INTRODUCTION TO COMPUTERS
Institute of Technology

BY ABDUL-RAHAMAN
Objectives
At the end of this course, students will be able to do
the following:









Definition of Computer ·
Types of computers .
Peripheral Device
Input & output devices ·
Memory and processing Device ·
Storage Devices ·
GUI AND CUI
Introduction to Operating System
Institute of Technology

BY ABDUL-RAHAMAN
Introduction to computer
A computer is an electronic machine that manipulates data
according to a list of instructions.

A computer is an electronic machine(device) that accepts input
(data), processes it and gives (output)results (information)and
save as an electronic file.

Institute of Technology

BY ABDUL-RAHAMAN
A primitive computer
A basic computer (primitive) consists of three major components:
o CPU (Central Processing Unit)
o IO (Input/Output)
o Memory
Input

CPU

Output

Memory

Data comes through input and the CPU process it based on a program in
memory. And the (result) output returned to memory or presented to
the user.
Institute of Technology

BY ABDUL-RAHAMAN
Types of computers
Computer types can be divided into 3 categories
according to electronic nature.
Types of computers are classified according to how a
particular Computer functions. These computer
types are:
· Analogue Computers
· Digital Computers
· Hybrid Computers

Institute of Technology

BY ABDUL-RAHAMAN
ANALOGUE COMPUTER (ANALOG)
Analogue computer uses analogue signals that
are represented by a continuous set of varying
voltages in scientific research centers ,hospitals
and flight centers.
Analogue computer types program arithmetic
and logical operations by measuring physical
changes i.e. temperatures or pressure.
Institute of Technology

BY ABDUL-RAHAMAN
Image of analogue computers

Institute of Technology

BY ABDUL-RAHAMAN
Image of analogue computers

Institute of Technology

BY ABDUL-RAHAMAN
Image of analogue computers

Institute of Technology

BY ABDUL-RAHAMAN
Digital computer
With these types of computers operation are on
electrical input that can attain two inputs, states of
ON=1 and state of OFF = 0.
With digital type of computers data is represented by
digital of 0 and 1 or off state and on state.
Digital computer type recognizes data by counting
discrete signal of (0 0r 1), they are high speed
programmable; they compute values and stores results.

Institute of Technology

BY ABDUL-RAHAMAN
Image of a digital computer

Institute of Technology

BY ABDUL-RAHAMAN
Image of a digital computer

Institute of Technology

BY ABDUL-RAHAMAN
HYBRID COMPUTER
Hybrid computer types are very unique, in the
sense that they combined both analogue and
digital features and operations.
Hybrid computers operate by using digital to
analogue convertor and analogue to digital
convertor.
E.g. personal computer

Institute of Technology

BY ABDUL-RAHAMAN
IMAGES OF HYBRID COMPUTER

HYBRID COMPUTER HYBRID COMPUTER

Institute of Technology

BY ABDUL-RAHAMAN
Classification of Computers
The classification of computers according to size /
appearance relates to the grouping of computers
according to their physical structure.
The computer classification from the largest to the
smallest single unit is as follows:
Supercomputers, Mainframe Computers, Mini
Computers, and Micro Computers
Institute of Technology

BY ABDUL-RAHAMAN
Supercomputers:
Super computer are the fastest high capacity
computers and very expensive.
Used for calculating speed and volumes in
weather forecasting, oil exploitation, aircraft
designing and handle about 1000 user at a
time.

Institute of Technology

BY ABDUL-RAHAMAN
An example of a supper computer

Institute of Technology

BY ABDUL-RAHAMAN
Mainframe computers
Mainframe computers are powerful computers
used mainly by large organizations for critical
applications.
Typically bulk data processing such as census,
industry and consumer statistics, enterprise
resource planning, and financial transaction
processing.

Institute of Technology

BY ABDUL-RAHAMAN
An example of a mainframe computer

Institute of Technology

BY ABDUL-RAHAMAN
An example of a mainframe computer

Institute of Technology

BY ABDUL-RAHAMAN
MINI COMPUTER
. Minicomputer are mid-range called
refrigerator machine with less storage capacity
and processing speed.
Used by small companies for accounting and
finance, and handle about 4 to 100 users at a
time.

Institute of Technology

BY ABDUL-RAHAMAN
An example of a mini computer

Institute of Technology

BY ABDUL-RAHAMAN
MICRO COMPUTER
Personal Computer is the smallest with low
storage capacity and processing speed.
It support only one monitor, key board and a user
at a time.

Institute of Technology

BY ABDUL-RAHAMAN
EXAMPLE OF MICRO COMPUTERS

Institute of Technology

BY ABDUL-RAHAMAN
Basic parts of a computer
There are four (4) basic parts of a computer:
 Mouse
 Keyboard

 Monitor
 System Unit

Institute of Technology

BY ABDUL-RAHAMAN
Mouse
A mouse is a hand-held or an input device that
controls the movement of pointer on the screen.
Position the pointer on an object is known as pointing.

Mouse
Institute of Technology

BY ABDUL-RAHAMAN
Types of Mouse
There are many types of computer mice, but the three (3)common types are namely:

Base on their ports
1)

PS/2 mouse

2)

USB mouse

3)

Serial mouse
Institute of Technology

BY ABDUL-RAHAMAN
Types of Mouse
There are many types of computer mice, but the three (3)common types are
namely:

Base on their designed
standard mouse
optical mouse

wireless mouse
Institute of Technology

BY ABDUL-RAHAMAN
BY ABDUL-RAHAMAN
Parts of a mouse

Plastic case (body)

Institute of Technology

BY ABDUL-RAHAMAN
HOW TO HOLD A MOUSE
Thumb finger
Little finger

Ring finger
Middle finger

Index finger

Institute of Technology

BY ABDUL-RAHAMAN
Actions of a mouse
This section explain the actions of the mouse



Pointing



Mouse Pointer



Clicking



Mouse Pad



Double Clicking



Right Clicking



Dragging



Right Dragging

Institute of Technology

BY ABDUL-RAHAMAN
Pointing
To direct the tip of the mouse pointer on an item.

CLICKING
Press and release the left mouse button once.

DOUBLE CLICKING
Quickly press and release the left mouse button twice.

RIGHT CLICKING
Press and release the right mouse button once. A shortcut menu appears.

Institute of Technology

BY ABDUL-RAHAMAN
Dragging
pressing and holding down the left mouse button on an object or
selected text and moving it to a different position and release the left
button.

RIGHT DRAGGING
Right-drag is to press and hold down the right mouse button on an
object, move to different position and release the button to drop the
item.

MOUSE POINTER
Mouse pointer is an arrow that appears on the screen and is controlled by
the movement of the ball.

