D. Vasudevaraju
• Understanding difference between Routine versus Non-
routine lifts
• Hazards in Lifting activities
• AZDP Requirements
• Planning the lifting operations
• Roles & Responsibilities
• Method of slinging the load
• Examination testing & control
2
• Routine Lift
A lift can be categorized as routine if it is repetitive in nature and
involves loads that are similar in terms of shape & size.
• Non-Routine Lift
A lift refers to lifting operations that are complex, carried out for the
first time or lifting close to the lifting capacity of the crane.
3
• Lifting involved with more than one crane/Equipment.
• Lift of load without designated hooking points.
• Operator cant see the load.
• Lifting of people
• Lifting near existing buildings
• Operations of lifting equipment more than 75% of weight
capacity of lifting equipment etc.
4
- failure of lifting equipment;
- falling loads;
- workers being crushed by a moving load or lifting equipment.
- Soil Collapse
- Boom touching the power line
- Fall from height while assisting lifting operations by standing at
height above floor level
5
Equipment failure Falling Objects Collision
Boom touching
power lines
6
■ Overloading
■ Uneven or unstable ground
■ Failure to use the outriggers
■ High winds
■ Extending the jib of the crane too far
out
■ Structural failure of parts
7
Improper rigging can lead to
falling loads
8
 A lifting plan must be prepared, checked and issued by competent authorised
persons prior to any lifting operation
 No person shall be positioned under any suspended load or between any
suspended load and fixed objects
 All equipment and accessories used for lifting operations must be uniquely
identified, marked with the safe working load, listed in a register, and subject to
formal regular inspections:
every 6 months minimum for accessories
every 12 months minimum for equipment
 All lifting equipment and accessories must have a valid manufacturer’s
certificate or thorough examination records.
9
 A formal documented risk assessment must be undertaken and communicated
to the persons performing any lifting operations
 Alstom must ensure that a designated leader is formally appointed to supervise
each work activity where there are lifting operations
 All persons preparing and issuing lifting plans must be subject to recorded
competence checks to ensure necessary training experience and qualification
 All persons involved in lifting operations must be subject to recorded
competence checks to ensure necessary training experience and qualification
prior to commencing work
 A Permit to Work must be established prior to any non-routine lifting operation
10
 Prior to commencing any non-routine lifting operation, an on-site recorded pre-
lift meeting, including toolbox talks, must be conducted to review the phases of
the operation using risk assessment, lifting plan and drawings as a basis.
 Prior to commencing any lifting operation, the designated leader responsible for
that operation must ensure that roles and responsibilities are clearly allocated
and communicated to each lifting team member, as defined by the lifting plan
 The communication method, as defined in the lifting plan, must be applied when
the lifting operation involves more than one person. Only the designated person
responsible will provide instructions to the lifting equipment operator. However,
the operator shall obey a stop signal at all times, no matter who gives it
 All defective, non-inspected or unidentified lifting accessories and equipment
must be either quarantined or destroyed
11
 All lifting accessories must be subject to a pre-use inspection by the user.
Powered lifting equipment must be subject to daily inspection.
 All lifting equipment and accessories must be stored and maintained in a correct
manner
 Evidence of the competency of the independent competent persons testing and
examining lifting equipment shall be provided.
12
Lifting Plan should be prepared, reviewed and issued
only by authorised competent persons and consider
below
1.The Weight Of The Load (Including Rigging)
2.The Size Of The Load
3.Available Head Room
4.Method Of Lifting
5.Selection Of The Appropriate Rigging
13
6. The Working Radius
7. Selection Of The Most Suitable Crane
8. Ground Compaction
9. Position Of Obstacles (If Any)
10. Packing/ Timbers To Land The Load On
11. Weather Conditions
12. Appropriate Level Of Permit To Work
13.All persons involved in lifting should be competent in their roles
14. TPI certificates & legal documents for Lifting equipment
14
All Discipline Engineers/Technicians are responsible for: Those
personnel who directly supervise any lifting operation are
responsible for ensuring that all materials are handled in a safe
and correct manner and in accordance with this Procedure.
Site Engineer/Supervisor Role:
Safety Officer /Engineer Role:
The HSE Officer /Engineers are responsible for monitoring
safe working practices on site
15
Lifting Supervisor Role:
• Competent & trained
• Confirm the weight of the load before rigging commences.
• Ensure the load is properly rigged and supervise the rigging crew.
• Ensure rigging material or equipment is correctly assembled.
• Ensure the safety of lifting crew and any others who may be affected.
• Ensure everyone is in a safe area before lifting.
• Carry out regular checks on any rigging/lifting equipment.
• Ensure hazardous areas properly barricaded.
• Issue a Permit to Work for non-routine lifts.
• Conduct pre-lift briefings.
• Ensure hands signals and communication are properly managed
16
• Competent and trained
• Respond to signals from lift supervisor
/banksman
• Respond to ALL stop signals.
• Know equipment and test controls
• Follow instruction (site/manufacturer).
• Ensure all lifting equipment is safe for use.
• Daily inspection through check list
• Be aware of other risks (electrical line).
• Be in control of the movement at all times.
Crane Operator Role:
17
Crane Operator Must NOT:
• Bypass any safety system.
• Leave a load suspended when unattended.
• Undertake a lifting operation if it is unsafe.
• Lift loads above people.
• Do anything that will distract their
attention.
18
• Attach & remove the lifting gears (slings, shackles, tag lines, etc.),
• Attend the tag lines of loads being lifted,
• Shall be medically fit, with particular regard to strength, agility, eyesight,
hearing & reflexes,
• Shall have received minimum training or shall have experience of lifting,
• Shall be able to select lifting gears suitable for the loads to be lifted,
• Shall be able to understand the language of the signalman.
Riggers Role
19
Signal Man:
• Supervises the lifting operations,
• Is responsible for the safety of the whole lifting operation,
• Shall have been trained in the job or shall be able to demonstrate his ability
& experience,
• Shall ensure the riggers operate safely and follow the basic rules for safe
lifting (use of tag lines, means of escape, safe location, etc.),
• Shall ensure that personnel not involved with the lifting operation is kept
well away,
• Shall keep visual or radio communication with the crane driver,
• Shall ensure that he is identified & fully understood by the crane driver and
by the riggers.
20
21
22
23
24
25
26
27
28
29
30
31
Whenever any sling is used, the following practices shall
be observed!
1.Slings that are damaged or defective shall not be used.
2.Slings shall not be shortened with knots or bolts or other
makeshift devices.
3.Sling legs shall not be kinked.
4.Slings shall not be loaded in excess of their rated capacity.
5.Slings used in a Basket Hitch shall have the load balanced to
prevent slippage.
6.Slings shall be securely attached to the load.
32
7.Slings shall be padded or protected from the sharp edges of
their loads.
8.Suspended loads shall be kept free of obstructions.
9.All employees shall be kept clear of loads about to be lifted
and of suspended loads.
10.Hands or fingers shall not be placed between the sling and
it’s load while the sling is being tightened around the load
11. Shock loading is prohibited.
12. A sling shall not be pulled from under a load when the
load is resting on the sling.
33
Examples of wire ropes sling to be removed from service
34
35
Examples of shackles to be removed from service
36
37
• Don’t allow any one under suspended load
or between suspended load and fixed
objects.
• Proper Lifting Plan
38
39

