CENTRAL INSTITUTE OF
TECHNOLOGY, RAIPUR
PRESENTED BY
PARAMJEET PATEL
Anil ku. Kashyap
Avinash shrives
Sameer mishra
MINING 5TH SEM
VOCATINAL TRAINING REPORT 2015
IN JAMUNA-KOTMA AREA
INDEX
1.INRODUCTION
2.GEOLOGICAL INFORMATION
3.TECHNICAL INFORMATION
4.SURFACE FEATURE AND UNDER GROUND FEATURE
5.OPENING INFORMATION
6..METHOD OF WORKING
7.DEPILLARING INFORMATION
8.PILLAR EXTRACTION INFORMATION
9.CYCLE OF OPRATION
10. SAFETY FOR SUPPORT INFORMATION
11. MACHINERY USED IN MINE
12.VENTILATION REPORT
INTRODUCTION
 NAME OF AREA :- Jamuna-kotma.
 NAME OF MINE:- Jamuna 9&10.
 DATE OF MINE OPENING:- 23/03/1985.
 LOCATION OF MINE :- Jamuna 9&10 mine is located in Anuppur district
of M.P. in In Jamuna9&10 mine is approachable as following:-
By train from :- 5km from Kotma station.
3km from Harad station.
By roadway:- 35km from NH-78 Anuppur to Manendragarh.
 PRODUCTION PER DAY:-650TE
GEOLOGICAL INFORMATIOn
 Jamuna 9&10 mine form apart of the south Rewa plateau constituting a part of
Sohagpur plain.
 The geological sequence is encountered in represented by Alluvium , Barakars ,
Talchirs and Archeans .
 Only Barakar formation consist of workable coal seam
 The general strike of coal seam is east-west.
 seam gradient is:- 1in 27 in the direction of S31°E
 The lower kotma seam has been traversed by fault ,ranging in throw up to 6m.
 There are for coal bearing in the kotma block investigate for underground mining
the seams are as follows:-
 Upper kotma
 Middle kotma
 Lower kotma 1
 Lower kotma 2
 there only lower kotma 2& middle kotma seams are economically workable.
TECHNICAL INFORMATION
No. of workable coal seam M.K.&L.K.-2
Name of seam being worked L.K.2
Average thickness of coal seam 2.80 M
Nature of roof SANDSTONE
Nature of floor SHALY sandstone
Make of water 800gpm
Pumping capacity 1500gpm
Degree of gassiness Degree 1
Incubation period of L.K.2 seam 12 month
Minimum cover L.K.2 seam 40m
Maximum cover L.K.2 seam 91m
Coal grade G6
Parting between M.K.& L.K.2 25-40 M
Life of mine 6 YEAR
Calorific value of L.K.2 seam 5726KCal/KG
SURFACE FEATURE OF MINE
B
1
2
3
4
M
O
L
C
W
T
I I
M MAGINE ROOM
COAL BUNKERS
MANAGER OFFICE
OFFICE OF
FOLLOWING-
1.VENTILATION OFFICER
2.SAFETY OFFICER
3.ENGINEER’S
4.LEAVE DPP.
INCLINE NO.10
INCLINE NO. 9
TAMPLE
WORKSHOPE
MAGINE OFFICE
CANTEEN
B
1
M
O
I
I
T
W
C
UNDERGROUD FEATURE
 MINER’S STATION BENCH, TABLE,
 FIRE FITING STATION FIRE EXTINGUISHER CYLENDERS AND BUCKET FILLED
WITH SAND
 RESERVE STATION EXLOSIVE, ROOF BOLTING RODS E.T.C
 CONVERGENCE STATION
 AIR MESURNMENT STATION
 FIRST AID STATION STRECHER, FIRST AID BOX,E.T.C
 AIR BLAST STATION
 SUB STATION TRANSFORMERS
OPENING INFORMATION
 The coal seam of Jamuna 9&10 mine has been approached by
two inclines and one shaft.
NAME OF ENTERY LENGTH/DEPTH GRADIENT PURPOSE
INCLINE NO. 9 374 M 1 IN5 TRAVELING
ROADWAY,BELT WAY,
INTAKE AIR WAY.
