Unit / Section: Area:
Activity:
Unit: Date of JSA 30/05/2022
JSA Team
Step #
Probability
(H, M, L)
Assiging priority
Residual hazard
(H, M, L)
Project L
Project/EHS
Project/Services
Project
Project
Project
Project
Project/Services
Project
Project
Project
Project
Project
Project
Project
2 H Project L
15-Persons shall wear safety harnesses for height work
1
1-May result in exposing people and/or potential to
harm or danger
2-Presence of non – certified personnel at
radiography site
3-Radiation Leak
4-Accidental Entry of unauthorized personnel
7-Communication Method during working
H
Site Preparation and
checking the Workplace
1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in
advance
2-The Radiographer supervisor responsible for this activity has to check the PPEs of his staff to
ensure that all required items are available and properly used.
3-Authorized work permit for RT holders shall ensure obtaining and maintaining valid work
permits.
4-SBM to ensure that no person other than Radiographers is at site.Moreover,04 Nos SBM to
required around the barrication of Boiler
5-Suspend any ongoing work at radiography site or barricade area
6-Check the Isotope Storage Box for no radiation leak.
7- Check the safe radiation level and barricade the area; installing radiation warning lights &
alert sign
8-Cnergyico will provide the walki-talki to Radiographer ,if any emergency occur in the area to
stop the RT activity and source to shift the designated Box
9-Warning lights before starting the activity
10-All members of the radiographic teams to be in possession of personnel dosimeters and a
calibrated radiation survey meters at all times
11-Source should be attended at all times. Area to be cleared of all personnel before and during
exposure of the source and barricaded (Restricted area).
12-Warning signs to be located.
Equipment Tag
Special PPEs & Equipments
Required
JSA Score
Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles
Boiler A
Potential Hazard
Basic Job Steps Control Measures
Transportation of sealed
sources.
Radiation accident to public.
1-Transport the source in the proper designed box and source box must be locked, source must
be used or handled by trained,and authorized Personnel
2-Same vehicle to use for source transfered at workplace .
3-Vehicle must not stop at any public place and never left unattended.
4-Diesel Vehicle to utilize for transportation of source inside plant and valid licence for driving
13-Only skilled and certified Radiographers are authorized to perform this work
14-Persons working in elevated positions shall be provided with safe, inspected and certified
scaffoldings platform.
Department : Project
Radiography
Job Safety Analysis
Unit / Section: Area:
Activity:
Unit: Date of JSA 30/05/2022
JSA Team
Step #
Probability
(H, M, L)
Assiging priority
Residual hazard
(H, M, L)
1
1-May result in exposing people and/or potential to
harm or danger
2-Presence of non – certified personnel at
radiography site
3-Radiation Leak
4-Accidental Entry of unauthorized personnel
7-Communication Method during working
H
Site Preparation and
checking the Workplace
1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in
advance
Equipment Tag
Special PPEs & Equipments
Required
JSA Score
Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles
Boiler A
Potential Hazard
Basic Job Steps Control Measures
Department : Project
Radiography
Job Safety Analysis
3 H Project L
EHS & ERT
Name & Signature
Approving signature
Name & Signature Name & Signature
Radiography
1-Slip trip and fall
2-Health damage
3-Ionizing Radiation
1-An exposed source must be returned to its safe container immediately on the request of
operating personnel, or in the event of a fire, or other emergency,or falling
2-For radiography, the source shall be monitored both during exposure and retraction to ensure
accurate location into collimator and safe
return to projector.
3-Area to be barricaded for the protection of radiation is aprroximately 07 Metre.
4-Calibration and certified radiation survey meter to require at site
5-Radiation warning symbol, Danger Board, Flashing Light and warning sign provided at the
barricades.
6-Direct reading dosimeter for radiographer dose monitoring.
7-TLD/Film badge must be available with radiographer.
Maximum personnel exposure limits 2000 mR/year
8-Standby person to restrict movement of authorized personnel.
9-On completion of work, remove all barriers, signs and blinking lights and check equipment
lists and leaving job site tidy.
Area owner Executer

More Related Content

Similar to JSA of Radiography for Boiler A - Copy.pdf

JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfHaroon AbdulRahim
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Garry Pepper
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Garry Pepper
 
Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Dwarika Bhushan Sharma
 
New media risk
New media riskNew media risk
New media riskgusmcc09
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment filechopriroti
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docxalmamunmolla96
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpKJP Consulting
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.doganiArber Dogani
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Safety in Radiography.pdf
Safety in Radiography.pdfSafety in Radiography.pdf
Safety in Radiography.pdfraj kumar singh
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
 