Institute of Technology

BY ABDULRAHAMAN
keyboard
The keyboard is the primary input device for entering
data and executing commands.

The keyboard is laid out like the keys on a typewriter.
It has 102 to 110 keys and with 256 to 260 characters.

BY ABDUL-RAHAMAN
Institute of Technology
TYPES OF COMPUTER KEYBOARD
There are two (2) types of computer keyboard
namely:


Standard Keyboard

Multimedia

Keyboard

BY ABDUL-RAHAMAN
Institute of Technology
Standard keyboard (qwerty)
It is named after the first six leftmost letters on the top alphabetical line
of the keyboard.
Also called a QWERTY keyboard because of the layout on its typing area.
It has about 103 keys and about 257 characters.

Institute of Technology

BY ABDULRAHAMAN
Multimedia keyboard
Designed for the user to access often-used programs such as
Internet, music, and email.
It contains buttons that control various computer processes, such as
turning on the computer's power, putting the CPU to sleep, and waking it
up again.
It comes in various connection formats, including PS/2, USB, and wireless.
Depending on the manufacturer.

BY ABDUL-RAHAMAN
Institute of Technology
Parts of a keyboard
The computer keyboard is divided into five main parts as showed below
Home Keys

Calculator Keys

Function Keys

Arrow Keys
Typing Standard Key
Institute of Technology

BY ABDUL-RAHAMAN
Special key
The standard keyboard contains special key such as:
Keys
Esc
Tab
Caps Lock
Shift
Ctrl
Alt
Space Bar
Enter
Backspace

Meaning
Escape
Tab
Caps Lock
Shift
Control
Altertive
Space Bar
Enter
Backspace

Institute of Technology

Symbol

BY ABDUL-RAHAMAN
Special keys
Escape key used to get out of troubles.
Tab key used to advance the cursor some distances away from the margin.
Caps Lock key used to change upper case to lower case (capital to small
letters)and vise visa.
Shift, Ctrl and Alt key used to combine with other keys to perform a task.
Space bar key used to give space between words.
Enter Key used to start a new line or end a paragraph.
Backspace key used to advance the cursor one step backwards.
Institute of Technology

BY ABDUL-RAHAMAN
Monitor
Is a display unit used to view the content of the system unit. The screen is made up of red,
green and blue dots.
The video card send signals out to the monitor. The information video card sends control
which dots are light up and how bright they are determines the picture you see.
Another name for a monitor is video display terminal (VDT) or Visual display unit (VDU).

Institute of Technology

BY ABDUL-RAHAMAN
TYPES OF MONITOR
There are two (2) types of monitor as follows:



Cathode Ray Tube (CRT)



Liquid crystal Display (LCD)

Institute of Technology

BY ABDUL-RAHAMAN
LIQUID CRYSTAL DISPLAY (LCD)
The LCD (Liquid Crystal
Display).
This is also called Flat
screen.

It has the following
advantages over the CRT:
Takes up less space
Lighter in weight
Uses less power
Institute of Technology

BY ABDUL-RAHAMAN
SYSTEM UNIT
It is also known as a base unit, is the main body of a desktop computer.

System Unit

It consisting of a plastic case containing the motherboard, power supply,
cooling fans, memory models and expansion cards that are plugged into the
motherboard, such as video and network card.

Institute of Technology

BY ABDUL-RAHAMAN
TYPES OF SYSTEM UNIT
They are two (2) types of system unit

Institute of Technology

BY ABDUL-RAHAMAN
COMPONENTS OF THE SYSTEM UNIT
Hard
Disk

Power
Pack

Cmon Battery

CD-ROM
Drive

Cooling
Fan
Floppy Disk
Drive

Heat
Sink

CPU

Video Card
(VGA)

Mother
Board

Memory
Ribbon Cables

Institute of Technology

BY ABDUL-RAHAMAN
MOTHERBOARD
The motherboard is the main circuit board in which all component
communicate through in the PC.
Every components either directly plugging into it or communicating through
the motherboards ports.

Institute of Technology

BY ABDUL-RAHAMAN
RIBBON CABLES
These are cables (wires) used internally in a PC to connect hard disk, CD and
floppy.
For external connections, round-shaped cables are preferred over ribbon ones.

Institute of Technology

BY ABDUL-RAHAMAN
CMOS BATTERY
A tiny device on the motherboard that create a
computer system to run smoothly.
Its function is to keep the computer date and time up
till date.

Institute of Technology

BY ABDUL-RAHAMAN
CENTRAL PROCESSING UNIT (CPU)
A CPU is the brain that runs a computer. CPU
(Central Processing Unit) is the core chip to a
computer.
It process data to information which is then
outputted to the user.
Another name for a CPU is Processor

Institute of Technology

BY ABDUL-RAHAMAN
HEAT SINK
It is a device that absorbs the excess heat
generated by a processor (CPU).

Institute of Technology

BY ABDUL-RAHAMAN
COOLING FAN
The cooling fan produce air to cool the heat sink so it
can absorb more heat from the processor (CPU)
The CPU - produce a ton of heat and cause overheating
to the machine if not check will crash the computer.

Institute of Technology

BY ABDUL-RAHAMAN
HARD DISK DRIVE (HDD)
The hard disk drive is the main primarily storage device for the computer
system that stores all data and files.
Also known as the "C drive" because Microsoft assigns the "C" drive letter to
the primary partition(division) by default on the primary hard drive.

Institute of Technology

BY ABDUL-RAHAMAN
Parts of a Hard Disk Drive

Institute of Technology

BY ABDUL-RAHAMAN
CD-ROM DRIVE
A CD drive is connected to a computer and on which a
CD-ROM can be ‘played’ (computer science) a device
that writes data onto or reads data from a storage
medium.

CD-ROM Drive

Institute of Technology

BY ABDUL-RAHAMAN
FLOPPY DISK DRIVE(FDD)
It is a small drive that takes a little plastic square shaped disks.
Is a place where a floppy disk(a diskette) is inserted (removable storage
device).
They are out of date, pen drives can take much data/information than
diskette.
Today new computers are sold without a floppy disk drive.

Floppy Disk Drive
Institute of Technology

BY ABDUL-RAHAMAN
FLOPPY DISKETTE
It is a magnetic disc with a microfilm and capable
of storing information depending on the density.
They are read and written by a floppy disk drive
(FDD).
It is slotted into the floppy disk drive (Drive A: B: )
computer to access the information stored on it.

