TUNNEL BORING MACHINE :
PPT PRESENTATION
BY – ROHIT GHOSH
B.TECH VTH SEM
(MINING ENGINEERING)
TUNNEL BORING
MACHINE (TBM)
• TUNNEL BORING MACHINE IS ALSO KNOWN
AS "MOLE" AS IT EXCAVATE TUNNELS WITH A
CIRCULAR CROSSESTION THROUGH VARIETY
OF SOIL AND ROCK STRATA . IT WAS FIRST
INVENTED ON 1863 BY BRITISH ARMY
OFFICER MAJOR FREDERICK EDWARD AND
BLACKETT BEAUMONT.
LINE
DIAGRAM
FOR TBM
TYPES OF
TBM :
• THERE ARE 2 TYPES OF TBM THEY ARE
AS FOLLOWS :
• 1 . HARD ROCK TBM:
• SHIELD TYPE TBM (SINGLE AND
DOUBLE TYPE)
• 2 . SOFT ROCK TBM :
• EARTH PRESSURE BALANCE MACHINE
[EPB]
• SLURRY SHIELD TBM
APPLICATION BASED ON TYPES OF TBM:
1. HARD ROCK TBM:
SINGLE SHIELD TBM :
• IT DOES NOT HAVE ANY SHEILD AS BECAUSE OF SOFT GROUND TYPE.
• EXCAVATION IS DONE BY CUTTER ROLLS TRANSFERRED THROUGH OPENING IN THE
CUTTER HEAD TO BELT CONVEYOR.
• THERE IS NO EXCAVATION CHAMBER AS CHIPS ARE OF SOLID NOT OF SLURRY.
• MORE SMOOTHER TUNNEL WALLS CAN BE CREATED BY SINGLE SHEILD TBM .
DOUBLE SHIELD TBM :
• THESE ARE THE MOST TECHNICALLY COMPLEX TUNNEL BORING MACHINE TYPE.
• THESE ARE IDEALLY SUITED FOR DRILLING LONG TUNNELS IN HARD ROCK WHERE
GEOLOGICAL FAULT ZONE OCCURS.
• ITS MAIN FEATURE IS AN EXTENDABLE FRONT SHIELD WHERE AS IN SINGLE SHIELD
HYDROLLIC THRUST ARE USED.
2 . SOFT ROCK TBM
EPB TECNOLOGY :
• EPB IS USED IN SOFT GROUND TYPE LESS THAN 7 BARS OF PRESSURE.
• IT CONTAINS COMBINATION OF TUNGSTEN CARBIDE CUTTING BITS, CARBIDE DISC
CUTTERS/HARD ROCK DISC CUTTERS.
• IT GOT ITS NAME EPB BECAUSE OF ITS CAPABILITY OF HOLDING SOFT GROUNG BY
MAINTAING BALANCE BETWEEN EARTH AND PRESSURE.
• IT USE BENTONITE , POLYMERS AND FOAMTO STABILIZE THE GROUND.
SLURREY SHIELD TBM :
• IN SOFT GROUND WITH HIGH WATER PRESSURE AND LARGE AMOUNT OF GROUND
WATER SLURRY SHIELD TBM IS USED.
• IT OFFERS A COMPLETE WORKING ENVIRONMENT.
• THE MACHINE CONTAIN RECYCLING PLANTS FOR PURIFICATION OF WATER.
CONSTRUCTION
AND OPERATION :
1. THE WHOLE TBM IS TRACK MOUNTED.
2. THE WORKING PROCEDURE / OPERATION OF A TBM
MACHINE IS DIVIDED INTO 2 PHASES .
a) THE TUNNELING PHASE
b) THE RING BUILDING PHASE
TUNNELING
PHASE
PARTS USED IN TUNNELING
PHASE :
TUNNELING PHASE :
• THESE WHOLE MACHINE IS OPERATED FROM AN OPERATING CABIN WHICH IS
LOCATED IN THE MACHINE ITSELF.
• THE TUNNELING PHASE CONTAIN A CUTTING HEAD CONSIST OF MANY CUTTING
BLADES MADE OF STEEL USED TO CUT HARD ROCK BODIES.
• THE WHOLE CUTTING HEAD / WHEEL ROTATES UPTO 2 REVOLUTION / MIN .
• THE MAIN AIM IS TO CREATE A BALANCE BETWEEN AMOUNT OF MATERIAL CUT
TO AMOUNT OF MATERIAL REMOVED.
• NEARLY 50 HYDROLIC MOTORS DEVELOPING UPTO 94100KN OF TORQUE IS USED
TO ROTATE THE CUTTING HEAD / WHEEL.
• DURING SHEAR DRIVE IN UNSUPPORTED GROUND FACE SUPPORT IS GENERATED
TO COUNTER BALANCE AND STABLE THE SYSTEM.
• THE CONTINUOUS MOVEMENT OF THE MACHINE IS DONE BY HYDROLIC JACK
