Time + Attention Management
KIK Custom Products Leadership Training
What you will learn today…
You will learn Time + Attention
Management skills to apply and be
more efficient + effective every day
Time + Attention Management
Learning Objectives…
 Learn why Time + Attention Management can
be easy or difficult
 Learn the Time Management Matrix to better
understand and improve our Time + Attention
Management skills
 Learn steps to overcome procrastination –
Eat that Frog
Time + Attention Management
“Time management” is really a
misnomer – the challenge is not
to manage time, but manage
ourselves. The key is not to
prioritize what’s on your schedule,
but to schedule your priorities.”
Stephen Covey
So, what does Time + Attention
Management mean to you?
Time can’t be managed…It just is.
So, time management is really about
managing our attention.
Time + Attention Management
Staying focused on the task at hand is
more difficult than ever. There are…
• Open Workspaces
• Tons of Media Sources vying for our attention
• Individuals acting in crisis mode all the time
Time + Attention Management
What do you think is the #1 enemy of
Attention Management?
Distractions
What are some categories of Distractions?
• Self
• People
• Organizational
Time + Attention Management
Some distractions are ok/good, but
need to be managed
All distractions should fall into Q2/Q1
of the matrix; and if not, re-evaluate
 Groups of 3:
 a distractor
 an employee trying to work or have a
conversation
 an observer/other conversationalist
Role Play
Distractions
The employee’s goal is to try and tactfully diffuse the distraction
Stephen Covey’s book, The 7 Habits of Highly
Effective People, provide us with the Time
Management Matrix. It will help us prioritize
and determine which activities best warrant our
attention and resources…
The 7 Habits of Highly Effective People
It provides the judgment as to whether activities are
URGENT, IMPORTANT, BOTH or NEITHER.
This is crucial for good time management.
Urgent
Not
Urgent
Important
Not
Important
Q-1 Q-2
Q-3 Q-4
Time
Management
Matrix
Time Management Matrix
Urgent + Important:
These are real major emergencies and crisis issues,
significant demands for information from superiors or
customers, project work with imminent deadlines,
meetings and appointments, reports and other
submissions, staff issues or needs, problem resolution,
fire-fighting fixes, and serious urgent complaints.
Time Management Matrix
Urgent + Important:
DO NOW
(Vying for immediate attention and critical to your success and/or of the
organization.)
What to do:
• Subject to confirming the importance of these tasks, do this
task now…
• Prioritize tasks according to their relative urgency
• If 2 or more tasks are equally urgent, ask what the needed
requirements are from the person requesting the task
• Look for ways to break the task down to simplify
• Plan this task in quadrant 2 for next time
Time Management Matrix
Not Urgent, but Important:
Activities that fall into this quadrant include: planning
an preparation; project planning and scheduling;
research and investigation; networking, relationship
building, thinking and creating; modelling, designing,
and testing; systems and process development;
anticipative, preventative activities or communication.
Time Management Matrix
Not Urgent, but Important:
PLAN TO DO
These tasks are most important yet
neglected:
• Plan time-slots for doing these
• Break big tasks down to separate logical stages
• Use project management tools and methods
• Inform other people of your planned time-slots and
schedules: Having a visual schedule is key.
(not “in your face” but critical to your success and/or that of your organization)
Time Management Matrix
Urgent, but not Important
This quadrant houses trivial and “off-loaded” requests from
others, apparent emergencies, ad-hoc interruptions,
misunderstandings appearing as complaints, irrelevant
distractions, pointless routines or activities, dealing with
accumulated unresolved trivia, duplicated effort,
unnecessary double-checking, and the boss’s whims or
tantrums. Scrutinize these demands and help originators,
even your boss, to re-assess the real importance of these
tasks.
Time Management Matrix
Urgent, but not Important:
REJECT (Diplomatically)
These tasks are tricky:
• Practice and develop your ability to explain why you can’t
• Where possible, reject and avoid these tasks immediately
• Look for causes of repeating demands, so you can stop it
• Educate and train others to manage their own time and
priorities, so you don’t end up getting involved
• Question old policies and assumptions to see if they still are
valid
(“in your face” – but not important to your success and/or that of the
organization.)
Time Management Matrix
Neither Urgent nor Important:
Finally, Q4 contains the many unnecessary and
unchallenged routines, “comfort” activities; computer
games, net surfing, excessive breaks, chatting and
gossip (face to face and phone); social and domestic
communications; silly emails and text messages;
daydreaming and doodling; interrupting others; tidying,
changing screen savers, internet and YouTube surfing;
drink and drug abuse; aimless travel and driving.