More Related Content

What's hot

Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpointJomish John
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptKamran Zafar
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
working at height
working at heightworking at height
working at heightJYOTHISHKT
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentationJulianElbu
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hightGaurav Singh Rajput
 

What's hot (20)

Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Toolbox Talk-Working at height
Toolbox Talk-Working at height Toolbox Talk-Working at height
Toolbox Talk-Working at height
 
Forklift training
Forklift training Forklift training
Forklift training
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Working at-height
Working at-height Working at-height
Working at-height
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Work At Height
Work At HeightWork At Height
Work At Height
 
working at height
working at heightworking at height
working at height
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 

Similar to Lifting Operation Safety ppt.pptx

Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryRamana Reddy G
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptxAizazFarhat3
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekRoseGaming1
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetyAtlantic Training, LLC.
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practicesViktor Bily
 
Rig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.docRig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.docYasserAbdulkareem1
 
How to handle the Crane & Lifting Safety Campaign.pptx
How to handle the Crane & Lifting Safety Campaign.pptxHow to handle the Crane & Lifting Safety Campaign.pptx
How to handle the Crane & Lifting Safety Campaign.pptxssuserc653e6
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 
Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment Manish Yadav
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sitesPrastowo Priyatmoko
 

Similar to Lifting Operation Safety ppt.pptx (20)

Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhek
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practices
 
Rig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.docRig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.doc
 
How to handle the Crane & Lifting Safety Campaign.pptx
How to handle the Crane & Lifting Safety Campaign.pptxHow to handle the Crane & Lifting Safety Campaign.pptx
How to handle the Crane & Lifting Safety Campaign.pptx
 
UTA_AST-Rigging.pptx
UTA_AST-Rigging.pptxUTA_AST-Rigging.pptx
UTA_AST-Rigging.pptx
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
Liffting supervisor
Liffting supervisorLiffting supervisor
Liffting supervisor
 
Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
 

Recently uploaded

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Lifting Operation Safety ppt.pptx