Institute of Technology

BY ABDUL-RAHAMAN
TYPE OF FLOPPY DISKETTE
There are two (2) types of floppy diskettes as
follow:


3½ floppy diskette

5¼

floppy diskette

Institute of Technology

BY ABDUL-RAHAMAN
3½ FLOPPY DISKETTE
It is a magnetic disc with a
microfilm and capable of
storing information
depending on the density,
slotted into the floppy disk
drive (Drive A:)

3½ Floppy Diskette

Capable of storing from 400K to 1.4MB of data. The common once are 720K (double-density) and
1.44MB (high-density).
Macintoshes support disks of 400K, 800K, and 1.2MB.

Institute of Technology

BY ABDUL-RAHAMAN
5¼ FLOPPY DISKETTE
This is also a magnetic disc with a microfilm and capable of storing
information depending on the density, slotted into the diskette drive (Drive B:)

5¼ Floppy Diskette

It is capable of storing between 100K and 1.2MB (megabytes) of data.
The most common sizes are 360K and 1.2MB.
BY ABDULRAHAMAN
Institute of Technology
MEMORY
The computer memory is a temporary storage device which holds the data and
instructions that (CPU) needs to process.

Before a program can be run, it must be loaded from a storage medium (hard disk)
into the memory for CPU to have direct access to it.
Memory is a necessity to every computer. It is primary storage device, it can be
either ROM or RAM

Institute of Technology

BY ABDUL- RAHAMAN
TYPES OF MEMORY
There are two (2) main types of computer memory as
follow:
 Read Only Memory (ROM)

 Random Access Memory (RAM)

Institute of Technology

BY ABDUL-RAHAMAN
READ ONLY MEMORY (ROM)
The Read-Only Memory (ROM) stores the BIOS
that runs when the computer is powered on.
Or otherwise begins execution, a process known
as Bootstrapping, or "booting" or "booting up".

Institute of Technology
RANDOM ACCESS MEMORY (RAM)
RAM is the working memory of a computer system that stores input data,
intermediate results, programs, and other information temporarily.
It can be read and written. It is volatile, that is all data will be erased when the
power is turned off.

Institute of Technology

BY ABDUL-RAHAMAN
POWER SUPPLY (POWER PACK)
A power supply unit (PSU) converts alternating current (AC) electric power to
low-voltage direct current (DC) power for the internal components of the
computer. Is mostly found in the system unit.

Institute of Technology

BY ABDUL-RAHAMAN
VIDEO CARD (VGA)
The video card is responsible for what you see on the monitor.
The main function of the video card is to generate and output images to the
computer screen.
Better graphics card equals better performance when playing games or
working on a high resolution monitor.

Institute of Technology

BY ABDUL-RAHAMAN
TYPE OF VIDEO CARDS (VGA)

AGP Video Card

PCI Express Video Card

PCI Video Card
Institute of Technology

BY ABDUL-RAHAMAN
PERIPHERAL DEVICES
Peripheral device are optional device connected to the computer externally such as
printer, scanner, tape device, microphone and external modem.
And internal such as CD-ROM or internal modem and CPU, expansion cards.
Peripheral devices are classified base on their functions.

Scanner

Microphone

Printer

Projector
Web Cam

Light Pen

Speakers

Plotter

Wireless Router
Institute of Technology
BY ABDUL-RAHAMA
PRINTER
This device is used to print a report or hardcopy, after data or information has been processes.
Printers are designed to print in any colour, but some, just one colour i.e. Black.

A print out from the printer is term as hardcopy.

Canon SELPHY DS810

Prints any colour
Institute of Technology

HP Laser Jet 2055
Prints only black

BY ABDUL-RAHAMAN
SCANNER
A scanner is a device that is able to transfer images or pictures in to the
computer to be store.
Such images or pictures are usually not found in the computer; thus the need
to be scan.

HP Scanjet 3670

HP ScanJet 4370
Institute of Technology

BY ABDUL-RAHAMAN
INPUT DEVICE
Input devices are devices used to feed information or provide the control
signals to the computer.
Keyboard and the Mouse are the examples of the input devices.

Microphone

Keyboard
Mouse

Light Pen
Web Cam
Scanner
Institute of Technology

BY ABDULRAHAMAN
OUTPUT DEVICES
Output devices are devices used to display results.
Printer, speaker and the monitor are the examples of the output devices.

Projector
Monitor

Plotter
Printer
Speaker
Institute of Technology

BY ABDUL-RAHAMAN
Plotter
Plotters were the first type of printer that could print with
colour and render graphics and full-size engineering
drawing.
But plotter are much more expensive than printers.

Plotter

Institute of Technology

BY ABDUL-RAHAMAN
Projector
A Projector is an output device that project and
display video, images or computer data on a screen
or other flat form.

Projector
Institute of Technology

BY ABDUL-RAHAMAN
Sound Speakers
Sound Speakers enable the computer user (liveware)
to hear sound from the computer.

Sound speakers
BY ABDULRAHAMAN
Institute of Technology
INPUT/OUTPUT DEVICE
Referred to as a IO device, an input/output device is a hardware device that accepts
inputted information and also has the capability of outputting that information.
Network Card

Touch Screen
Photocopier
Wireless Card

Wireless Router

Sound Card
Modem
Institute of Technology

BY ABDULRAHAMAN
SOUND CARD
Also known as an audio card, is an internal computer expansion card that
facilitates the input and output of audio signals to and from a computer

TOUCH SCREEN
It is display screen that allows commands to be entered by touching the screen.

Touch screens are generally used in the locations such as airports and hotels to
display certain type of menu.

Institute of Technology

BY ABDUL-RAHAMAN
STORAGE DEVICES
A storage device is a device that is used to store the information such as hard
disk drive, flash drive, floppy disk and the tape drive.

Secure Digital
Card

Hard Disk

Pen Drive

Floppy Diskette

Compact Disc
Secure Digital
Card
Blu-ray DVD

Zip Disk

Digital Versatile Disc
Or
Digital Video Disc

PC Card
Institute of Technology

BY ABDUL-RAHAMAN
BLU-RAY DVD
Blu-ray Disc (official abbreviation BD) is an optical disc storage medium
designed to supersede the DVD format.

The plastic disc is 120 mm in diameter and 1.2 mm thick, the same size as
DVDs and CDs.
Blu-ray Discs contain 25 GB (23.31 GB) per layer, with dual layer discs (50 GB)
being the norm for feature-length video discs.
Triple layer discs (100 GB) and quadruple layers (128 GB) are available for BDXL Blu-ray re-writer drives
.

Philips Double
Layer 50GB
Institute of Technology

BY ABDULRAHAMAN
THE ZIP DISK
A zip disk is a computer hardware device that stores data.

A zip disk drive is somewhat like floppy disk drive, only that
the size of disks inserted into the devices are different.
Where a normal floppy disk can hold about 1.44 megabytes
of data, a zip disk can hold around 100 megabytes of data

Zip Disk
Institute of Technology

BY ABDUL-RAHAMAN
USER INTERFACE
User interface is the space where interaction between the user and the
computer occurs.

