SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1257
Review on Risk Assessment of Supply Chain Management in
Construction Projects
Rishikesh S. Aher1, Prof. S. D. Bonde2, Prof. B. A. Konnur3
1PG Scholar (M. Tech – Construction Management)
2Associate Professor (Civil Engineering Department)
3Assistant Professor (Civil Engineering Department)
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Construction plays a key role in economic
development of a country. It is vital for growth on account of
industrialization, urbanization, and infrastructure
development. Construction sector is very diverse and
unorganized in nature. Also most of the construction
companies are small and medium scale enterprises. Efficient
and sustainable supply chain management(SCM)ispivotal for
the delivery of a successful project. However, theapplicationof
SCM in construction industry is still evolving. Purpose of
present study is to examine the current practices of SCM used
in the construction industry and identifying the risk factors of
SCM in Construction projects. To fulfill these objectives
literature review approach was adopted in which various
research articles were involved. The construction industries
lack in implementing Supply Chain Management (SCM)
concept and develop models that support the decision-making
and planning. This study will ensure the effective
implementation of Supply Chain Management inConstruction
Industry.
Key Words: Supply Chain Management, Construction
Industry, SCM in Construction Industry.
1. INTRODUCTION
Construction plays a key role in economic development of a
country. A construction project supply chain may contain
hundreds of firms, contractors;subcontractors;material and
equipment suppliers; engineering and design firms; and
consulting firms etc. It remains highly fragmented and
involves many small and medium size suppliers and
subcontractors. Also construction projects need a high level
of coordination among various stakeholders, who have
conflicting interests during the life of the projectandinvolve
various short and long-term business to business relations.
Procurement of each material and service involves risks at
various nodes of the procurement channel. Risk
managementdecisionsinconstructionsupplychainsand can
be used for various different projects wouldbringenormous
savings to construction firms.
The construction industries lack in implementing Supply
Chain Management (SCM) concept and develop models that
support the decision-making and planning. This study gives
idea about improvement in implementation of SCM in
Construction industry effectively.
1.1 Concept of Supply Chain Management
SCM is a concept that started in the manufacturing industry.
It is seen as a demanding innovation that is built on previous
changes such as Total Quality Management (TQM) and Just-
in-time (JIT).The supply chain is “the network of
organizations that are involved, through upstream and
downstreamlinkages,inthedifferentprocessesandactivities
that produce value in the form of productsandservicesinthe
hands of the ultimatecustomer.”Similarly,asupplychainhas
been conceptualized as “a system whose constituent parts
include materials supplies, production facilities, distribution
services and customers linked via the feed forward flow of
materials and the feedback flow of information”.
In the construction sector, the supply chain presents a
growing economic burdenassociatedwithpoorperformance
and a poor quality of the final product, which leads to a low
customer satisfaction and a decline in productivity and
efficiency, while competition in this sector increases. This is
due to the constant delays in the work site because of late
deliveries, lack of integrated management and lack of
collaboration between the various stakeholders involved in
the project, leading to the need for a thorough analysis of
these Supply chain in the industry.
Therefore, there has been an increasing interest in SCM
applied in the construction industry, with the objective to
understand and characterize failures and to propose
solutions in order to improve the coordination of the many
subcontractors and suppliers of the construction industry
supply chain.
Hence, the implementation of SCM in the construction
industry aims to, reduce the storage of raw materials and
equipment, perform more advantageous purchases and
streamline transportation, eliminate waste and add value to
the final product, i.e., making the supply chain more efficient
and effective. When deadlines are reliable, when service
exists in case of an emergency, order placement is easy and
there is a quality after-salesservice,valueisaddedtothefinal
product, which only happens if there is a good relationship
and trust between contractors,suppliersandsubcontractors.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1258
2. Methodology
