SlideShare a Scribd company logo
MATS SCHOOL OF ENGG. & TECH. 
RAIPUR 
MINING ENGINEERING 
TRAINING REPORT OF RAJNAGAR R.O 
5 & 6 MINE 
SUBMITTED TO SUBMITTED BY 
Mr. BHARGAVA K. IYENGAR 1. VIJAYANT PRATAP SINGH 
(H.O.D. OF MINING) (ID No: MU12BEMIN015) 
2. LUCKY KUMAR BHARTI 
(ID No: MU12BEMIN016)
INTRODUCTION 
SITUATED IN SOUTH EASTERN PART OF RAJNAGAR 
COLLIERY AREA AND ABOUT 15 KM FROM AREA HQ 
RAJNAGAR RO 5&6 MINE IS LOCATED ABOUT 2 KM . 
NAME OF THE SEAM BEING WORKED: BIJURI RAILWAY 
STATION AND ABOUT 8 KM NORTH WEST OF 
KOTMA RAILWAY STAION. 
A METALLED ROAD LINKING ANUPPUR TO 
MANENDRAGARH PASSAS PARALLEL TO NORTH 
BOUNDARY OF THE MINE . IT IS APPROACHABLE 
FROM RAJNAGAR TOWN BY A 3 KM LONG 
METALLED ROAD AND IS IN THE ANUPPUR 
DISTRICT OF MADHYA PRADESH .
INTRODUCTION 
THE SEAM IS THE LOWEST ONE OUT OF THE FOUR COAL 
BOARING HORIZON FOUND IN THE AREA AND IS 
APPROACHED THROUGH A PAIR OF INCLINE NO. 5 AND NO. 6 
.BOTH THE INCLINE ARE USED AS INTAKE AIRWAYS . 
RETURN OF THE MINE IS THROUGH THE AIR SHAFT WITH AN 
AXIAL FLOW EXHAUST FAN INSTALLED THERE ON. 
THE MAIN STARTED PRODUCING COAL IN 1990. PRODUCTION 
TARGET IS MEET BY WORKING TWO PANELS A MECHANISED 
SDL PANEL LOADING ON CONVEYORS BELT PONIES AND A 
MANUAL PANEL THE COAL BEING LOADED. 
THE MAIN PRODUCED 154216 Te. IN THE 
PROCEEDING YEAR .THE TARGET OF PRESENT YEAR IS 389420 
Te. AND DURING THE CURRENT YEAR WE HAVE PRODUCED 
325422 UP TO Dec. 2013
TECHNICAL INFORMATION 
1. NAME OF MINE : RAJNAGAR RO 
5&6 MINE 
2. NAME OF SEAM BEING WORKED : 5A,7A1,6E 
3. DATE OF OPENING : 1976 
4. MINING LEASE AREA : 306.86HECTARE 
5. SURFACE RIGHT AREA : 5.962 HECTARE 
6. GEOLOGICAL RESERVES : 5MT 
7. DIRECTION OF FULL DEPTH : 5.31 DEGREEEAST 
8. SEAM GRADIENT : 1 IN 23 
9. AVERAGES THICKNESS 2.6M
11 .NATURE OF ROOF DEPILLARING PANEL 
WESTERN PART: SANDSTONE 
NORTHERN PART: SANDSTONE 
12. NATURE OF FLOOR SHALAY SANDSTONE 
13. ROCKMASS RATING (RMR) DEPILLARING PANEL 
WESTERN PART : 55.14 
14. ROOF CATEGORIZATION FAIR
HISTORY SHEET OF RAJNAGAR RO 5&6 MINE 
GENERAL INFORMATION 
NAME OF MINE : RAJNAGAR RO 
5&6 MINE. 
DATE OF OPENING : 1976 
LIFE OF MINE : 40 Yr 
MANPOWER ON ROLL ON AS (01/01/14) : 1248 
MANDAYS WORKED IN 2013 - 2014 : 255480 
PRODUCTION IN 2013 - 2014 : 325422
NAME OF AGENT : SUDHIR CHOUDHARY 
NAME OF MANAGER : 1)V.R. KATHERIA 
2) P.K. VISHWAKARMA 
NAME OF SAFETY OFFICER : R.L. PATEL 
NAME OF SURVEYOR : ANAND SINGH 
NAME OF MINE ER. : DEEPAK BANTHIYA 
NAME OF SE. MANAGER : BHARAT SINGH
NAME OF VENTILATION OFFICER : S.L . RAI 
NAME OF COLLIERY ENGG. : T.K. CHATTERGEE 
NAME OF SE. OVERMAN : P.K. SHRIVASTAVA 
NAME OF SE. SIRDAR : POHARI SINGH 
NAME OF SE. DOCTOR : S.S. RAM 
VOCATIONAL TRAINING 
T ARGET - 180 
ACTUAL - 92 
ACCIDENT UPTO JAN13 TO DEC 13 :REPORTABLE -05
PART-II 
GEOLOGICAL AND MINE CONDITION 
1.No/NAME OF SEAM BEING WORKED : 5A,7A1,6E 
2.NATURE OF ROOF & FLOOR : SHALAY SANDSTONE 
3.HYDRO GEOLOGICAL CONDITION OF MINE 
WATER SEEPAGE FROM STRATA MAKES THE FLOOR OF 
THE MOST OF MINE WET . TOTAL MAKE OF WATER IS 400 
GPM TO PUMPOUT THIS MAKE THREE PUMPS OF 500GPM 
CAPACITY EACH INSTALLED IN MAIN DIP
PART-III 
STATUS OF SAFETY , INFLAMABL E :NIL 
2. HISTORY OF IGNITION OR EXPLOSIONS FIRE :NIL 
HISTORY OF SURFACE FIRE :NIL 
HISTORY OF UNDERGROUND FIRE :NIL 
IGNITION TEMPERATURE 112DEG. C
ROOF CONTROL 
SUPPORT OF ROOF BY ROOF BOLTING WHERE EVER REQUIRED BY ROPE STICHING, 
COG SUPPORT 
LIABILITY TO BUMPS IF ANY AND THEIR FREQUENCY : NIL 
