The document provides information about the Eglinton Crosstown LRT project in Toronto:
- It operates 11 transit agencies across the Greater Toronto and Hamilton Area and Ottawa, serving over 7 million people with 70 million customer journeys annually.
- Updates are provided on progress at various construction sites along the route including the Eglinton Maintenance and Storage Facility, Mount Dennis Station, the rail corridor, West Portal elevated guideway, and Keelesdale, Caledonia, Fairbank stations.
- Construction activities in 2019 include concrete pours, rebar and structural steel installation, backfilling, utility works and traffic configurations at different locations to support ongoing work.
Leaside Laird CLC November 2019 PresentationCrosstown TO
This is a bi-monthly meeting hosted by Metrolinx and Crosslinx to provide construction and community relations updates to the members of Leaside and Laird Construction Liaison Committee (CLC).
Fairbank-Oakwood Construction Update - November 2021Crosstown TO
The document provides a construction progress update for the Fairbank and Oakwood stations on the Eglinton Crosstown LRT project. For Fairbank station, elevator, escalator, and floor installations were completed in October. Wall, ceiling, and lighting installations are ongoing through 2021. Sidewalk restoration along Eglinton Avenue is also ongoing. For Oakwood station, architectural finishes and mechanical/electrical works are underway in the station box through 2021. Main and secondary entrance construction is also progressing with architectural installations. The traffic configuration around both stations will continue through 2021 as construction progresses.
West works open house deck March 12 2020 Crosstown TO
The document provides construction updates for the Eglinton Crosstown project's western works, including the Eglinton Maintenance and Storage Facility (EMSF), Mount Dennis Station, Railway Corridor, West Portal and Elevated Guideway, Keelesdale Station, and Caledonia Station. Key milestones from 2019 are noted and remaining work for 2020 includes completing architectural elements, road restoration, and system installations to allow for train testing and commissioning. Progress photos depict ongoing construction at each location.
This document provides updates on construction progress for the Eglinton Crosstown LRT project in September 2021, including:
1) Work is underway at Eglinton Station for 24 hours a day with extended construction hours, as well as periodic TTC closures for platform extension works.
2) Traffic configurations around Eglinton Station are changing in late September for approximately 6 months to facilitate construction of the south-west entrance.
3) At Mount Pleasant Station, station box construction and main and secondary entrance construction are underway through 2021, while the current traffic configuration is expected to remain in place through late summer 2021.
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
The document provides updates on construction progress and planned activities at Chaplin Station on the Eglinton Crosstown LRT. Construction will continue into 2021 with activities like station box construction, concrete pours, and utility works taking place. This may cause noise, lane reductions and temporary road closures. Photos show ongoing rebar installation and waterproofing work at the station.
Construction is ongoing at multiple locations along Section One of the Eglinton Crosstown LRT. At Leaside Station, final works are underway at the station box and entrances through early 2021. At Laird Station, works are continuing on the main and secondary entrances through late 2020. Along the at-grade portion, duct bank installation under the West Don River Bridge will occur for six weeks in October, and a pedestrian staircase is being installed at Eglinton and Leslie through November. Rehabilitation of the CP Bridge east of Leslie will take place until late November.
The document provides information about the Eglinton Crosstown LRT project in Toronto:
- It operates 11 transit agencies across the Greater Toronto and Hamilton Area and Ottawa, serving over 7 million people with 70 million customer journeys annually.
- Updates are provided on progress at various construction sites along the route including the Eglinton Maintenance and Storage Facility, Mount Dennis Station, the rail corridor, West Portal elevated guideway, and Keelesdale, Caledonia, Fairbank stations.
- Construction activities in 2019 include concrete pours, rebar and structural steel installation, backfilling, utility works and traffic configurations at different locations to support ongoing work.
Leaside Laird CLC November 2019 PresentationCrosstown TO
This is a bi-monthly meeting hosted by Metrolinx and Crosslinx to provide construction and community relations updates to the members of Leaside and Laird Construction Liaison Committee (CLC).
Fairbank-Oakwood Construction Update - November 2021Crosstown TO
The document provides a construction progress update for the Fairbank and Oakwood stations on the Eglinton Crosstown LRT project. For Fairbank station, elevator, escalator, and floor installations were completed in October. Wall, ceiling, and lighting installations are ongoing through 2021. Sidewalk restoration along Eglinton Avenue is also ongoing. For Oakwood station, architectural finishes and mechanical/electrical works are underway in the station box through 2021. Main and secondary entrance construction is also progressing with architectural installations. The traffic configuration around both stations will continue through 2021 as construction progresses.
West works open house deck March 12 2020 Crosstown TO
The document provides construction updates for the Eglinton Crosstown project's western works, including the Eglinton Maintenance and Storage Facility (EMSF), Mount Dennis Station, Railway Corridor, West Portal and Elevated Guideway, Keelesdale Station, and Caledonia Station. Key milestones from 2019 are noted and remaining work for 2020 includes completing architectural elements, road restoration, and system installations to allow for train testing and commissioning. Progress photos depict ongoing construction at each location.
This document provides updates on construction progress for the Eglinton Crosstown LRT project in September 2021, including:
1) Work is underway at Eglinton Station for 24 hours a day with extended construction hours, as well as periodic TTC closures for platform extension works.
2) Traffic configurations around Eglinton Station are changing in late September for approximately 6 months to facilitate construction of the south-west entrance.
3) At Mount Pleasant Station, station box construction and main and secondary entrance construction are underway through 2021, while the current traffic configuration is expected to remain in place through late summer 2021.
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
The document provides updates on construction progress and planned activities at Chaplin Station on the Eglinton Crosstown LRT. Construction will continue into 2021 with activities like station box construction, concrete pours, and utility works taking place. This may cause noise, lane reductions and temporary road closures. Photos show ongoing rebar installation and waterproofing work at the station.