CYLINDERS BY APPLING 500 BARS OF PRESSURE AT CUTTING HEAD ALONG THE
CUTTING PHASE.
• IT ALSO HAS GRIPPERS WHICH ARE JUST LIKE A SUPPORTING ARMS OF TBM.
• THESE GRIPPERS ARE USED ONLY WHEN CUTTER HEAD MOVES FORWARD
AGAINST THE TUNNEL FACE.
TUNNELING PHASE
• ALL THE CUTOFF SOIL GET COLLECTED AND TRANSFER
THROUGH SCREW CONVEYOR CHAMBER WHICH INTERN GET
TRANSPORTED TO BELT CONEYOR CHAMBER.
• SOME TIMES SOME EXPLOSIVE FUMES LIKE FIREDAM MAY
ALSO ENTER THR CONVEYOR CHAMBERS SO IN ORDER TO
DEAL WITH IT GOOD AMOUNT OF VENTILATTION IS
PROVIDED AND FOR MORE SAFETY IT ALSO CONTAIN
EXPLOSIVE STATIONS.
• ONCE TUNNEL BUILDING PHASE IS COMPLETED AT A
REQUIRED DISTANCE THEN IT GETS STOPPED AND THE RING
BUILDING PHASE GET STARTED.
RING BUILDING PHASE :
PARTS OF RING BUILDING PHASE :
THE RING BUILDING
PHASE :
• THE COMPLETE MACHENE IS WORKING INSIDE
THE CONCRETE FRAME .
• THESE CONCRETE SEGMENTS ARE READY MADE
(i.e.) CREATED IN FACTORIES AND BEEN
SUPPLIED TO THE WORKING AREA .
• THESE CONCRETE FABRICATED PLATES ARE
LIFTED AND PLACED ON THE SEGMENT FEADER .
• A SEGMENT FEADER IS JUST A BELT DRIVE
SYSTEM CARRING THE SEGMENTS TO THE
ERRECTER.
• THESE CONCRETE FABRICATED PLATES ARE
LIFTED BY A HANGING CRANE WHICH LIFTS THE
PLATES WITH THE HELP OF A VACCUM PLATE.
• THE SEGMENT FEADER THEN PROCEEDS
FORWARD.
THE RING BUILDING
PHASE :
• THE ERRECTER COLLECTS THE CONCREATE SEGMENTS FROM THE
SEGMENT FEADER AND PLACE IT IN A CORRECT CIRCULAR SHAPE .
• THE ERRECTER IS A CIRCULAR DEVICE WHICH RUNS ON HANGING TRACK
.
• THESE ERRECTER CONSIST OF A VACCUME PLATE WHICH HELPS IN
LIFTING THE CONCRETE PLATES.
• THE ERRECTER HAS A SPEACIALLITY AS IT CAN ROTATE IN 360 DEGREE.
THESE HELPS THE ERRECTER TO PLACE THE SEGMENTS IN ITS PROPER
PLACE.
• THE ERRECTER RUNS ON LAZER TECNOLOGY WHICH PLACES THE
SEGMENT CORRECTLY.
• THE HYDROLIC JAG MOVE BACK AS THE SEGMENT IS TO BE PLACED AND
WHEN THE SEGMENT IS PLACED THEN THE JACK PRESSES IT TO IT PLACE
SO THAT THE SEGMENT COULD BE BOLTED ALONG THE PREVIOUS
SEGMENT.
• THE WHOLE PROCESS OF TUNNELING AND RING BUILDING IS
SIMULTANIOUS AND RUN CONTINUOUSLYONE AFTER OTHER.
ADVANTAGES
AND
DISADVANTAGES
OF TBM :
ADVANTAGES :
• STRUCTURAL STABILITY AND SAFETY AT THE FACE AND
WORKING AREA .
• CONTINUOUS AND FAST IN OPERATION.
• CONSISTENT , LESS-SKILLED AND EASILY TRAINED OPERATION.
• SAFER AND PLEASANT WORKING ENVIRONMENT.
• LESS LABOUR NEEDED.
DISADVANTAGES :
• HIGH COST DUE TO NEED OF SUPPORTING THINGS SUCH AS
CONVEYOR BELTS , RAILS , SLURRY SEPARATING PLANT , SLURRY
PIPELINES ETC.
• HIGH COST OF ASSOCIATED SUPPLIES (i.e.) TBM CUTTERS ETC.
• TBM EXCAVATION RATES IS 4 TO 6 TIMES HIGHER BECAUSE OF
WHICH ITS USAGE ITS MAINTAINANCE COST INCREASES.
CONCLUSION
• IT IS AN ALL IN ONE MACHINE WITH ALL THE
EQUIPMENT FITTED AND THUS ELIMINATES
LONG PROCEDURE OF BLASTING , DRILLING ,
LEVELING , AND DUMPING .
THANK U

