Dulles Metro is Coming
                                                                                                                                        May 2011


Bridge Construction Moving Soon to Route 7 Near SAIC
As construction continues at peak levels for Phase 1
of the Dulles Corridor Metrorail Project, drivers will
continue to see multiple construction activities in the
coming weeks from East Falls Church to Reston.

   •      Work is intensifying at I-66 and the Dulles
          Connector Road where the Dulles extension
          will connect with the Metro’s existing
          Orange Line. To facilitate that connection,
          rail construction will force single-tracking for
          the Orange Line between the East Falls
          Church and West Falls Church Metrorail
          stations intermittently over the coming
          months. Some closures of those two stations
          also will be needed, causing service
          interruptions for transit users. Dates and
          details will be announced well in advance.

   •      Pier construction has changed the
          complexion of the mile-long stretch of Route
          7 from Route 123 west to the Dulles Toll       APPROACHING TYSONS CENTRAL 123: Construction continues on the bridges across Tysons Boulevard.
          Road. The last lane shift of Route 7 will take Photo by Chuck Samuelson, Dulles Corridor Metrorail Project
          place in late May when westbound lanes are                               of the Tysons East Station and then cross Capital One
          shifted near the entrance to the eastbound lanes of the                  Drive. This work should be completed by July.
          Dulles Toll Road toward I-66.
                                                                            •      Another of the blue and yellow horizontal cranes is now
   •      Construction of the rail bridges along Route 123 is                      working to complete its work near the Tysons Central
          scheduled soon over Scotts Crossing Road/Colshire                        123 Metrorail Station at the corner of Route 123 and
          Drive. The bridges are being built with one of three                     Tysons Boulevard. When that work is done, the crane
          horizontal cranes that are being used to build bridges in                will be disassembled and moved to the Route 7 corridor
          the Route 123 corridor. Once the bridges across Scotts                   near SAIC.
          Crossing are complete, the crane will move along the top
                                                                            •      For the past several weeks, drivers on the Capital
                                                                                   Beltway (I-495) have experienced few lane closures
                                                                                   caused by Dulles Rail construction. However, multiple
                                                                                   overnight lane closings of the northbound lanes near
                                                                                   the Route 123 intersection resume this month.
                                                                                   Overnight closings in the southbound lanes will also be
                                                                                   scheduled and closings of both north and southbound
                                                                                   lanes will continue.

                                                                                       •   Some ramps from I-495 to Route 123 also will be closed
                                                                                           intermittently overnight as the bridges over I-495
                                                                                           continue.

                                                                                       •   Day and night work will continue on all five stations.

                                                                                       •   Work on the flyover from Route 7 to the median of the
                                                                                           Dulles International Airport Access Highway is
AT I-66: Construction continues close to Metro’s Orange Line. Photo by Chuck Samuel-
son, Dulles Corridor Metrorail Project
                                                                                           continuing.
       For general information on the Dulles Corridor Metrorail Project, please visit our website at
                             www.dullesmetro.com or call (703) 572-0506.
PROGRESS! PROGRESS!: Work continues on the Tysons East Station along Route 123 at
Scotts Crossing. This will be the first stop on the westbound Dulles Rail extension.
Photo by Stephen Barna, Dulles Corridor Metrorail Project
                                                                                               ON TOP OF THE TUNNEL: Cranes frame the view of the Sheraton Hotel in the dis-
Eastbound Dulles Airport Access Highway                                                        tance in this photo looking west from the top of the cut-and-cover tunnel area along
                                                                                               Route 7, leading to the future Tysons Central 7 Metrorail Station. Photo by Stephen
Detours Closing Intermittently Overnight                                                       Barna, Dulles Corridor Metrorail Project

The eastbound lanes of the Dulles International Airport Access                                 Sunset Hills Substation Approved
Highway (DIAAH) are now closed intermittently overnights                                       Dulles Corridor Metrorail Project contractors are moving ahead
through the end of July from approximately 8 p.m. to 5 a.m.                                    with construction of a traction power substation and train
because of Dulles Corridor Metrorail Project construction.                                     control room along Sunset Hills in Reston near Hunter Mill Road
                                                                                               just east of the existing VDOT facility.
The closings are necessary because rail construction crews are                                 The location of this facility was approved by the Fairfax County
working on a large concrete structure that will straddle two                                   Planning Commission in late April following a public hearing. It
piers on each side of the eastbound DIAAH. The exit to Route 7                                 is one of many support facilities being built along the Phase 1
(Leesburg Pike) will remain open.                                                              alignment from East Falls Church to Reston.

