JSA-Piling or Concreting for Foundations & Building

JSA-Piling or Concreting for Foundations & Building
Sr. Activity Potential Hazards Control Measures
1.
Mobilization of equipment &
Materials
1.Involvement of unskilled personnel
2.Piling machine hit with plant/equipment & structures
3.Unauthorised/ uninspected equipment/tools at site
4.Personnel injury/property damage
5.Overhead structures/pipe racks
6.Slip, Trip & Fall
7.Inclement weather condition
 Trained & skilled staff to be authorized for working
 Ensure JSA briefing & Daily TBT to all workforce before commencing the
activity
 Use of authorized & designated routes
 Only inspected Equipment/Tools must be allowed at the worksite
 Use the right tools for the right job
 Ensure safe transportation of equipment/materials at the worksite
 Avoid throwing of materials
 All of the materials to be secured while its transportation to work site
 Ensure a safe distance of piling machine from overhead structures/pipe racks
 Water sprinkling to be carried out on regular biases to avoid dust
 Take care of overhead structure/pipe racks
 Keep access/walkways always clear from any obstruction
 Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
 Restrict movement of heavy vehicles/equipment in rain/fog
2. Piling with Piling Machine 1.Uncertified piling Machine & Operator,
2.Personnel hit by the movement of the piling machine,
3.Working in live areas
4.Sling broken, load drop
5.Slip, Trip & Fall
6.Inclement weather condition
7.Fire & explosion
 Pile machine & its operator should be certified
 Banks man should be available at the site to control the movement of heavy
vehicles/equipment
 Keep away all unauthorized people during movement of heavy vehicle/equipment
 Be careful of nearby live areas
 Ensure Close HSE monitoring /supervision
 Ensure proper & inspected accessories being used for drilling
 Ensure that drilling bit is properly fixed with locking pins
 Keep away during the drilling operation
 the working area should properly be barricaded
JSA-Piling or Concreting for Foundations & Building
Project/Facility: Reference No:
Client: Date of Assessments:
Assessed by: Date of Next Assessment:
Reviewed by: Approved by:
Activity: JSA-Piling or Concreting for Foundations & Building
Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs &
Emergency contact numbers to be in place at the job location
Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard
identified by any of the working team members during the job, the JSA review process should be carried on.
JSA-Piling or Concreting for Foundations & Building
 Ensure proper stacking of all materials at the site
 Keep access/walkways always clear from any obstruction
 Ensure proper housekeeping of the workplace all the time
 Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
 Restrict movement of heavy vehicles/equipment in rain/fog
 Ensure availability of inspected fire extinguishers at site
 Conduct proper gas test before start job
 Flame arrestor to be installed in all vehicles/equipment
3. Lowering of Steel Cage
structure & Concreting of
piles
1.Personnel hand injury while handling with steel
2.People under a suspended load
3.Unbalancing of load
4.Miscommunication between operator & signalman
5.Improper signalling during lowering of the steel cage
structure
6.Inappropriate PPE’s/Tools during concrete work
7.Skin contact with concrete or other chemicals
 Ensure the Involvement of skilled labour
 Ensure use of proper PPE’s
 Deliver TBT before commencing work
 Ensure use of inspected & colour coded hand tools & rigging accessories
 The area should be properly barricaded during lifting operations
 Ensure proper stacking of all materials at the worksite
 Maintain good housekeeping all the time
 Use of appropriate PPE’s during concrete
 Ensure use of inspected tools for the right job
 Availability of freshwater at site
4. Working at night shift hours 1.Poor visibility at night hours
2.Vehicles/equipment hit with people, equipment or
structure
3.Slip, trip & fall
 Ensure proper lighting arrangement for late-night working hours
 Careful movement of vehicles/equipment in night hours
 Place refection tapes at hard barriers, structures
 Banks men should wear high visibility reflection vests
 No working should be allowed in poor lighting conditions
 Ensure proper housekeeping to avoid tripping
1 of 2