  • 2. • Understanding difference between Routine versus Non- routine lifts • Hazards in Lifting activities • AZDP Requirements • Planning the lifting operations • Roles & Responsibilities • Method of slinging the load • Examination testing & control 2
  • 3. • Routine Lift A lift can be categorized as routine if it is repetitive in nature and involves loads that are similar in terms of shape & size. • Non-Routine Lift A lift refers to lifting operations that are complex, carried out for the first time or lifting close to the lifting capacity of the crane. 3
  • 4. • Lifting involved with more than one crane/Equipment. • Lift of load without designated hooking points. • Operator cant see the load. • Lifting of people • Lifting near existing buildings • Operations of lifting equipment more than 75% of weight capacity of lifting equipment etc. 4
  • 5. - failure of lifting equipment; - falling loads; - workers being crushed by a moving load or lifting equipment. - Soil Collapse - Boom touching the power line - Fall from height while assisting lifting operations by standing at height above floor level 5
  • 6. Equipment failure Falling Objects Collision Boom touching power lines 6
  • 7. ■ Overloading ■ Uneven or unstable ground ■ Failure to use the outriggers ■ High winds ■ Extending the jib of the crane too far out ■ Structural failure of parts 7
  • 8. Improper rigging can lead to falling loads 8
  • 9.  A lifting plan must be prepared, checked and issued by competent authorised persons prior to any lifting operation  No person shall be positioned under any suspended load or between any suspended load and fixed objects  All equipment and accessories used for lifting operations must be uniquely identified, marked with the safe working load, listed in a register, and subject to formal regular inspections: every 6 months minimum for accessories every 12 months minimum for equipment  All lifting equipment and accessories must have a valid manufacturer’s certificate or thorough examination records. 9
  • 10.  A formal documented risk assessment must be undertaken and communicated to the persons performing any lifting operations  Alstom must ensure that a designated leader is formally appointed to supervise each work activity where there are lifting operations  All persons preparing and issuing lifting plans must be subject to recorded competence checks to ensure necessary training experience and qualification  All persons involved in lifting operations must be subject to recorded competence checks to ensure necessary training experience and qualification prior to commencing work  A Permit to Work must be established prior to any non-routine lifting operation 10
  • 11.  Prior to commencing any non-routine lifting operation, an on-site recorded pre- lift meeting, including toolbox talks, must be conducted to review the phases of the operation using risk assessment, lifting plan and drawings as a basis.  Prior to commencing any lifting operation, the designated leader responsible for that operation must ensure that roles and responsibilities are clearly allocated and communicated to each lifting team member, as defined by the lifting plan  The communication method, as defined in the lifting plan, must be applied when the lifting operation involves more than one person. Only the designated person responsible will provide instructions to the lifting equipment operator. However, the operator shall obey a stop signal at all times, no matter who gives it  All defective, non-inspected or unidentified lifting accessories and equipment must be either quarantined or destroyed 11
  • 12.  All lifting accessories must be subject to a pre-use inspection by the user. Powered lifting equipment must be subject to daily inspection.  All lifting equipment and accessories must be stored and maintained in a correct manner  Evidence of the competency of the independent competent persons testing and examining lifting equipment shall be provided. 12
  • 13. Lifting Plan should be prepared, reviewed and issued only by authorised competent persons and consider below 1.The Weight Of The Load (Including Rigging) 2.The Size Of The Load 3.Available Head Room 4.Method Of Lifting 5.Selection Of The Appropriate Rigging 13