TYPE OF ROOF DRILLING M/C USED : HAND HOLD ELECTRIC DRILL OF 1-1/2 HP. 
TYPE OF ROOF BOLT USED :TOR STEEL RIBBED 19 -22 mm 1-5 m LONG 
& BEARING PLATES. 
TYPE OF GROUTING MATERIALS USED : MICON ENGG. CALCUTTA 
MAKE & NO. OF ANCHOR TESTING MACHING USED : NIL 
TYPE OF STEEL SUPPORT USED AND REASON FOR PREFRENCE. 
PIT PROPS : AS CONVENTIONAL PROP AND AS NOTCH PROPS BELOW 
GIRDERS 
TATA CHOCKES : AS CONVENTIONAL COG AND FOR GOAF EDGE SUPPORT
PART-IV 
VENTILATION FAN 
TYPE, CAPACITY AND WATER GUAGE OF THE TYPE PV -160 
MAIN MECHANICAL VENTILATOR MENTION CAPACITY -3500MCUBE /min 
AND H.P.OF MOTOR W.G. -19 H.P. -90 
2. ARRANGEMENT REVERSAL POWER CABLE : PROVIDED BY ARRANGEMENT OF 
DOORS 
3. AVAILABILITY OF EQUIPMENT FOR VENTILATION SURVEY. 
: ANEMOMETER : VANE TYOE -02 
: DIGITAL -01 
: HYDROMET 
:METHANOMETER
STRATA CONTROL SYSTEM & ORGANISATION 
GEOMINING CONDITIONS: 
NAME OF SEAM BEING WORKED : 5A , 6E , 7A1 
WORKNG THICKNESS :2.4 TO 3.0 m 
METHOD OF WORKING :BORD & PILLAR (DEV) &DEPILLARING 
GALLERY SIZE :4.2 TO 2.1 m 
PILLAR SIZE : 25 X 25m 
COVER : 70m TO 110 m 
ROOF : FINE TO MEDIUM GRAINED SAND STONE 
FLOOR : INTER BENDED FINE TO MEDIUM GRAINED, SAND STONE 
WITH LENTICALS OF 
COAL & CARD SHALE 
OCCURRENCE OF SLIPS , CLEAVAGE , PLANES , FAULTS , FISSURES , COAL STREAKS ,
SYSTEMATIC SUPPORT RULES /SUPPORT PLAN : 
SUPPORT OF FRESHLY EXPOSED ROOF WITHIN 10m OF DEVLOPMENT 
PANELS FRESHLY EXPOSED ROOF OF EITHIN 10m WILL BE SUPPORTED 
BY FULL COLUMN GROUTED ROOF BOLTS WITH INORGANIC CEMENT 
CAPSULES OR WITH TIMBER /PROPS/PIT PROP AT A DISTANCE OF 1.2 m 
IN SAME ROW AND 1.2m BETWEEN TWO ADJACENT ROWS OR 
WITHCROSS BARS AT 1.2m OR ROOF STITCHING AT A DISTANCE OF 1.2m 
WITH ONE OR TWO DOWELS 1.2m APART 
THE LAST ROW OF SUPPORT SHALL NOT BE MORE THAN 1.8 
FROM THE FACE AND SHALL BE AS CLOSE TO THE FACE AS POSSIBLE .
VENTILATION 
THE VENTILATION OF THE MINE IS BEING PLANNED WITH THE VIEW 
OF SAFETY & ECONOMY OF WHOLE OF THE MINE. THE MAIN 
MECHANICAL VENTILATOR EXHAUST FAN INSTALLED ON SURFACE AT 
AIR SHAFT. INCLINE NO. 5 & 6 ARE SERVING AS THE MAIN RETURN . 
THE VENTILATION STOPPINGS AND AIR CROSSINGS 
HAVE BEEN AND BEING MADE AND MAINTAINED . LEAKAGES ARE 
BEING CHECKED AND MINIMISED . 
THE EFFECTIVE TEMPERATURE INALL THE DISTRICT IS BEING 
MAINTAINED AROUND 25DEG C.
THE DETAILS OF MAIN MECHANICAL VENTILATOR ARE AS FOLLOWS . 
MAKE : VOLTS PV 160 
MOTOR: : 90 HP 
TYPE : AXIAL FLOW FAN , EXHAUST 
QUANTITY : 3500m3/minutes 
PRESSURE W.G. : 19mm 
DIAMETER OF IMPELLER : 1600mm 
NO. OF IMPELLER BLADES : 08 Nos. 
F AN SPEED : 780 RPM
POWER SUPPLY & DISTRIBUTION 
AT SURFACE SUB STATION OF RAJNAGAR R.O. 5/6 MINE. 3.3KV ARE 
RECEIVED AT 600Amps OBTAINED FROM SURFACE SUB STATION OF 
RAJNAGAR TRANSMITTED THROUGH A400 Amps. TO SURFACE 
TRANSFORMER OF 500 KVA AND TO THE UG 600Amps. AT SUB 
STATION . 
FROM SURFACE TRANSFORMER 550 volts ARE FED TO :- 
SURFACE BELT . 
MAIN MECHANICAL VENTILATOR . 
HAULAGE . 
MAIN DIP OF UG PUMP 
SAW MACHINE AND 
LIGHTING TRANSFORMER
FROM 600Amps OCB AT O LEVELS SUB STATION 3.3 KV ARE 
TRANSMITTED TO KVA TRANSFORMER THERE ITSELF AND THROUGH 
400 Amps ACB TO THE TRANSFORMER OF 315 KVA AT 15 LEVELS SUB 
STATION TO THE 22 RISE SUB STATION IN P9 SDL PANELS AND TO 15 
RISE/3 LEVELS SUB STATION IN P5MANUAL PANEL. 
FROM 315 KVA TRANSFORMER AT O LEVELS 550 volts ARE FED TO: - 
LIGHTING TRANSFORMER 
GATE BELT 
LEVELS AND ALL WORKING LEVELS PONY CONVEYORS 
. 
O LEVELS PUMP AND ALL OTHER PUMPS 
RISE & 2 LEVELS ENDLESS HAULAGE