Recommended

risk assessment - pile cap.pdf by
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
586 views4 slides
JHA HEAVY LIFTING OF VESSEL.pdf by
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfHaroon AbdulRahim
12 views11 slides
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH BASF DAHEJ GUJARAT.pdf by
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH  BASF DAHEJ GUJARAT.pdfHAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH  BASF DAHEJ GUJARAT.pdf
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH BASF DAHEJ GUJARAT.pdfMohsinKhan281076
251 views6 slides
Methodstatement welding by
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
10.9K views9 slides
Mawaz CV by
Mawaz CVMawaz CV
Mawaz CVMawaz Akhter
240 views5 slides
update 20feb1 by
update 20feb1update 20feb1
update 20feb1CHRISTOPHER Rickie CHRISTIE
149 views6 slides

More Related Content

Similar to JSA-Piling or Concreting for Foundations & Building

Project by
ProjectProject
ProjectKhurram Shahzad
176 views25 slides
Turn Key Group Services - OHS Toolkit by
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkitturnkeygroupservices
1.1K views37 slides
Plant ; equipment dismantling of scaffold by
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldBimal Chandra Das
211 views3 slides
Lifting equipment at work by
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
5.2K views36 slides
AHU.pdf by
AHU.pdfAHU.pdf
AHU.pdfSyedMoazzamAliAli1
35 views6 slides
LPG Chloride treaters foundation execution_Rev.00.pdf by
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
12 views6 slides

Similar to JSA-Piling or Concreting for Foundations & Building (20)

Plant ; equipment dismantling of scaffold by Bimal Chandra Das
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
Bimal Chandra Das211 views
Lifting equipment at work by Paul Smith
Lifting equipment at workLifting equipment at work
Lifting equipment at work
Paul Smith5.2K views
LPG Chloride treaters foundation execution_Rev.00.pdf by JESUSBASILIOANTONIO
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
Construction safety lecture-3 by Saleem Malik
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
Saleem Malik1.4K views
150 Question Answers | Occupational Health & Safety by Muhammad Usman
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
Muhammad Usman24.7K views
Safety protocols of construction site.pptx by Zeeshan Yousaf
Safety protocols of construction site.pptxSafety protocols of construction site.pptx
Safety protocols of construction site.pptx
Zeeshan Yousaf8 views
7 Falsework (Temporary Works) Risk Assessment Templates.docx by Dwarika Bhushan Sharma
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
Demolition of existing boiler house by AnatoliZ
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
AnatoliZ3.8K views
Excavations ppt by Colleen True
Excavations pptExcavations ppt
Excavations ppt
Colleen True45.4K views
Excavations by FFSafety
ExcavationsExcavations
Excavations
FFSafety1.7K views
Jha rock drill use and maintenance romo by nafable
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
nafable1.2K views
hot works for construction of temporary facilities by Fãrük Ñäzmî
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
Fãrük Ñäzmî910 views

Recently uploaded

2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx by
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptxlwang78
83 views19 slides
Proposal Presentation.pptx by
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptxkeytonallamon
42 views36 slides
Generative AI Models & Their Applications by
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their ApplicationsSN
8 views1 slide
CHEMICAL KINETICS.pdf by
CHEMICAL KINETICS.pdfCHEMICAL KINETICS.pdf
CHEMICAL KINETICS.pdfAguedaGutirrez
13 views337 slides
Codes and Conventions.pptx by
Codes and Conventions.pptxCodes and Conventions.pptx
Codes and Conventions.pptxIsabellaGraceAnkers
9 views5 slides
Introduction to CAD-CAM.pptx by
Introduction to CAD-CAM.pptxIntroduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptxsuyogpatil49
5 views15 slides

Recently uploaded(20)

2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx by lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang7883 views
Generative AI Models & Their Applications by SN
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their Applications
SN8 views
Introduction to CAD-CAM.pptx by suyogpatil49
Introduction to CAD-CAM.pptxIntroduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptx
suyogpatil495 views
Design_Discover_Develop_Campaign.pptx by ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth632 views
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) by Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
MSA Website Slideshow (16).pdf by msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla76 views
GDSC Mikroskil Members Onboarding 2023.pdf by gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil53 views
Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ... by AltinKaradagli
Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ...Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ...
Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ...
AltinKaradagli12 views
Instrumentation & Control Lab Manual.pdf by NTU Faisalabad
Instrumentation & Control Lab Manual.pdfInstrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdf
NTU Faisalabad 6 views
SUMIT SQL PROJECT SUPERSTORE 1.pptx by Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 15 views
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... by csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn5 views