  • 14. 6. The Working Radius 7. Selection Of The Most Suitable Crane 8. Ground Compaction 9. Position Of Obstacles (If Any) 10. Packing/ Timbers To Land The Load On 11. Weather Conditions 12. Appropriate Level Of Permit To Work 13.All persons involved in lifting should be competent in their roles 14. TPI certificates & legal documents for Lifting equipment 14
  • 15. All Discipline Engineers/Technicians are responsible for: Those personnel who directly supervise any lifting operation are responsible for ensuring that all materials are handled in a safe and correct manner and in accordance with this Procedure. Site Engineer/Supervisor Role: Safety Officer /Engineer Role: The HSE Officer /Engineers are responsible for monitoring safe working practices on site 15
  • 16. Lifting Supervisor Role: • Competent & trained • Confirm the weight of the load before rigging commences. • Ensure the load is properly rigged and supervise the rigging crew. • Ensure rigging material or equipment is correctly assembled. • Ensure the safety of lifting crew and any others who may be affected. • Ensure everyone is in a safe area before lifting. • Carry out regular checks on any rigging/lifting equipment. • Ensure hazardous areas properly barricaded. • Issue a Permit to Work for non-routine lifts. • Conduct pre-lift briefings. • Ensure hands signals and communication are properly managed 16
  • 17. • Competent and trained • Respond to signals from lift supervisor /banksman • Respond to ALL stop signals. • Know equipment and test controls • Follow instruction (site/manufacturer). • Ensure all lifting equipment is safe for use. • Daily inspection through check list • Be aware of other risks (electrical line). • Be in control of the movement at all times. Crane Operator Role: 17
  • 18. Crane Operator Must NOT: • Bypass any safety system. • Leave a load suspended when unattended. • Undertake a lifting operation if it is unsafe. • Lift loads above people. • Do anything that will distract their attention. 18
  • 19. • Attach & remove the lifting gears (slings, shackles, tag lines, etc.), • Attend the tag lines of loads being lifted, • Shall be medically fit, with particular regard to strength, agility, eyesight, hearing & reflexes, • Shall have received minimum training or shall have experience of lifting, • Shall be able to select lifting gears suitable for the loads to be lifted, • Shall be able to understand the language of the signalman. Riggers Role 19
  • 20. Signal Man: • Supervises the lifting operations, • Is responsible for the safety of the whole lifting operation, • Shall have been trained in the job or shall be able to demonstrate his ability & experience, • Shall ensure the riggers operate safely and follow the basic rules for safe lifting (use of tag lines, means of escape, safe location, etc.), • Shall ensure that personnel not involved with the lifting operation is kept well away, • Shall keep visual or radio communication with the crane driver, • Shall ensure that he is identified & fully understood by the crane driver and by the riggers. 20
  • 21. 21
  • 22. 22
  • 23. 23
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. Whenever any sling is used, the following practices shall be observed! 1.Slings that are damaged or defective shall not be used. 2.Slings shall not be shortened with knots or bolts or other makeshift devices. 3.Sling legs shall not be kinked. 4.Slings shall not be loaded in excess of their rated capacity. 5.Slings used in a Basket Hitch shall have the load balanced to prevent slippage. 6.Slings shall be securely attached to the load. 32
  • 33. 7.Slings shall be padded or protected from the sharp edges of their loads. 8.Suspended loads shall be kept free of obstructions. 9.All employees shall be kept clear of loads about to be lifted and of suspended loads. 10.Hands or fingers shall not be placed between the sling and it’s load while the sling is being tightened around the load 11. Shock loading is prohibited. 12. A sling shall not be pulled from under a load when the load is resting on the sling. 33
  • 34. Examples of wire ropes sling to be removed from service 34
  • 35. 35
  • 36. Examples of shackles to be removed from service 36
  • 37. 37
  • 38. • Don’t allow any one under suspended load or between suspended load and fixed objects. • Proper Lifting Plan 38
  • 39. 39