FROM 315 TRANSFORMER AT 15 L SUB STATION 550 volts ARE FED TO:- 
7A GATE BELT CONVEYORS. 
MAIN DIP / 17 AND 5A LEVELS PUMP 
2 LEVELS ENDLESS . 
LIGHTING TRANSFORMER
FROM 315 KVA TRANSFORMER AT 22 RISE/9L 550 volts ARE FED TO :- 
30 RISE AND 33 RISE PONY BELT CONVEYORS . 
SWITH GEAR PANELS OF AL FOUR SDLs 
UDM MACHINE 
PUMPS 
DRILL PANELS & DRILLING MACHINE 
LIGHTING TRANSFORMER .
FROM 315 KVA TRANSFORMER IN 15 RISE /2 LEVELS SUB STATION 550 volts ARE FED TO :- 
SWITH GEAR PANELS OF 432 NO. SDL. 
TUGGER HAULAGE OF 32 RISE . 
FACE PUMP OF 16L/20D AND 4AOF 3L/2D 
DRILL PANELS 
ELECTRICAL LAYOUT IS SHOWN IN SEPERATELY : 
SURFACE MACHINERY 
LIGHTING LOAD :TRANSFORMER CRAMP ----5KVA 
BAND SAW M/C : 5HP 
DIRECT HAULAGE :50 HP 
TRUNK BELT : 120 HP 
LATHE M/C : 03 HP
UNDERGROUND MACHINERY 
DRILLS :1.5 HP 
HAULAGES ENDLESS : 50 
DIRECT HAULAGESS : 50 
PUMPS :120 
CONVEYORS , GATE :120 
LIGHTING LOAD :5KVA
USE OF EXPLOSIVES 
ONLY APPROVED TYPE OF SHOTFIRING IS USED . 
TYPE OF EXPLODER : SUPERCOAL 5 NUMBER 
SHOT FIRING CABLE : TWIN CORE 4/0.91 sq/inch 
PRESCRIBED SHOTFIRING TOOLS : PROVIDED . 
RESERVED STATION : PROVIDED AND MAINTAINED 
ALL ACTION OF SAFETY DURING BLASTING / SHOTFIRING : 
PRECAUTION ARE TAKEN 
MAGAZINE TYPE : PORTABLE TYPE
TRANSPORTATION OF COAL & MATERIALS 
FROM DEV. PANEL COAL LOADE D BY SDLs ON 
CONVEYORS POINTS IS TRANSPORTED OUT BY 
THROUGH GATE BELT CONVEYORS AND TRUNK 
BELT CONVEYORS TO SURFACE BUNKER PANELS. 
TRANSPORTATION LAYOUT IS SHOWN 
IN A SEPARATE LEAF WHICH FOLLOWS.
DISCRIPTION 
RAJNAGAR 5/6 MINE IS A UNDERGROUND MINE AND THE SEAM IN WHICH THE 
DEVELOPMENT AS WELL AS DEPILLARING METHOD IS GOING ON. RAJNAGAR MINE WAS STARTED ON 
MARCH 1976 AND AT THE TIME OF SURVEY ITS AGE IS ESTIMATED 35 YEAR . BUT THE PRODUCTION 
FROM THE 5 & 6 MINE IS STILL IN PROGRESS. RAJNAGAR 5/6 MINE IS 9KM FROM BIJURI RAILWAY 
STATION. RAJNAGAR 5/6 MINE IS IN SHALLOW DEPTH . SO THE INCLINE OPENING METHOD IS 
ADOPTED. IN THE INCLINE OPENING THERE IS TWO PATH ONE FOR THE IN AND OUT OF MAN POWER 
WHICH IS CONNECTED TO THE INCLINE AND THE SECOND IS THE INCLINE ITSELF WHERE THE 
TRANSPORTATION OF MATERIAL TAKE PLACE WITH THE HELP OF HAULAGE TRACLINE MADE FOR 
MATERIAL TRANSPORTATION . THE TRANSPORTATION OF MATERIAL INCLUDE HEAVY MACHINERY i.e. 
SAND ,BRICK , WIRE, etc. WHICH ARE USEFUL AND VALUABLE FOR THE MINE . THE TRANSPORTATION 
ARE DONE WITH THE TUBS . THE TUBS USED FOR THE TRANSPORTATION ARE OPERATED BY THE ROPE 
WHICH PULL THE TUBS BY THE ELECTRICALLY OPERATED MOTER ON WHICH THE ROPE IS WOUNDED 
IN A ROUND . IN THE RAJNAGAR 5/6 MINE WHEN WE ENTER INSIDE THE MINE THEN THE FLOOR THE 
SEAM AT THE RIGHT SIDE OF THE HAULAGE THERE IS A PUMP ON WHICH ALL THE WATER OF THE MINE 
IS STORED AND THEIR IT IS PUMPED OUT . IF WE PROCEED FURTHER IN STRATED WAY THEN THE 
HAULAGE IS DIVIDED INTO TWO PATH RIGHT PROCEED TO THE DEVELOPMENT AND LEFT TO THE 
DEPILLARING FACE. AT THE DEVELOPMENT SIDE THE DEVELOPMENT PROCESS IS IN PROGRESS BY 
DRILLING AND BLASTING METHOD.IN ADDITION TO THAT THE CONSTRUCTION OF HAULAGE AS WELL 
AS SUPPORT AND OTHER ELECTRICAL CONNECTION ARE DONE . THE TRANSPORTATION OF THE COAL 
IS DONE WITH THE HELP OF SIDE DISCHARGE LOADER (SDL) IN WHICH THE COAL IS LOADED AND 
DISCHARGED TO THE TUBS FROM WHERE IT IS TAKEN TO THE TIPPLER WITH THE HELP OF ROPE OR 
DIRECTLY TRANSPORTED TO THE CONVEYOR BELT FROM IT IS TAKEN TO THE SURFACE AND LOADED 
TO THE TRUCKS AND TRANSPORTED TO MAIN VEHICLE i.e. RAILWAY TUBS FROM WHERE IT IS TAKEN BY 
THE POWERPLANT.
THANK- YOU

