civil engineering field particularly in
the construction supervision, has been involved in the design, preparation of specifications,
Supervision of construction hospital building with 250 Bed and with the high profile medical center.
Ayla Hotel & Tourism Co. Perspective Consultant Engineering ,Aqaba , Jordan
Construction Manager
Feb 2006 – July 2008
Projects:
 Kempanski Hotel-Aqaba, Jordan
Responsibilities: To supervise several projects simultaneously, direct and follow staff members,
control projects under construction hotel building with 210 Room in high luxury facilities, monitor
construction activities against approved program and contract condition, solve problems, watch for
construction activities.
Administering contractual matters, quality control, Random review of working drawings (Shop
Drawings) in accordance with contract documents, communicating with contract parts and/ or
concerned condition with all services departments and agencies.
Aqaba Special economic zone authority (ASEZA)
Project Manager
July 2002 – Jan 2006
Projects:
 Civil defiance complex at Al-Dorra.
 Aqabawe Mosque.
 Forth zone infrastructure development.
 Exhibition land infrastructure.
 Omar bin Al-Khatab Mosque.
 Proto type 50 unit project.
Responsibilities: Responsible for the activities and efficiency of the staff for the satisfactory
prosecution of the Work under supervision. Has responsibility to build and maintain an organization
that can effectively provide the necessary staking, testing and inspection to ensure the Project is
constructed according to plans and Specifications.
Three Tigers Trading Co. (Hotel construction & management)
Executive Engineer
2000 – June 2002
Projects:
 Bristol Hotel – Amman Jordan
Responsibilities: Responsible for Supervision of Construction works & shop drawing review,
providing supplemental drawings and details are required, review of staff reports, daily project dairy
preparation, confirmation submittal requests for construction, testing and review of joint
measurement sheets.
Khaled Hbeisheh
Sr.Civil Engineer
5|
Ahmad Abu Khormah Est.Cont.
Site Engineer
Aug 1998 – June 1999
Projects:
 Housing project private sectors building
Responsibilities: Responsible for construction of Housing project private sectors building, Review
of staff reports, daily project dairy preparation, Confirmation submittal requests for construction,
testing and review of joint measurement sheets.
Yaghi & Abu Keshek Eng. Cont.Est
Resident Engineer
June 1997 –June 1998
Projects:
 Housing project private sectors building
Responsibilities: Responsible for construction coordination/Supervision for project involved Private
sectors buildings.
Waleed Baba'a engineering concultant
Residential Engineer
1995 – 1997
Responsibilities: Responsibilities As a Residential Engineer in supervision on schools of education
(school of Al-Zawahreh),Housing sector projects reviewing of shop drawings, projects program
preparing, review of material requirements, organized the duties of project staff, communicating
with clients and/or consultants.
Burhan Nur Eng. Establishment for contracting
Inspection Engineer
April 1993 –Nov 1995
Responsibilities: Responsibilities for the construction of School building,Reviewing of shop
drawings, projects program preparing, review of material requirements, organized the duties of
project staff, communicating with clients and/or consultants, conducted periodic meeting with
projects staff and/or sub-contractors.

More Related Content

What's hot

harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitaeHarvey Sarda
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Renilo Ubusan
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5Ramiz Siddiq
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction ManagerEdwardo Figuracion
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CVZAIDI Djahid
 

What's hot (20)

Resume
ResumeResume
Resume
 
Zain Ul Abideen_281116
Zain Ul Abideen_281116Zain Ul Abideen_281116
Zain Ul Abideen_281116
 
Mohannad Al Twait-CV1
Mohannad Al Twait-CV1Mohannad Al Twait-CV1
Mohannad Al Twait-CV1
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 
Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CV
 

Viewers also liked

Viewers also liked (16)

Marketing Loves Sales 2016 Presentation
Marketing Loves Sales 2016 PresentationMarketing Loves Sales 2016 Presentation
Marketing Loves Sales 2016 Presentation
 