Literature Review is Methodology adopted for carried out
this study on Supply Chain Management in Construction
Industry. For this literatures were studied which are
available in Journals. Fromthisriskfactorswereidentifiedon
SCM in Construction Industry.
2. 1 Literature Review
“Supply ChainManagement:EffectiveToolin Construction
Industry” By Mulla Aneesa. I, Dr. A.K. Gupta, Prof. D. B.
Desai
In this article Supply Chain Management (SCM) has been
considered as a very useful tool for the management of the
construction industry. This study gives the important
principles and characteristics of SCM for a construction
industry. Supply Chain Management is recognized as a
leading process improvement, cost saving and revenue
enhancing businessstrategy.SCMissuggestedasapromising
means forimprovingconstructionperformancethemainidea
being that supply chain processes should be integrated in
order to provide better customer value. However, the
implementation of SCM practices might pose a number of
challenges; SCM is considered to be especiallyproblematicin
relation to the construction industry.
“Supply Chain Management: A Review of Implementation
Risks in the Construction Industry” By Davide Aloini,
Riccardo Dulmin, Valeria Mininno and Simone Ponticelli
The research described in this paper analyzes the
development of supply chain management (SCM)
introduction in the construction industry, investigating the
risk factors affecting the implementation of SCM principles.
This study identifies a lack of construction supply chain risk
management (CSCRM) literature which is mainly conceptual
and descriptiveandfocusedespeciallyontheriskassessment
phase. A total of 13 common risk factors are identified in
literature and critically analyzed considering eight key
perspectives. These stress the attention on the project
planning phase and confirm the main contractor as the main
promoter for the SCM practice.
“Supply chain knowledge management: A literature
review” By Marianna Marra, William Ho, John S. Edwards
This paper aims to contribute to the debate on the role of
knowledge management in supply chain management by
reviewing the published literature. This review identifies
various theoretical and methodological characteristicsofthe
way in which knowledge management applications are
proposed in the supply chaincontext.Inthispapertheresults
of a structured review of knowledge management literature
in supply chain management are presented.
“Dynamic ControlofConstructionSupplyChaintoImprove
Labour Performance” By
SungkonMoon,PayamR.ZekavatandLeonhardE.Bernold
The goal of this research is to present a proactive concept of
quality control that is holistic in nature, defining quality as a
function of process waste generated along the construction
supplychain. To verify the proposed method,thefieldtesting
in this paper discusses the prefabricatedrebarsupplysystem
of an actual construction site in Kensington, New South
Wales, Australia. One of the critical tasks in the construction
industry is to accomplish the required levels of quality. In
considering the quality as a managerial target, former
methodologies stipulated that the ultimate goal should be
focused on final quality. However, with the advent of total
qualitymanagement,thedynamicapproachbegantograbthe
attention of the research field. The high quality of rebar
supply ensured by the master-bundle concept enabled the
steel fixers to increase their productive time from 31.5 to
77.4%. As expected, this radical change was accompanied by
a drastic reduction of process waste from 45.5 to 6.2%. The
realization of these substantial performance improvements
will rest on the industry’s ability to adopt mutually
supportive relationships and agile communication channels
across the supply chain.
“A Study on Supply Chain Frame Work in Construction
Industry” ByV. Charles Durai, Dr. K. Sentamilselvan
This paper made an attempt to know the significant
relationship between the respondents’ demographic
variables and their attitude regarding supply chain
management supply chain frame work in Construction
Industry. 100 sampleswereselectedrandomlyfromChennai,
Tamil-Nadu. Basedontheobjectivescertainhypotheseswere
formulated. Statistical tools such as one-way analysis of
variance (ANOVA) and Correlation method was used to
analyse the data. Questionnaire and interview method was
used to collect the necessary data.
The study made an attempt to identify the factors and
respondent’s attitude regarding thesupplychainframework
in construction industry. Result concluded that respondents
significantly differintheirattitudeandalsosomefactorssuch
as firm level, project level, investment cost and Modern
communication system are influenced.
3. Factors Identification
According to the methodology followed in this study
literature survey and discussion were conducted in the SCM