Construction is ongoing at multiple locations along Section One of the Eglinton Crosstown LRT. At Leaside Station, final works are underway at the station box and entrances through early 2021. At Laird Station, works are continuing on the main and secondary entrances through late 2020. Along the at-grade portion, duct bank installation under the West Don River Bridge will occur for six weeks in October, and a pedestrian staircase is being installed at Eglinton and Leslie through November. Rehabilitation of the CP Bridge east of Leslie will take place until late November.
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project. For Eglinton Station, it notes that deep excavation is underway at two sites until 2019 and that Berwick Avenue will be closed for facility building construction on two upcoming Fridays. For Mount Pleasant Station, it outlines construction activities such as scaffold removal, shallow excavation, and watermain installation occurring over the next few months. It also includes photos of construction progress.
Central Eastern Works Open House - October 2019Crosstown TO
Contains current and upcoming stages of construction for the stations/stops of: Eglinton, Mount Pleasant, Leaside, Laird, Brentcliffe (Portal), Sunnybrook Park and Science Centre.
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020Crosstown TO
The document provides updates on construction activities at Eglinton and Mount Pleasant stations for the Eglinton Crosstown project. At Eglinton Station, deep excavation is ongoing at the TTC bus depot and Salvation Army sites through mid-2020. Periodic closures of Berwick Avenue and lanes of Hillsdale Avenue are also planned through 2020 for TTC line 1 facility construction. Tunnel ventilation shaft construction under Yonge Street will continue through June 2020. At Mount Pleasant Station, shallow excavation and roof construction is nearly complete, with deep excavation and utility reinstatement scheduled to begin in February for approximately 5-6 months. Scaffold removal and facade restoration at Eglinton Junior Public School is planned for March.
The document provides updates on construction activities for Sections 3 and 4 of the Eglinton Crosstown LRT project from O'Connor Station to Kennedy Station in July 2021. It notes that finishing work is largely complete at stops along this section and vehicle testing is ongoing between Brentcliffe and Kennedy through December 2021. Road restoration between these points is scheduled from August 2021 through fall 2021. It also provides details on watermain relocation work occurring at Kennedy Station from June to September 2021 and the temporary relocation of the west GO platform and pedestrian detour at Kennedy Station through August 2022.
Fairbank & Oakwood Construction Liaison Committee July 2018Crosstown TO
This document provides construction updates for three stations on the Eglinton Crosstown LRT project: Caledonia Station, Fairbank Station, and Oakwood Station. For Caledonia Station, it notes that drilling dewatering wells, deep excavation, and concrete pours are ongoing through summer 2018. For Fairbank Station, it lists current and planned construction activities and staging through 2019. For Oakwood Station, it provides a rendering of the planned station design, outlines current staging, and lists planned construction activities and impacts from May to October 2018, including underground excavation, watermain lining that may require closing Times Road for two months.
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Crosstown TO
This document provides updates on construction progress for three stations on the Eglinton Crosstown LRT project: Caledonia Station, Fairbank Station, and Oakwood Station. For each station, construction activities for the winter of 2018 are outlined, including excavation, utility relocation, and support work. Renderings and plans are presented to illustrate station designs and construction staging. Key impacts to traffic and pedestrians are also summarized. The presentation aims to inform community members of current and upcoming work.
Leaside and Laird CLC - January 11, 2021Crosstown TO
This document provides updates on construction progress for the Eglinton Crosstown LRT project at Leaside and Laird stations. At Leaside station, work continues within the station box and entrances and will extend into early 2021, including concrete work, rebar installation and masonry. Construction of the main and secondary entrances is ongoing. At Laird station, forming and concrete work continues at the main and secondary entrances through March 2021, while tunnel and track work occurs beneath Eglinton Avenue. Crane removal and escalator delivery will result in short-term traffic changes in mid-February. Retaining wall construction at Eglinton east of Brentcliffe is on hold for slope remediation and will resume in
Leaside-Laird CLC Meeting - Presentation - November 8, 2021Crosstown TO
The document provides updates on construction progress at the Leaside and Laird stations of the Eglinton Crosstown LRT. At Leaside Station, work is ongoing on the station box, main entrance, and secondary entrance through 2021. Overnight utility works are scheduled for November 11th. At Laird Station, work includes main and secondary entrance construction through fall 2021, with sidewalk restoration and utility installations occurring in November. Lane reductions on Laird Drive are required for utility work from November 1st to 11th. Photos show ongoing construction and installation work.
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Crosstown TO
Construction updates were provided for the Leaside Station, Laird Station, and the area between Brentcliffe Portal and Leslie Street for the Crosstown LRT project. At Leaside Station, permanent works are underway at the main and secondary entrances and will continue into late 2020 and early 2021 respectively. At Laird Station, permanent works inside the completed cavern will continue through 2020, and utility and road restoration will begin mid-2020. Between Brentcliffe Portal and Leslie Street, guideway construction and utility relocation is ongoing, and a retaining wall will be constructed north of Eglinton Avenue from May to August 2020.
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project. For Section One between Brentcliffe Road and Victoria Park Avenue, work includes road widening, retaining wall construction, bridge rehabilitation, and multi-use path building. Section Two between Aga Khan Park and O'Connor sees road work, sidewalk construction, track laying, and shelter installation at O'Connor station. Construction is ongoing at Science Centre station with mechanical and electrical work as well as entrance building.
Pharmacy to Kennedy - November meeting Crosstown TO
The document provides an update on construction activities along Section Three and Four of the Eglinton Crosstown LRT project from O'Connor Station to Ionview Station. Road restoration from Brentcliffe Road to Kennedy Road is ongoing and will continue through winter 2021 and 2022. Testing and commissioning of light rail vehicles is also ongoing east of Brentcliffe Road. Construction at Kennedy Station is progressing with the main entrance works nearing completion in November 2021. Road configuration changes are planned at Kennedy Station in December 2021 and Transway Crescent will be closed for approximately two months for road restoration works.