TYPES OF USER INTERFACE
There are two types of user interfaces between a computer application and
the user. They are:

 Graphical User Interface (GUI)
 Character User Interface (CUI) or Command Line Interface (CLI)

Institute of Technology

BY ABDUL-RAHAMAN
GRAPHICAL USER INTERFACE (GUI)
Allows users to interact with the computer, using icons, windows and menus, with
the help of a pointing device, such as a mouse.
In GUI more task can run simultaneously and user friendly interface.
Application : Windows (Operating System)

Institute of Technology

BY ABDULRAHAMAN
Character User Interface (CUI)
An interface that allows users to interact with the computer, using codes (text), with the
help of a keyboard.
In CUI one task run at a time. Anther name for Character user interface is Command Line
Interface (CLI)
Application : MS Dos (Operating System)

Institute of Technology

BY ABDUL-RAHAMAN
BOOT
Boot is the process of turning on the computer.
To do this, press the power switch that is used to put the unit on.
Nowadays, it is located in front of the computer. Pushing it would start the
computer.

System
Unit
Power
Monitor
Power

Institute of Technology

BY ABDUL- RAHAMAN
Types of booting
There are two types of booting namely:
o Cool Booting

o Warm Booting
• Cool booting is the process of putting the
switch of the system unit and the monitor on.
• Warm booting is the process of restarting the
computer.
Institute of Technology

BY ABDULRAHAMAN
process of booting
In computing, booting (also known as booting up) is a process that starts
operating systems when the user turns on a computer system.
A boot sequence is the initial set of operations that the computer performs
when power is switched on. The boot loader typically loads the main operating
system for the computer.

Information about computer

Welcome screen

Checking components

Desktop

Institute of Technology

Type of Operating system

BY
ABDULRAHAMA
N
Desktop
The Desktop is a graphical user interface which serves as a communication
link between the computer and the user (live ware)

Institute of Technology

BY ABDULRAHAMA
Icons

Wallpaper

Parts of the desktop

Taskbar
Notification area

Start button
Institute of Technology

BY ABDUL-RAHAMAN
Parts of the desktop
Start button -Provides access to Windows XP programs, documents, and
information on the Internet. (Generally located in the bottom left corner of
the desktop and the far left of the Task bar.)
Taskbar -Contains buttons that give you quick access to common tools and
the programs currently running. (Located across the bottom of the desktop.)

Icons are small pictures used to represent programs.
Notification Area located at the bottom right corner of the taskbar tell the
user what ever is happening in the computer.
Taskbar

Pointer -A small object, such as an arrow, that moves on the screen when
you move the mouse.
Institute of Technology

BY ABDUL-RAHAMAN
Window
A window is a rectangular area of the screen in which you view
program folders, files, or icons.
The window is made up of several components that are the same for
all windows in Windows XP and Windows applications and make it
easy for you to manage your work.

Institute of Technology

BY ABDULRAHAMAN
PARTS OF A WINDOW

Institute of Technology

BY ABDULRAHAMAN
PARTS OF A WINDOW
Menu bar -Contains the titles of menus, such as File, Edit, and Help. (Located
along the top of the window under the Title bar.)
Control Menu Icon-Drop-down menu on the Title bar with the Minimize,
Maximize/Restore, Close, Move and Size functions. (Located on the left side
of the Title bar)
Title bar -Contains the window title and basic window control buttons.
(Located at the top of the window.)
Control Menu Icon in every window, a little icon in the upper-left corner that
can be used to control the window.
Clicking the icon opens the window’s control menu while double clicking the
icon is a shortcut for closing the window.

Institute of Technology

BY ABDUL-RAHAMAN
PARTS OF A WINDOW
Minimize button a small minus button at the top right window which is used
to reduce the window on to the taskbar as an icon (
)

Maximize button two small (
) rectangular boxes overlap together
which is used to increase the size of your windows to fill the screen

Close button a small ( x )button located at the top right corner of the
window used to exit out off the window

Institute of Technology

BY ABDUL-RAHAMAN
COMPUTER WARES
Computer wares refers to the physical, internal and living parts
that makes a computer to work.
There are three(3) types of computer wares.

(i) hardware
(ii) software

(iii) live ware

Institute of Technology

BY ABDUL-RAHAMAN
Hardware
Hardware – the physical parts of a computer you can see, torch and
feel. e.g. system unit, monitor, keyboard, mouse. etc.

Software – the internal programs that tell a computer what to do and
how to do it, or runs on hardware.
E.g. operating system (windows xp, Linux, ubuntu, zubuntu, window 7.
etc.)
live ware – human beings ( man ,woman, children) that create and
use computers.
Institute of Technology

BY ABDUL-RAHAMAN
SOFTWARE
Software is a collection of computer programs and related
data that provide instructions for telling a computer what

to do and how to do it.
In other words, software is a general name given to all
computer program.

Institute of Technology

BY ABDULRAHAMAN
TYPES OF SOFTWARE
There are two (2) types of computer software
namely:
I. System Software

II.

Application Software

Institute of Technology

BY ABDUL-RAHAMAN
System software

System software

also known as operating system(o s)

the soul of a computer.
This program controls the affairs of the computer and manage the
hardware resources.
E.g. MS DOS, Windows, Linux, Apple, Macintosh, OS/2 etc.
Without this program one can not use the computer.
Means the operating system have to be installed before the computer
can be use, even before the applications.

Institute of Technology

BY ABDUL-RAHAMAN
APPLICATION SOFTWARE
Application Software is a computer software designed to
help the user to perform specific tasks.
Examples include:
a) Enterprise software,
b) Accounting software,
c) Office suites,
d) Graphics software
e) And media player. etc.

Institute of Technology

BY ABDUL-RAHAMAN
TYPES OF APPLICATION SOFTWARE
There are three (3) types of application software
namely:
1. End-user software ( can be downloaded from
internet freely)
2. Packaged software (created for selling)
3. Custom-made software (designed purposely for a
particular organization)
4. Utility software for protecting your pc. E.g.
Antivirus.

Institute of Technology

BY ABDUL-RAHAMAN
operating system
An operating system (OS) is a set of programs that manage computer
hardware resources and provide common services for application
software.
The operating system is the most important type of system
software in a computer system.

A user cannot run an application program on the computer without an
operating system, unless the application program is self booting.

