JSA-Piling or Concreting for Foundations & Building
1. JSA-Piling or Concreting for Foundations & Building
Sr. Activity Potential Hazards Control Measures
1.
Mobilization of equipment &
Materials
1.Involvement of unskilled personnel
2.Piling machine hit with plant/equipment & structures
3.Unauthorised/ uninspected equipment/tools at site
4.Personnel injury/property damage
5.Overhead structures/pipe racks
6.Slip, Trip & Fall
7.Inclement weather condition
Trained & skilled staff to be authorized for working
Ensure JSA briefing & Daily TBT to all workforce before commencing the
activity
Use of authorized & designated routes
Only inspected Equipment/Tools must be allowed at the worksite
Use the right tools for the right job
Ensure safe transportation of equipment/materials at the worksite
Avoid throwing of materials
All of the materials to be secured while its transportation to work site
Ensure a safe distance of piling machine from overhead structures/pipe racks
Water sprinkling to be carried out on regular biases to avoid dust
Take care of overhead structure/pipe racks
Keep access/walkways always clear from any obstruction
Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
Restrict movement of heavy vehicles/equipment in rain/fog
2. Piling with Piling Machine 1.Uncertified piling Machine & Operator,
2.Personnel hit by the movement of the piling machine,
3.Working in live areas
4.Sling broken, load drop
5.Slip, Trip & Fall
6.Inclement weather condition
7.Fire & explosion
Pile machine & its operator should be certified
Banks man should be available at the site to control the movement of heavy
vehicles/equipment
Keep away all unauthorized people during movement of heavy vehicle/equipment
Be careful of nearby live areas
Ensure Close HSE monitoring /supervision
Ensure proper & inspected accessories being used for drilling
Ensure that drilling bit is properly fixed with locking pins
Keep away during the drilling operation
the working area should properly be barricaded
JSA-Piling or Concreting for Foundations & Building
Project/Facility: Reference No:
Client: Date of Assessments:
Assessed by: Date of Next Assessment:
Reviewed by: Approved by:
Activity: JSA-Piling or Concreting for Foundations & Building
Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs &
Emergency contact numbers to be in place at the job location
Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard
identified by any of the working team members during the job, the JSA review process should be carried on.
2. JSA-Piling or Concreting for Foundations & Building
Ensure proper stacking of all materials at the site
Keep access/walkways always clear from any obstruction
Ensure proper housekeeping of the workplace all the time
Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
Restrict movement of heavy vehicles/equipment in rain/fog
Ensure availability of inspected fire extinguishers at site
Conduct proper gas test before start job
Flame arrestor to be installed in all vehicles/equipment
3. Lowering of Steel Cage
structure & Concreting of
piles
1.Personnel hand injury while handling with steel
2.People under a suspended load
3.Unbalancing of load
4.Miscommunication between operator & signalman
5.Improper signalling during lowering of the steel cage
structure
6.Inappropriate PPE’s/Tools during concrete work
7.Skin contact with concrete or other chemicals
Ensure the Involvement of skilled labour
Ensure use of proper PPE’s
Deliver TBT before commencing work
Ensure use of inspected & colour coded hand tools & rigging accessories
The area should be properly barricaded during lifting operations
Ensure proper stacking of all materials at the worksite
Maintain good housekeeping all the time
Use of appropriate PPE’s during concrete
Ensure use of inspected tools for the right job
Availability of freshwater at site
4. Working at night shift hours 1.Poor visibility at night hours
2.Vehicles/equipment hit with people, equipment or
structure
3.Slip, trip & fall
Ensure proper lighting arrangement for late-night working hours
Careful movement of vehicles/equipment in night hours
Place refection tapes at hard barriers, structures
Banks men should wear high visibility reflection vests
No working should be allowed in poor lighting conditions
Ensure proper housekeeping to avoid tripping