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Crosstown TO
This document provides updates on construction activities for the Eglinton Crosstown LRT project in July 2020, including:
1) Extended excavation hours beneath the TTC box at Eglinton Station through August 2020.
2) Upcoming closures on Berwick Ave and Hillsdale Ave for TTC facility building construction.
3) Tunnel ventilation shaft construction on Yonge St through December 2020.
4) A concrete pour at the former TTC bus depot site on July 8th for 8 hours.
It also summarizes work at Mount Pleasant Station over the next year, including tunnel demolition, deep excavation, utility work, and concrete pours for station entrances.
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Crosstown TO
The document provides updates on construction progress and planned activities at Eglinton Station and Mount Pleasant Station on the Eglinton Crosstown LRT. At Eglinton Station, deep excavation will continue through fall 2020 with extended work hours. Construction of the TTC facility services building and a tunnel ventilation shaft are also underway. Near Mount Pleasant Station, tunnel demolition, deep excavation, and utility works will continue through 2021 along with concrete pouring and steel installations for the secondary entrance. Photos show recent construction progress inside the station boxes.
Final central east open house oct282020Crosstown TO
The document provides a project update and summaries of work completed and remaining for 2020-2021 at various stations on the Eglinton Crosstown LRT project in Toronto. It notes that as of the end of 2020, three stations will be largely complete and 69% of track has been installed. Summaries are provided for each of Eglinton, Mount Pleasant, Leaside, Laird, Sunnybrook Park and Science Centre stations outlining progress to date and work still to be done. It also outlines the project's commitments to community benefits through hiring and local business spending.
Central West Fall Open House - Oct 28 2019Crosstown TO
This document provides information on the Metrolinx Eglinton Crosstown LRT project, including:
- Summaries of the project's mission, vision, services, and 2041 Regional Transportation Plan.
- Renderings and descriptions of construction progress and timelines at eight station sites: Fairbank, Oakwood, Cedarvale, Forest Hill, Chaplin, Avenue, and Eglinton.
- Photos showing current construction stages like excavation, concrete work, and tunnel boring machine removal.
- Maps of upcoming traffic configurations during construction stages near each station.
Pharmacy kennedy clc meeting - deck - march 26,2019Crosstown TO
The document provides an update on construction progress and upcoming work for the Eglinton Crosstown LRT project in the Pharmacy and Kennedy areas. In Pharmacy, guideway and road work is ongoing, with intersection paving at Pharmacy Avenue scheduled for March 30-31 and April 13-14. In Kennedy, major milestones have been completed including the vertical piles and GO East platform restoration. Current activities include utility relocations and support of excavation for Kennedy Portal and Station Box. Upcoming work includes completion of the West Portal by summer 2019 and installation of a telecommunications antenna at Kennedy Station.
This document provides updates on construction progress and upcoming work for several stations on the Eglinton Crosstown LRT project in Toronto, including Chaplin, Avenue, Eglinton, Mount Pleasant, and Leaside stations. Construction will continue through 2019 and into 2020, with deep excavation, concrete works, and entrance construction taking place. Traffic configurations around some stations will be changing in late 2019. Renderings and photos show examples of station features and construction stages.
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project. For Section One between Brentcliffe Road and Victoria Park Avenue, work includes road widening, retaining wall construction, bridge rehabilitation, and multi-use path building. Section Two between Aga Khan Park and O'Connor sees road work, sidewalk construction, track laying, and shelter installation at O'Connor station. Construction is ongoing at Science Centre station with mechanical and electrical work as well as entrance building.
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project. For Eglinton Station, it notes that deep excavation is underway at two sites until 2019 and that Berwick Avenue will be closed for facility building construction on two upcoming Fridays. For Mount Pleasant Station, it outlines construction activities such as scaffold removal, shallow excavation, and watermain installation occurring over the next few months. It also includes photos of construction progress.
Central Eastern Works Open House - October 2019Crosstown TO
Contains current and upcoming stages of construction for the stations/stops of: Eglinton, Mount Pleasant, Leaside, Laird, Brentcliffe (Portal), Sunnybrook Park and Science Centre.
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020Crosstown TO
The document provides updates on construction activities at Eglinton and Mount Pleasant stations for the Eglinton Crosstown project. At Eglinton Station, deep excavation is ongoing at the TTC bus depot and Salvation Army sites through mid-2020. Periodic closures of Berwick Avenue and lanes of Hillsdale Avenue are also planned through 2020 for TTC line 1 facility construction. Tunnel ventilation shaft construction under Yonge Street will continue through June 2020. At Mount Pleasant Station, shallow excavation and roof construction is nearly complete, with deep excavation and utility reinstatement scheduled to begin in February for approximately 5-6 months. Scaffold removal and facade restoration at Eglinton Junior Public School is planned for March.
The document provides updates on construction activities for Sections 3 and 4 of the Eglinton Crosstown LRT project from O'Connor Station to Kennedy Station in July 2021. It notes that finishing work is largely complete at stops along this section and vehicle testing is ongoing between Brentcliffe and Kennedy through December 2021. Road restoration between these points is scheduled from August 2021 through fall 2021. It also provides details on watermain relocation work occurring at Kennedy Station from June to September 2021 and the temporary relocation of the west GO platform and pedestrian detour at Kennedy Station through August 2022.
Fairbank & Oakwood Construction Liaison Committee July 2018Crosstown TO
This document provides construction updates for three stations on the Eglinton Crosstown LRT project: Caledonia Station, Fairbank Station, and Oakwood Station. For Caledonia Station, it notes that drilling dewatering wells, deep excavation, and concrete pours are ongoing through summer 2018. For Fairbank Station, it lists current and planned construction activities and staging through 2019. For Oakwood Station, it provides a rendering of the planned station design, outlines current staging, and lists planned construction activities and impacts from May to October 2018, including underground excavation, watermain lining that may require closing Times Road for two months.