Institute of Technology

BY ABDUL-RAHAMAN
THE END!!!
THANK YOU
Institute of Technology

BY ABDUL-RAHAMAN

Introduction to computers by abdul rahaman

  • 1.
    INTRODUCTION TO COMPUTERS Instituteof Technology BY ABDUL-RAHAMAN
  • 2.
    Objectives At the endof this course, students will be able to do the following:         Definition of Computer · Types of computers . Peripheral Device Input & output devices · Memory and processing Device · Storage Devices · GUI AND CUI Introduction to Operating System Institute of Technology BY ABDUL-RAHAMAN
  • 3.
    Introduction to computer Acomputer is an electronic machine that manipulates data according to a list of instructions. A computer is an electronic machine(device) that accepts input (data), processes it and gives (output)results (information)and save as an electronic file. Institute of Technology BY ABDUL-RAHAMAN
  • 4.
    A primitive computer Abasic computer (primitive) consists of three major components: o CPU (Central Processing Unit) o IO (Input/Output) o Memory Input CPU Output Memory Data comes through input and the CPU process it based on a program in memory. And the (result) output returned to memory or presented to the user. Institute of Technology BY ABDUL-RAHAMAN
  • 5.
    Types of computers Computertypes can be divided into 3 categories according to electronic nature. Types of computers are classified according to how a particular Computer functions. These computer types are: · Analogue Computers · Digital Computers · Hybrid Computers Institute of Technology BY ABDUL-RAHAMAN
  • 6.
    ANALOGUE COMPUTER (ANALOG) Analoguecomputer uses analogue signals that are represented by a continuous set of varying voltages in scientific research centers ,hospitals and flight centers. Analogue computer types program arithmetic and logical operations by measuring physical changes i.e. temperatures or pressure. Institute of Technology BY ABDUL-RAHAMAN
  • 7.
    Image of analoguecomputers Institute of Technology BY ABDUL-RAHAMAN
  • 8.
    Image of analoguecomputers Institute of Technology BY ABDUL-RAHAMAN
  • 9.
    Image of analoguecomputers Institute of Technology BY ABDUL-RAHAMAN
  • 10.
    Digital computer With thesetypes of computers operation are on electrical input that can attain two inputs, states of ON=1 and state of OFF = 0. With digital type of computers data is represented by digital of 0 and 1 or off state and on state. Digital computer type recognizes data by counting discrete signal of (0 0r 1), they are high speed programmable; they compute values and stores results. Institute of Technology BY ABDUL-RAHAMAN
  • 11.
    Image of adigital computer Institute of Technology BY ABDUL-RAHAMAN
  • 12.
    Image of adigital computer Institute of Technology BY ABDUL-RAHAMAN
  • 13.
    HYBRID COMPUTER Hybrid computertypes are very unique, in the sense that they combined both analogue and digital features and operations. Hybrid computers operate by using digital to analogue convertor and analogue to digital convertor. E.g. personal computer Institute of Technology BY ABDUL-RAHAMAN
  • 14.
    IMAGES OF HYBRIDCOMPUTER HYBRID COMPUTER HYBRID COMPUTER Institute of Technology BY ABDUL-RAHAMAN
  • 15.
    Classification of Computers Theclassification of computers according to size / appearance relates to the grouping of computers according to their physical structure. The computer classification from the largest to the smallest single unit is as follows: Supercomputers, Mainframe Computers, Mini Computers, and Micro Computers Institute of Technology BY ABDUL-RAHAMAN
  • 16.
    Supercomputers: Super computer arethe fastest high capacity computers and very expensive. Used for calculating speed and volumes in weather forecasting, oil exploitation, aircraft designing and handle about 1000 user at a time. Institute of Technology BY ABDUL-RAHAMAN
  • 17.
    An example ofa supper computer Institute of Technology BY ABDUL-RAHAMAN
  • 18.
    Mainframe computers Mainframe computersare powerful computers used mainly by large organizations for critical applications. Typically bulk data processing such as census, industry and consumer statistics, enterprise resource planning, and financial transaction processing. Institute of Technology BY ABDUL-RAHAMAN
  • 19.
    An example ofa mainframe computer Institute of Technology BY ABDUL-RAHAMAN
  • 20.
    An example ofa mainframe computer Institute of Technology BY ABDUL-RAHAMAN
  • 21.
    MINI COMPUTER . Minicomputerare mid-range called refrigerator machine with less storage capacity and processing speed. Used by small companies for accounting and finance, and handle about 4 to 100 users at a time. Institute of Technology BY ABDUL-RAHAMAN
  • 22.
    An example ofa mini computer Institute of Technology BY ABDUL-RAHAMAN
  • 23.
    MICRO COMPUTER Personal Computeris the smallest with low storage capacity and processing speed. It support only one monitor, key board and a user at a time. Institute of Technology BY ABDUL-RAHAMAN
  • 24.
    EXAMPLE OF MICROCOMPUTERS Institute of Technology BY ABDUL-RAHAMAN
  • 25.
    Basic parts ofa computer There are four (4) basic parts of a computer:  Mouse  Keyboard  Monitor  System Unit Institute of Technology BY ABDUL-RAHAMAN
  • 26.
    Mouse A mouse isa hand-held or an input device that controls the movement of pointer on the screen. Position the pointer on an object is known as pointing. Mouse Institute of Technology BY ABDUL-RAHAMAN
  • 27.
    Types of Mouse Thereare many types of computer mice, but the three (3)common types are namely: Base on their ports 1) PS/2 mouse 2) USB mouse 3) Serial mouse Institute of Technology BY ABDUL-RAHAMAN
  • 28.
    Types of Mouse Thereare many types of computer mice, but the three (3)common types are namely: Base on their designed standard mouse optical mouse wireless mouse Institute of Technology BY ABDUL-RAHAMAN BY ABDUL-RAHAMAN
  • 29.
    Parts of amouse Plastic case (body) Institute of Technology BY ABDUL-RAHAMAN
  • 30.
    HOW TO HOLDA MOUSE Thumb finger Little finger Ring finger Middle finger Index finger Institute of Technology BY ABDUL-RAHAMAN
  • 31.
    Actions of amouse This section explain the actions of the mouse  Pointing  Mouse Pointer  Clicking  Mouse Pad  Double Clicking  Right Clicking  Dragging  Right Dragging Institute of Technology BY ABDUL-RAHAMAN
  • 32.
    Pointing To direct thetip of the mouse pointer on an item. CLICKING Press and release the left mouse button once. DOUBLE CLICKING Quickly press and release the left mouse button twice. RIGHT CLICKING Press and release the right mouse button once. A shortcut menu appears. Institute of Technology BY ABDUL-RAHAMAN
  • 33.
    Dragging pressing and holdingdown the left mouse button on an object or selected text and moving it to a different position and release the left button. RIGHT DRAGGING Right-drag is to press and hold down the right mouse button on an object, move to different position and release the button to drop the item. MOUSE POINTER Mouse pointer is an arrow that appears on the screen and is controlled by the movement of the ball. Institute of Technology BY ABDULRAHAMAN