field focusing on the material supply for construction
projects. For this various journals and research papers are
referred from the articles publishedbyworld–widejournals:
ASCE, Science Direct (Elsevier), Springer, etc.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1259
After selecting the research papers, they were reviewed in
order to identify relevant risk factors. Total of 9 risk factors
are identified which will affect the SCM in materialsupplyfor
construction project. These factors are mentioned below:
1. Awareness about SCM Benefits
2. Training and Instruction about SCM in an
organization
3. Communication between participants
4. Number of Suppliers (Specific for material)
5. Selection of suppliers
6. SCM relationship with the supplier
a. Simplify the ordering process
b. Cost benefits
c. Simplify the construction process
d. Better quality service
7. Internal organizational functions
a. Transport of Material
b. Inventory
c. Storage of material
d. Purchasing of material
8. IT system for SCM
9. Conflict resolution procedure
These are the relevant critical factors, according to which
further study will be done. Effect of these factors on SCM in
construction project will be studied based on the
questionnaire survey.
4. Questionnaire Preparation
Questionnaire is certainly the best known of the research
instruments used for gathering information from people. Its
purpose is to collect the required data from the respondents.
Questionnaire will be administrated by phone call, mail or
personal interview.
While designing the questionnaire, steps were followed as
mentioned below:
1. Decide the information required:
The first step is to decide what are the things required to
know from the respondent
2. Choose the methods of reaching your target respondents:
Following are the methods of reaching the target
respondents:
a. Personal Interview
b. Mail
c. Phone Call
3. Decide the question content
4. Develop the question wording:
It provides the respondent with an easy method ofindicating
hisanswer- he does not haveto thinkabout how toarticulate
his answer. Responses can be easily classified, making
analysis very straight forward. It permits the respondent to
specify the answer categoriesmostsuitablefortheirpurpose.
5. Ordering the questions:
Following is the order to be followed:
a. Opening questions.
b. Question flow
c. Question variety
d. Closing Question
6. Check the length of questionnaire:
In general, it is best for a questionnaire to be as short as
possible. A long questionnaire leads to a long interview and
this is open to the dangers of boredom on the part of
respondent.
7. Pre-test the questionnaire:
Test the questionnaire on a smallsample of yoursubject first
this is possible at least it on colleagues or friends. The aim
here to detect any flaws in questionandcorrectthesepriorto
main survey.
8. Develop the final survey form:
It means designed questionnairewillbeadministeredamong
the selected sample respondents to the study.
Based upon the 9 critical factorsidentifiedfromtheliterature
survey as mentioned questionnaire were prepared. By
following above steps questionnaire were designed as
mentioned below:
Fig -1: Questionnaire Form
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1260
Fig -2: Questionnaire Form
5. CONCLUSION
According to the study, various risk factors were identified
from literature review and questionnaire also prepared for
implementation of Supply Chain Management in
Construction Industry. There is wide scope to study further
on the implementation of SCM in Construction Industry.
Questionnaire based Survey should be adopted for the
further study.
REFERENCES
[1] Chirag Patel, Bhavin Kashiyani,“ Review ofSupplyChain
Management in Construction” International Journal of
Advanced Research in Engineering, Science and
Management
[2] Davide Aloini, Riccardo Dulmin, Valeria Mininno and
Simone Ponticelli, “Supply chain management: a review
of implementation risks in the construction industry,”
Business Process Management Journal, ResearchGate
(2012)
[3] Ila Manuj, John T. Mentzer, “Global Supply Chain Risk
Management,” Journal of Business Logistics (2008)
[4] Kannan Govindan, Mathiyazhagan Kaliyan, Devika
Kannan, A.N. Haq (2014), “Barriers analysis for green
supply chain management implementation in Indian
industries using analytic hierarchy process,” Science
Directs (2014)
[5] Sharadchandra V. Patil & Prof. D. B. Desai, “Analysis of
Supply Chain Management in Infrastructure and
Construction Project Planning for Maharashtra Region,”
IJESRT (2018)
[6] Sudhir Yadav, Gargi Sojitra Ray, “Supply Chain
Management in Flyover Projects in India,” Journal of
Construction in Developing Countries (2015)
[7] Sungkon Moon, Payam R. Zekavat and Leonhard E.
Bernold, “Dynamic Control ofConstructionSupplyChain
to Improve Labour Performance,” ASCE Library (2015)