Time Management Matrix
Neither Urgent nor Important:
RESIST + CEASE
These tasks are unnecessary + are usually
unchallenged:
• These activities have no positive outcomes
• Often they may be stress related, so find the root cause
• Have a clear structure or schedule of tasks for each day in
quadrant 2 to remove the temptation
• These activities are not tasks and provide a refuge from the
effort of discipline
(the real time wasters – not vying for immediate attention and not important to
success)
Urgent
Not
Urgent
Important
Not
Important
Q-1 Q-2
Q-3 Q-4
Time
Management
Matrix
Q-1 Q-2
Q-3 Q-4
Time
Management
Matrix
Now it’s time to build your own
Time Management Matrix
based on an average work day
here at KIK. Take the tasks and
prioritize them in the correct
quadrants:
 Daily Tasks…
 Typical fire-fighting…
 Typical interruptions…
 Unexpected items…
 Leadership needs…
 Direct Boss needs…
Do Now. Plan to Do.
Reject
(nicely).
Resist + Cease.
Proactive vs Reactive
Attention Management
Being Proactive means thinking ahead and planning how
to head off or deal with problems before they arise
Being Reactive means that you respond to problems after
they occur
Reactive items live in Q-1
Proactive items live in
You should spend more time in Q2 instead of Q1…
Attention Management
What does Attention Management to you?
Attention management increases the ability to focus
attention.
Four areas of Attention
 Intentional: plan strategically and prioritize
 Responsive: responds and puts out fires
 Interrupted: too much time answering messages and doing
non-valued added work
 Unproductive: waste time at work…Facebook, chatting a lot…
Attention Management
So, how can we manage our attention better?
Eat the Frog!
(Take Action!)
Attention Management
“Eat that Frog*” is a metaphor for tackling the
most challenging task of your day – the one you are most
likely to procrastinate on, but also probably the one that
can have the greatest positive impact
*Adapted from the book, Eat That Frog! 21 Great Ways to Stop Procrastinating and Get more Done in Less Time – Brian Tracy
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop
procrastinating and get things done faster…
1. Set the table: Write out your goals and objectives
2. Plan every day in advance: every minute planning can
save you 5 or 10 minutes in execution
3. Apply the 80/20 rule: 20% of your activities will account
for 80% of your results
4. Consider the consequences: most important tasks and
priorities can have the most serious consequences – focus on
these above all else
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop procrastinating
and get things done faster…cont.
5. Practice creative procrastination: learn to
deliberately put off tasks that are low value
6. Use the A B C D E Method: take a few moments to
prioritize on your most important activities
 This is the best method for setting priorities on your list
once you have determined your major goals or
objectives - You place one of those letters in the margin
before each of the tasks on your list before you begin
Eat the Frog!
(Take Action!)
Attention Management
The A B C D E Method…
“A” = “very important;” something you must do
“B” = “important;” something you should do
“C” = “nice to do;” but which are not as important as ‘A’ or ‘B,’ tasks
“D” = “delegate”
“E” = “eliminate, whenever possible”
When you use the A B C D E method, you can very easily sort out
what is important and unimportant - then focus your time and attention
on those items on your list that are most essential for you to do
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop procrastinating
and get things done faster…cont.
7. Focus on key results: Identify and determine the results
necessary to get your job done well
8. The Law of 3: Identify 3 things that account for 90% of
your contribution and get them done first
9. Prepare thoroughly before you begin: have
everything you need at hand before you start
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop procrastinating
and get things done faster…cont.
10.Eat the frog one bite at a time: you can accomplish
the biggest task one bite at a time
11.Upgrade your key skills: the more skilled you are the
faster you start and the sooner you get them done
12.Leverage your special talents: Know your strengths
and throw your whole heart into what you do well
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop procrastinating
and get things done faster…cont.
13.Identify your key constraints: determine the
bottlenecks, internal and external - focus on alleviating them
14.Put pressure on yourself: think you’re going on
vacation and you have to get your tasks completed before
15.Maximize your personal power: get lots of rest so you
can perform your best
16.Motivate yourself into action: look for the good in
every situation – always be optimistic and constructive
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop procrastinating
and get things done faster…cont.
17.Technology time sinks: use technology to improve the
quality of your communication, but not a slave to it
18.Slice and dice the task: break complex tasks down into
bite-sized pieces and do one at a time
19.Create large chunks of time: Organize your day around
large blocks of time to concentrate and focus
20.Develop a sense of urgency: Move fast on your key
tasks – be known to do things quickly and well
Eat the Frog!