INCLINE NO.10 348 M 1IN 4 HAULAGE ROAD
WAY,INTAKE AIR
WAY.
SHAFT 76M(4.2 M IN
DIAMETER.)
---------------------- RETURN AIR WAY
METHOD OF WORKING
 Jamuna 9&10 mine has two workable coal seam
 middle kotma
 lower kotma-2
 Both seams are developed by bord and pillar method of mining.
 Now in present lower kotma -2 seam is depillaring by diagonal slicing technic in
 Panel-11A
 Panel- 16B
 In this mine coal is extracted by solid blasting of coal
P
P
P
P
P
P
P
P
P
P
P
P
BORD AND PILLAR METHOD WITH PANEL SYSTEM OF MINING
PANEL
P-PILLAR
J-JUNCTION
G-GALLERY19M
19M
4M
J
G
23M
5 4
9
3
6
6 5
7
8
1
2
3
10
2 1 0
4 3 2
5 4 3
7 6 5 4
8
9 8
7 6
7 6
5 4
5
GOAF
PANEL
DEPILLARING INFORMATION
1
2
1
EXTRECTED PILLAR
PILLAR UNDER EXTRECTION
REMAINING PILLAR
PILLAR NUMBER
GALLERY WIDTH=4.3 M
PILLAR SIZE =19×19
PILLAR EXTRACTION INFORMATION
PILLAR SPLITTING 3.4M
SLICE
-1
SLICE
-2
SLIC
E -4
SLICE
-3
4.5M 4.5M
4.5M 4.5M
4.5M
19M
19 M
4.3M 2.3M
- RIB.
7.25M7.25M
CYCLE OF OPRATION
DRESSI
NG
DRILLI
NG
CHAR
GING
BLASTI
NG
LOADI
NG
TRANS
PORTA
TION
Dressing &DRILLING
 Diameter of drilling rod -32m
 Length of drill hole – 1m to 1.2m
 Diameter of drill hole- 42mm
 Length Of drilling rod -1.5m
DRILLING
UNIVERSAL
DRILL
MACHINE
COAL DRILL
MACHINE
CHARGING and blasting
Explosive Name- Pentadyne (P5)
Explosive weight- 185g
Explosive used in one hole -370g to555g
Charging time of one hole-25s
Detonator used –ordinary electric detonator
LOADING
LOADING
L.H.D S.D.L
BUKET CAPACITY OF LHD-1.5 te
BUKET CAPACITY OF SDL-2 TE
TRANSPORTATION
• BY-belt
conveyor
• Belt size-
800mm to
1200mm
SUPPORT USED IN MINE
 Following supports are used in depillaring under ground coal mine:-
• Steel & Wooden Cog support.
• Prop support.
• Cross bar support.
• Roof bolting by roof support.
• Roof stitching by waste wire rope.
• W plate support.
• Steel cog &corner prop support is used specially for depillaring area.
WOODEN COG
STEEL COG
ROOF BOLTING
PROPE SUPPORT
POWER TRANSMITION CABEL
VENTILATION INFORMATION
 In Jamuna 9&10 mine mechanical ventilation is applied for ventilate the mine.
 Details of mechanical ventilator are given bellow:-
Particular Detail
Type Axial flow fan (Exhaust)
Fan diameter 2000 MM
Fan pulley diameter 211inch.
Fan R.P.M 800 R.P.M
Motor 120h.p, 1440 R.P.M
Motor pulley diameter 12 inch
No. of blade in fan 08
Blade angle 19°
Humidity 96%
No. of person employ in shift 235 per shift
VENTILATION SURVEY
ANIMOMETER BACK FRONT HYGROMETER
MACHINERY USED IN MINE
S
no.
MACHINE NAME QUNTITY
01 Coal drill machine 07
02 Universal drill
machine(U.D.M)
02
03 Load hole dumper(L.H.D) 03
04 Side discharge loader 01
05 Direct haulage 03
06 Endless haulage 01
07 Pony belt conveyors
08 Main belt conveyor etc. 01
Following machines are used in mine:-
SAFTEY EQUIPMENT
 HELMATE
 GUMBOOT
 TORCH
 GOGGEL
MINE PLAN OF JAMUNA
9&10 INCLINE MINE
THANK YOU