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Crosstown TO
This document provides updates on construction progress for three stations on the Eglinton Crosstown LRT project: Caledonia Station, Fairbank Station, and Oakwood Station. For each station, construction activities for the winter of 2018 are outlined, including excavation, utility relocation, and support work. Renderings and plans are presented to illustrate station designs and construction staging. Key impacts to traffic and pedestrians are also summarized. The presentation aims to inform community members of current and upcoming work.
Leaside and Laird CLC - January 11, 2021Crosstown TO
This document provides updates on construction progress for the Eglinton Crosstown LRT project at Leaside and Laird stations. At Leaside station, work continues within the station box and entrances and will extend into early 2021, including concrete work, rebar installation and masonry. Construction of the main and secondary entrances is ongoing. At Laird station, forming and concrete work continues at the main and secondary entrances through March 2021, while tunnel and track work occurs beneath Eglinton Avenue. Crane removal and escalator delivery will result in short-term traffic changes in mid-February. Retaining wall construction at Eglinton east of Brentcliffe is on hold for slope remediation and will resume in
Leaside-Laird CLC Meeting - Presentation - November 8, 2021Crosstown TO
The document provides updates on construction progress at the Leaside and Laird stations of the Eglinton Crosstown LRT. At Leaside Station, work is ongoing on the station box, main entrance, and secondary entrance through 2021. Overnight utility works are scheduled for November 11th. At Laird Station, work includes main and secondary entrance construction through fall 2021, with sidewalk restoration and utility installations occurring in November. Lane reductions on Laird Drive are required for utility work from November 1st to 11th. Photos show ongoing construction and installation work.
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Crosstown TO
Construction updates were provided for the Leaside Station, Laird Station, and the area between Brentcliffe Portal and Leslie Street for the Crosstown LRT project. At Leaside Station, permanent works are underway at the main and secondary entrances and will continue into late 2020 and early 2021 respectively. At Laird Station, permanent works inside the completed cavern will continue through 2020, and utility and road restoration will begin mid-2020. Between Brentcliffe Portal and Leslie Street, guideway construction and utility relocation is ongoing, and a retaining wall will be constructed north of Eglinton Avenue from May to August 2020.
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project. For Section One between Brentcliffe Road and Victoria Park Avenue, work includes road widening, retaining wall construction, bridge rehabilitation, and multi-use path building. Section Two between Aga Khan Park and O'Connor sees road work, sidewalk construction, track laying, and shelter installation at O'Connor station. Construction is ongoing at Science Centre station with mechanical and electrical work as well as entrance building.
Pharmacy to Kennedy - November meeting Crosstown TO
The document provides an update on construction activities along Section Three and Four of the Eglinton Crosstown LRT project from O'Connor Station to Ionview Station. Road restoration from Brentcliffe Road to Kennedy Road is ongoing and will continue through winter 2021 and 2022. Testing and commissioning of light rail vehicles is also ongoing east of Brentcliffe Road. Construction at Kennedy Station is progressing with the main entrance works nearing completion in November 2021. Road configuration changes are planned at Kennedy Station in December 2021 and Transway Crescent will be closed for approximately two months for road restoration works.
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Crosstown TO
This document provides updates on construction activities for the Eglinton Crosstown LRT project in July 2020, including:
1) Extended excavation hours beneath the TTC box at Eglinton Station through August 2020.
2) Upcoming closures on Berwick Ave and Hillsdale Ave for TTC facility building construction.
3) Tunnel ventilation shaft construction on Yonge St through December 2020.
4) A concrete pour at the former TTC bus depot site on July 8th for 8 hours.
It also summarizes work at Mount Pleasant Station over the next year, including tunnel demolition, deep excavation, utility work, and concrete pours for station entrances.
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Crosstown TO
The document provides updates on construction progress and planned activities at Eglinton Station and Mount Pleasant Station on the Eglinton Crosstown LRT. At Eglinton Station, deep excavation will continue through fall 2020 with extended work hours. Construction of the TTC facility services building and a tunnel ventilation shaft are also underway. Near Mount Pleasant Station, tunnel demolition, deep excavation, and utility works will continue through 2021 along with concrete pouring and steel installations for the secondary entrance. Photos show recent construction progress inside the station boxes.
Final central east open house oct282020Crosstown TO
The document provides a project update and summaries of work completed and remaining for 2020-2021 at various stations on the Eglinton Crosstown LRT project in Toronto. It notes that as of the end of 2020, three stations will be largely complete and 69% of track has been installed. Summaries are provided for each of Eglinton, Mount Pleasant, Leaside, Laird, Sunnybrook Park and Science Centre stations outlining progress to date and work still to be done. It also outlines the project's commitments to community benefits through hiring and local business spending.
Central West Fall Open House - Oct 28 2019Crosstown TO
This document provides information on the Metrolinx Eglinton Crosstown LRT project, including:
- Summaries of the project's mission, vision, services, and 2041 Regional Transportation Plan.
- Renderings and descriptions of construction progress and timelines at eight station sites: Fairbank, Oakwood, Cedarvale, Forest Hill, Chaplin, Avenue, and Eglinton.
- Photos showing current construction stages like excavation, concrete work, and tunnel boring machine removal.
- Maps of upcoming traffic configurations during construction stages near each station.
Pharmacy kennedy clc meeting - deck - march 26,2019Crosstown TO
The document provides an update on construction progress and upcoming work for the Eglinton Crosstown LRT project in the Pharmacy and Kennedy areas. In Pharmacy, guideway and road work is ongoing, with intersection paving at Pharmacy Avenue scheduled for March 30-31 and April 13-14. In Kennedy, major milestones have been completed including the vertical piles and GO East platform restoration. Current activities include utility relocations and support of excavation for Kennedy Portal and Station Box. Upcoming work includes completion of the West Portal by summer 2019 and installation of a telecommunications antenna at Kennedy Station.