This Airport Access Highway closure follows the schedule                                       Traction power substations and train control rooms are
below. All times are approximate:                                                              necessary to supply electrical power to Metrorail train cars
  •     7 p.m. – The left lane of the westbound highway will                                   throughout the future rail extension of the Dulles Corridor.
        close near Route 7.                                                                    They are prefabricated buildings that will be delivered to the
  •     7:30 p.m. – The right lane of the eastbound highway                                    construction site after foundation work is complete. The
        will close near Route 7.                                                               construction is expected to last throughout the end of the
  •     8 p.m. – All eastbound Airport Access Highway traffic                                    year.
        will be diverted on to a single westbound lane. At this                                Working with residents of the area, the Rail Project officials
        time, westbound Airport Access Highway will be                                         developed an extensive landscaping plan that will be
        two-way.                                                                               implemented when construction is completed.
  •     Closures will be picked up in reverse order, to be
        completed at 5 a.m. the following mornings.                                            Meanwhile, crews will access the area from the Dulles Toll
                                                                                               Road and Sunset Hills Road. All work will be done during
Route 123 Ramp to Eastbound DCR Opening                                                        daytime hours, in compliance with Fairfax County’s noise
Now Delayed Until Mid-July                                                                     regulations.
The reopening of the ramp from southbound Route 123 from
the McLean area to the eastbound Dulles Connector Road to
I-66 to downtown Washington has been delayed until mid-July.
Rail project contractors had expected this ramp to reopen in
late May. However, the reopening requires significant
repaving. A contract for that work is expected to be set later
this month.

 WANT TO KNOW MORE?
 To set up a briefing for your homeowners association, civic
 group, professional or business group, or business, please
 email outreach@dullesmetro.com or call (703) 448-5550.

 CONSTRUCTION HOTLINE
 For construction-related emergencies, call the Dulles Corridor
                                                                                               BRIDGES OVER THE BELTWAY: Lane closings on I-495, the Capital Beltway, are re-
 Metrorail Project Hotline at 877-585-6789.                                                    suming as construction for the bridges for the future Dulles Corridor Metrorail line
                                                                                               continues. Photo by Chuck Samuelson, Dulles Corridor Metrorail Project
                    1 5 9 3 S p r i n g H i l l R o a d , S u i t e 3 0 0 , V i e n n a , VA 2 2 1 8 2 w w w. d u l l e s m e t r o . c o m 7 0 3 . 5 7 2 . 0 5 0 6

More Related Content

What's hot

Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
Faizan Shabbir
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco
Ankur Saxena
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed Bridges
Hussein Zidan
 
Presentation on Suspension Bridge
Presentation on Suspension BridgePresentation on Suspension Bridge
Presentation on Suspension Bridge
mantukr4ever
 
suspension bridge
suspension bridgesuspension bridge
suspension bridge
Gaurav Rawat
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
Gaurav Rawat
 
Susppension bridges
Susppension bridges Susppension bridges
Susppension bridges
Muhammad Essam
 
San francisco oakland bay bridge
San francisco oakland bay bridgeSan francisco oakland bay bridge
San francisco oakland bay bridgeBob Prieto
 
Eiffel Tower and Golden Gate Bridge Facts and Information :)
Eiffel Tower and Golden Gate Bridge Facts and Information :)Eiffel Tower and Golden Gate Bridge Facts and Information :)
Eiffel Tower and Golden Gate Bridge Facts and Information :)
Jenalyn Besa
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
mominzaki
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
ShrafatBalti
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
IAEME Publication
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
Sanamau Waitogu
 
Bridge construction atlas
Bridge construction atlasBridge construction atlas
Bridge construction atlas
jose bonifacio de souza leite cuadros
 
Rohit jain 0809
Rohit jain 0809Rohit jain 0809
Rohit jain 0809Dhruv Seth
 
Cables & suspension bridges
Cables & suspension bridgesCables & suspension bridges
Cables & suspension bridges
pratik vanam
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 
Highway pdf
Highway pdfHighway pdf
Highway pdf
Saqib Imran
 

What's hot (20)

Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed Bridges
 
Presentation on Suspension Bridge
Presentation on Suspension BridgePresentation on Suspension Bridge
Presentation on Suspension Bridge
 
suspension bridge
suspension bridgesuspension bridge
suspension bridge
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
 
Susppension bridges
Susppension bridges Susppension bridges
Susppension bridges
 
San francisco oakland bay bridge
San francisco oakland bay bridgeSan francisco oakland bay bridge
San francisco oakland bay bridge
 
Eiffel Tower and Golden Gate Bridge Facts and Information :)
Eiffel Tower and Golden Gate Bridge Facts and Information :)Eiffel Tower and Golden Gate Bridge Facts and Information :)
Eiffel Tower and Golden Gate Bridge Facts and Information :)
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
 
Bridge construction atlas
Bridge construction atlasBridge construction atlas
Bridge construction atlas
 
Rohit jain 0809
Rohit jain 0809Rohit jain 0809
Rohit jain 0809
 
Cables & suspension bridges
Cables & suspension bridgesCables & suspension bridges
Cables & suspension bridges
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Highway pdf
Highway pdfHighway pdf
Highway pdf
 

Viewers also liked

Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro railkarthik1923
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
Mayur Soni
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
ravindra sonkar
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
Pradeep Srinivas
 
Bangalore traffic - Solution
Bangalore traffic - SolutionBangalore traffic - Solution
Bangalore traffic - Solution
Dasarathi GV
 
Namma metro - social media plan
Namma metro - social media planNamma metro - social media plan
Namma metro - social media plan
Josemon Sholly
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail projectSaravanan rulez
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
Karan Shah
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
Anshuman Tyagi
 
Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro station
Amit Kumar Tiwari
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
Nithy Anand
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 

Viewers also liked (16)

Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Bangalore traffic - Solution
Bangalore traffic - SolutionBangalore traffic - Solution
Bangalore traffic - Solution
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Namma metro - social media plan
Namma metro - social media planNamma metro - social media plan
Namma metro - social media plan
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro station
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 

Similar to May 2011 Dulles Metro Construction Update

Dulles metro construction update oct 2010
Dulles metro construction update oct 2010Dulles metro construction update oct 2010
Dulles metro construction update oct 2010Brian Block
 
Dulles Metro June 2012
Dulles Metro June 2012Dulles Metro June 2012
Dulles Metro June 2012
Brian Block
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)novacsi
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Crosstown TO
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown UpdateCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Crosstown TO
 
Pharmacy kennedy clc meeting- april 30, 2019
Pharmacy kennedy clc meeting- april 30, 2019Pharmacy kennedy clc meeting- april 30, 2019
Pharmacy kennedy clc meeting- april 30, 2019
Crosstown TO
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Crosstown TO
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
Crosstown TO
 
Leaside open house sep 2014 slides
Leaside open house sep 2014   slidesLeaside open house sep 2014   slides
Leaside open house sep 2014 slidesCrosstown TO
 
Leaside open house sep 2014 Slides
Leaside open house sep 2014 SlidesLeaside open house sep 2014 Slides
Leaside open house sep 2014 Slides
Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Crosstown TO
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018
Crosstown TO
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Crosstown TO
 

Similar to May 2011 Dulles Metro Construction Update (20)

Dulles metro construction update oct 2010
Dulles metro construction update oct 2010Dulles metro construction update oct 2010
Dulles metro construction update oct 2010
 
Dulles Metro June 2012
Dulles Metro June 2012Dulles Metro June 2012
Dulles Metro June 2012
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Pharmacy kennedy clc meeting- april 30, 2019
Pharmacy kennedy clc meeting- april 30, 2019Pharmacy kennedy clc meeting- april 30, 2019
Pharmacy kennedy clc meeting- april 30, 2019
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
Leaside open house sep 2014 slides
Leaside open house sep 2014   slidesLeaside open house sep 2014   slides
Leaside open house sep 2014 slides
 
Leaside open house sep 2014 Slides
Leaside open house sep 2014 SlidesLeaside open house sep 2014 Slides
Leaside open house sep 2014 Slides
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
 

More from Brian Block

Your Home will be Everywhere!
Your Home will be Everywhere!Your Home will be Everywhere!
Your Home will be Everywhere!
Brian Block
 
Fuller presentation nvar economic summit
Fuller presentation nvar economic summitFuller presentation nvar economic summit
Fuller presentation nvar economic summitBrian Block
 
