This document discusses improvements to the highwall mining method. It begins by providing background on highwall mining and describing the current methodology. It then outlines some shortcomings of the existing approach, such as stability issues when mining near old underground mines or with multiple seams. The document proposes four innovations to address these shortcomings: 1) a mechanized roof bolting technique, 2) a method for backfilling using the push beams, 3) a two-trench mining technique, and 4) controlled caving through planned blasting. These innovations aim to improve stability and safety in highwall mining operations.
A short description of Highwall Mining and its performance and application. The details of the equipments and the mining procedure are mentioned. Hope it will help you guys!
It's a case Study for High wall Mining thats done in SCCL.
Also you can find awesome videos related to Mining activities in my YOUTUBE CHANNEL i.e. Knowledge Stuff. Please SUBSCRIBE my channel. My youtube link is given below:-
https://www.youtube.com/channel/UCKgkj6M1M-AWlonTzn_51Gw
Also there are some videos you may like:-
HIGHWALL Mining in INDIA :-
https://www.youtube.com/watch?v=uqlmBm81aIw
Drilling and Blasting Videos at Bauxite OCP - https://www.youtube.com/watch?v=dNwSZq5T3bg
Biggest Dragline Excavator in INDIA -
https://www.youtube.com/watch?v=FLg6ZPtfzHs
A typical day at an OPEN cast mine :-
https://www.youtube.com/watch?v=JYeqqX7BaTw
I hope you like it and share it.
The basic principle of BG method is to be extract thick coal seams by drilling and blasting of roof and sides of gallery, which are driven at the bottom at the bottom of the seam at regular intervals.
Blasting gallery method is the appropriate method for the extraction of thick seam.
BLASTING OF RING HOLES PRODUCTION PER RING BLAST EXPLAINED
development of main headings and gate roads with the use of road heading and bolter miners has paramount importance for effective production from a Longwall mine
it is a mining method by which we can extract the coal of highwall, when the open cast reaches to its limiting point, by the help of this method we can extract the locked up coal.
A short description of Highwall Mining and its performance and application. The details of the equipments and the mining procedure are mentioned. Hope it will help you guys!
It's a case Study for High wall Mining thats done in SCCL.
Also you can find awesome videos related to Mining activities in my YOUTUBE CHANNEL i.e. Knowledge Stuff. Please SUBSCRIBE my channel. My youtube link is given below:-
https://www.youtube.com/channel/UCKgkj6M1M-AWlonTzn_51Gw
Also there are some videos you may like:-
HIGHWALL Mining in INDIA :-
https://www.youtube.com/watch?v=uqlmBm81aIw
Drilling and Blasting Videos at Bauxite OCP - https://www.youtube.com/watch?v=dNwSZq5T3bg
Biggest Dragline Excavator in INDIA -
https://www.youtube.com/watch?v=FLg6ZPtfzHs
A typical day at an OPEN cast mine :-
https://www.youtube.com/watch?v=JYeqqX7BaTw
I hope you like it and share it.
The basic principle of BG method is to be extract thick coal seams by drilling and blasting of roof and sides of gallery, which are driven at the bottom at the bottom of the seam at regular intervals.
Blasting gallery method is the appropriate method for the extraction of thick seam.
BLASTING OF RING HOLES PRODUCTION PER RING BLAST EXPLAINED
development of main headings and gate roads with the use of road heading and bolter miners has paramount importance for effective production from a Longwall mine
it is a mining method by which we can extract the coal of highwall, when the open cast reaches to its limiting point, by the help of this method we can extract the locked up coal.
Overview of Highwall Mining. A small Pictorial Demonstration files. New Technology. Solution to unreachable beded deposit. Highwall mining is a remotely controlled mining method which extracts coal from the base of an exposed highwall. The method has the advantage of low capital cost and less lead time compared with a full underground mine, while being capable of producing in excess of 1 million tonnes per system per year.
Every Step you need in planning to extend a working open cast mine to underground mine on reaching a pit bottom.