This document provides updates on construction progress and upcoming work for several stations on the Eglinton Crosstown LRT project in Toronto, including Chaplin, Avenue, Eglinton, Mount Pleasant, and Leaside stations. Construction will continue through 2019 and into 2020, with deep excavation, concrete works, and entrance construction taking place. Traffic configurations around some stations will be changing in late 2019. Renderings and photos show examples of station features and construction stages.
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project. For Section One between Brentcliffe Road and Victoria Park Avenue, work includes road widening, retaining wall construction, bridge rehabilitation, and multi-use path building. Section Two between Aga Khan Park and O'Connor sees road work, sidewalk construction, track laying, and shelter installation at O'Connor station. Construction is ongoing at Science Centre station with mechanical and electrical work as well as entrance building.
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Crosstown TO
Extended construction hours from 4:30am to 11pm will continue on the Eglinton Crosstown LRT project. This may involve guideway construction, road widening, retaining walls, and bridge work. There will be daily lane closures and potential sidewalk closures along Eglinton Ave. Noise from construction can be expected. From December to June 2020, guideway work will occur on the West Don River bridge and road work will be on the south side of Eglinton Ave between Brentcliffe Rd and the east portal. A retaining wall east of Brentcliffe Rd will be constructed from May to August 2020.
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)Crosstown TO
The document provides updates on construction activities for Section One and Section Two of the at-grade portion of the Eglinton Crosstown LRT project. For Section One from Brentcliffe Road to Sunnybrook Park Stop, work includes installing light poles and sidewalks, excavating for a retaining wall, and restoring areas around bridges. For Section Two from Aga Khan Park & Museum Stop to O'Connor Stop, work includes platform installation, guideway wall construction, and sidewalk/curb/driveway work between Bermondsey Rd and Victoria Park Ave. The Science Centre Station update outlines work like mechanical installation, deck removal, and tunnel/terminal construction.
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project in the Chaplin and Avenue station areas in July 2020. At Chaplin station, work will continue on the tertiary and main entrances through winter 2021, including rebar installation, concrete works, and station box construction. Chaplin Crescent will remain closed until July 31 for bridge removal works. At Avenue station, final lining, waterproofing and mechanical works will continue through late 2020, with concrete pours three times per week. Eglinton Connects streetscape work is underway between Lascelles Blvd and Duplex Ave and will continue into early 2021. Traffic configurations will be implemented in stages through this period.
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Crosstown TO
Construction activities for the Eglinton Crosstown LRT are ongoing between O'Connor Station and Kennedy Station. Shelter installations are complete at some stops, while concrete works and rebar installations are ongoing at other stops. Overhead power cable installations will require short road closures. Roadwork and utility relocations are continuing between Ionview Road and Kennedy Road. At Kennedy Station, structural work and system installations are ongoing with all work scheduled to be complete by late 2020. Traffic changes are planned at Kennedy Station for October 2020.
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project in July and August 2020. It summarizes that at various stops concrete, rebar installation, and shelter installation will occur. It also outlines roadwork and sidewalk installation between Birchmount Road and Kennedy Road in August. Finally, it details ongoing work at Kennedy Station, including structural activities and relocation of the GO Transit platform in mid-August for approximately one year.
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Crosstown TO
The document provides construction updates for the Crosstown LRT project between Victoria Park Station and Kennedy Station from May 26, 2020. It outlines ongoing and upcoming construction activities at several stops and intersections along Eglinton Avenue including platform construction at Hakimi/Lebovic stop, culvert reconstruction at Rosemount Drive, and left turn removals at Birchmount Road. Construction is also continuing within Kennedy Station with concrete works, underground utility installation, and decking removal at the Eglinton/Kennedy intersection through early July 2020.
Avenue & Chaplin CLC - Construction Update: September 9, 2020Crosstown TO
The document provides updates on construction activities for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. It details the delivery of a dewatering system tank, ongoing construction of station entrances and the station box, and work on the Eglinton Connects streetscape project between September 2020 and 2021. Construction will include concrete pours, utility work and installation of street furnishings. Traffic reductions on Eglinton Avenue are expected during this time period.
Cedarvale- Forest Hill Construction Update (July 29, 2020)Crosstown TO
Crews will be performing construction work on the Eglinton Crosstown LRT project at Cedarvale and Forest Hill stations over the next few months. At Cedarvale Station, a 36-hour concrete pour will occur from July 31 to August 1, reducing Eglinton Avenue to one lane in each direction. Extended construction hours will also resume to complete pedestrian tunnels near Eglinton West Station. At Forest Hill Station, excavation and construction of station entrances will continue through 2020, and concrete pours are scheduled for August 14 and late August at the secondary entrance. Traffic configurations will be impacted at both stations through late summer due to this ongoing construction work.
Metrolinx is a transportation agency that serves the Greater Toronto and Hamilton Area. It operates GO Transit, UP Express, and manages the PRESTO fare payment system. Metrolinx aims to connect communities through regional transit and published a Regional Transportation Plan in 2008 to quadruple rapid transit access. Upcoming works on Eglinton Crosstown LRT stations in 2019-2020 include excavation, concrete pours, traffic configuration changes, and underpinning the existing subway line at Eglinton station to allow construction of the underground interchange station.
- The document provides a construction update for the Eglinton Crosstown LRT project in Toronto, including progress at various stations along the eastern section from Science Centre station to Kennedy station.
- Construction is ongoing with excavation, structural works, guideway and track installation underway or completed at most stations. Interior station works and finishes are nearing completion at Science Centre station.
- The project involves a 19km LRT route, 10km underground and 9km at surface, with 15 underground stations and 10 surface stops. A maintenance facility is also being constructed.