  • 34.
    keyboard The keyboard isthe primary input device for entering data and executing commands. The keyboard is laid out like the keys on a typewriter. It has 102 to 110 keys and with 256 to 260 characters. BY ABDUL-RAHAMAN Institute of Technology
  • 35.
    TYPES OF COMPUTERKEYBOARD There are two (2) types of computer keyboard namely:  Standard Keyboard Multimedia Keyboard BY ABDUL-RAHAMAN Institute of Technology
  • 36.
    Standard keyboard (qwerty) Itis named after the first six leftmost letters on the top alphabetical line of the keyboard. Also called a QWERTY keyboard because of the layout on its typing area. It has about 103 keys and about 257 characters. Institute of Technology BY ABDULRAHAMAN
  • 37.
    Multimedia keyboard Designed forthe user to access often-used programs such as Internet, music, and email. It contains buttons that control various computer processes, such as turning on the computer's power, putting the CPU to sleep, and waking it up again. It comes in various connection formats, including PS/2, USB, and wireless. Depending on the manufacturer. BY ABDUL-RAHAMAN Institute of Technology
  • 38.
    Parts of akeyboard The computer keyboard is divided into five main parts as showed below Home Keys Calculator Keys Function Keys Arrow Keys Typing Standard Key Institute of Technology BY ABDUL-RAHAMAN
  • 39.
    Special key The standardkeyboard contains special key such as: Keys Esc Tab Caps Lock Shift Ctrl Alt Space Bar Enter Backspace Meaning Escape Tab Caps Lock Shift Control Altertive Space Bar Enter Backspace Institute of Technology Symbol BY ABDUL-RAHAMAN
  • 40.
    Special keys Escape keyused to get out of troubles. Tab key used to advance the cursor some distances away from the margin. Caps Lock key used to change upper case to lower case (capital to small letters)and vise visa. Shift, Ctrl and Alt key used to combine with other keys to perform a task. Space bar key used to give space between words. Enter Key used to start a new line or end a paragraph. Backspace key used to advance the cursor one step backwards. Institute of Technology BY ABDUL-RAHAMAN
  • 41.
    Monitor Is a displayunit used to view the content of the system unit. The screen is made up of red, green and blue dots. The video card send signals out to the monitor. The information video card sends control which dots are light up and how bright they are determines the picture you see. Another name for a monitor is video display terminal (VDT) or Visual display unit (VDU). Institute of Technology BY ABDUL-RAHAMAN
  • 42.
    TYPES OF MONITOR Thereare two (2) types of monitor as follows:  Cathode Ray Tube (CRT)  Liquid crystal Display (LCD) Institute of Technology BY ABDUL-RAHAMAN
  • 43.
    LIQUID CRYSTAL DISPLAY(LCD) The LCD (Liquid Crystal Display). This is also called Flat screen. It has the following advantages over the CRT: Takes up less space Lighter in weight Uses less power Institute of Technology BY ABDUL-RAHAMAN
  • 44.
    SYSTEM UNIT It isalso known as a base unit, is the main body of a desktop computer. System Unit It consisting of a plastic case containing the motherboard, power supply, cooling fans, memory models and expansion cards that are plugged into the motherboard, such as video and network card. Institute of Technology BY ABDUL-RAHAMAN
  • 45.
    TYPES OF SYSTEMUNIT They are two (2) types of system unit Institute of Technology BY ABDUL-RAHAMAN
  • 46.
    COMPONENTS OF THESYSTEM UNIT Hard Disk Power Pack Cmon Battery CD-ROM Drive Cooling Fan Floppy Disk Drive Heat Sink CPU Video Card (VGA) Mother Board Memory Ribbon Cables Institute of Technology BY ABDUL-RAHAMAN
  • 47.
    MOTHERBOARD The motherboard isthe main circuit board in which all component communicate through in the PC. Every components either directly plugging into it or communicating through the motherboards ports. Institute of Technology BY ABDUL-RAHAMAN
  • 48.
    RIBBON CABLES These arecables (wires) used internally in a PC to connect hard disk, CD and floppy. For external connections, round-shaped cables are preferred over ribbon ones. Institute of Technology BY ABDUL-RAHAMAN
  • 49.
    CMOS BATTERY A tinydevice on the motherboard that create a computer system to run smoothly. Its function is to keep the computer date and time up till date. Institute of Technology BY ABDUL-RAHAMAN
  • 50.
    CENTRAL PROCESSING UNIT(CPU) A CPU is the brain that runs a computer. CPU (Central Processing Unit) is the core chip to a computer. It process data to information which is then outputted to the user. Another name for a CPU is Processor Institute of Technology BY ABDUL-RAHAMAN
  • 51.
    HEAT SINK It isa device that absorbs the excess heat generated by a processor (CPU). Institute of Technology BY ABDUL-RAHAMAN
  • 52.
    COOLING FAN The coolingfan produce air to cool the heat sink so it can absorb more heat from the processor (CPU) The CPU - produce a ton of heat and cause overheating to the machine if not check will crash the computer. Institute of Technology BY ABDUL-RAHAMAN
  • 53.
    HARD DISK DRIVE(HDD) The hard disk drive is the main primarily storage device for the computer system that stores all data and files. Also known as the "C drive" because Microsoft assigns the "C" drive letter to the primary partition(division) by default on the primary hard drive. Institute of Technology BY ABDUL-RAHAMAN
  • 54.
    Parts of aHard Disk Drive Institute of Technology BY ABDUL-RAHAMAN
  • 55.
    CD-ROM DRIVE A CDdrive is connected to a computer and on which a CD-ROM can be ‘played’ (computer science) a device that writes data onto or reads data from a storage medium. CD-ROM Drive Institute of Technology BY ABDUL-RAHAMAN
  • 56.
    FLOPPY DISK DRIVE(FDD) Itis a small drive that takes a little plastic square shaped disks. Is a place where a floppy disk(a diskette) is inserted (removable storage device). They are out of date, pen drives can take much data/information than diskette. Today new computers are sold without a floppy disk drive. Floppy Disk Drive Institute of Technology BY ABDUL-RAHAMAN
  • 57.
    FLOPPY DISKETTE It isa magnetic disc with a microfilm and capable of storing information depending on the density. They are read and written by a floppy disk drive (FDD). It is slotted into the floppy disk drive (Drive A: B: ) computer to access the information stored on it. Institute of Technology BY ABDUL-RAHAMAN
  • 58.
    TYPE OF FLOPPYDISKETTE There are two (2) types of floppy diskettes as follow:  3½ floppy diskette 5¼ floppy diskette Institute of Technology BY ABDUL-RAHAMAN
  • 59.
    3½ FLOPPY DISKETTE Itis a magnetic disc with a microfilm and capable of storing information depending on the density, slotted into the floppy disk drive (Drive A:) 3½ Floppy Diskette Capable of storing from 400K to 1.4MB of data. The common once are 720K (double-density) and 1.44MB (high-density). Macintoshes support disks of 400K, 800K, and 1.2MB. Institute of Technology BY ABDUL-RAHAMAN