More Related Content

What's hot

Alignment of value drivers in outcome based contracts
Alignment of value drivers in outcome based contractsAlignment of value drivers in outcome based contracts
Alignment of value drivers in outcome based contracts
Shaun West
 
Ajceb vol2 no2bowen
Ajceb vol2 no2bowenAjceb vol2 no2bowen
Ajceb vol2 no2bowenRatzman III
 
Electrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for UtilitiesElectrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for Utilities
Tata Power Delhi Distribution Limited
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET Journal
 
White Paper_RIBER_Kunal
White Paper_RIBER_KunalWhite Paper_RIBER_Kunal
White Paper_RIBER_Kunalkunalparekh27
 
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_PresentationFoliage
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET Journal
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
IRJET Journal
 
Innovation As Maturity
Innovation As Maturity Innovation As Maturity
Innovation As Maturity
Malcolm Ryder
 
Tp96 pub102
Tp96 pub102Tp96 pub102
Tp96 pub102
Dave Davidson
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
IRJET Journal
 
Logistic improvement using scor
Logistic improvement using scorLogistic improvement using scor
Logistic improvement using scorShashank Kapoor
 
Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3
wpfisherjr
 
Smart Grid Operational Services Supply Chain Fact Sheet
Smart Grid Operational Services Supply Chain Fact SheetSmart Grid Operational Services Supply Chain Fact Sheet
Smart Grid Operational Services Supply Chain Fact SheetGord Reynolds
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
Antonio Reis
 
Manufacturing Process Dependencies and the Performance of Prismatic Large For...
Manufacturing Process Dependencies and the Performance of Prismatic Large For...Manufacturing Process Dependencies and the Performance of Prismatic Large For...
Manufacturing Process Dependencies and the Performance of Prismatic Large For...
Antonio Reis
 
Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...
IRJET Journal
 
IRJET- A Study on Productivity of Concreting Work in Building Construction in...
IRJET- A Study on Productivity of Concreting Work in Building Construction in...IRJET- A Study on Productivity of Concreting Work in Building Construction in...
IRJET- A Study on Productivity of Concreting Work in Building Construction in...
IRJET Journal
 

What's hot (19)

Alignment of value drivers in outcome based contracts
Alignment of value drivers in outcome based contractsAlignment of value drivers in outcome based contracts
Alignment of value drivers in outcome based contracts
 
Ajceb vol2 no2bowen
Ajceb vol2 no2bowenAjceb vol2 no2bowen
Ajceb vol2 no2bowen
 
Electrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for UtilitiesElectrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for Utilities
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
White Paper_RIBER_Kunal
White Paper_RIBER_KunalWhite Paper_RIBER_Kunal
White Paper_RIBER_Kunal
 
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
Waf Calgary 2008
Waf Calgary 2008Waf Calgary 2008
Waf Calgary 2008
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
Innovation As Maturity
Innovation As Maturity Innovation As Maturity
Innovation As Maturity
 
Tp96 pub102
Tp96 pub102Tp96 pub102
Tp96 pub102
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
 
Logistic improvement using scor
Logistic improvement using scorLogistic improvement using scor
Logistic improvement using scor
 
Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3
 
Smart Grid Operational Services Supply Chain Fact Sheet
Smart Grid Operational Services Supply Chain Fact SheetSmart Grid Operational Services Supply Chain Fact Sheet
Smart Grid Operational Services Supply Chain Fact Sheet
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
 
Manufacturing Process Dependencies and the Performance of Prismatic Large For...
Manufacturing Process Dependencies and the Performance of Prismatic Large For...Manufacturing Process Dependencies and the Performance of Prismatic Large For...
Manufacturing Process Dependencies and the Performance of Prismatic Large For...
 
Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...
 
IRJET- A Study on Productivity of Concreting Work in Building Construction in...
IRJET- A Study on Productivity of Concreting Work in Building Construction in...IRJET- A Study on Productivity of Concreting Work in Building Construction in...
IRJET- A Study on Productivity of Concreting Work in Building Construction in...
 

Similar to IRJET- Review on Risk Assessment of Supply Chain Management in Construction Projects

A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSA STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
Tina Gabel
 
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET Journal
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
IJERA Editor
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...
IRJET Journal
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET Journal
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain Management
IRJET Journal
 
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
Dr. David Mburu (PhD)
 
IRJET- Enhancement of Productivity and Minimization of Waste using Lean C...
IRJET-  	  Enhancement of Productivity and Minimization of Waste using Lean C...IRJET-  	  Enhancement of Productivity and Minimization of Waste using Lean C...
IRJET- Enhancement of Productivity and Minimization of Waste using Lean C...
IRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
 
Controlling quality supply chain issues for infrastructure projects
Controlling quality supply chain issues for infrastructure projectsControlling quality supply chain issues for infrastructure projects
Controlling quality supply chain issues for infrastructure projects
Aniruddha Kulkarni
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET Journal
 
The Effect of Green Supply Chain Management on the Construction Industry – A ...
The Effect of Green Supply Chain Management on the Construction Industry – A ...The Effect of Green Supply Chain Management on the Construction Industry – A ...
The Effect of Green Supply Chain Management on the Construction Industry – A ...
IRJET Journal
 
supply chain management in civil engineering
supply chain management in civil engineeringsupply chain management in civil engineering
supply chain management in civil engineering
deepika977036
 