More Related Content

What's hot

High Wall Mining
High Wall MiningHigh Wall Mining
High Wall Mining
Prateek Sharma
 
HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)
Pushon Ghosh
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall Mining
Shantanu kumar
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
SATYANARAYANA I
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
RohitGhosh42
 
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_QatarComprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Pallav Sharma
 
ZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill Rig
Owen Ji
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
rutuldave
 
CCTEG Drill equipment and technology
CCTEG Drill equipment and technologyCCTEG Drill equipment and technology
CCTEG Drill equipment and technology
Owen Ji
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OC
Abdul Mujeeb
 
Chp equipments in indian power scenario
Chp  equipments in indian power scenarioChp  equipments in indian power scenario
Chp equipments in indian power scenario
Boben Anto Chemmannoor
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
Safdar Ali
 
Coal Handling System
Coal Handling SystemCoal Handling System
Coal Handling System
shaikhsaif
 
Develpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousDevelpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuous
Shubham Agrawal
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
Ashrant Dass
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
Vijay Raj
 
Planning a coal handling plant
Planning a  coal handling plantPlanning a  coal handling plant
Planning a coal handling plant
PRABIR DATTA
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
akhilesh kumar gupta
 
CHP
CHP CHP

What's hot (19)

High Wall Mining
High Wall MiningHigh Wall Mining
High Wall Mining
 
HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall Mining
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
 
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_QatarComprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
 
ZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill Rig
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
CCTEG Drill equipment and technology
CCTEG Drill equipment and technologyCCTEG Drill equipment and technology
CCTEG Drill equipment and technology
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OC
 
Chp equipments in indian power scenario
Chp  equipments in indian power scenarioChp  equipments in indian power scenario
Chp equipments in indian power scenario
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Coal Handling System
Coal Handling SystemCoal Handling System
Coal Handling System
 
Develpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousDevelpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuous
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
 
Planning a coal handling plant
Planning a  coal handling plantPlanning a  coal handling plant
Planning a coal handling plant
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
CHP
CHP CHP
CHP
 

Viewers also liked

Summer training report
Summer training reportSummer training report
Summer training report
Shivendra Awasthi
 
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
Piyush Dwivedi
 
Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training report
Kundan Giri
 
secl Project cost budgeting
secl Project cost budgetingsecl Project cost budgeting
secl Project cost budgeting
Vikas Soni
 
NCL Singrauli project
NCL Singrauli projectNCL Singrauli project
NCL Singrauli project
Vishal Singh
 
PRESENTATION
PRESENTATIONPRESENTATION
PRESENTATION
Akhilesh Kumar
 
CCL Points of View on Leadership Development Through the Lens of Relational L...
CCL Points of View on Leadership Development Through the Lens of Relational L...CCL Points of View on Leadership Development Through the Lens of Relational L...
CCL Points of View on Leadership Development Through the Lens of Relational L...
Charles Palus
 
Role of transmission system in cars
Role of transmission system in carsRole of transmission system in cars
Role of transmission system in cars
Transmisison repairs shop
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
VR M
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
VR M
 