Step-wise procedure to be followed is clearly mentioned.
Justifies the Indian Laws.
Sublevel Stoping method is explained in detail.
Case study of a copper mine is presented for eg.
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
The said technical paper was presented by Rajesh Prasad in IC TRAM 2018 (International Conference- Technological Advancement in Railways and Metro Projects at Manekshaw Centre New Delhi on 04.10.2018
The secondary mining technology for extracting the remaining coal from the open pit mining methods.
Cited as:
Boeut, S., & Loawattanabandit, P. " Design of Auger Highwall Mining: A case study at Mae Tan Coal Mine, Thailand", in Proc. ASEAN++2016 Towards Geo-resources Education in ASEAN Economic Community, 2016, pp. 304-321.
importance of coal handling system, necessity and requirement of coal handling system, various transportation means, methods and equipment's, advantages and disadvantages of various methods, coal unloading videos.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
1. IMPROVEMENT OF HIGHWALL
MINING METHOD
Team Name- THE RISERS
Team Members:-
1. JASMEET SALUJA
2. JASMEET SINGH CHHABRA
3. SHUBHAM CHAUHAN
2. Why Highwall ??
• Coal has been recognized as the most important source of energy for electricity
generation in India.
• Currently the country produces more than 550 million tonnes of coal per year,
more than 80% of which comes from opencast mines.
• Despite of having the fourth largest coal reserve and being the third largest coal
producing country in the world, India needs to import coal to meet its growing
requirement.
• Most of the opencast coal mines were started in early eighties in India. Many of
these opencast mines are reaching their pit limits.
• A significant amount of coal is blocked in non workable thin seams, in the
highwalls, below surface dwellings in these opencast mines.
• Highwall mining is a proven technology in USA and Australia to extract the blocked
coal in thin non-workable seams and the coal blocked in the highwall of opencast
mines.
3. What is Highwall Method of Mining??
• Highwall mining is a proven primary method for mining coal from
outcropping horizontal seams.
• In this method of mining, an Unmanned Continuous Miner is driven
underground and operated in front of the highwall.
• The highwall mining machine stands on the pit floor or on a bench,
directly in front of the exposed seam and makes long parallel
rectangular drives into the coal seam.
• A remote-operated cutter module is pushed into the seam by a string
of Push Beams (unmanned coal-conveying elements) that transport
the mined coal back to the entry of the drive onto a stockpile.
4. Machinery Details
1. General Details
• Length base approx. - 22 meters
• Width base approx. - 8.3 meters
• Weight base approx. - 160 tonnes
• Length of push beams - 6 meters ( 6 tonnes each )
• 50 push beams per miner
• Max. force in: approx. - 170 tonnes,
• Max force out: approx. - 350 tonnes.
5. Launch Vehicle :-
Mine Mode Dimensions
Width: 10 m (33.6 ft)
Height: 8.4 m (28 ft)
Length: 16.6 m (55.3 ft)
Weight: Highwall Mining System 225 000 kg
(496,040 lb)
Weight: Push Beam 5 624 kg (12,400 lb)
Weight: Low-Seam Cutter Module 21 800 kg
(48,061 lb)
Weight: High-Seam Cutter Module 43 084 kg
(93,000 lb)
Coal Seam Height Range 760 mm (30 in) to
3.05 m (10 ft)
Maximum Penetration Capability 305 m
(1,000 ft)
6. Cutter Head
Two types of Cutter Heads are available:
i) Low-seam cutter
{for seams 0.76 – 1.62 m (2.5 – 5.3 ft) in height}
ii) High-seam cutter
{to mine 1.3 – 3.05 m (4.3 – 10 ft) seams in height. }
The cutter modules are interchangeable and
quickly attached to the powerhead assembly.
The cutting cycle is fully automated, yet
allows the operator to manually adjust the
machine function using an ampere reading as
the coal seam varies.