8353 moline place brochure
8353 moline place brochure8353 moline place brochure
8353 moline place brochureBrian Block
 
Virginia real estate 1st quarter report
Virginia real estate 1st quarter reportVirginia real estate 1st quarter report
Virginia real estate 1st quarter reportBrian Block
 
Trends in Virginia Housing Market - 1st Quarter 2010
Trends in Virginia Housing Market - 1st Quarter 2010Trends in Virginia Housing Market - 1st Quarter 2010
Trends in Virginia Housing Market - 1st Quarter 2010
Brian Block
 
Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010
Brian Block
 
Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010
Brian Block
 
Economic and Real Estate Market Update from National Association of REALTORS
Economic and Real Estate Market Update from National Association of REALTORSEconomic and Real Estate Market Update from National Association of REALTORS
Economic and Real Estate Market Update from National Association of REALTORS
Brian Block
 

More from Brian Block (8)

Your Home will be Everywhere!
Your Home will be Everywhere!Your Home will be Everywhere!
Your Home will be Everywhere!
 
Fuller presentation nvar economic summit
Fuller presentation nvar economic summitFuller presentation nvar economic summit
Fuller presentation nvar economic summit
 
8353 moline place brochure
8353 moline place brochure8353 moline place brochure
8353 moline place brochure
 
Virginia real estate 1st quarter report
Virginia real estate 1st quarter reportVirginia real estate 1st quarter report
Virginia real estate 1st quarter report
 
Trends in Virginia Housing Market - 1st Quarter 2010
Trends in Virginia Housing Market - 1st Quarter 2010Trends in Virginia Housing Market - 1st Quarter 2010
Trends in Virginia Housing Market - 1st Quarter 2010
 
Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010
 
Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010Trends in Virginia's Housing Markets - 1st Quarter 2010
Trends in Virginia's Housing Markets - 1st Quarter 2010
 
Economic and Real Estate Market Update from National Association of REALTORS
Economic and Real Estate Market Update from National Association of REALTORSEconomic and Real Estate Market Update from National Association of REALTORS
Economic and Real Estate Market Update from National Association of REALTORS
 

Recently uploaded

Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
anothershaneroberts
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Joseph Lewis Aguirre
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Listing Turkey
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
VickyAulakh1
 
The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
Listing Turkey
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
JagadishKR1
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
Vinra Construction
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop AG
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
Farmland Bazaar
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
simpolosparkteam
 
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfRixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Listing Turkey
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
VickyAulakh1
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
SVN International Corp.
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
Listing Turkey
 

Recently uploaded (20)

Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
 
The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
 
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfRixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
 