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
Metrolinx acknowledges that the Eglinton Crosstown LRT operates on Indigenous land and is committed to meaningful reconciliation. Construction is underway at Avenue Station with utility works planned for March 21st requiring lane reductions for 8 weeks. At Chaplin Station, the tertiary entrance and demolition of 6 Gilgorm Road are ongoing with Chaplin Crescent closed for 2 weeks. Eglinton Connects streetscape work between Eastbourne and Duplex Avenues continues through 2022 with one lane of traffic in each direction.
Avenue & Chaplin CLC - Construction Update: September 1, 2021Crosstown TO
The document provides updates on construction activities at Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the tertiary, main, and secondary entrances as well as station box construction through fall 2021, with activities such as concrete work, steel installations, and utility works expected to cause noise and lane reductions. At Avenue Station, similar construction is ongoing on the station box, main and secondary entrances through 2021, with deliveries, concrete pours, and crane use impacting traffic. Eglinton Connects streetscape work between Lascelles Blvd and Duplex Ave will begin as early as September 7th, reducing traffic to one lane in each direction for approximately two
The document provides updates on construction activities for the Eglinton Crosstown LRT project in sections 3 and 4 from O'Connor Station to Kennedy Station in November and December 2020. It outlines concrete works, sidewalk construction, track works, and other activities taking place at stops along the route. It also discusses traffic changes and pedestrian detours planned at Kennedy Station in early December 2020 and August 2020 respectively to accommodate GO Transit platform relocation works. Construction is ongoing at stations and is expected to continue through late 2020.
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationCrosstown TO
The document provides updates on construction activities at the Leaside and Laird stations for the Crosstown LRT. At Leaside Station, excavation and concrete work is ongoing at the main and secondary entrances and within the station box. Deep excavation and material deliveries will continue through 2020. At Laird Station, concrete work is progressing within the completed cavern and at the main and secondary entrances, with permanent works expected to continue through 2020. Traffic restrictions will remain in place at both stations to accommodate ongoing construction.
Central West Fall Open House Presentation Deck - October 14, 2020Crosstown TO
Metrolinx & Eglinton Crosstown LRT Project: Presentation material for the Central West Fall Virtual Open House, held on the Metrolinx Engage website, on October 14, 2020. Stations covered: Fairbank, Oakwood, Cedarvale, Forest Hill, Chaplin, Avenue, Eglinton.
Similar to Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting (20)
Western Works CLC - January 17, 2023.pdfCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT project. It summarizes work completed in December 2022 and ongoing work at Caledonia Station, Keelesdale Station, and Mount Dennis Station. It also discusses track installation in the rail corridor, testing of light rail vehicles at the Eglinton Maintenance and Storage Facility, and lane reductions planned for heat trace installation works. Construction and testing activities are expected to continue through early 2023 and into 2023.
The document provides updates on construction activities for the Eglinton Crosstown LRT. Work is ongoing at Caledonia, Keelesdale, and Mount Dennis stations, and in the rail corridor, and will continue through spring 2023. This includes finishing works, system testing, and commissioning of trains. Lane reductions will occur between Weston Rd and Black Creek Dr in March for heat trace installation works. LRVs are being tested on the mainline in preparation for passenger service.
The document provides updates on construction progress for the Eglinton Crosstown LRT project, including at Leaside and Laird stations. At Leaside Station, architectural finishes, mechanical and electrical works are underway with station box and entrance construction expected to be complete in spring 2023. At Laird Station, similar finishing works are ongoing with the main and secondary entrances projected to be finished in early 2023. Utility works and asphalt restoration requiring periodic lane closures on Eglinton Avenue are also outlined.
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project. It notes that work will continue through spring 2023 at Eglinton Station to finish architectural details, mechanical, electrical and testing. It also provides details on construction progress photos and updates for Mount Pleasant Station, including ongoing work on the station box and entrances through spring 2023. Traffic impacts are noted at both locations through late May 2023 for line painting and other works.
Chaplin-Avenue CLC - May 3 2023 Updated.pptxCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT Chaplin Station and Avenue Station. For Chaplin Station, work is underway on the station entrances, station box, and Chaplin Parkette through Spring 2023. For Avenue Station, construction is ongoing on the station box, main and secondary entrances, and Eglinton Avenue streetscape through Summer 2023. Traffic configurations and lane closures are also outlined.
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project from Brentcliffe Road to O'Connor Drive. It notes that vehicle testing is ongoing from Brentcliffe to Kennedy, and that landscaping will continue through the summer. It also summarizes specific utility works, platform works, traffic restrictions and closures taking place between April and May 2023 at various locations along the route. Photos show examples of construction progress such as Presto machine installations and work at Aga Khan Park Station.
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project from Pharmacy Station to Kennedy Station. It notes that vehicle testing and landscaping work will continue through spring 2023 between Brentcliffe and Kennedy stations. Between O'Connor and Ionview stops, traffic sign installation and line painting will take place through late spring. Sidewalk repairs are scheduled along Eglinton Ave East from mid-March 2023. Testing and commissioning activities are ongoing at Kennedy Station and will continue into early 2023. GO train platform service at Kennedy Station will shift east through 2023 with accessibility shuttle services provided.
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
The document provides an update on construction activities for the Eglinton Crosstown LRT project from Pharmacy Station to Kennedy Station. It summarizes that testing and commissioning of light rail vehicles is ongoing between Brentcliffe Road and Kennedy Road through 2023. It also outlines ongoing construction and finishing work at multiple stations along the route including O'Connor, Pharmacy, Golden Mile, Birchmount, Ionview and Kennedy stations. Temporary traffic and pedestrian configurations are in place at 1995 Eglinton Avenue East and Kennedy Station during construction activities.
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
The document provides updates on construction progress for different sections of the Eglinton Crosstown LRT project. Section One details work between Brentcliffe Portal to Sunnybrook Park Stop including vehicle testing, noise barrier removal, landscaping and utility works. Section Two details work from Aga Khan Park & Museum Stop to O'Connor Stop including vehicle testing, station finishes, and upcoming watermain restoration works. Science Centre Station work includes finishing activities and ongoing traffic configuration. Photos show ongoing signage, electrical and landscaping work throughout the alignment.