Employee welfare
Employee welfareEmployee welfare
Employee welfare
sania223
 
Northern Coalfields Limited NCL
Northern Coalfields Limited NCLNorthern Coalfields Limited NCL
Northern Coalfields Limited NCL
Amity International Business School
 
Vocational training report format
Vocational training report formatVocational training report format
Vocational training report format
Ankit Namdev
 
NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)
PRADEEP GOSWAMI PRADEEP
 

Viewers also liked (14)

Summer training report
Summer training reportSummer training report
Summer training report
 
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
 
Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training report
 
secl Project cost budgeting
secl Project cost budgetingsecl Project cost budgeting
secl Project cost budgeting
 
NCL Singrauli project
NCL Singrauli projectNCL Singrauli project
NCL Singrauli project
 
PRESENTATION
PRESENTATIONPRESENTATION
PRESENTATION
 
CCL Points of View on Leadership Development Through the Lens of Relational L...
CCL Points of View on Leadership Development Through the Lens of Relational L...CCL Points of View on Leadership Development Through the Lens of Relational L...
CCL Points of View on Leadership Development Through the Lens of Relational L...
 
Role of transmission system in cars
Role of transmission system in carsRole of transmission system in cars
Role of transmission system in cars
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
Employee welfare
Employee welfareEmployee welfare
Employee welfare
 
Northern Coalfields Limited NCL
Northern Coalfields Limited NCLNorthern Coalfields Limited NCL
Northern Coalfields Limited NCL
 
Vocational training report format
Vocational training report formatVocational training report format
Vocational training report format
 
NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)
 

Similar to mats underground mining training report

Jamuna910 ppt
Jamuna910 pptJamuna910 ppt
Jamuna910 ppt
PARAMJEETPATEL
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
Ashish Kumar Yadav
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Tejasvi Anant
 
Tipong report
Tipong report Tipong report
Tipong report
sanjay kumar choudhary
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
Bikash Gyawali
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
Shishupal03012015
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
Shishupal03012015
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
Himanshu Chakravarti
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORT
Suryanshu Jain
 
30120130406007
3012013040600730120130406007
30120130406007
IAEME Publication
 
Earthing in electrical network
Earthing in electrical networkEarthing in electrical network
Earthing in electrical network
BHAGWAN PRASAD
 
Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines
Pratyush Ranjan Nath
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
AYAN MONDAL
 
Gomti action plan
Gomti action planGomti action plan
Gomti action plan
Anchit Agrawal
 
42 h08nw0011 (copy)
42 h08nw0011 (copy)42 h08nw0011 (copy)
42 h08nw0011 (copy)
RyanPaul Mandel
 
Boilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant OverviewBoilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant Overview
seshu seelamsetti
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
Anil Venkata Nag Kothur
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)
Anuj Ranjan
 
trisuli hydropower nepal
trisuli hydropower nepaltrisuli hydropower nepal
trisuli hydropower nepal
surendra purbey
 
Danapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelDanapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final Model
Md Ishteyaque
 

Similar to mats underground mining training report (20)

Jamuna910 ppt
Jamuna910 pptJamuna910 ppt
Jamuna910 ppt
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Tipong report
Tipong report Tipong report
Tipong report
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORT
 
30120130406007
3012013040600730120130406007
30120130406007
 
Earthing in electrical network
Earthing in electrical networkEarthing in electrical network
Earthing in electrical network
 
Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
Gomti action plan
Gomti action planGomti action plan
Gomti action plan
 
42 h08nw0011 (copy)
42 h08nw0011 (copy)42 h08nw0011 (copy)
42 h08nw0011 (copy)
 
Boilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant OverviewBoilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant Overview
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)
 
trisuli hydropower nepal
trisuli hydropower nepaltrisuli hydropower nepal
trisuli hydropower nepal
 
Danapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelDanapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final Model
 

Recently uploaded

International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 

Recently uploaded (20)