Critique on papers related to supply chain management
Critique on papers related to supply chain management Critique on papers related to supply chain management
Critique on papers related to supply chain management
Trushart Wagh
 
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Steve Jones
 
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economyResponsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economyDr Lendy Spires
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
IRJET Journal
 
Comprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in ConstructionComprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in Construction
GHARBANWAO
 

Similar to IRJET- Review on Risk Assessment of Supply Chain Management in Construction Projects (20)

A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSA STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
 
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction Projects
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain Management
 
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
 
IRJET- Enhancement of Productivity and Minimization of Waste using Lean C...
IRJET-  	  Enhancement of Productivity and Minimization of Waste using Lean C...IRJET-  	  Enhancement of Productivity and Minimization of Waste using Lean C...
IRJET- Enhancement of Productivity and Minimization of Waste using Lean C...
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
Controlling quality supply chain issues for infrastructure projects
Controlling quality supply chain issues for infrastructure projectsControlling quality supply chain issues for infrastructure projects
Controlling quality supply chain issues for infrastructure projects
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
 
The Effect of Green Supply Chain Management on the Construction Industry – A ...
The Effect of Green Supply Chain Management on the Construction Industry – A ...The Effect of Green Supply Chain Management on the Construction Industry – A ...
The Effect of Green Supply Chain Management on the Construction Industry – A ...
 
supply chain management in civil engineering
supply chain management in civil engineeringsupply chain management in civil engineering
supply chain management in civil engineering
 
Critique on papers related to supply chain management
Critique on papers related to supply chain management Critique on papers related to supply chain management
Critique on papers related to supply chain management
 
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
 
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economyResponsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
Comprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in ConstructionComprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in Construction
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 

IRJET- Review on Risk Assessment of Supply Chain Management in Construction Projects