More Related Content

Similar to Jamuna910 ppt

mats underground mining training report
mats underground mining training reportmats underground mining training report
mats underground mining training reportVijayant Singh
 
Western Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportWestern Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportSushant Kumar
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...AMIT SAHU
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & IndiaVR M
 
Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines Pratyush Ranjan Nath
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxGholamRabbaniGhause
 
Lepanto Consolidated Mining Company Introduction
Lepanto Consolidated Mining Company IntroductionLepanto Consolidated Mining Company Introduction
Lepanto Consolidated Mining Company IntroductionCharles Jojo Besitan
 
Deepak kohli rsmml traning report
Deepak kohli rsmml traning reportDeepak kohli rsmml traning report
Deepak kohli rsmml traning reportDeepak kohli
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)wooilindo
 
Training report-hzl-cszl
Training report-hzl-cszlTraining report-hzl-cszl
Training report-hzl-cszlAnil Maurya
 

Similar to Jamuna910 ppt (20)

mats underground mining training report
mats underground mining training reportmats underground mining training report
mats underground mining training report
 
Tipong report
Tipong report Tipong report
Tipong report
 
Western Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportWestern Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training Report
 
Satyajeet
SatyajeetSatyajeet
Satyajeet
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines Longwall Equpments with a case study of Jhanjra ECL mines
Longwall Equpments with a case study of Jhanjra ECL mines
 
Case study plant4 putrajaya[arul hisham]
Case study plant4 putrajaya[arul hisham]Case study plant4 putrajaya[arul hisham]
Case study plant4 putrajaya[arul hisham]
 
Crpl
CrplCrpl
Crpl
 
CRPL
CRPLCRPL
CRPL
 
Gulshan rahangdale
Gulshan rahangdaleGulshan rahangdale
Gulshan rahangdale
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptx
 
Lepanto Consolidated Mining Company Introduction
Lepanto Consolidated Mining Company IntroductionLepanto Consolidated Mining Company Introduction
Lepanto Consolidated Mining Company Introduction
 
Deepak kohli rsmml traning report
Deepak kohli rsmml traning reportDeepak kohli rsmml traning report
Deepak kohli rsmml traning report
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
 
TRAINNING PPT (1).pptx
TRAINNING PPT (1).pptxTRAINNING PPT (1).pptx
TRAINNING PPT (1).pptx
 
Mahadevpuri ug mine
Mahadevpuri ug mineMahadevpuri ug mine
Mahadevpuri ug mine
 
Training report-hzl-cszl
Training report-hzl-cszlTraining report-hzl-cszl
Training report-hzl-cszl
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