More Related Content

What's hot

Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
jagadish chintu
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
Arpit Srivastava
 
Tunneling
TunnelingTunneling
Tunneling
Safdar Ali
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
partha sharma
 
Draglines
DraglinesDraglines
Draglines
tiaiosycollege
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
1971995
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
Sathish Kumar
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
Hamed Zarei
 
Blasting equipment
Blasting equipmentBlasting equipment
Blasting equipment
Gaurang Kakadiya
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Construction Tech. and Mgmt., VNIT Nagpur
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
Er.Sunil Wasade
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
Jyoti Khatiwada
 
Power shovel
Power shovelPower shovel
Power shovel
Anand Kumar
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
Parth Desani
 
Ripper production
Ripper productionRipper production
Ripper production
VIJAY KUMAR
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
Jagriti Mandal
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)
IshaneeSharma
 
tunnel boring machine
tunnel boring machine tunnel boring machine
tunnel boring machine
Milan Sheta
 

What's hot (20)

Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
Tunneling
TunnelingTunneling
Tunneling
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Draglines
DraglinesDraglines
Draglines
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
 
Blasting equipment
Blasting equipmentBlasting equipment
Blasting equipment
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Power shovel
Power shovelPower shovel
Power shovel
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Ripper production
Ripper productionRipper production
Ripper production
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)
 
tunnel boring machine
tunnel boring machine tunnel boring machine
tunnel boring machine
 
Blasting
BlastingBlasting
Blasting
 
Tbm
TbmTbm
Tbm
 

Similar to Tunnel boring machine ppt

CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
Suyash Awasthi
 
Riveting
RivetingRiveting
Riveting
Ansh Agarwal
 
riveting-191116181211.pdf
riveting-191116181211.pdfriveting-191116181211.pdf
riveting-191116181211.pdf
PrinceRaja26
 
LOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSLOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICS
Mohan Doshi
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
Shyam Anandjiwala
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
Safiullah Khan
 
Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshul
Anshul Shakya
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
ABHISHEK SINGH
 
underwater construction
underwater constructionunderwater construction
underwater construction
Yasir Hashmi
 
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
Rakesh Kumar Choubey
 
TURNING MACHINES.pptx
TURNING MACHINES.pptxTURNING MACHINES.pptx
TURNING MACHINES.pptx
Richard523548
 
Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMB
indranjanGhosh
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
Jasmeet Singh Saluja
 
Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)
S M Rahat Rahman
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
Er.Sunil Wasade
 
Copper Engg Foundry Eqpt Presentation Ppt
Copper Engg Foundry Eqpt Presentation PptCopper Engg Foundry Eqpt Presentation Ppt
Copper Engg Foundry Eqpt Presentation PptVijay Balaji
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
Mayur Rahangdale
 

Similar to Tunnel boring machine ppt (20)

CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
TURBINE FUNDAMENTAL
TURBINE FUNDAMENTALTURBINE FUNDAMENTAL
TURBINE FUNDAMENTAL
 
Riveting
RivetingRiveting
Riveting
 
riveting-191116181211.pdf
riveting-191116181211.pdfriveting-191116181211.pdf
riveting-191116181211.pdf
 
LOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSLOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICS
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
 
DRAWING PROCESS AND DRAWING MACHINES
DRAWING PROCESS AND DRAWING MACHINESDRAWING PROCESS AND DRAWING MACHINES
DRAWING PROCESS AND DRAWING MACHINES
 
Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshul
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
 
TURNING MACHINES.pptx
TURNING MACHINES.pptxTURNING MACHINES.pptx
TURNING MACHINES.pptx
 
Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMB
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
TATA STEEL PPT
TATA STEEL PPTTATA STEEL PPT
TATA STEEL PPT
 
Copper Engg Foundry Eqpt Presentation Ppt
Copper Engg Foundry Eqpt Presentation PptCopper Engg Foundry Eqpt Presentation Ppt
Copper Engg Foundry Eqpt Presentation Ppt
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
 

Recently uploaded

COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 

Recently uploaded (20)

COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 

Tunnel boring machine ppt

  • 1. TUNNEL BORING MACHINE : PPT PRESENTATION BY – ROHIT GHOSH B.TECH VTH SEM (MINING ENGINEERING)
  • 2. TUNNEL BORING MACHINE (TBM) • TUNNEL BORING MACHINE IS ALSO KNOWN AS "MOLE" AS IT EXCAVATE TUNNELS WITH A CIRCULAR CROSSESTION THROUGH VARIETY OF SOIL AND ROCK STRATA . IT WAS FIRST INVENTED ON 1863 BY BRITISH ARMY OFFICER MAJOR FREDERICK EDWARD AND BLACKETT BEAUMONT.
  • 4. TYPES OF TBM : • THERE ARE 2 TYPES OF TBM THEY ARE AS FOLLOWS : • 1 . HARD ROCK TBM: • SHIELD TYPE TBM (SINGLE AND DOUBLE TYPE) • 2 . SOFT ROCK TBM : • EARTH PRESSURE BALANCE MACHINE [EPB] • SLURRY SHIELD TBM
  • 5. APPLICATION BASED ON TYPES OF TBM: 1. HARD ROCK TBM: SINGLE SHIELD TBM : • IT DOES NOT HAVE ANY SHEILD AS BECAUSE OF SOFT GROUND TYPE. • EXCAVATION IS DONE BY CUTTER ROLLS TRANSFERRED THROUGH OPENING IN THE CUTTER HEAD TO BELT CONVEYOR. • THERE IS NO EXCAVATION CHAMBER AS CHIPS ARE OF SOLID NOT OF SLURRY. • MORE SMOOTHER TUNNEL WALLS CAN BE CREATED BY SINGLE SHEILD TBM . DOUBLE SHIELD TBM : • THESE ARE THE MOST TECHNICALLY COMPLEX TUNNEL BORING MACHINE TYPE. • THESE ARE IDEALLY SUITED FOR DRILLING LONG TUNNELS IN HARD ROCK WHERE GEOLOGICAL FAULT ZONE OCCURS. • ITS MAIN FEATURE IS AN EXTENDABLE FRONT SHIELD WHERE AS IN SINGLE SHIELD HYDROLLIC THRUST ARE USED.
  • 6. 2 . SOFT ROCK TBM EPB TECNOLOGY : • EPB IS USED IN SOFT GROUND TYPE LESS THAN 7 BARS OF PRESSURE. • IT CONTAINS COMBINATION OF TUNGSTEN CARBIDE CUTTING BITS, CARBIDE DISC CUTTERS/HARD ROCK DISC CUTTERS. • IT GOT ITS NAME EPB BECAUSE OF ITS CAPABILITY OF HOLDING SOFT GROUNG BY MAINTAING BALANCE BETWEEN EARTH AND PRESSURE. • IT USE BENTONITE , POLYMERS AND FOAMTO STABILIZE THE GROUND. SLURREY SHIELD TBM : • IN SOFT GROUND WITH HIGH WATER PRESSURE AND LARGE AMOUNT OF GROUND WATER SLURRY SHIELD TBM IS USED. • IT OFFERS A COMPLETE WORKING ENVIRONMENT. • THE MACHINE CONTAIN RECYCLING PLANTS FOR PURIFICATION OF WATER.
  • 7. CONSTRUCTION AND OPERATION : 1. THE WHOLE TBM IS TRACK MOUNTED. 2. THE WORKING PROCEDURE / OPERATION OF A TBM MACHINE IS DIVIDED INTO 2 PHASES . a) THE TUNNELING PHASE b) THE RING BUILDING PHASE
  • 8. TUNNELING PHASE PARTS USED IN TUNNELING PHASE :
  • 9. TUNNELING PHASE : • THESE WHOLE MACHINE IS OPERATED FROM AN OPERATING CABIN WHICH IS LOCATED IN THE MACHINE ITSELF. • THE TUNNELING PHASE CONTAIN A CUTTING HEAD CONSIST OF MANY CUTTING BLADES MADE OF STEEL USED TO CUT HARD ROCK BODIES. • THE WHOLE CUTTING HEAD / WHEEL ROTATES UPTO 2 REVOLUTION / MIN . • THE MAIN AIM IS TO CREATE A BALANCE BETWEEN AMOUNT OF MATERIAL CUT TO AMOUNT OF MATERIAL REMOVED. • NEARLY 50 HYDROLIC MOTORS DEVELOPING UPTO 94100KN OF TORQUE IS USED TO ROTATE THE CUTTING HEAD / WHEEL. • DURING SHEAR DRIVE IN UNSUPPORTED GROUND FACE SUPPORT IS GENERATED TO COUNTER BALANCE AND STABLE THE SYSTEM. • THE CONTINUOUS MOVEMENT OF THE MACHINE IS DONE BY HYDROLIC JACK CYLINDERS BY APPLING 500 BARS OF PRESSURE AT CUTTING HEAD ALONG THE CUTTING PHASE. • IT ALSO HAS GRIPPERS WHICH ARE JUST LIKE A SUPPORTING ARMS OF TBM. • THESE GRIPPERS ARE USED ONLY WHEN CUTTER HEAD MOVES FORWARD AGAINST THE TUNNEL FACE.