International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 

mats underground mining training report

  • 1. MATS SCHOOL OF ENGG. & TECH. RAIPUR MINING ENGINEERING TRAINING REPORT OF RAJNAGAR R.O 5 & 6 MINE SUBMITTED TO SUBMITTED BY Mr. BHARGAVA K. IYENGAR 1. VIJAYANT PRATAP SINGH (H.O.D. OF MINING) (ID No: MU12BEMIN015) 2. LUCKY KUMAR BHARTI (ID No: MU12BEMIN016)
  • 2. INTRODUCTION SITUATED IN SOUTH EASTERN PART OF RAJNAGAR COLLIERY AREA AND ABOUT 15 KM FROM AREA HQ RAJNAGAR RO 5&6 MINE IS LOCATED ABOUT 2 KM . NAME OF THE SEAM BEING WORKED: BIJURI RAILWAY STATION AND ABOUT 8 KM NORTH WEST OF KOTMA RAILWAY STAION. A METALLED ROAD LINKING ANUPPUR TO MANENDRAGARH PASSAS PARALLEL TO NORTH BOUNDARY OF THE MINE . IT IS APPROACHABLE FROM RAJNAGAR TOWN BY A 3 KM LONG METALLED ROAD AND IS IN THE ANUPPUR DISTRICT OF MADHYA PRADESH .
  • 3. INTRODUCTION THE SEAM IS THE LOWEST ONE OUT OF THE FOUR COAL BOARING HORIZON FOUND IN THE AREA AND IS APPROACHED THROUGH A PAIR OF INCLINE NO. 5 AND NO. 6 .BOTH THE INCLINE ARE USED AS INTAKE AIRWAYS . RETURN OF THE MINE IS THROUGH THE AIR SHAFT WITH AN AXIAL FLOW EXHAUST FAN INSTALLED THERE ON. THE MAIN STARTED PRODUCING COAL IN 1990. PRODUCTION TARGET IS MEET BY WORKING TWO PANELS A MECHANISED SDL PANEL LOADING ON CONVEYORS BELT PONIES AND A MANUAL PANEL THE COAL BEING LOADED. THE MAIN PRODUCED 154216 Te. IN THE PROCEEDING YEAR .THE TARGET OF PRESENT YEAR IS 389420 Te. AND DURING THE CURRENT YEAR WE HAVE PRODUCED 325422 UP TO Dec. 2013
  • 4. TECHNICAL INFORMATION 1. NAME OF MINE : RAJNAGAR RO 5&6 MINE 2. NAME OF SEAM BEING WORKED : 5A,7A1,6E 3. DATE OF OPENING : 1976 4. MINING LEASE AREA : 306.86HECTARE 5. SURFACE RIGHT AREA : 5.962 HECTARE 6. GEOLOGICAL RESERVES : 5MT 7. DIRECTION OF FULL DEPTH : 5.31 DEGREEEAST 8. SEAM GRADIENT : 1 IN 23 9. AVERAGES THICKNESS 2.6M
  • 5. 11 .NATURE OF ROOF DEPILLARING PANEL WESTERN PART: SANDSTONE NORTHERN PART: SANDSTONE 12. NATURE OF FLOOR SHALAY SANDSTONE 13. ROCKMASS RATING (RMR) DEPILLARING PANEL WESTERN PART : 55.14 14. ROOF CATEGORIZATION FAIR
  • 6. HISTORY SHEET OF RAJNAGAR RO 5&6 MINE GENERAL INFORMATION NAME OF MINE : RAJNAGAR RO 5&6 MINE. DATE OF OPENING : 1976 LIFE OF MINE : 40 Yr MANPOWER ON ROLL ON AS (01/01/14) : 1248 MANDAYS WORKED IN 2013 - 2014 : 255480 PRODUCTION IN 2013 - 2014 : 325422
  • 7. NAME OF AGENT : SUDHIR CHOUDHARY NAME OF MANAGER : 1)V.R. KATHERIA 2) P.K. VISHWAKARMA NAME OF SAFETY OFFICER : R.L. PATEL NAME OF SURVEYOR : ANAND SINGH NAME OF MINE ER. : DEEPAK BANTHIYA NAME OF SE. MANAGER : BHARAT SINGH
  • 8. NAME OF VENTILATION OFFICER : S.L . RAI NAME OF COLLIERY ENGG. : T.K. CHATTERGEE NAME OF SE. OVERMAN : P.K. SHRIVASTAVA NAME OF SE. SIRDAR : POHARI SINGH NAME OF SE. DOCTOR : S.S. RAM VOCATIONAL TRAINING T ARGET - 180 ACTUAL - 92 ACCIDENT UPTO JAN13 TO DEC 13 :REPORTABLE -05
  • 9. PART-II GEOLOGICAL AND MINE CONDITION 1.No/NAME OF SEAM BEING WORKED : 5A,7A1,6E 2.NATURE OF ROOF & FLOOR : SHALAY SANDSTONE 3.HYDRO GEOLOGICAL CONDITION OF MINE WATER SEEPAGE FROM STRATA MAKES THE FLOOR OF THE MOST OF MINE WET . TOTAL MAKE OF WATER IS 400 GPM TO PUMPOUT THIS MAKE THREE PUMPS OF 500GPM CAPACITY EACH INSTALLED IN MAIN DIP
  • 10. PART-III STATUS OF SAFETY , INFLAMABL E :NIL 2. HISTORY OF IGNITION OR EXPLOSIONS FIRE :NIL HISTORY OF SURFACE FIRE :NIL HISTORY OF UNDERGROUND FIRE :NIL IGNITION TEMPERATURE 112DEG. C