(Take Action!)
Attention Management
Here are 21 great ways to stop procrastinating
and get things done faster…cont.
21.Single handle every task: set clear priorities, start
immediately on your most important task, and then work
without stopping until the job is 100% complete…
This is the real key to high performance
and maximum personal productivity
Lastly…
Time + Attention Management
 Manage Yourself
 Schedule Priorities
 Focus and Don’t get distracted
 Use the Time Management Matrix to
prioritize and determine what warrants your
attention and resources
 Look for ways to break down the task and
simplify
 Align your priorities with your leader
 Plan your day in advance
 Prepare thoroughly before you begin a task
 Have a sense of Urgency
 Manage prioritized tasks and follow through
on your commitments
 Accept only necessary distractions – Q1/Q2
 Manage Yourself and provide guidelines for your
team
 Set clear priorities for you and your team
 Work with your team to respond and put out fires
immediately
 Help your team live in Q2 as much as possible
 Always be open, honest and be provide clear
direction regarding priorities
 Plan your day in advance and know what your
team’s day looks like
 Help prioritize and ensure follow through of
completion through to the end for your team
 Guard your team against organizational
distractions – Only change course when
necessary
Time + Attention Management
 Learn why Time + Attention Management can
be easy or difficult
 Learn the Time Management Matrix to better
understand and improve our Time + Attention
Management skills
 Learn steps to overcome procrastination –
Eat that Frog
So, did we…?
Time + Attention Management
Additional Resources…
 The 7 Habits of Highly Effective People: Powerful
Lessons in Personal Change
Stephen R. Covey
 The Oz Principle: Getting Results Through Individual +
Organizational Accountability
Roger Connors, Tom Smith and Craig Hickman
 Eat That Frog: 21 Great Ways to Stop Procrastinating
and Get More Done in Less Time
Brian Tracy

LinkedIn Time + Attention Management

  • 1.
    Time + AttentionManagement KIK Custom Products Leadership Training What you will learn today… You will learn Time + Attention Management skills to apply and be more efficient + effective every day
  • 2.
    Time + AttentionManagement Learning Objectives…  Learn why Time + Attention Management can be easy or difficult  Learn the Time Management Matrix to better understand and improve our Time + Attention Management skills  Learn steps to overcome procrastination – Eat that Frog
  • 3.
    Time + AttentionManagement “Time management” is really a misnomer – the challenge is not to manage time, but manage ourselves. The key is not to prioritize what’s on your schedule, but to schedule your priorities.” Stephen Covey
  • 4.
    So, what doesTime + Attention Management mean to you? Time can’t be managed…It just is. So, time management is really about managing our attention. Time + Attention Management
  • 5.
    Staying focused onthe task at hand is more difficult than ever. There are… • Open Workspaces • Tons of Media Sources vying for our attention • Individuals acting in crisis mode all the time Time + Attention Management What do you think is the #1 enemy of Attention Management? Distractions
  • 6.
    What are somecategories of Distractions? • Self • People • Organizational Time + Attention Management Some distractions are ok/good, but need to be managed All distractions should fall into Q2/Q1 of the matrix; and if not, re-evaluate
  • 7.
     Groups of3:  a distractor  an employee trying to work or have a conversation  an observer/other conversationalist Role Play Distractions The employee’s goal is to try and tactfully diffuse the distraction
  • 8.
    Stephen Covey’s book,The 7 Habits of Highly Effective People, provide us with the Time Management Matrix. It will help us prioritize and determine which activities best warrant our attention and resources… The 7 Habits of Highly Effective People It provides the judgment as to whether activities are URGENT, IMPORTANT, BOTH or NEITHER. This is crucial for good time management.
  • 9.
  • 10.
    Time Management Matrix Urgent+ Important: These are real major emergencies and crisis issues, significant demands for information from superiors or customers, project work with imminent deadlines, meetings and appointments, reports and other submissions, staff issues or needs, problem resolution, fire-fighting fixes, and serious urgent complaints.
  • 11.
    Time Management Matrix Urgent+ Important: DO NOW (Vying for immediate attention and critical to your success and/or of the organization.) What to do: • Subject to confirming the importance of these tasks, do this task now… • Prioritize tasks according to their relative urgency • If 2 or more tasks are equally urgent, ask what the needed requirements are from the person requesting the task • Look for ways to break the task down to simplify • Plan this task in quadrant 2 for next time
  • 12.