This proven technology allows the cutter
module to accurately follow the coal seam
and produce a clean product.
Cutting Width :- 2.9 – 3.5m
7. Push Beams
Push beams are 6 m long rectangular
reinforced steel box structures
Push beams are joined together to
form a string.
The string of the push beams:
a) pushes and pulls the cutter unit in
and out of the seam
b) conveys the mined coal to the
surface through two contra-rotating
augers.
c) Support the hose chain.
d) Supply air to the face to flush the
methane and keep the face cool.
8. The Push Beam string is the backbone of
the machine; pushing and pulling the cutter module
in and out of the highwall with retract forces up to
363 tonnes.
The push beams also transport mined coal
and support the hose chain that supplies
control and power to the cutter.
Moving coal inside the push beam (via a pair
of screw conveyors) protects the coal from
contamination and the moving mechanical
parts from rock debris, resulting in higher
availability
9. A strong method of attachment that is
secured and disengaged quickly.
• A horizontal hinge design that allows
the string and cutter to navigate
through coal seam rolls and
undulations
• Structural rigidity that ensures mining
in parallel drives
• A simple design free of electrical and
hydraulic connections
• Push beams that can be stacked six
high for storage in narrow worksites,
even under tough pushing and pulling
conditions
10. Robust Reel & Chain
Stores and protects :
power cable for cutter head,
control cable for cutter head,
methane sensor cable,
hydraulic pressure hose for cutter
cooling water hose etc.
Hoses are protected by steel plates and
links.
Hose chain automatically unwinds and
winds during mining.
11. Operators Cabin
The Cat highwall mining system is equipped with a
comfortable, air-conditioned cab that offers a full view of
the mining operation and the highwall. The fullsuspension
operator seat and the two user-friendly touchscreens
create an ergonomic workplace, placing controls and system
information at the operator’s fingertips.
Salient Features:
1. Fibre Optic Gyro Navigation System
Ensure the parallelism of the galleries and maintain adequate pillar thickness throughout the gallery
2. Continuous Methane Monitoring System
Monitors the % of methane at the face. At 0.75 %, gives warning to the operator and at 1.25 %, automatically. shut
off power supply.
3. Temperature control
Monitors the temperature of the face. The face is kept cool by circulating air through augers in the push beam. The
3
augers are capable of circulating 48 m
/min of air.
12. Excellent Mobility
The Highwall mining system is an agile, self-propelled
machine that operates on contour benches as narrow as
18 m (59 ft). It trams easily from entry to entry and
discharges coal in tight spaces.
An optional right-angle conveyor system discharges coal
on the right or left side on narrow benches. It can also
discharge onto a stacking conveyor system, where
coal is moved to the center of the bench for stockpiling
large volumes.
Four heavy-duty, hydraulically-powered tracks articulate
independently in two operating modes – mine mode and
tram mode – and can rotate the machine 360°, which
improves maneuverability in congested areas. Mine mode
is used for moving parallel to the highwall, while tram
mode is used when moving from pit to pit.
16. The three methods for
commencing of Highwall
Mining are clearly
shown in the picture.
17. 1. Trench Mining Trench mining is practiced for
mining thin, reasonably flat coal
seams which may not be
amenable to opencast mining.
In this method, an artificial
highwall is created by making a
trench up to the coal seam.
The miner is positioned on the
floor of the seam within the
trench and galleries are driven on
both sides of the trench
18. 2. Contour Mining Contour mining is used to
extract outcropped coal seams
in hilly area.
The highwall mining follows
the contour of the seam along
the hill side.
19. 3. Open Pit Mining Highwall mining is used to
work the coal blocked in the
highwall of an opencast mine.
In this method the highwall
miner is positioned on the floor
of the seam and in front of the
highwall and galleries are
driven in the exposed seam in
the highwall.