May 2011 Dulles Metro Construction Update

  • 1. Dulles Metro is Coming May 2011 Bridge Construction Moving Soon to Route 7 Near SAIC As construction continues at peak levels for Phase 1 of the Dulles Corridor Metrorail Project, drivers will continue to see multiple construction activities in the coming weeks from East Falls Church to Reston. • Work is intensifying at I-66 and the Dulles Connector Road where the Dulles extension will connect with the Metro’s existing Orange Line. To facilitate that connection, rail construction will force single-tracking for the Orange Line between the East Falls Church and West Falls Church Metrorail stations intermittently over the coming months. Some closures of those two stations also will be needed, causing service interruptions for transit users. Dates and details will be announced well in advance. • Pier construction has changed the complexion of the mile-long stretch of Route 7 from Route 123 west to the Dulles Toll APPROACHING TYSONS CENTRAL 123: Construction continues on the bridges across Tysons Boulevard. Road. The last lane shift of Route 7 will take Photo by Chuck Samuelson, Dulles Corridor Metrorail Project place in late May when westbound lanes are of the Tysons East Station and then cross Capital One shifted near the entrance to the eastbound lanes of the Drive. This work should be completed by July. Dulles Toll Road toward I-66. • Another of the blue and yellow horizontal cranes is now • Construction of the rail bridges along Route 123 is working to complete its work near the Tysons Central scheduled soon over Scotts Crossing Road/Colshire 123 Metrorail Station at the corner of Route 123 and Drive. The bridges are being built with one of three Tysons Boulevard. When that work is done, the crane horizontal cranes that are being used to build bridges in will be disassembled and moved to the Route 7 corridor the Route 123 corridor. Once the bridges across Scotts near SAIC. Crossing are complete, the crane will move along the top • For the past several weeks, drivers on the Capital Beltway (I-495) have experienced few lane closures caused by Dulles Rail construction. However, multiple overnight lane closings of the northbound lanes near the Route 123 intersection resume this month. Overnight closings in the southbound lanes will also be scheduled and closings of both north and southbound lanes will continue. • Some ramps from I-495 to Route 123 also will be closed intermittently overnight as the bridges over I-495 continue. • Day and night work will continue on all five stations. • Work on the flyover from Route 7 to the median of the Dulles International Airport Access Highway is AT I-66: Construction continues close to Metro’s Orange Line. Photo by Chuck Samuel- son, Dulles Corridor Metrorail Project continuing. For general information on the Dulles Corridor Metrorail Project, please visit our website at www.dullesmetro.com or call (703) 572-0506.
  • 2. PROGRESS! PROGRESS!: Work continues on the Tysons East Station along Route 123 at Scotts Crossing. This will be the first stop on the westbound Dulles Rail extension. Photo by Stephen Barna, Dulles Corridor Metrorail Project ON TOP OF THE TUNNEL: Cranes frame the view of the Sheraton Hotel in the dis- Eastbound Dulles Airport Access Highway tance in this photo looking west from the top of the cut-and-cover tunnel area along Route 7, leading to the future Tysons Central 7 Metrorail Station. Photo by Stephen Detours Closing Intermittently Overnight Barna, Dulles Corridor Metrorail Project The eastbound lanes of the Dulles International Airport Access Sunset Hills Substation Approved Highway (DIAAH) are now closed intermittently overnights Dulles Corridor Metrorail Project contractors are moving ahead through the end of July from approximately 8 p.m. to 5 a.m. with construction of a traction power substation and train because of Dulles Corridor Metrorail Project construction. control room along Sunset Hills in Reston near Hunter Mill Road just east of the existing VDOT facility. The closings are necessary because rail construction crews are The location of this facility was approved by the Fairfax County working on a large concrete structure that will straddle two Planning Commission in late April following a public hearing. It piers on each side of the eastbound DIAAH. The exit to Route 7 is one of many support facilities being built along the Phase 1 (Leesburg Pike) will remain open. alignment from East Falls Church to Reston. This Airport Access Highway closure follows the schedule Traction power substations and train control rooms are below. All times are approximate: necessary to supply electrical power to Metrorail train cars • 7 p.m. – The left lane of the westbound highway will throughout the future rail extension of the Dulles Corridor. close near Route 7. They are prefabricated buildings that will be delivered to the • 7:30 p.m. – The right lane of the eastbound highway construction site after foundation work is complete. The will close near Route 7. construction is expected to last throughout the end of the • 8 p.m. – All eastbound Airport Access Highway traffic year. will be diverted on to a single westbound lane. At this Working with residents of the area, the Rail Project officials time, westbound Airport Access Highway will be developed an extensive landscaping plan that will be two-way. implemented when construction is completed. • Closures will be picked up in reverse order, to be completed at 5 a.m. the following mornings. Meanwhile, crews will access the area from the Dulles Toll Road and Sunset Hills Road. All work will be done during Route 123 Ramp to Eastbound DCR Opening daytime hours, in compliance with Fairfax County’s noise Now Delayed Until Mid-July regulations. The reopening of the ramp from southbound Route 123 from the McLean area to the eastbound Dulles Connector Road to I-66 to downtown Washington has been delayed until mid-July. Rail project contractors had expected this ramp to reopen in late May. However, the reopening requires significant repaving. A contract for that work is expected to be set later this month. WANT TO KNOW MORE? To set up a briefing for your homeowners association, civic group, professional or business group, or business, please email outreach@dullesmetro.com or call (703) 448-5550. CONSTRUCTION HOTLINE For construction-related emergencies, call the Dulles Corridor BRIDGES OVER THE BELTWAY: Lane closings on I-495, the Capital Beltway, are re- Metrorail Project Hotline at 877-585-6789. suming as construction for the bridges for the future Dulles Corridor Metrorail line continues. Photo by Chuck Samuelson, Dulles Corridor Metrorail Project 1 5 9 3 S p r i n g H i l l R o a d , S u i t e 3 0 0 , V i e n n a , VA 2 2 1 8 2 w w w. d u l l e s m e t r o . c o m 7 0 3 . 5 7 2 . 0 5 0 6