  • 11. ROOF CONTROL SUPPORT OF ROOF BY ROOF BOLTING WHERE EVER REQUIRED BY ROPE STICHING, COG SUPPORT LIABILITY TO BUMPS IF ANY AND THEIR FREQUENCY : NIL TYPE OF ROOF DRILLING M/C USED : HAND HOLD ELECTRIC DRILL OF 1-1/2 HP. TYPE OF ROOF BOLT USED :TOR STEEL RIBBED 19 -22 mm 1-5 m LONG & BEARING PLATES. TYPE OF GROUTING MATERIALS USED : MICON ENGG. CALCUTTA MAKE & NO. OF ANCHOR TESTING MACHING USED : NIL TYPE OF STEEL SUPPORT USED AND REASON FOR PREFRENCE. PIT PROPS : AS CONVENTIONAL PROP AND AS NOTCH PROPS BELOW GIRDERS TATA CHOCKES : AS CONVENTIONAL COG AND FOR GOAF EDGE SUPPORT
  • 12. PART-IV VENTILATION FAN TYPE, CAPACITY AND WATER GUAGE OF THE TYPE PV -160 MAIN MECHANICAL VENTILATOR MENTION CAPACITY -3500MCUBE /min AND H.P.OF MOTOR W.G. -19 H.P. -90 2. ARRANGEMENT REVERSAL POWER CABLE : PROVIDED BY ARRANGEMENT OF DOORS 3. AVAILABILITY OF EQUIPMENT FOR VENTILATION SURVEY. : ANEMOMETER : VANE TYOE -02 : DIGITAL -01 : HYDROMET :METHANOMETER
  • 13. STRATA CONTROL SYSTEM & ORGANISATION GEOMINING CONDITIONS: NAME OF SEAM BEING WORKED : 5A , 6E , 7A1 WORKNG THICKNESS :2.4 TO 3.0 m METHOD OF WORKING :BORD & PILLAR (DEV) &DEPILLARING GALLERY SIZE :4.2 TO 2.1 m PILLAR SIZE : 25 X 25m COVER : 70m TO 110 m ROOF : FINE TO MEDIUM GRAINED SAND STONE FLOOR : INTER BENDED FINE TO MEDIUM GRAINED, SAND STONE WITH LENTICALS OF COAL & CARD SHALE OCCURRENCE OF SLIPS , CLEAVAGE , PLANES , FAULTS , FISSURES , COAL STREAKS ,
  • 14. SYSTEMATIC SUPPORT RULES /SUPPORT PLAN : SUPPORT OF FRESHLY EXPOSED ROOF WITHIN 10m OF DEVLOPMENT PANELS FRESHLY EXPOSED ROOF OF EITHIN 10m WILL BE SUPPORTED BY FULL COLUMN GROUTED ROOF BOLTS WITH INORGANIC CEMENT CAPSULES OR WITH TIMBER /PROPS/PIT PROP AT A DISTANCE OF 1.2 m IN SAME ROW AND 1.2m BETWEEN TWO ADJACENT ROWS OR WITHCROSS BARS AT 1.2m OR ROOF STITCHING AT A DISTANCE OF 1.2m WITH ONE OR TWO DOWELS 1.2m APART THE LAST ROW OF SUPPORT SHALL NOT BE MORE THAN 1.8 FROM THE FACE AND SHALL BE AS CLOSE TO THE FACE AS POSSIBLE .
  • 15. VENTILATION THE VENTILATION OF THE MINE IS BEING PLANNED WITH THE VIEW OF SAFETY & ECONOMY OF WHOLE OF THE MINE. THE MAIN MECHANICAL VENTILATOR EXHAUST FAN INSTALLED ON SURFACE AT AIR SHAFT. INCLINE NO. 5 & 6 ARE SERVING AS THE MAIN RETURN . THE VENTILATION STOPPINGS AND AIR CROSSINGS HAVE BEEN AND BEING MADE AND MAINTAINED . LEAKAGES ARE BEING CHECKED AND MINIMISED . THE EFFECTIVE TEMPERATURE INALL THE DISTRICT IS BEING MAINTAINED AROUND 25DEG C.
  • 16. THE DETAILS OF MAIN MECHANICAL VENTILATOR ARE AS FOLLOWS . MAKE : VOLTS PV 160 MOTOR: : 90 HP TYPE : AXIAL FLOW FAN , EXHAUST QUANTITY : 3500m3/minutes PRESSURE W.G. : 19mm DIAMETER OF IMPELLER : 1600mm NO. OF IMPELLER BLADES : 08 Nos. F AN SPEED : 780 RPM
  • 17. POWER SUPPLY & DISTRIBUTION AT SURFACE SUB STATION OF RAJNAGAR R.O. 5/6 MINE. 3.3KV ARE RECEIVED AT 600Amps OBTAINED FROM SURFACE SUB STATION OF RAJNAGAR TRANSMITTED THROUGH A400 Amps. TO SURFACE TRANSFORMER OF 500 KVA AND TO THE UG 600Amps. AT SUB STATION . FROM SURFACE TRANSFORMER 550 volts ARE FED TO :- SURFACE BELT . MAIN MECHANICAL VENTILATOR . HAULAGE . MAIN DIP OF UG PUMP SAW MACHINE AND LIGHTING TRANSFORMER
  • 18. FROM 600Amps OCB AT O LEVELS SUB STATION 3.3 KV ARE TRANSMITTED TO KVA TRANSFORMER THERE ITSELF AND THROUGH 400 Amps ACB TO THE TRANSFORMER OF 315 KVA AT 15 LEVELS SUB STATION TO THE 22 RISE SUB STATION IN P9 SDL PANELS AND TO 15 RISE/3 LEVELS SUB STATION IN P5MANUAL PANEL. FROM 315 KVA TRANSFORMER AT O LEVELS 550 volts ARE FED TO: - LIGHTING TRANSFORMER GATE BELT LEVELS AND ALL WORKING LEVELS PONY CONVEYORS . O LEVELS PUMP AND ALL OTHER PUMPS RISE & 2 LEVELS ENDLESS HAULAGE