Sesion 4
Sesion 4 Sesion 4
Sesion 4
 
National Physique Committee: Ryne Bessler
National Physique Committee: Ryne BesslerNational Physique Committee: Ryne Bessler
National Physique Committee: Ryne Bessler
 
Clase07
Clase07Clase07
Clase07
 
原住民表達藝術 余師
原住民表達藝術 余師原住民表達藝術 余師
原住民表達藝術 余師
 
Math 2012 pspm 2
Math 2012 pspm 2Math 2012 pspm 2
Math 2012 pspm 2
 
Sesion 4
Sesion 4 Sesion 4
Sesion 4
 
Octavo
OctavoOctavo
Octavo
 
Diapositives web i cataleg
Diapositives web i catalegDiapositives web i cataleg
Diapositives web i cataleg
 
Producto 2
Producto 2Producto 2
Producto 2
 
傳統文物解說
傳統文物解說傳統文物解說
傳統文物解說
 
Manifesto da base
Manifesto da baseManifesto da base
Manifesto da base
 
認識 ---布農文物
認識 ---布農文物認識 ---布農文物
認識 ---布農文物
 
reflexion
reflexionreflexion
reflexion
 
Glomerulonefritis rapidamente progresiva
Glomerulonefritis rapidamente progresivaGlomerulonefritis rapidamente progresiva
Glomerulonefritis rapidamente progresiva
 
Seminario falla cardiaca
Seminario falla cardiacaSeminario falla cardiaca
Seminario falla cardiaca
 

Similar to Khaled Hubaisheh Resume

Similar to Khaled Hubaisheh Resume (20)

Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Haifa Resume
Haifa Resume Haifa Resume
Haifa Resume
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUME
 
CV Updated 2
CV Updated 2CV Updated 2
CV Updated 2
 
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
 
UPDATED RESUME (13)
UPDATED RESUME (13)UPDATED RESUME (13)
UPDATED RESUME (13)
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
LastNew CV
LastNew CVLastNew CV
LastNew CV
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
Senior Project Engineer
Senior Project EngineerSenior Project Engineer
Senior Project Engineer
 
