Introduction to Cloud B2B Integration
B2B Outlook – Getting Very Cloudy 
The Cloud is not hype, it is real and here today! 
Productivity gains lie outside the enterprise 
B2B challenges and the hunt for ROI 
OpenText Confidential. ©2014 All Rights Reserved. 2
CIOs are Embracing Cloud Computing 
OpenText Confidential. ©2014 All Rights Reserved. 3 
 Following divestiture from Ford, Jaguar 
Land Rover (JLR) had 18Tb of emails to 
extract from Ford’s Microsoft Exchange 
Server 
 JLR’s CIO saw this as an opportunity to do 
things differently 
 Adoption of cloud based applications has 
helped to simplify their ICT/B2B 
infrastructure 
"The strategy will be one of 
simplification, standardisation 
and modernisation. Where I can 
deem services and technology 
as being commodity I will seek 
to externalise, outsource or 
place them in the cloud." 
CIO, JLR 
Link to Article
Significant Investment in Cloud 
Infrastructures 
OpenText Confidential. ©2014 All Rights Reserved. 4 
Google invests $850M in its data 
centre infrastructure 
Apple invests $1Billion in 
North Carolina data centre 
Microsoft invests $500M in 
Dublin based data centre
Evolution of Business Integration 
Enterprise 
Community 
Management 
Customer Data 
Integration 
Supply Chain 
Visibility 
Web-Based 
Portals 
Sense and 
Respond 
Mainframe ASP SaaS Cloud Computing 
OpenText Confidential. ©2014 All Rights Reserved. 5 
Enterprise 
Application 
integration 
Cross-Enterprise 
Integration 
1995 
Strategic/Competitive 
Customer Centric 
2000 
Organisation Critical 
Department Specific 
2005 2010 2015 
Unisys 
Integration 
Business 
Intelligence 
Secure Web 
Services 
RFID and 
EPC 
Sales Force 
Automation 
Enterprise 
Resource Planning 
Business 
Process Mgmt 
Business 
Activity 
Monitoring
What is Cloud Computing?
Security-as-a-Service 
OpenText Confidential. ©2014 All Rights Reserved. 7 
What is Cloud Computing? 
Platform-as-a-Service 
Managed Video-as-a-Service 
Software-as-a-Service 
SaaS 
Integration-as-a-Service 
Data-as-a-Service IaaS 
DaaS 
Infrastructure-as-a-Service 
Everything-as-a-Service 
Computing-as-a-Service 
Hardware-as-a-Service 
Database-as-a-Service 
Anything-as-a-Service 
Voice-as-a-Service 
HaaS 
XaaS 
Ruby Cloud Platform-as-a-Service
Definition of Cloud Computing 
A standardised IT capability (services, software or infrastructure) 
delivered via internet technologies in a pay-per-use, self-service way 
Cloud services are shared services, under virtualised management, 
accessible over the internet 
A style of computing where massively scalable IT-related capabilities 
are provided “as a service” using internet technologies to multiple 
external customers 
OpenText Confidential. ©2014 All Rights Reserved. 8
Characteristics of a Cloud Environment 
OpenText Confidential. ©2014 All Rights Reserved. 9 
 Dynamic- One of the keys to cloud 
computing is on-demand 
provisioning 
 Massively Scalable- The service 
must react immediately to your 
needs 
 Multi-Tenant- Cloud computing, by 
its nature, delivers shared services
Characteristics of a Cloud Environment 
OpenText Confidential. ©2014 All Rights Reserved. 10 
 Self-Service - As a user, you can 
use the service as you require 
 Per-Usage Based Pricing Model - 
You should only ever pay for the 
amount of service you consume 
 IP-Based Architecture - Cloud 
architectures are based on 
virtualised, internet based 
technologies
OpenText Confidential. ©2014 All Rights Reserved. 11 
Types of Cloud 
 Public Cloud – Available to the general public or 
large industry group and is owned by an 
organisation selling cloud services 
 Community Cloud – Shared by several 
organisations and supports a specific community 
that has shared concerns 
 Private Cloud – Operated solely for an 
organisation or company 
 Hybrid Cloud – Combination of two of the above, 
they remain unique entities but are bound together 
by standardised technologies
Migrating Your Business to the Cloud 
Strategy 
Maintenance 
OpenText Confidential. ©2014 All Rights Reserved. 12 
HR CRM 
SCM ERP 
By Application By Geography 
By Process 
Planning 
Testing 
Implementation
Three Layers of Cloud Computing
Three Layers of Cloud Computing 
Business 
Applications 
Application 
Infrastructure 
Compute & 
Storage 
OpenText Confidential. ©2014 All Rights Reserved. 14
OpenText Confidential. ©2014 All Rights Reserved. 15 
Infrastructure-as-a-Service 
 Delivers computer infrastructure, typically 
platform virtualisation as a service. Its an 
evolution of virtual private server offerings 
 Includes servers, memory and storage that 
allow a customer to scale up or down as 
required 
 Infrastructure can be used by customers to run 
their own software with only the amount of 
resource that is needed at a given moment in 
time
OpenText Confidential. ©2014 All Rights Reserved. 16 
Platform-as-a-Service 
 Delivers a computing platform and/or solution 
stack as a service, often consuming cloud 
infrastructure and sustaining cloud 
applications. 