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1257 Review on Risk Assessment of Supply Chain Management in Construction Projects Rishikesh S. Aher1, Prof. S. D. Bonde2, Prof. B. A. Konnur3 1PG Scholar (M. Tech – Construction Management) 2Associate Professor (Civil Engineering Department) 3Assistant Professor (Civil Engineering Department) ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Construction plays a key role in economic development of a country. It is vital for growth on account of industrialization, urbanization, and infrastructure development. Construction sector is very diverse and unorganized in nature. Also most of the construction companies are small and medium scale enterprises. Efficient and sustainable supply chain management(SCM)ispivotal for the delivery of a successful project. However, theapplicationof SCM in construction industry is still evolving. Purpose of present study is to examine the current practices of SCM used in the construction industry and identifying the risk factors of SCM in Construction projects. To fulfill these objectives literature review approach was adopted in which various research articles were involved. The construction industries lack in implementing Supply Chain Management (SCM) concept and develop models that support the decision-making and planning. This study will ensure the effective implementation of Supply Chain Management inConstruction Industry. Key Words: Supply Chain Management, Construction Industry, SCM in Construction Industry. 1. INTRODUCTION Construction plays a key role in economic development of a country. A construction project supply chain may contain hundreds of firms, contractors;subcontractors;material and equipment suppliers; engineering and design firms; and consulting firms etc. It remains highly fragmented and involves many small and medium size suppliers and subcontractors. Also construction projects need a high level of coordination among various stakeholders, who have conflicting interests during the life of the projectandinvolve various short and long-term business to business relations. Procurement of each material and service involves risks at various nodes of the procurement channel. Risk managementdecisionsinconstructionsupplychainsand can be used for various different projects wouldbringenormous savings to construction firms. The construction industries lack in implementing Supply Chain Management (SCM) concept and develop models that support the decision-making and planning. This study gives idea about improvement in implementation of SCM in Construction industry effectively. 1.1 Concept of Supply Chain Management SCM is a concept that started in the manufacturing industry. It is seen as a demanding innovation that is built on previous changes such as Total Quality Management (TQM) and Just- in-time (JIT).The supply chain is “the network of organizations that are involved, through upstream and downstreamlinkages,inthedifferentprocessesandactivities that produce value in the form of productsandservicesinthe hands of the ultimatecustomer.”Similarly,asupplychainhas been conceptualized as “a system whose constituent parts include materials supplies, production facilities, distribution services and customers linked via the feed forward flow of materials and the feedback flow of information”. In the construction sector, the supply chain presents a growing economic burdenassociatedwithpoorperformance and a poor quality of the final product, which leads to a low customer satisfaction and a decline in productivity and efficiency, while competition in this sector increases. This is due to the constant delays in the work site because of late deliveries, lack of integrated management and lack of collaboration between the various stakeholders involved in the project, leading to the need for a thorough analysis of these Supply chain in the industry. Therefore, there has been an increasing interest in SCM applied in the construction industry, with the objective to understand and characterize failures and to propose solutions in order to improve the coordination of the many subcontractors and suppliers of the construction industry supply chain. Hence, the implementation of SCM in the construction industry aims to, reduce the storage of raw materials and equipment, perform more advantageous purchases and streamline transportation, eliminate waste and add value to the final product, i.e., making the supply chain more efficient and effective. When deadlines are reliable, when service exists in case of an emergency, order placement is easy and there is a quality after-salesservice,valueisaddedtothefinal product, which only happens if there is a good relationship and trust between contractors,suppliersandsubcontractors.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1258 2. Methodology Literature Review is Methodology adopted for carried out this study on Supply Chain Management in Construction Industry. For this literatures were studied which are available in Journals. Fromthisriskfactorswereidentifiedon SCM in Construction Industry. 2. 1 Literature Review “Supply ChainManagement:EffectiveToolin Construction Industry” By Mulla Aneesa. I, Dr. A.K. Gupta, Prof. D. B. Desai In this article Supply Chain Management (SCM) has been considered as a very useful tool for the management of the construction industry. This study gives the important principles and characteristics of SCM for a construction industry. Supply Chain Management is recognized as a leading process improvement, cost saving and revenue enhancing businessstrategy.SCMissuggestedasapromising means forimprovingconstructionperformancethemainidea being that supply chain processes should be integrated in order to provide better customer value. However, the implementation of SCM practices might pose a number of challenges; SCM is considered to be especiallyproblematicin relation to the construction industry. “Supply Chain Management: A Review of Implementation Risks in the Construction Industry” By Davide Aloini, Riccardo Dulmin, Valeria Mininno and Simone Ponticelli The research described in this paper analyzes the development of supply chain management (SCM) introduction in the construction industry, investigating the risk factors affecting the implementation of SCM principles. This study identifies a lack of construction supply chain risk management (CSCRM) literature which is mainly conceptual and descriptiveandfocusedespeciallyontheriskassessment phase. A total of 13 common risk factors are identified in literature and critically analyzed considering eight key perspectives. These stress the attention on the project planning phase and confirm the main contractor as the main promoter for the SCM practice. “Supply chain knowledge management: A literature review” By Marianna Marra, William Ho, John S. Edwards This paper aims to contribute to the debate on the role of knowledge management in supply chain management by reviewing the published literature. This review identifies various theoretical and methodological characteristicsofthe way in which knowledge management applications are proposed in the supply chaincontext.Inthispapertheresults of a structured review of knowledge management literature in supply