Jamuna910 ppt

  • 1. CENTRAL INSTITUTE OF TECHNOLOGY, RAIPUR PRESENTED BY PARAMJEET PATEL Anil ku. Kashyap Avinash shrives Sameer mishra MINING 5TH SEM VOCATINAL TRAINING REPORT 2015 IN JAMUNA-KOTMA AREA
  • 2. INDEX 1.INRODUCTION 2.GEOLOGICAL INFORMATION 3.TECHNICAL INFORMATION 4.SURFACE FEATURE AND UNDER GROUND FEATURE 5.OPENING INFORMATION 6..METHOD OF WORKING 7.DEPILLARING INFORMATION 8.PILLAR EXTRACTION INFORMATION 9.CYCLE OF OPRATION 10. SAFETY FOR SUPPORT INFORMATION 11. MACHINERY USED IN MINE 12.VENTILATION REPORT
  • 3. INTRODUCTION  NAME OF AREA :- Jamuna-kotma.  NAME OF MINE:- Jamuna 9&10.  DATE OF MINE OPENING:- 23/03/1985.  LOCATION OF MINE :- Jamuna 9&10 mine is located in Anuppur district of M.P. in In Jamuna9&10 mine is approachable as following:- By train from :- 5km from Kotma station. 3km from Harad station. By roadway:- 35km from NH-78 Anuppur to Manendragarh.  PRODUCTION PER DAY:-650TE
  • 4. GEOLOGICAL INFORMATIOn  Jamuna 9&10 mine form apart of the south Rewa plateau constituting a part of Sohagpur plain.  The geological sequence is encountered in represented by Alluvium , Barakars , Talchirs and Archeans .  Only Barakar formation consist of workable coal seam  The general strike of coal seam is east-west.  seam gradient is:- 1in 27 in the direction of S31°E  The lower kotma seam has been traversed by fault ,ranging in throw up to 6m.  There are for coal bearing in the kotma block investigate for underground mining the seams are as follows:-  Upper kotma  Middle kotma  Lower kotma 1  Lower kotma 2  there only lower kotma 2& middle kotma seams are economically workable.
  • 5. TECHNICAL INFORMATION No. of workable coal seam M.K.&L.K.-2 Name of seam being worked L.K.2 Average thickness of coal seam 2.80 M Nature of roof SANDSTONE Nature of floor SHALY sandstone Make of water 800gpm Pumping capacity 1500gpm Degree of gassiness Degree 1 Incubation period of L.K.2 seam 12 month Minimum cover L.K.2 seam 40m Maximum cover L.K.2 seam 91m Coal grade G6 Parting between M.K.& L.K.2 25-40 M Life of mine 6 YEAR Calorific value of L.K.2 seam 5726KCal/KG
  • 6. SURFACE FEATURE OF MINE B 1 2 3 4 M O L C W T I I M MAGINE ROOM COAL BUNKERS MANAGER OFFICE OFFICE OF FOLLOWING- 1.VENTILATION OFFICER 2.SAFETY OFFICER 3.ENGINEER’S 4.LEAVE DPP. INCLINE NO.10 INCLINE NO. 9 TAMPLE WORKSHOPE MAGINE OFFICE CANTEEN B 1 M O I I T W C
  • 7. UNDERGROUD FEATURE  MINER’S STATION BENCH, TABLE,  FIRE FITING STATION FIRE EXTINGUISHER CYLENDERS AND BUCKET FILLED WITH SAND  RESERVE STATION EXLOSIVE, ROOF BOLTING RODS E.T.C  CONVERGENCE STATION  AIR MESURNMENT STATION  FIRST AID STATION STRECHER, FIRST AID BOX,E.T.C  AIR BLAST STATION  SUB STATION TRANSFORMERS
  • 8. OPENING INFORMATION  The coal seam of Jamuna 9&10 mine has been approached by two inclines and one shaft. NAME OF ENTERY LENGTH/DEPTH GRADIENT PURPOSE INCLINE NO. 9 374 M 1 IN5 TRAVELING ROADWAY,BELT WAY, INTAKE AIR WAY. INCLINE NO.10 348 M 1IN 4 HAULAGE ROAD WAY,INTAKE AIR WAY. SHAFT 76M(4.2 M IN DIAMETER.) ---------------------- RETURN AIR WAY
  • 9. METHOD OF WORKING  Jamuna 9&10 mine has two workable coal seam  middle kotma  lower kotma-2  Both seams are developed by bord and pillar method of mining.  Now in present lower kotma -2 seam is depillaring by diagonal slicing technic in  Panel-11A  Panel- 16B  In this mine coal is extracted by solid blasting of coal
  • 10. P P P P P P P P P P P P BORD AND PILLAR METHOD WITH PANEL SYSTEM OF MINING PANEL P-PILLAR J-JUNCTION G-GALLERY19M 19M 4M J G 23M
  • 11. 5 4 9 3 6 6 5 7 8 1 2 3 10 2 1 0 4 3 2 5 4 3 7 6 5 4 8 9 8 7 6 7 6 5 4 5 GOAF PANEL DEPILLARING INFORMATION 1 2 1 EXTRECTED PILLAR PILLAR UNDER EXTRECTION REMAINING PILLAR PILLAR NUMBER GALLERY WIDTH=4.3 M PILLAR SIZE =19×19
  • 12. PILLAR EXTRACTION INFORMATION PILLAR SPLITTING 3.4M SLICE -1 SLICE -2 SLIC E -4 SLICE -3 4.5M 4.5M 4.5M 4.5M 4.5M 19M 19 M 4.3M 2.3M - RIB. 7.25M7.25M
  • 14. Dressing &DRILLING  Diameter of drilling rod -32m  Length of drill hole – 1m to 1.2m  Diameter of drill hole- 42mm  Length Of drilling rod -1.5m DRILLING UNIVERSAL DRILL MACHINE COAL DRILL MACHINE
  • 15. CHARGING and blasting Explosive Name- Pentadyne (P5) Explosive weight- 185g Explosive used in one hole -370g to555g Charging time of one hole-25s Detonator used –ordinary electric detonator
  • 16. LOADING LOADING L.H.D S.D.L BUKET CAPACITY OF LHD-1.5 te BUKET CAPACITY OF SDL-2 TE
  • 18. SUPPORT USED IN MINE  Following supports are used in depillaring under ground coal mine:- • Steel & Wooden Cog support. • Prop support. • Cross bar support. • Roof bolting by roof support. • Roof stitching by waste wire rope. • W plate support. • Steel cog &corner prop support is used specially for depillaring area. WOODEN COG STEEL COG ROOF BOLTING PROPE SUPPORT POWER TRANSMITION CABEL
  • 19. VENTILATION INFORMATION  In Jamuna 9&10 mine mechanical ventilation is applied for ventilate the mine.  Details of mechanical ventilator are given bellow:- Particular Detail Type Axial flow fan (Exhaust) Fan diameter 2000 MM Fan pulley diameter 211inch. Fan R.P.M 800 R.P.M Motor 120h.p, 1440 R.P.M Motor pulley diameter 12 inch No. of blade in fan 08 Blade angle 19° Humidity 96% No. of person employ in shift 235 per shift
  • 21. MACHINERY USED IN MINE S no. MACHINE NAME QUNTITY 01 Coal drill machine 07 02 Universal drill machine(U.D.M) 02 03 Load hole dumper(L.H.D) 03 04 Side discharge loader 01 05 Direct haulage 03 06 Endless haulage 01 07 Pony belt conveyors 08 Main belt conveyor etc. 01 Following machines are used in mine:-
  • 22. SAFTEY EQUIPMENT  HELMATE  GUMBOOT  TORCH  GOGGEL
  • 23. MINE PLAN OF JAMUNA 9&10 INCLINE MINE