    Time Management Matrix NotUrgent, but Important: Activities that fall into this quadrant include: planning an preparation; project planning and scheduling; research and investigation; networking, relationship building, thinking and creating; modelling, designing, and testing; systems and process development; anticipative, preventative activities or communication.
  • 13.
    Time Management Matrix NotUrgent, but Important: PLAN TO DO These tasks are most important yet neglected: • Plan time-slots for doing these • Break big tasks down to separate logical stages • Use project management tools and methods • Inform other people of your planned time-slots and schedules: Having a visual schedule is key. (not “in your face” but critical to your success and/or that of your organization)
  • 14.
    Time Management Matrix Urgent,but not Important This quadrant houses trivial and “off-loaded” requests from others, apparent emergencies, ad-hoc interruptions, misunderstandings appearing as complaints, irrelevant distractions, pointless routines or activities, dealing with accumulated unresolved trivia, duplicated effort, unnecessary double-checking, and the boss’s whims or tantrums. Scrutinize these demands and help originators, even your boss, to re-assess the real importance of these tasks.
  • 15.
    Time Management Matrix Urgent,but not Important: REJECT (Diplomatically) These tasks are tricky: • Practice and develop your ability to explain why you can’t • Where possible, reject and avoid these tasks immediately • Look for causes of repeating demands, so you can stop it • Educate and train others to manage their own time and priorities, so you don’t end up getting involved • Question old policies and assumptions to see if they still are valid (“in your face” – but not important to your success and/or that of the organization.)
  • 16.
    Time Management Matrix NeitherUrgent nor Important: Finally, Q4 contains the many unnecessary and unchallenged routines, “comfort” activities; computer games, net surfing, excessive breaks, chatting and gossip (face to face and phone); social and domestic communications; silly emails and text messages; daydreaming and doodling; interrupting others; tidying, changing screen savers, internet and YouTube surfing; drink and drug abuse; aimless travel and driving.
  • 17.
    Time Management Matrix NeitherUrgent nor Important: RESIST + CEASE These tasks are unnecessary + are usually unchallenged: • These activities have no positive outcomes • Often they may be stress related, so find the root cause • Have a clear structure or schedule of tasks for each day in quadrant 2 to remove the temptation • These activities are not tasks and provide a refuge from the effort of discipline (the real time wasters – not vying for immediate attention and not important to success)
  • 18.
  • 19.
    Q-1 Q-2 Q-3 Q-4 Time Management Matrix Nowit’s time to build your own Time Management Matrix based on an average work day here at KIK. Take the tasks and prioritize them in the correct quadrants:  Daily Tasks…  Typical fire-fighting…  Typical interruptions…  Unexpected items…  Leadership needs…  Direct Boss needs… Do Now. Plan to Do. Reject (nicely). Resist + Cease.
  • 20.
    Proactive vs Reactive AttentionManagement Being Proactive means thinking ahead and planning how to head off or deal with problems before they arise Being Reactive means that you respond to problems after they occur Reactive items live in Q-1 Proactive items live in You should spend more time in Q2 instead of Q1…
  • 21.
    Attention Management What doesAttention Management to you? Attention management increases the ability to focus attention. Four areas of Attention  Intentional: plan strategically and prioritize  Responsive: responds and puts out fires  Interrupted: too much time answering messages and doing non-valued added work  Unproductive: waste time at work…Facebook, chatting a lot… Attention Management
  • 22.
    So, how canwe manage our attention better? Eat the Frog! (Take Action!) Attention Management “Eat that Frog*” is a metaphor for tackling the most challenging task of your day – the one you are most likely to procrastinate on, but also probably the one that can have the greatest positive impact *Adapted from the book, Eat That Frog! 21 Great Ways to Stop Procrastinating and Get more Done in Less Time – Brian Tracy
  • 23.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster… 1. Set the table: Write out your goals and objectives 2. Plan every day in advance: every minute planning can save you 5 or 10 minutes in execution 3. Apply the 80/20 rule: 20% of your activities will account for 80% of your results 4. Consider the consequences: most important tasks and priorities can have the most serious consequences – focus on these above all else
  • 24.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster…cont. 5. Practice creative procrastination: learn to deliberately put off tasks that are low value 6. Use the A B C D E Method: take a few moments to prioritize on your most important activities  This is the best method for setting priorities on your list once you have determined your major goals or objectives - You place one of those letters in the margin before each of the tasks on your list before you begin
  • 25.