Similar to JSA of Radiography for Boiler A - Copy.pdf (20)

JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
CONFINED SPACES
CONFINED SPACESCONFINED SPACES
CONFINED SPACES
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
New media risk
New media riskNew media risk
New media risk
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bp
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Safety in Radiography.pdf
Safety in Radiography.pdfSafety in Radiography.pdf
Safety in Radiography.pdf
 
VolkerFitzpatrick
VolkerFitzpatrickVolkerFitzpatrick
VolkerFitzpatrick
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

JSA of Radiography for Boiler A - Copy.pdf

  • 1. Unit / Section: Area: Activity: Unit: Date of JSA 30/05/2022 JSA Team Step # Probability (H, M, L) Assiging priority Residual hazard (H, M, L) Project L Project/EHS Project/Services Project Project Project Project Project/Services Project Project Project Project Project Project Project 2 H Project L 15-Persons shall wear safety harnesses for height work 1 1-May result in exposing people and/or potential to harm or danger 2-Presence of non – certified personnel at radiography site 3-Radiation Leak 4-Accidental Entry of unauthorized personnel 7-Communication Method during working H Site Preparation and checking the Workplace 1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in advance 2-The Radiographer supervisor responsible for this activity has to check the PPEs of his staff to ensure that all required items are available and properly used. 3-Authorized work permit for RT holders shall ensure obtaining and maintaining valid work permits. 4-SBM to ensure that no person other than Radiographers is at site.Moreover,04 Nos SBM to required around the barrication of Boiler 5-Suspend any ongoing work at radiography site or barricade area 6-Check the Isotope Storage Box for no radiation leak. 7- Check the safe radiation level and barricade the area; installing radiation warning lights & alert sign 8-Cnergyico will provide the walki-talki to Radiographer ,if any emergency occur in the area to stop the RT activity and source to shift the designated Box 9-Warning lights before starting the activity 10-All members of the radiographic teams to be in possession of personnel dosimeters and a calibrated radiation survey meters at all times 11-Source should be attended at all times. Area to be cleared of all personnel before and during exposure of the source and barricaded (Restricted area). 12-Warning signs to be located. Equipment Tag Special PPEs & Equipments Required JSA Score Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles Boiler A Potential Hazard Basic Job Steps Control Measures Transportation of sealed sources. Radiation accident to public. 1-Transport the source in the proper designed box and source box must be locked, source must be used or handled by trained,and authorized Personnel 2-Same vehicle to use for source transfered at workplace . 3-Vehicle must not stop at any public place and never left unattended. 4-Diesel Vehicle to utilize for transportation of source inside plant and valid licence for driving 13-Only skilled and certified Radiographers are authorized to perform this work 14-Persons working in elevated positions shall be provided with safe, inspected and certified scaffoldings platform. Department : Project Radiography Job Safety Analysis
  • 2. Unit / Section: Area: Activity: Unit: Date of JSA 30/05/2022 JSA Team Step # Probability (H, M, L) Assiging priority Residual hazard (H, M, L) 1 1-May result in exposing people and/or potential to harm or danger 2-Presence of non – certified personnel at radiography site 3-Radiation Leak 4-Accidental Entry of unauthorized personnel 7-Communication Method during working H Site Preparation and checking the Workplace 1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in advance Equipment Tag Special PPEs & Equipments Required JSA Score Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles Boiler A Potential Hazard Basic Job Steps Control Measures Department : Project Radiography Job Safety Analysis 3 H Project L EHS & ERT Name & Signature Approving signature Name & Signature Name & Signature Radiography 1-Slip trip and fall 2-Health damage 3-Ionizing Radiation 1-An exposed source must be returned to its safe container immediately on the request of operating personnel, or in the event of a fire, or other emergency,or falling 2-For radiography, the source shall be monitored both during exposure and retraction to ensure accurate location into collimator and safe return to projector. 3-Area to be barricaded for the protection of radiation is aprroximately 07 Metre. 4-Calibration and certified radiation survey meter to require at site 5-Radiation warning symbol, Danger Board, Flashing Light and warning sign provided at the barricades. 6-Direct reading dosimeter for radiographer dose monitoring. 7-TLD/Film badge must be available with radiographer. Maximum personnel exposure limits 2000 mR/year 8-Standby person to restrict movement of authorized personnel. 9-On completion of work, remove all barriers, signs and blinking lights and check equipment lists and leaving job site tidy. Area owner Executer