SlideShare a Scribd company logo
1 of 2
[Type text]
JSA FOR Radiography work
PROJECT - NISSAN (2ASDU)
DATE OF PREPARATION – 20/01/2014
S.No Scope of Activity Hazard Control measures Request by
1) Workingareaand
workpermit
Checksafeworkingconditionofall
surroundingworkarea
Personal Safety
Checkallworkareaandnotifyotheractivities.*
Obtainworkpermitifrequired.*
PPE (Safety Helmet, Shoes, PersonalMonitoring)*
Liaise with QA/QC Dept. to have all prefabricatedjoints
2) Prior to Radiographic
Operation
* Public Safety Proper Staging with Life Line for Radiographic if doing on
elevated place.* Subcontractor shall provide advance Schedule
of the on planned activities to SECL.* Access Road to specific
exposure area shall becordoned off with yellow rope, radiation
warningsignboard and in warning light to be displayed
3) Handling of
RadiographicMaterial
s
Personal Safety*
Public Safety
Only approved personal with badge shall handle /operate
Radiographic projector.* The personnel shall always work
with safetyprinciple of " Time shielding and distance"*
Monitor the dosi level with radiation survey meter * Ensure
that the specific exposure area is clearedof unauthorized
person and monitor the controlledarea to prevent unauthorized
entry
Completion of
Exposure /Operation
Source not return to
shieldposition
Monitor the dosi level after retracting thesource into the
projector.* Check the projector and ensure that the sourcehas
been returned and in locked position.* Ensure that the
radiographic equipment has beenremoved from site and inform
the safetydepartment and security on the work completion.
Movement within site * Lost of equipment*
Isotope drop-out
The radiographic projector shall never be leftunattended and it
shall always be monitor byapprovedagencycompetentperson.*
Ensure that the isotope is in locked position prior to moving
the projector
. Emergency * Fire at Site* Accident
at Site (Personnel)*
Accident at Site
(Equipment
* Ensure that the isotope is retracted and in lockedposition.*
Removedtheprojector,boundaryandwarningsigns for rescue team.*
Attend to injuries and if further treatment isrequire, ceased
operation and inform safety officer/security .* Try retract
isotope back into projector andmonitor with the survey meter
[Type text]
JSA FOR Radiography work
PROJECT - NISSAN (2ASDU)
DATE OF PREPARATION – 20/01/2014
if the isotope isjammed,carryoutemergencyprocedures.* Notify
details to safety dept. as soon as possible
Storage of
radiographic
Projector
Public safety /
unauthorizedhandling /
lost
The source pit shall meet project approvedprocedure
requirements.* Radiographic projector when not in use, shall
bekept safely in the source pit that is approved byPMC /
SECL.* The source pit shall always be locked.* Movement of
projector from source pit (in/out)shall be recorded by PMC /
SECL approvedpersonnel.* Entry and handling shall be
permitted only byIOCL / EIL approved agency personnel

More Related Content

What's hot

252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
DusanJankovic8
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
Phạm Thành
 
2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
VISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docx
VISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docxVISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docx
VISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docx
Dwarika Bhushan Sharma
 

What's hot (20)

OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and MachineryOSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
Struck by caught between in Construction by Delaware Department of Labor
Struck by caught between in Construction by Delaware Department of LaborStruck by caught between in Construction by Delaware Department of Labor
Struck by caught between in Construction by Delaware Department of Labor
 
JSA For Work at Height.docx
JSA For Work at Height.docxJSA For Work at Height.docx
JSA For Work at Height.docx
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Scaffolding checklist
Scaffolding checklistScaffolding checklist
Scaffolding checklist
 
2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
VISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docx
VISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docxVISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docx
VISITOR SAFETY INDUCTION Form # HSEQ - VSI Rev 2 - S.docx
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdf
 
mock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bitemock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bite
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 

Similar to JSA FOR Radiography work.docx

Site_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdfSite_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdf
ObijiakuIjeoma
 
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
AnatoliZ
 

Similar to JSA FOR Radiography work.docx (20)

JSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdfJSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdf
 
TBR - MSCL Piping Installation shutdown 2023.docx
TBR - MSCL Piping Installation shutdown 2023.docxTBR - MSCL Piping Installation shutdown 2023.docx
TBR - MSCL Piping Installation shutdown 2023.docx
 
Safety in Radiography.pdf
Safety in Radiography.pdfSafety in Radiography.pdf
Safety in Radiography.pdf
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
 
Site_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdfSite_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdf
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
JHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdf
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
FARC nº 21 – 4G1. TD01B - AAA.docx
FARC nº 21 – 4G1. TD01B - AAA.docxFARC nº 21 – 4G1. TD01B - AAA.docx
FARC nº 21 – 4G1. TD01B - AAA.docx
 
Pressure testing
Pressure testingPressure testing
Pressure testing
 
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 

Recently uploaded

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

JSA FOR Radiography work.docx

  • 1. [Type text] JSA FOR Radiography work PROJECT - NISSAN (2ASDU) DATE OF PREPARATION – 20/01/2014 S.No Scope of Activity Hazard Control measures Request by 1) Workingareaand workpermit Checksafeworkingconditionofall surroundingworkarea Personal Safety Checkallworkareaandnotifyotheractivities.* Obtainworkpermitifrequired.* PPE (Safety Helmet, Shoes, PersonalMonitoring)* Liaise with QA/QC Dept. to have all prefabricatedjoints 2) Prior to Radiographic Operation * Public Safety Proper Staging with Life Line for Radiographic if doing on elevated place.* Subcontractor shall provide advance Schedule of the on planned activities to SECL.* Access Road to specific exposure area shall becordoned off with yellow rope, radiation warningsignboard and in warning light to be displayed 3) Handling of RadiographicMaterial s Personal Safety* Public Safety Only approved personal with badge shall handle /operate Radiographic projector.* The personnel shall always work with safetyprinciple of " Time shielding and distance"* Monitor the dosi level with radiation survey meter * Ensure that the specific exposure area is clearedof unauthorized person and monitor the controlledarea to prevent unauthorized entry Completion of Exposure /Operation Source not return to shieldposition Monitor the dosi level after retracting thesource into the projector.* Check the projector and ensure that the sourcehas been returned and in locked position.* Ensure that the radiographic equipment has beenremoved from site and inform the safetydepartment and security on the work completion. Movement within site * Lost of equipment* Isotope drop-out The radiographic projector shall never be leftunattended and it shall always be monitor byapprovedagencycompetentperson.* Ensure that the isotope is in locked position prior to moving the projector . Emergency * Fire at Site* Accident at Site (Personnel)* Accident at Site (Equipment * Ensure that the isotope is retracted and in lockedposition.* Removedtheprojector,boundaryandwarningsigns for rescue team.* Attend to injuries and if further treatment isrequire, ceased operation and inform safety officer/security .* Try retract isotope back into projector andmonitor with the survey meter
  • 2. [Type text] JSA FOR Radiography work PROJECT - NISSAN (2ASDU) DATE OF PREPARATION – 20/01/2014 if the isotope isjammed,carryoutemergencyprocedures.* Notify details to safety dept. as soon as possible Storage of radiographic Projector Public safety / unauthorizedhandling / lost The source pit shall meet project approvedprocedure requirements.* Radiographic projector when not in use, shall bekept safely in the source pit that is approved byPMC / SECL.* The source pit shall always be locked.* Movement of projector from source pit (in/out)shall be recorded by PMC / SECL approvedpersonnel.* Entry and handling shall be permitted only byIOCL / EIL approved agency personnel