21. Method’s Shortcomings
Problems in Highwall Mining :-
1. Highwall Mining near old Underground mines,
2. Multiple-seam and Multiple-lift Highwall mining,
3. The width and frequency of barrier pillars.
4. The width of hole and web pillar
5. Machine getting trapped under Highwall
6. Coal blocked in Web & Barrier Pillars
Highwall stability is the major ground control related safety concern.
Ground control plans for highwall mining must specify hole width, web pillar width,
barrier pillar width and number of holes between barriers.
22. In this article, we have focused particularly in Determining
the Web Pillar and Barrier Pillar Width, There Frequency in a
Panel and Highwall Stability.
Using Mark-Bieniawski formula as a standard, we have devised a Computer
Program for calculating the above mentioned factors.
A user just needs to enter the following informations:
i) Height of Coal Seam
ii) Maximum and Minimum Overburden Height
iii) Hole Width
iv) Panel Width
23. Mark-Bieniawski Formulas
• Coal Pillar Strength
Sp = Si [ 0.64 + 0.54 W / H ]
Where:
Sp = web or barrier pillar strength
Si = in situ coal strength
W = web or barrier pillar width
H = mining height
25. • Stability Factor for Web Pillars
SFwp = web pillar strength / web pillar stress
• If the number of web pillars in a panel is selected as “N”, then the Panel Width
is given by :-
Wpn = N (Wwp + We) + We
26. • Neglecting the stress carried by the web pillars (i.e. assuming that they
have all failed), the average vertical stress on a barrier pillar is
Sbp = Sv (Wpn + Wbp) / Wbp
Where:
Wpn = panel width
Wbp = barrier pillar width
• Similarly, the stability factor for barrier pillars against strength failure is
simply
SFbp = barrier pillar strength / barrier pillar stress
27. Our Innovations
1. Roof Bolting Technique :-
• Considering the average height of holes in highwall mining which
normally varies from 0.9 to 3.05 m , and the instability of Immediate
Roof at that hole heights with the length of extraction.
• The Mechanized Roof Bolt Technique can be applied to keep the
immediate roof intact that is prevent separation which is the main
cause for failure.
• The Roof Bolts shall be inserted into the roof by proper drilling
arrangements provided along the length of the push beams . The
bolts would be of minimum length when inserted vertically upward.
The length of bolts can even be increased by inserting them slantly
upto the limits permissible.
28. 2. Back Filling Measures :-
• Keeping in mind the use of push beams to transport or carry the
coal from the face to the mouth .
• By reversing the direction of the auger motion the supply of
filling material from the mouth to the face might be done to
provide for the back filling of the material.
• Various improvisation techniques for the back filling can be
obtained by practical application of this method at the site and
can further be developed on the basis of results so obtained so
that the filling material be dumped efficiently with some
compactness.
29. 3. Two Trench Technique
• So far we have seen the highwall technique in the light of single
trench technique in which, in a panel, multiple parallel holes are
made with desired web pillars in between them.
• In case of hills, where trenches on both the sides of the seam are
possible, in panel, a hole can be drawn from first trench and now
after leaving the desired web pillar width , next hole can be made
from the opposite side upto the acceptable depth .
• This might decrease the loads on the web pillars and subsequently on
the barrier pillars. This extra safety might be utilized in enhancing the
further coal extraction by robbing the barrier pillars at last or even
working parts of barrier pillars.
30.
31.
32. 4. Controlled Caving
• Most of Highwall Mining sites are under previously worked Opencast
mines or Hilltops ( Outcrops ). These areas are isolated ones which do
not contain any Property of Importance on the surface.
• Hence, using the method of PLANNED & CONTROLLED BLASTING
regular caving can be managed as this will reduce a great amount of
overlying pressure on the pillars and will contribute to Safety of Pillars
and increase in Percentange Extraction.
• This may also eliminate the need for leaving web pillars for the
Overburden support.
33. Conclusion
• Thus we conclude that , by introduction of these techniques
the stability and safety in Highwall Mining Operations can
significantly be improved.
• Further, in near future Highwall Mining may prove to be a
significant method for coal production.