  • 60.
    5¼ FLOPPY DISKETTE Thisis also a magnetic disc with a microfilm and capable of storing information depending on the density, slotted into the diskette drive (Drive B:) 5¼ Floppy Diskette It is capable of storing between 100K and 1.2MB (megabytes) of data. The most common sizes are 360K and 1.2MB. BY ABDULRAHAMAN Institute of Technology
  • 61.
    MEMORY The computer memoryis a temporary storage device which holds the data and instructions that (CPU) needs to process. Before a program can be run, it must be loaded from a storage medium (hard disk) into the memory for CPU to have direct access to it. Memory is a necessity to every computer. It is primary storage device, it can be either ROM or RAM Institute of Technology BY ABDUL- RAHAMAN
  • 62.
    TYPES OF MEMORY Thereare two (2) main types of computer memory as follow:  Read Only Memory (ROM)  Random Access Memory (RAM) Institute of Technology BY ABDUL-RAHAMAN
  • 63.
    READ ONLY MEMORY(ROM) The Read-Only Memory (ROM) stores the BIOS that runs when the computer is powered on. Or otherwise begins execution, a process known as Bootstrapping, or "booting" or "booting up". Institute of Technology
  • 64.
    RANDOM ACCESS MEMORY(RAM) RAM is the working memory of a computer system that stores input data, intermediate results, programs, and other information temporarily. It can be read and written. It is volatile, that is all data will be erased when the power is turned off. Institute of Technology BY ABDUL-RAHAMAN
  • 65.
    POWER SUPPLY (POWERPACK) A power supply unit (PSU) converts alternating current (AC) electric power to low-voltage direct current (DC) power for the internal components of the computer. Is mostly found in the system unit. Institute of Technology BY ABDUL-RAHAMAN
  • 66.
    VIDEO CARD (VGA) Thevideo card is responsible for what you see on the monitor. The main function of the video card is to generate and output images to the computer screen. Better graphics card equals better performance when playing games or working on a high resolution monitor. Institute of Technology BY ABDUL-RAHAMAN
  • 67.
    TYPE OF VIDEOCARDS (VGA) AGP Video Card PCI Express Video Card PCI Video Card Institute of Technology BY ABDUL-RAHAMAN
  • 68.
    PERIPHERAL DEVICES Peripheral deviceare optional device connected to the computer externally such as printer, scanner, tape device, microphone and external modem. And internal such as CD-ROM or internal modem and CPU, expansion cards. Peripheral devices are classified base on their functions. Scanner Microphone Printer Projector Web Cam Light Pen Speakers Plotter Wireless Router Institute of Technology BY ABDUL-RAHAMA
  • 69.
    PRINTER This device isused to print a report or hardcopy, after data or information has been processes. Printers are designed to print in any colour, but some, just one colour i.e. Black. A print out from the printer is term as hardcopy. Canon SELPHY DS810 Prints any colour Institute of Technology HP Laser Jet 2055 Prints only black BY ABDUL-RAHAMAN
  • 70.
    SCANNER A scanner isa device that is able to transfer images or pictures in to the computer to be store. Such images or pictures are usually not found in the computer; thus the need to be scan. HP Scanjet 3670 HP ScanJet 4370 Institute of Technology BY ABDUL-RAHAMAN
  • 71.
    INPUT DEVICE Input devicesare devices used to feed information or provide the control signals to the computer. Keyboard and the Mouse are the examples of the input devices. Microphone Keyboard Mouse Light Pen Web Cam Scanner Institute of Technology BY ABDULRAHAMAN
  • 72.
    OUTPUT DEVICES Output devicesare devices used to display results. Printer, speaker and the monitor are the examples of the output devices. Projector Monitor Plotter Printer Speaker Institute of Technology BY ABDUL-RAHAMAN
  • 73.
    Plotter Plotters were thefirst type of printer that could print with colour and render graphics and full-size engineering drawing. But plotter are much more expensive than printers. Plotter Institute of Technology BY ABDUL-RAHAMAN
  • 74.
    Projector A Projector isan output device that project and display video, images or computer data on a screen or other flat form. Projector Institute of Technology BY ABDUL-RAHAMAN
  • 75.
    Sound Speakers Sound Speakersenable the computer user (liveware) to hear sound from the computer. Sound speakers BY ABDULRAHAMAN Institute of Technology
  • 76.
    INPUT/OUTPUT DEVICE Referred toas a IO device, an input/output device is a hardware device that accepts inputted information and also has the capability of outputting that information. Network Card Touch Screen Photocopier Wireless Card Wireless Router Sound Card Modem Institute of Technology BY ABDULRAHAMAN
  • 77.
    SOUND CARD Also knownas an audio card, is an internal computer expansion card that facilitates the input and output of audio signals to and from a computer TOUCH SCREEN It is display screen that allows commands to be entered by touching the screen. Touch screens are generally used in the locations such as airports and hotels to display certain type of menu. Institute of Technology BY ABDUL-RAHAMAN
  • 78.
    STORAGE DEVICES A storagedevice is a device that is used to store the information such as hard disk drive, flash drive, floppy disk and the tape drive. Secure Digital Card Hard Disk Pen Drive Floppy Diskette Compact Disc Secure Digital Card Blu-ray DVD Zip Disk Digital Versatile Disc Or Digital Video Disc PC Card Institute of Technology BY ABDUL-RAHAMAN
  • 79.
    BLU-RAY DVD Blu-ray Disc(official abbreviation BD) is an optical disc storage medium designed to supersede the DVD format. The plastic disc is 120 mm in diameter and 1.2 mm thick, the same size as DVDs and CDs. Blu-ray Discs contain 25 GB (23.31 GB) per layer, with dual layer discs (50 GB) being the norm for feature-length video discs. Triple layer discs (100 GB) and quadruple layers (128 GB) are available for BDXL Blu-ray re-writer drives . Philips Double Layer 50GB Institute of Technology BY ABDULRAHAMAN
  • 80.
    THE ZIP DISK Azip disk is a computer hardware device that stores data. A zip disk drive is somewhat like floppy disk drive, only that the size of disks inserted into the devices are different. Where a normal floppy disk can hold about 1.44 megabytes of data, a zip disk can hold around 100 megabytes of data Zip Disk Institute of Technology BY ABDUL-RAHAMAN
  • 81.
    USER INTERFACE User interfaceis the space where interaction between the user and the computer occurs. TYPES OF USER INTERFACE There are two types of user interfaces between a computer application and the user. They are:  Graphical User Interface (GUI)  Character User Interface (CUI) or Command Line Interface (CLI) Institute of Technology BY ABDUL-RAHAMAN
  • 82.