  • 19. FROM 315 TRANSFORMER AT 15 L SUB STATION 550 volts ARE FED TO:- 7A GATE BELT CONVEYORS. MAIN DIP / 17 AND 5A LEVELS PUMP 2 LEVELS ENDLESS . LIGHTING TRANSFORMER
  • 20. FROM 315 KVA TRANSFORMER AT 22 RISE/9L 550 volts ARE FED TO :- 30 RISE AND 33 RISE PONY BELT CONVEYORS . SWITH GEAR PANELS OF AL FOUR SDLs UDM MACHINE PUMPS DRILL PANELS & DRILLING MACHINE LIGHTING TRANSFORMER .
  • 21. FROM 315 KVA TRANSFORMER IN 15 RISE /2 LEVELS SUB STATION 550 volts ARE FED TO :- SWITH GEAR PANELS OF 432 NO. SDL. TUGGER HAULAGE OF 32 RISE . FACE PUMP OF 16L/20D AND 4AOF 3L/2D DRILL PANELS ELECTRICAL LAYOUT IS SHOWN IN SEPERATELY : SURFACE MACHINERY LIGHTING LOAD :TRANSFORMER CRAMP ----5KVA BAND SAW M/C : 5HP DIRECT HAULAGE :50 HP TRUNK BELT : 120 HP LATHE M/C : 03 HP
  • 22. UNDERGROUND MACHINERY DRILLS :1.5 HP HAULAGES ENDLESS : 50 DIRECT HAULAGESS : 50 PUMPS :120 CONVEYORS , GATE :120 LIGHTING LOAD :5KVA
  • 23. USE OF EXPLOSIVES ONLY APPROVED TYPE OF SHOTFIRING IS USED . TYPE OF EXPLODER : SUPERCOAL 5 NUMBER SHOT FIRING CABLE : TWIN CORE 4/0.91 sq/inch PRESCRIBED SHOTFIRING TOOLS : PROVIDED . RESERVED STATION : PROVIDED AND MAINTAINED ALL ACTION OF SAFETY DURING BLASTING / SHOTFIRING : PRECAUTION ARE TAKEN MAGAZINE TYPE : PORTABLE TYPE
  • 24. TRANSPORTATION OF COAL & MATERIALS FROM DEV. PANEL COAL LOADE D BY SDLs ON CONVEYORS POINTS IS TRANSPORTED OUT BY THROUGH GATE BELT CONVEYORS AND TRUNK BELT CONVEYORS TO SURFACE BUNKER PANELS. TRANSPORTATION LAYOUT IS SHOWN IN A SEPARATE LEAF WHICH FOLLOWS.
  • 25. DISCRIPTION RAJNAGAR 5/6 MINE IS A UNDERGROUND MINE AND THE SEAM IN WHICH THE DEVELOPMENT AS WELL AS DEPILLARING METHOD IS GOING ON. RAJNAGAR MINE WAS STARTED ON MARCH 1976 AND AT THE TIME OF SURVEY ITS AGE IS ESTIMATED 35 YEAR . BUT THE PRODUCTION FROM THE 5 & 6 MINE IS STILL IN PROGRESS. RAJNAGAR 5/6 MINE IS 9KM FROM BIJURI RAILWAY STATION. RAJNAGAR 5/6 MINE IS IN SHALLOW DEPTH . SO THE INCLINE OPENING METHOD IS ADOPTED. IN THE INCLINE OPENING THERE IS TWO PATH ONE FOR THE IN AND OUT OF MAN POWER WHICH IS CONNECTED TO THE INCLINE AND THE SECOND IS THE INCLINE ITSELF WHERE THE TRANSPORTATION OF MATERIAL TAKE PLACE WITH THE HELP OF HAULAGE TRACLINE MADE FOR MATERIAL TRANSPORTATION . THE TRANSPORTATION OF MATERIAL INCLUDE HEAVY MACHINERY i.e. SAND ,BRICK , WIRE, etc. WHICH ARE USEFUL AND VALUABLE FOR THE MINE . THE TRANSPORTATION ARE DONE WITH THE TUBS . THE TUBS USED FOR THE TRANSPORTATION ARE OPERATED BY THE ROPE WHICH PULL THE TUBS BY THE ELECTRICALLY OPERATED MOTER ON WHICH THE ROPE IS WOUNDED IN A ROUND . IN THE RAJNAGAR 5/6 MINE WHEN WE ENTER INSIDE THE MINE THEN THE FLOOR THE SEAM AT THE RIGHT SIDE OF THE HAULAGE THERE IS A PUMP ON WHICH ALL THE WATER OF THE MINE IS STORED AND THEIR IT IS PUMPED OUT . IF WE PROCEED FURTHER IN STRATED WAY THEN THE HAULAGE IS DIVIDED INTO TWO PATH RIGHT PROCEED TO THE DEVELOPMENT AND LEFT TO THE DEPILLARING FACE. AT THE DEVELOPMENT SIDE THE DEVELOPMENT PROCESS IS IN PROGRESS BY DRILLING AND BLASTING METHOD.IN ADDITION TO THAT THE CONSTRUCTION OF HAULAGE AS WELL AS SUPPORT AND OTHER ELECTRICAL CONNECTION ARE DONE . THE TRANSPORTATION OF THE COAL IS DONE WITH THE HELP OF SIDE DISCHARGE LOADER (SDL) IN WHICH THE COAL IS LOADED AND DISCHARGED TO THE TUBS FROM WHERE IT IS TAKEN TO THE TIPPLER WITH THE HELP OF ROPE OR DIRECTLY TRANSPORTED TO THE CONVEYOR BELT FROM IT IS TAKEN TO THE SURFACE AND LOADED TO THE TRUCKS AND TRANSPORTED TO MAIN VEHICLE i.e. RAILWAY TUBS FROM WHERE IT IS TAKEN BY THE POWERPLANT.