Rehan CV
Rehan CVRehan CV
Rehan CV
 
shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 

Khaled Hubaisheh Resume

  • 1. Khaled Hbeisheh Sr.Civil Engineer 1| YEARS OF EXPERIENCE Total Years: 23 Middle East: 23 With Parsons: 3+ EDUCATION BSc. In Civil Engineering, Faculty of Engineer, University of Engineering & Technology Lahore/Pakistan, 1992 PROFESSIONAL MEMBERSHIP Membership of the Jordan Engineers Association (JEA) (No.11444 / Civil) Membership of Jordanian Constructions Contractors Association (JCCA) since 2011 Membership of Saudi counsel of Engineers (No.150485), Degree Consultant CE OTHERS Nationality: Jordanian Language: English, Arabic Year of Birth: 1967 Office Based: Tabuk, Saudi Arabia RELEVANT PROJECT EXPERIENCE Saudi Arabian Parsons Limited, Saudi Arabia Senior Structural Engineer - Civil Nov 2013 - Present Project:  Minsitry of Housing Project - Tabuk Responsibilities: A - Report and communicate with MOH Management in the following aspects:  Communicate with MOH Concerned Department continuously regarding Project Progress and areas of concern  Propose construction staff to comply with AGREEMENT requirements and COMPANY procedures.  Establish and maintain specific project procedures for Construction Supervision Management.  Advice MOH representative on any potential variation to the CONTRACTOR's /Scope of work that may generate cost or time impact and present RE assessment. EXPERIENCE PROFILE 23 years of intensive experience in wide range of Structural and Civil Engineering Projects in the areas of Roads and Bridges Construction,Industrial and Commercial Buildings, Irrigation and Drainage projects comprising of earth work and Industrial Structures works on Irrigation flow, Strom water system. Having strong skills such as:  Hands-on experience in contracts administration and planning management such as allocation and monitoring of resources, design criteria,scheduling,control estimate and rate analysis.  Thorough knowledge of materials and quality control.  Review and assessment of Shop and as-built Drawings.  Excellent analytical ability and ability to prepare technical and Contract Statements and Reports.  Excellent interpersonal and managerial skills,as negotiating and advisory skills, to coordinate projects implementation with projects owners, clients,consultant and related municipal and government officials and authorities.
  • 2. Khaled Hbeisheh Sr.Civil Engineer 2|  Present approved staff mobilization,demobilization,leave and replacement plans for approval by MOH ahead of time.  Lead construction staff in assessing variation, claims and report, to MOH management the technical position of the proposed variation.  Advise MOH of any foreseen slippage of Progress and propose corrective actions.  Present feed back to MOH internal auditing and any other third party auditing hired by MOH.  Review and initial RE assessment of monthly progress invoices.  Co-ordinate and review staff performance and ensure compliance with requirements and project management good practice.  Review weekly and monthly reports as presented by Contractor's  Review/approved by RE and present to MOH comments of non-compliance , and I or of concern and corrective action.  Assess change request as submitted by Contractor after reviewed and recommended by RE and prepare relevant reports and MOH with recommendations.  Attend Executive meetings, weekly progress meeting, Quality meetings, Safety meetings and make sure that weekly technical meetings are attended by all relevant parties.  Facilitating PROJECTS audits carried out by MOH and/or company. B - Supervise the construction team covering the following responsibilities:  Make sure that the proposed staff already to all staff approved by Client with full compliance with AGREEMENT requirements and COMPANY procedures .  Carry out documents induction course to all staff to ensure their awareness of the project requirements.  Make sure that all staff is aware of the project approved procedures, scope of work and drawings.  Issue and/or comment Contractor proposed site organization, key personnel CV's after they reviewed by RE.  Review and monitor in timely manner, the Contractor's proposed construction equipments and manpower histogram and advice MOH of any shortage.  Establish documented procedures to Overview and comment on proposed Sub-contractor, Vendors, material, shop drawings and any other transmittal by contractor, Any deviation from project requirements shall be properly reported to MOH Management addressing any possible Time and/or Cost Impact associated with it.  Ensure contractors compliance with its contractual obligations concerning Design changes, Tender Notices etc.  Regular visit to Project site for monitoring of site activities in respect of Quality, Safety and Progress and advice MOH representatives of finding , areas of concern and corrective action.  Lead the supervision team to evaluate all request for information (RFI) as submitted by the CONTRACTOR in timely manner. Then prepare the response to the CONTRACTOR without delay .  Ensure supervision staff involvement and implementation of field Quality Control Procedures, Safety and Progress aspects.