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
The document provides updates on construction progress for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. For Chaplin Station, work is underway on the station entrances, station box, and Chaplin Parkette through Spring 2023, with periodic lane closures on Chaplin Cres. For Avenue Station, construction is ongoing on the station box, entrances, and Eglinton Avenue streetscape/cycle track between Avenue Rd and Duplex Ave, with the traffic configuration shifting and lane reductions expected by March 2, 2023. Periodic lane and sidewalk closures as well as pedestrian rerouting will occur.
Leaside-Laird CLC - March 13, 2023.pdfCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT project. It summarizes work happening at Leaside Station, including finishing the station box, main entrance, and secondary entrance through spring 2023. It also summarizes work at Laird Station, including main and secondary entrance construction through early 2023. Utility and road work is occurring through spring 2023 at both stations.
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
The document provides updates on construction progress for different sections of the Eglinton Crosstown LRT project. Section One details work happening from Brentcliffe Portal to Sunnybrook Park Stop, including vehicle testing, noise barrier removal, landscaping, and overnight utility works. Section Two details work from Aga Khan Park & Museum Stop to O'Connor Stop, including vehicle testing, landscaping, station finishes, and upcoming watermain restoration works. Science Centre Station work includes finishing activities and ongoing traffic configuration. Photos show ongoing signage, electrical, and landscaping works.
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project. It acknowledges that the project is taking place on Indigenous land and discusses the importance of reconciliation. It then details construction timelines and plans for the Eglinton and Mount Pleasant stations, including extended work hours, entrance construction, traffic shifts, and anticipated completion dates in spring 2023. Photos show progress on the station structures and entrances.
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
The document provides updates on construction progress at the Chaplin Station and Avenue Station sites of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the main, secondary, and tertiary entrances through December 2022, along with station box construction and road closures. At Avenue Station, station box construction and work on the main and secondary entrances is progressing through December 2022, along with Eglinton Avenue streetscape and cycle track construction between Eastbourne and Duplex Avenues. Construction photos depict ongoing work.
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
The document provides updates on construction progress for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. For Chaplin Station, construction of the main, secondary and tertiary entrances and Chaplin Parkette are underway through Spring 2023. Station box construction and intersection reinstatement at Chaplin Cres and Eglinton Ave are also progressing. For Avenue Station, station box construction, main and secondary entrance construction, and Eglinton Avenue streetscape work are underway through Spring 2023, with a traffic configuration change expected in early February 2023. Construction photos depict progress at station boxes, entrances and connections to local trails.
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
This is a meeting invite for the Brentcliffe-Victoria Park CLC (Construction Liaison Committee) Monthly Meeting, covering the Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan, Wynford, Sloane and O’ Connor Stops.
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT project. It discusses ongoing work at Eglinton Station including extended hours for station box construction and main entrance construction. It also discusses ongoing work at Mount Pleasant Station including station box construction and main and secondary entrance construction. Traffic configuration changes at Mount Pleasant are also noted as completed. Construction progress photos of station box work are included.
Leaside-Laird CLC - January 9, 2023.pdfCrosstown TO
The document provides updates on construction progress at the Eglinton Crosstown LRT Leaside and Laird stations. At Leaside Station, work is underway on the station box, main entrance, secondary entrance, and utility and road works, with sidewalk restoration planned for January 9-11, 2023. At Laird Station, work continues on the main entrance, secondary entrance, and station box, with sidewalk restoration and monitoring well decommissioning requiring periodic lane reductions into early-mid 2023. Photos show ongoing construction and finishing works at both stations.
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
Construction updates for the following locations/stops: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan Park & Museum, Wynford, Sloane and O'Connor.
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
DI SEGUITO SONO PUBBLICATI, AI SENSI DELL'ART. 11 DELLA LEGGE N. 3/2019, GLI IMPORTI RICEVUTI DALL'ENTRATA IN VIGORE DELLA SUDDETTA NORMA (31/01/2019) E FINO AL MESE SOLARE ANTECEDENTE QUELLO DELLA PUBBLICAZIONE SUL PRESENTE SITO
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteCori Faklaris
Working with data is a challenge for many organizations. Nonprofits in particular may need to collect and analyze sensitive, incomplete, and/or biased historical data about people. In this talk, Dr. Cori Faklaris of UNC Charlotte provides an overview of current AI capabilities and weaknesses to consider when integrating current AI technologies into the data workflow. The talk is organized around three takeaways: (1) For better or sometimes worse, AI provides you with “infinite interns.” (2) Give people permission & guardrails to learn what works with these “interns” and what doesn’t. (3) Create a roadmap for adding in more AI to assist nonprofit work, along with strategies for bias mitigation.
Indira awas yojana housing scheme renamed as PMAYnarinav14
Indira Awas Yojana (IAY) played a significant role in addressing rural housing needs in India. It emerged as a comprehensive program for affordable housing solutions in rural areas, predating the government’s broader focus on mass housing initiatives.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
The Antyodaya Saral Haryana Portal is a pioneering initiative by the Government of Haryana aimed at providing citizens with seamless access to a wide range of government services
2. 2
Section 1 At-Grade Updates
Brentcliffe Portal to Sunnybrook Park Stop
Brentcliffe Portal
2
3. 3
Extended Construction Hours Continue
• Starting November 11, 2019, crews will work extended hours to accelerate construction (4:30 a.m. –
11:00 p.m.). Construction activities may include, guideway construction, road widening, retaining wall
construction, hydro utility installation and bridge rehabilitation.