JSA-Piling or Concreting for Foundations & Building

  • 1. JSA-Piling or Concreting for Foundations & Building Sr. Activity Potential Hazards Control Measures 1. Mobilization of equipment & Materials 1.Involvement of unskilled personnel 2.Piling machine hit with plant/equipment & structures 3.Unauthorised/ uninspected equipment/tools at site 4.Personnel injury/property damage 5.Overhead structures/pipe racks 6.Slip, Trip & Fall 7.Inclement weather condition  Trained & skilled staff to be authorized for working  Ensure JSA briefing & Daily TBT to all workforce before commencing the activity  Use of authorized & designated routes  Only inspected Equipment/Tools must be allowed at the worksite  Use the right tools for the right job  Ensure safe transportation of equipment/materials at the worksite  Avoid throwing of materials  All of the materials to be secured while its transportation to work site  Ensure a safe distance of piling machine from overhead structures/pipe racks  Water sprinkling to be carried out on regular biases to avoid dust  Take care of overhead structure/pipe racks  Keep access/walkways always clear from any obstruction  Stop work in case of any inclement weather conditions (rain, storm, fog etc.)  Restrict movement of heavy vehicles/equipment in rain/fog 2. Piling with Piling Machine 1.Uncertified piling Machine & Operator, 2.Personnel hit by the movement of the piling machine, 3.Working in live areas 4.Sling broken, load drop 5.Slip, Trip & Fall 6.Inclement weather condition 7.Fire & explosion  Pile machine & its operator should be certified  Banks man should be available at the site to control the movement of heavy vehicles/equipment  Keep away all unauthorized people during movement of heavy vehicle/equipment  Be careful of nearby live areas  Ensure Close HSE monitoring /supervision  Ensure proper & inspected accessories being used for drilling  Ensure that drilling bit is properly fixed with locking pins  Keep away during the drilling operation  the working area should properly be barricaded JSA-Piling or Concreting for Foundations & Building Project/Facility: Reference No: Client: Date of Assessments: Assessed by: Date of Next Assessment: Reviewed by: Approved by: Activity: JSA-Piling or Concreting for Foundations & Building Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs & Emergency contact numbers to be in place at the job location Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard identified by any of the working team members during the job, the JSA review process should be carried on.
  • 2. JSA-Piling or Concreting for Foundations & Building  Ensure proper stacking of all materials at the site  Keep access/walkways always clear from any obstruction  Ensure proper housekeeping of the workplace all the time  Stop work in case of any inclement weather conditions (rain, storm, fog etc.)  Restrict movement of heavy vehicles/equipment in rain/fog  Ensure availability of inspected fire extinguishers at site  Conduct proper gas test before start job  Flame arrestor to be installed in all vehicles/equipment 3. Lowering of Steel Cage structure & Concreting of piles 1.Personnel hand injury while handling with steel 2.People under a suspended load 3.Unbalancing of load 4.Miscommunication between operator & signalman 5.Improper signalling during lowering of the steel cage structure 6.Inappropriate PPE’s/Tools during concrete work 7.Skin contact with concrete or other chemicals  Ensure the Involvement of skilled labour  Ensure use of proper PPE’s  Deliver TBT before commencing work  Ensure use of inspected & colour coded hand tools & rigging accessories  The area should be properly barricaded during lifting operations  Ensure proper stacking of all materials at the worksite  Maintain good housekeeping all the time  Use of appropriate PPE’s during concrete  Ensure use of inspected tools for the right job  Availability of freshwater at site 4. Working at night shift hours 1.Poor visibility at night hours 2.Vehicles/equipment hit with people, equipment or structure 3.Slip, trip & fall  Ensure proper lighting arrangement for late-night working hours  Careful movement of vehicles/equipment in night hours  Place refection tapes at hard barriers, structures  Banks men should wear high visibility reflection vests  No working should be allowed in poor lighting conditions  Ensure proper housekeeping to avoid tripping