    GRAPHICAL USER INTERFACE(GUI) Allows users to interact with the computer, using icons, windows and menus, with the help of a pointing device, such as a mouse. In GUI more task can run simultaneously and user friendly interface. Application : Windows (Operating System) Institute of Technology BY ABDULRAHAMAN
  • 83.
    Character User Interface(CUI) An interface that allows users to interact with the computer, using codes (text), with the help of a keyboard. In CUI one task run at a time. Anther name for Character user interface is Command Line Interface (CLI) Application : MS Dos (Operating System) Institute of Technology BY ABDUL-RAHAMAN
  • 84.
    BOOT Boot is theprocess of turning on the computer. To do this, press the power switch that is used to put the unit on. Nowadays, it is located in front of the computer. Pushing it would start the computer. System Unit Power Monitor Power Institute of Technology BY ABDUL- RAHAMAN
  • 85.
    Types of booting Thereare two types of booting namely: o Cool Booting o Warm Booting • Cool booting is the process of putting the switch of the system unit and the monitor on. • Warm booting is the process of restarting the computer. Institute of Technology BY ABDULRAHAMAN
  • 86.
    process of booting Incomputing, booting (also known as booting up) is a process that starts operating systems when the user turns on a computer system. A boot sequence is the initial set of operations that the computer performs when power is switched on. The boot loader typically loads the main operating system for the computer. Information about computer Welcome screen Checking components Desktop Institute of Technology Type of Operating system BY ABDULRAHAMA N
  • 87.
    Desktop The Desktop isa graphical user interface which serves as a communication link between the computer and the user (live ware) Institute of Technology BY ABDULRAHAMA
  • 88.
    Icons Wallpaper Parts of thedesktop Taskbar Notification area Start button Institute of Technology BY ABDUL-RAHAMAN
  • 89.
    Parts of thedesktop Start button -Provides access to Windows XP programs, documents, and information on the Internet. (Generally located in the bottom left corner of the desktop and the far left of the Task bar.) Taskbar -Contains buttons that give you quick access to common tools and the programs currently running. (Located across the bottom of the desktop.) Icons are small pictures used to represent programs. Notification Area located at the bottom right corner of the taskbar tell the user what ever is happening in the computer. Taskbar Pointer -A small object, such as an arrow, that moves on the screen when you move the mouse. Institute of Technology BY ABDUL-RAHAMAN
  • 90.
    Window A window isa rectangular area of the screen in which you view program folders, files, or icons. The window is made up of several components that are the same for all windows in Windows XP and Windows applications and make it easy for you to manage your work. Institute of Technology BY ABDULRAHAMAN
  • 91.
    PARTS OF AWINDOW Institute of Technology BY ABDULRAHAMAN
  • 92.
    PARTS OF AWINDOW Menu bar -Contains the titles of menus, such as File, Edit, and Help. (Located along the top of the window under the Title bar.) Control Menu Icon-Drop-down menu on the Title bar with the Minimize, Maximize/Restore, Close, Move and Size functions. (Located on the left side of the Title bar) Title bar -Contains the window title and basic window control buttons. (Located at the top of the window.) Control Menu Icon in every window, a little icon in the upper-left corner that can be used to control the window. Clicking the icon opens the window’s control menu while double clicking the icon is a shortcut for closing the window. Institute of Technology BY ABDUL-RAHAMAN
  • 93.
    PARTS OF AWINDOW Minimize button a small minus button at the top right window which is used to reduce the window on to the taskbar as an icon ( ) Maximize button two small ( ) rectangular boxes overlap together which is used to increase the size of your windows to fill the screen Close button a small ( x )button located at the top right corner of the window used to exit out off the window Institute of Technology BY ABDUL-RAHAMAN
  • 94.
    COMPUTER WARES Computer waresrefers to the physical, internal and living parts that makes a computer to work. There are three(3) types of computer wares. (i) hardware (ii) software (iii) live ware Institute of Technology BY ABDUL-RAHAMAN
  • 95.
    Hardware Hardware – thephysical parts of a computer you can see, torch and feel. e.g. system unit, monitor, keyboard, mouse. etc. Software – the internal programs that tell a computer what to do and how to do it, or runs on hardware. E.g. operating system (windows xp, Linux, ubuntu, zubuntu, window 7. etc.) live ware – human beings ( man ,woman, children) that create and use computers. Institute of Technology BY ABDUL-RAHAMAN
  • 96.
    SOFTWARE Software is acollection of computer programs and related data that provide instructions for telling a computer what to do and how to do it. In other words, software is a general name given to all computer program. Institute of Technology BY ABDULRAHAMAN
  • 97.
    TYPES OF SOFTWARE Thereare two (2) types of computer software namely: I. System Software II. Application Software Institute of Technology BY ABDUL-RAHAMAN
  • 98.
    System software System software alsoknown as operating system(o s) the soul of a computer. This program controls the affairs of the computer and manage the hardware resources. E.g. MS DOS, Windows, Linux, Apple, Macintosh, OS/2 etc. Without this program one can not use the computer. Means the operating system have to be installed before the computer can be use, even before the applications. Institute of Technology BY ABDUL-RAHAMAN
  • 99.
    APPLICATION SOFTWARE Application Softwareis a computer software designed to help the user to perform specific tasks. Examples include: a) Enterprise software, b) Accounting software, c) Office suites, d) Graphics software e) And media player. etc. Institute of Technology BY ABDUL-RAHAMAN
  • 100.
    TYPES OF APPLICATIONSOFTWARE There are three (3) types of application software namely: 1. End-user software ( can be downloaded from internet freely) 2. Packaged software (created for selling) 3. Custom-made software (designed purposely for a particular organization) 4. Utility software for protecting your pc. E.g. Antivirus. Institute of Technology BY ABDUL-RAHAMAN
  • 101.
    operating system An operatingsystem (OS) is a set of programs that manage computer hardware resources and provide common services for application software. The operating system is the most important type of system software in a computer system. A user cannot run an application program on the computer without an operating system, unless the application program is self booting. Institute of Technology BY ABDUL-RAHAMAN
  • 102.
    THE END!!! THANK YOU Instituteof Technology BY ABDUL-RAHAMAN

Editor's Notes