  • 3. Khaled Hbeisheh Sr.Civil Engineer 3| ACEPO Consultant & Engineers, Aqaba, Jordan Senior Quality Engineer July 2009 – Oct 2013 Projects:  Saraya Aqaba Project: Is one of the community sites at the South of Jordan our project scope includes all type of work like Apartments (2000 Apt), Commercial centers, Parks Playfields marine walls around the lagoon with water taxi & water cascade , apartments + resorts.Streets and Roads, Primary sub- station Potable water Pump station, Sewage treatments plant,all utilities network etc... Responsibilities:  Operation and resources including liaison with other QC Inspector. Coordinate ensure efficiency of the works and implementing.  Responsible for all aspects related to quality control are planned, resourced, performed, controlled, managed and documented. To stop and give immediate notifications/ report for any works that is non-confirming.  Ensuring projects are in compliance with policies and standards to meet all required guidelines & regulations.  Preparation of inspection and test plans also the checklist. Jointly with infrastructure works team and QA/QC Manager.  Routine site inspections and periodical off site inspections.  Ensuring that inspection systems and controls are implemented.  Ensuring that all test reports are verified to meet the contract requirements.  Issue and administer Non Conformance Reports as necessary and ensure follow up.  Preparation of QC Reports and Review of Weekly, Monthly Reports.  Attending site progress and safety meeting.  Verifying redlined drawing on site.  Creating snag list of remaining item and following up to close it.  Follow up the implementation and monitoring of the quality system procedures.  Identify jointly with the inspection team the non-conformances and take preventive and corrective actions.  Assists as necessary the engineering department in the evaluation and correction of specific quality control problems.  Ensures the quality records, acceptance certificates, in accordance with project requirements.  Ensuring that QMS documentation is up to date and promote necessary revisions with Department Heads.  Assist the operations team with method of statement, ITP, checklist. Alfadil engineering & contracting ,Consultant ventures longdon Wilson International and Sigma Consultant Engineering, Jordan Senior Structural engineer July 2008 – July 2009 Projects:
  • 4. Khaled Hbeisheh Sr.Civil Engineer 4|  Aqaba New Military Hospital Project, Jordan Responsibilities: Mr.Khaled with his extensive experience the civil engineering field particularly in the construction supervision, has been involved in the design, preparation of specifications, Supervision of construction hospital building with 250 Bed and with the high profile medical center. Ayla Hotel & Tourism Co. Perspective Consultant Engineering ,Aqaba , Jordan Construction Manager Feb 2006 – July 2008 Projects:  Kempanski Hotel-Aqaba, Jordan Responsibilities: To supervise several projects simultaneously, direct and follow staff members, control projects under construction hotel building with 210 Room in high luxury facilities, monitor construction activities against approved program and contract condition, solve problems, watch for construction activities. Administering contractual matters, quality control, Random review of working drawings (Shop Drawings) in accordance with contract documents, communicating with contract parts and/ or concerned condition with all services departments and agencies. Aqaba Special economic zone authority (ASEZA) Project Manager July 2002 – Jan 2006 Projects:  Civil defiance complex at Al-Dorra.  Aqabawe Mosque.  Forth zone infrastructure development.  Exhibition land infrastructure.  Omar bin Al-Khatab Mosque.  Proto type 50 unit project. Responsibilities: Responsible for the activities and efficiency of the staff for the satisfactory prosecution of the Work under supervision. Has responsibility to build and maintain an organization that can effectively provide the necessary staking, testing and inspection to ensure the Project is constructed according to plans and Specifications. Three Tigers Trading Co. (Hotel construction & management) Executive Engineer 2000 – June 2002 Projects:  Bristol Hotel – Amman Jordan Responsibilities: Responsible for Supervision of Construction works & shop drawing review, providing supplemental drawings and details are required, review of staff reports, daily project dairy preparation, confirmation submittal requests for construction, testing and review of joint measurement sheets.
  • 5. Khaled Hbeisheh Sr.Civil Engineer 5| Ahmad Abu Khormah Est.Cont. Site Engineer Aug 1998 – June 1999 Projects:  Housing project private sectors building Responsibilities: Responsible for construction of Housing project private sectors building, Review of staff reports, daily project dairy preparation, Confirmation submittal requests for construction, testing and review of joint measurement sheets. Yaghi & Abu Keshek Eng. Cont.Est Resident Engineer June 1997 –June 1998 Projects:  Housing project private sectors building Responsibilities: Responsible for construction coordination/Supervision for project involved Private sectors buildings. Waleed Baba'a engineering concultant Residential Engineer 1995 – 1997 Responsibilities: Responsibilities As a Residential Engineer in supervision on schools of education (school of Al-Zawahreh),Housing sector projects reviewing of shop drawings, projects program preparing, review of material requirements, organized the duties of project staff, communicating with clients and/or consultants. Burhan Nur Eng. Establishment for contracting Inspection Engineer April 1993 –Nov 1995 Responsibilities: Responsibilities for the construction of School building,Reviewing of shop drawings, projects program preparing, review of material requirements, organized the duties of project staff, communicating with clients and/or consultants, conducted periodic meeting with projects staff and/or sub-contractors.