  • 10. TUNNELING PHASE • ALL THE CUTOFF SOIL GET COLLECTED AND TRANSFER THROUGH SCREW CONVEYOR CHAMBER WHICH INTERN GET TRANSPORTED TO BELT CONEYOR CHAMBER. • SOME TIMES SOME EXPLOSIVE FUMES LIKE FIREDAM MAY ALSO ENTER THR CONVEYOR CHAMBERS SO IN ORDER TO DEAL WITH IT GOOD AMOUNT OF VENTILATTION IS PROVIDED AND FOR MORE SAFETY IT ALSO CONTAIN EXPLOSIVE STATIONS. • ONCE TUNNEL BUILDING PHASE IS COMPLETED AT A REQUIRED DISTANCE THEN IT GETS STOPPED AND THE RING BUILDING PHASE GET STARTED.
  • 11. RING BUILDING PHASE : PARTS OF RING BUILDING PHASE :
  • 12. THE RING BUILDING PHASE : • THE COMPLETE MACHENE IS WORKING INSIDE THE CONCRETE FRAME . • THESE CONCRETE SEGMENTS ARE READY MADE (i.e.) CREATED IN FACTORIES AND BEEN SUPPLIED TO THE WORKING AREA . • THESE CONCRETE FABRICATED PLATES ARE LIFTED AND PLACED ON THE SEGMENT FEADER . • A SEGMENT FEADER IS JUST A BELT DRIVE SYSTEM CARRING THE SEGMENTS TO THE ERRECTER. • THESE CONCRETE FABRICATED PLATES ARE LIFTED BY A HANGING CRANE WHICH LIFTS THE PLATES WITH THE HELP OF A VACCUM PLATE. • THE SEGMENT FEADER THEN PROCEEDS FORWARD.
  • 13. THE RING BUILDING PHASE : • THE ERRECTER COLLECTS THE CONCREATE SEGMENTS FROM THE SEGMENT FEADER AND PLACE IT IN A CORRECT CIRCULAR SHAPE . • THE ERRECTER IS A CIRCULAR DEVICE WHICH RUNS ON HANGING TRACK . • THESE ERRECTER CONSIST OF A VACCUME PLATE WHICH HELPS IN LIFTING THE CONCRETE PLATES. • THE ERRECTER HAS A SPEACIALLITY AS IT CAN ROTATE IN 360 DEGREE. THESE HELPS THE ERRECTER TO PLACE THE SEGMENTS IN ITS PROPER PLACE. • THE ERRECTER RUNS ON LAZER TECNOLOGY WHICH PLACES THE SEGMENT CORRECTLY. • THE HYDROLIC JAG MOVE BACK AS THE SEGMENT IS TO BE PLACED AND WHEN THE SEGMENT IS PLACED THEN THE JACK PRESSES IT TO IT PLACE SO THAT THE SEGMENT COULD BE BOLTED ALONG THE PREVIOUS SEGMENT. • THE WHOLE PROCESS OF TUNNELING AND RING BUILDING IS SIMULTANIOUS AND RUN CONTINUOUSLYONE AFTER OTHER.
  • 14. ADVANTAGES AND DISADVANTAGES OF TBM : ADVANTAGES : • STRUCTURAL STABILITY AND SAFETY AT THE FACE AND WORKING AREA . • CONTINUOUS AND FAST IN OPERATION. • CONSISTENT , LESS-SKILLED AND EASILY TRAINED OPERATION. • SAFER AND PLEASANT WORKING ENVIRONMENT. • LESS LABOUR NEEDED. DISADVANTAGES : • HIGH COST DUE TO NEED OF SUPPORTING THINGS SUCH AS CONVEYOR BELTS , RAILS , SLURRY SEPARATING PLANT , SLURRY PIPELINES ETC. • HIGH COST OF ASSOCIATED SUPPLIES (i.e.) TBM CUTTERS ETC. • TBM EXCAVATION RATES IS 4 TO 6 TIMES HIGHER BECAUSE OF WHICH ITS USAGE ITS MAINTAINANCE COST INCREASES.
  • 15. CONCLUSION • IT IS AN ALL IN ONE MACHINE WITH ALL THE EQUIPMENT FITTED AND THUS ELIMINATES LONG PROCEDURE OF BLASTING , DRILLING , LEVELING , AND DUMPING .