• The period between 4:30 a.m. – 7:00 a.m. will be primarily used to perform less noisy work, such as site
and traffic staging, preparatory works, excavation, concrete pours, deliveries and hauling
What to Expect
• Daily temporary lane closures along Eglinton Ave E and cross streets between theWest Don River
Bridge andVictoria Park Ave will be in effect to facilitate construction and deliveries
• Short-term pedestrian rerouting as well as temporary sidewalk and crosswalk closures may be
required to safely facilitate construction
• Noise from construction activities and equipment, such as removal of asphalt, excavation, trucks and
generators can be expected
• Site lighting can be expected
4. 4
Brentcliffe Portal to Leslie Street
December 19 through to Summer 2020
• The new configuration will
accommodate:
• Guideway construction on the
West Don River Bridge and
portal.
• Retaining wall construction
on the north side of Eglinton
Avenue East.
• The pedestrian sidewalk will be
available on the south side of
EglingtonAvenue East only.
• Electrical work will continue at the
Brentcliffe Portal.
5. 5
Sunnybrook Park Stop (Leslie Street)
Year What to Expect
2020
• Preparatory work for the new pedestrian staircase on the south side of
Eglinton at Leslie began January 2020. Construction will continue through to
spring 2020.
• Guideway construction will continue east and west of the intersection.
• Stop construction will continue through to spring 2020.
• Track work will begin, including rail installation and the installation of
overhead catenary system to support light rail vehicles.
DUCT BANK EXCAVATION AT
WEST DON RIVER BRIDGE
DUCT BANK EXCAVATION AT
WEST DON RIVER BRIDGE
10. 10
Science Centre Station Upcoming Traffic Configuration
February 2020 to late 2020
*Note: An additional traffic
stage will be required for
decking removal at the
intersection.This interim
stage will be in place for
approximately 2 months
sometime between March –
August 2020.
11. 11
Science Centre Station
Year What to Expect
2020
• Rail installation began October 2019 and will continue through to spring 2020.
• Electrical and mechanical work began November 2019 and will continue through to spring
2020.
• Track work and rail installation will continue through to Spring 2020.
• Waterproofing and backfill will continue through spring 2020.
Station Box
• Backfill of the roof slab is ongoing
• Interior works are ongoing
Main Entrance/PedestrianTunnels/BusTerminal
• Structural steel work and steel decking installation is ongoing at the bus terminal
• Glazing has started at the main entrance
• Structural steel work is complete at main entrance, glass installation will continue in early
2020
Portals
• All rebar and concrete works are complete
• Installation of lighting fixtures is ongoing at the west and east portals
12. 12
Science Centre Station Progress Photos
GLASS INSTALLATION AT THE
MAIN ENTRANCE
STRUCTURAL STEEL AT
BUS TERMINAL
FORMWORK INSTALLATION OF
ROOF SLAB AT STATION BOX
FORMWORK INSTALLATION OF STAIRS AT
STATION BOX
14. 14
Section 2 At-Grade Ongoing Construction Activities
Activities Area & Impacts Date
East Don River Bridge • Conduit installation under the
bridge
• Scaffolding removal under the
bridge
• Guideway construction
Ongoing to late January
2020
Early February 2020
Wynford Bridge • Guideway construction Early February 2020
Wilson Brook Culvert • East wing wall construction
• Backfill of wing wall
• Creek realignment
Complete
Early February 2020
Spring 2020
Retaining Wall at the East
Don River Bridge (north side
Eglinton Ave)
• Final grading Ongoing to mid January
2020
Retaining Wall at Saddle
Ridge Drive (south side
Eglinton Ave)
• Formwork and concrete
• Backfill and cul-de-sac
reconstruction
• New sidewalk
Complete
February 2020
Spring 2020
TPSS 10 • Delivery and installation of
structure
February 7-9, 2020
15. 15
Aga Khan Park Stop (Don Valley Parkway)
Year What to Expect
2020
• Stop construction will continue through to February 2020
• Guideway construction east and west of the DonValley Parkway
will continue through to mid 2020.
• Track work will begin including rail installation and the installment
of an overhead catenary system to support light rail vehicles
REBAR INSTALLATION AND
TRACK SLAB
REBAR INSTALLATION AND TRACK SLAB
16. 16
Aga Khan Park Stop Traffic Configuration
Early November through 2020
17. 17
Wynford Stop (Wynford Drive)
Year What to Expect
2020
• Bridge rehabilitation is complete
• Guideway and stop construction will begin February 2020
• Track work will begin, including rail installation and the installment of an
overhead catenary system to support light rail vehicles
18. 18
Sloane Stop (Sloane Ave and Bermondsey Road)
Year What to Expect
2020
• Guideway construction east and west of the intersection will continue
• Sloane stop construction will continue
• Guideway construction will continue between Jonesville Cres andVictoria
Park Ave
• Reconstruction of theWilson Brook Culvert will continue through to mid-2020
• Road reconstruction on the north of Eglinton Avenue East west of Jonesville
Cres and Wilson Brook Culvert will begin spring 2020
• Track work will begin, including rail installation and the installment of an
overhead catenary system to support light rail vehicles
19. 19
Credit Union and Swift Drive Traffic Configuration
Traffic movements reflect the permanent intersection configuration. The westbound left turn
movement will be permanently prohibited. Guideway construction will continue east and west
of the intersection.
Through 2020
20. 20
Sloane Stop Traffic Configuration
Mid December 2019 through to spring 2020
Guideway construction continues east and west of the Sloane/Bermondsey
intersection.
o Concrete barriers may be temporarily removed for construction vehicles entering
and exiting the guideway work zone.
o Temporary lane closures may be required.
22. 22
416-782-8118 or 416-482-7411
24 hours/7days a week
www.thecrosstown.ca
crosstown@metrolinx.com
facebook.com/thecrosstown
twitter.com/crosstownTO
instagram.com/eglinton_crosstown
Crosstown West Office
1848 Eglinton Ave W (at Dufferin)
Crosstown East Office
660 Eglinton Ave E (at Bayview)
Stay in Touch