    Eat the Frog! (TakeAction!) Attention Management The A B C D E Method… “A” = “very important;” something you must do “B” = “important;” something you should do “C” = “nice to do;” but which are not as important as ‘A’ or ‘B,’ tasks “D” = “delegate” “E” = “eliminate, whenever possible” When you use the A B C D E method, you can very easily sort out what is important and unimportant - then focus your time and attention on those items on your list that are most essential for you to do
  • 26.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster…cont. 7. Focus on key results: Identify and determine the results necessary to get your job done well 8. The Law of 3: Identify 3 things that account for 90% of your contribution and get them done first 9. Prepare thoroughly before you begin: have everything you need at hand before you start
  • 27.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster…cont. 10.Eat the frog one bite at a time: you can accomplish the biggest task one bite at a time 11.Upgrade your key skills: the more skilled you are the faster you start and the sooner you get them done 12.Leverage your special talents: Know your strengths and throw your whole heart into what you do well
  • 28.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster…cont. 13.Identify your key constraints: determine the bottlenecks, internal and external - focus on alleviating them 14.Put pressure on yourself: think you’re going on vacation and you have to get your tasks completed before 15.Maximize your personal power: get lots of rest so you can perform your best 16.Motivate yourself into action: look for the good in every situation – always be optimistic and constructive
  • 29.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster…cont. 17.Technology time sinks: use technology to improve the quality of your communication, but not a slave to it 18.Slice and dice the task: break complex tasks down into bite-sized pieces and do one at a time 19.Create large chunks of time: Organize your day around large blocks of time to concentrate and focus 20.Develop a sense of urgency: Move fast on your key tasks – be known to do things quickly and well
  • 30.
    Eat the Frog! (TakeAction!) Attention Management Here are 21 great ways to stop procrastinating and get things done faster…cont. 21.Single handle every task: set clear priorities, start immediately on your most important task, and then work without stopping until the job is 100% complete… This is the real key to high performance and maximum personal productivity Lastly…
  • 31.
    Time + AttentionManagement  Manage Yourself  Schedule Priorities  Focus and Don’t get distracted  Use the Time Management Matrix to prioritize and determine what warrants your attention and resources  Look for ways to break down the task and simplify  Align your priorities with your leader  Plan your day in advance  Prepare thoroughly before you begin a task  Have a sense of Urgency  Manage prioritized tasks and follow through on your commitments  Accept only necessary distractions – Q1/Q2  Manage Yourself and provide guidelines for your team  Set clear priorities for you and your team  Work with your team to respond and put out fires immediately  Help your team live in Q2 as much as possible  Always be open, honest and be provide clear direction regarding priorities  Plan your day in advance and know what your team’s day looks like  Help prioritize and ensure follow through of completion through to the end for your team  Guard your team against organizational distractions – Only change course when necessary
  • 32.
    Time + AttentionManagement  Learn why Time + Attention Management can be easy or difficult  Learn the Time Management Matrix to better understand and improve our Time + Attention Management skills  Learn steps to overcome procrastination – Eat that Frog So, did we…?
  • 33.
    Time + AttentionManagement Additional Resources…  The 7 Habits of Highly Effective People: Powerful Lessons in Personal Change Stephen R. Covey  The Oz Principle: Getting Results Through Individual + Organizational Accountability Roger Connors, Tom Smith and Craig Hickman  Eat That Frog: 21 Great Ways to Stop Procrastinating and Get More Done in Less Time Brian Tracy

Editor's Notes

  • #2 So, let’s get to learnin’!
  • #8 Divide group into groups of 3. There will be a distractor, an employee trying to work or have a conversation, and an observer/conversationalist.
  • #10 Urgent + Important = Q1 = Urgent Not Urgent + Important = Q2 = Important Urgent + Not Important = Q3 = Both Not Urgent + Not Important = Q4 = Neither
  • #19 Every task or goal that you have should fall into one of these quadrants. Writing them down and prioritizing will not only help you manage your time, but more importantly manages your attention to get things done. Urgent + Important = Q1 =Urgent Not Urgent + Important = Q2 = Important Urgent + Not Important = Q3 = Both Not Urgent + Not Important = Q4 = Neither
  • #20 Keep this open discussion for the 20-25 minute activity. Flip chart it out. Have 30 daily tasks that need to be organized. Have the 30 tasks listed, and a large Time Management Matrix to write on. Break the group into 4 separate groups. Allow them time for open discussion to determine what task goes where. Recap to see if there are any differences and discuss them.