chain management are presented. “Dynamic ControlofConstructionSupplyChaintoImprove Labour Performance” By SungkonMoon,PayamR.ZekavatandLeonhardE.Bernold The goal of this research is to present a proactive concept of quality control that is holistic in nature, defining quality as a function of process waste generated along the construction supplychain. To verify the proposed method,thefieldtesting in this paper discusses the prefabricatedrebarsupplysystem of an actual construction site in Kensington, New South Wales, Australia. One of the critical tasks in the construction industry is to accomplish the required levels of quality. In considering the quality as a managerial target, former methodologies stipulated that the ultimate goal should be focused on final quality. However, with the advent of total qualitymanagement,thedynamicapproachbegantograbthe attention of the research field. The high quality of rebar supply ensured by the master-bundle concept enabled the steel fixers to increase their productive time from 31.5 to 77.4%. As expected, this radical change was accompanied by a drastic reduction of process waste from 45.5 to 6.2%. The realization of these substantial performance improvements will rest on the industry’s ability to adopt mutually supportive relationships and agile communication channels across the supply chain. “A Study on Supply Chain Frame Work in Construction Industry” ByV. Charles Durai, Dr. K. Sentamilselvan This paper made an attempt to know the significant relationship between the respondents’ demographic variables and their attitude regarding supply chain management supply chain frame work in Construction Industry. 100 sampleswereselectedrandomlyfromChennai, Tamil-Nadu. Basedontheobjectivescertainhypotheseswere formulated. Statistical tools such as one-way analysis of variance (ANOVA) and Correlation method was used to analyse the data. Questionnaire and interview method was used to collect the necessary data. The study made an attempt to identify the factors and respondent’s attitude regarding thesupplychainframework in construction industry. Result concluded that respondents significantly differintheirattitudeandalsosomefactorssuch as firm level, project level, investment cost and Modern communication system are influenced. 3. Factors Identification According to the methodology followed in this study literature survey and discussion were conducted in the SCM field focusing on the material supply for construction projects. For this various journals and research papers are referred from the articles publishedbyworld–widejournals: ASCE, Science Direct (Elsevier), Springer, etc.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1259 After selecting the research papers, they were reviewed in order to identify relevant risk factors. Total of 9 risk factors are identified which will affect the SCM in materialsupplyfor construction project. These factors are mentioned below: 1. Awareness about SCM Benefits 2. Training and Instruction about SCM in an organization 3. Communication between participants 4. Number of Suppliers (Specific for material) 5. Selection of suppliers 6. SCM relationship with the supplier a. Simplify the ordering process b. Cost benefits c. Simplify the construction process d. Better quality service 7. Internal organizational functions a. Transport of Material b. Inventory c. Storage of material d. Purchasing of material 8. IT system for SCM 9. Conflict resolution procedure These are the relevant critical factors, according to which further study will be done. Effect of these factors on SCM in construction project will be studied based on the questionnaire survey. 4. Questionnaire Preparation Questionnaire is certainly the best known of the research instruments used for gathering information from people. Its purpose is to collect the required data from the respondents. Questionnaire will be administrated by phone call, mail or personal interview. While designing the questionnaire, steps were followed as mentioned below: 1. Decide the information required: The first step is to decide what are the things required to know from the respondent 2. Choose the methods of reaching your target respondents: Following are the methods of reaching the target respondents: a. Personal Interview b. Mail c. Phone Call 3. Decide the question content 4. Develop the question wording: It provides the respondent with an easy method ofindicating hisanswer- he does not haveto thinkabout how toarticulate his answer. Responses can be easily classified, making analysis very straight forward. It permits the respondent to specify the answer categoriesmostsuitablefortheirpurpose. 5. Ordering the questions: Following is the order to be followed: a. Opening questions. b. Question flow c. Question variety d. Closing Question 6. Check the length of questionnaire: In general, it is best for a questionnaire to be as short as possible. A long questionnaire leads to a long interview and this is open to the dangers of boredom on the part of respondent. 7. Pre-test the questionnaire: Test the questionnaire on a smallsample of yoursubject first this is possible at least it on colleagues or friends. The aim here to detect any flaws in questionandcorrectthesepriorto main survey. 8. Develop the final survey form: It means designed questionnairewillbeadministeredamong the selected sample respondents to the study. Based upon the 9 critical factorsidentifiedfromtheliterature survey as mentioned questionnaire were prepared. By following above steps questionnaire were designed as mentioned below: Fig -1: Questionnaire Form
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1260 Fig -2: Questionnaire Form 5. CONCLUSION According to the study, various risk factors were identified from literature review and questionnaire also prepared for implementation of Supply Chain Management in Construction Industry. There is wide scope to study further on the implementation of SCM in Construction Industry. Questionnaire based Survey should be adopted for the further study. REFERENCES [1] Chirag Patel, Bhavin Kashiyani,“ Review ofSupplyChain Management in Construction” International Journal of Advanced Research in Engineering, Science and Management [2] Davide Aloini, Riccardo Dulmin, Valeria Mininno and Simone Ponticelli, “Supply chain management: a review of implementation risks in the construction industry,” Business Process Management Journal, ResearchGate (2012) [3] Ila Manuj, John T. Mentzer, “Global Supply Chain Risk Management,” Journal of Business Logistics (2008) [4] Kannan Govindan, Mathiyazhagan Kaliyan, Devika Kannan, A.N. Haq (2014), “Barriers analysis for green supply chain management implementation in Indian industries using analytic hierarchy process,” Science Directs (2014) [5] Sharadchandra V. Patil & Prof. D. B. Desai, “Analysis of Supply Chain Management in Infrastructure and Construction Project Planning for Maharashtra Region,” IJESRT (2018) [6] Sudhir Yadav, Gargi Sojitra Ray, “Supply Chain Management in Flyover Projects in India,” Journal of Construction in Developing Countries (2015) [7] Sungkon Moon, Payam R. Zekavat and Leonhard E. Bernold, “Dynamic Control ofConstructionSupplyChain to Improve Labour Performance,” ASCE Library (2015)