 Allows users to use the clouds to develop new 
applications without the need to have the 
software or infrastructure purchased in-house 
 Essentially provides anything to support how a 
company builds and delivers web applications 
and services in the cloud
PaaS: A New Continent Emerging 
 By 2015, cloud-based solutions 
will be growing at a faster rate 
than on-premises solutions 
 By 2015, most enterprises will 
have part of their run-the-business 
software functionally executing in 
the cloud, using PaaS 
 By 2015, most enterprises using 
PaaS services or technologies will 
have a hybrid environment in 
which internal and external 
services are combined 
OpenText Confidential. ©2014 All Rights Reserved. 17
From Both Large and Small Companies 
OpenText Confidential. ©2014 All Rights Reserved. 18
OpenText Confidential. ©2014 All Rights Reserved. 19 
Software-as-a-Service 
 Delivers software over internet without the 
need to install applications on the 
customer’s own computers 
 SaaS applications are run from one 
centralised location, which means that the 
software can be accessed from any location 
over the internet 
 Centralised management of applications 
helps to simplify maintenance 
 Applications consumed on a pay-as-you-go 
basis
Benefits of Cloud Infrastructures
Benefits of Cloud Based B2B Integration 
OpenText Confidential. ©2014 All Rights Reserved. 21 
Global Accessibility 
Low Cost 
Consistent User Experience 
Scalability 
Easy to Maintain 
Rapid Deployment 
Flexibility 
Central Authentication
Traditional IT versus Cloud Computing 
Traditional IT Cloud Computing 
OpenText Confidential. ©2014 All Rights Reserved. 22 
Speed to 
market 
Enterprise applications take months or 
years to design, code, test and deploy 
Cloud provider is responsible for on-going 
development and clients simply use the 
most up to date application available 
Speed to 
Value 
Applications may need to be de-bugged 
and continually upgraded 
Cloud providers conduct all development 
and testing leaving the client to simply 
benefit from its usage 
Speed to 
ROI 
Even with significant capital investment, 
many companies never get to realise 
the expected ROI 
Subscription based model allows a client to 
pay for the service they actually use and is 
a highly predictable operational expense 
Managing 
TCO 
Cost of on-going support and 
maintenance can be over five times the 
initial license fee 
All on-going support and maintenance 
costs are rolled into the subscription fee 
Managing 
Innovation 
Technology deployment is always at 
least one step behind the business 
need, eg a system has to be developed 
based on the business need 
Cloud applications allow companies to 
quickly scale up solutions to business 
issues using ‘plug and play’ modules which 
can be utilised as and when required
Financial Benefits of Cloud Computing 
Factor On-premise Cloud-Computing 
Expenditure 
Capital expenditure Operating expense 
Type 
OpenText Confidential. ©2014 All Rights Reserved. 23 
Cash Flow 
Servers and software are 
purchased up front 
Payments are made 
as the service is 
provided 
Financial Risk 
Entire financial risk is 
taken upfront, with 
uncertain return 
Financial risk is 
taken monthly and 
is matched to return 
Income 
Statement 
Maintenance and 
depreciated capital 
expense 
Maintenance 
expense only 
Balance Sheet 
Software and hardware 
are carried as a long-term 
capital asset 
Nothing appears on 
the balance sheet
Not Forgetting the Green Benefits of 
Cloud Environments... 
Lower power consumption requirements 
Less computer/network equipment packaging to dispose of 
Minimises travel requirements for IT implementation teams 
Increased availability of information on lower power devices 
Less paper flowing across the supply chain 
OpenText Confidential. ©2014 All Rights Reserved. 24
Cloud B2B Integration
OpenText Confidential. ©2014 All Rights Reserved. 26 
Cloud Service Brokerage 
“The future of cloud computing will be permeated with the 
notion of brokers negotiating relationships between providers 
of cloud services and the service customers”
OpenText™ Trading Grid™ Provides a Single 
Integration Point Into the Enterprise 
OpenText Confidential. ©2014 All Rights Reserved. 27
OpenText™ Active Community 
Improving Collaboration Across the Supply Chain 
OpenText Confidential. ©2014 All Rights Reserved. 28
The Cloud Provides IT with Rapid Access 
to Built-In Expertise and Capabilities 
OpenText Confidential. ©2014 All Rights Reserved. 29 
Business Context 
 Ability to Introspect and Breakdown 
Messages in to Structured Objects 
 Pre-defined document standards 
 Business user interfaces 
Process Orchestration 
 Manages end-to-end information flow 
with conditions and visibility, and 
coordinates access to shared services 
 Tailored Visibility 
Data Enrichment 
 Compute services for transformation 
 Operational Business Rules and Data Quality 
 Extensive libraries 
Identity and Control 
 Pre-wired integration pairs 
 Global B2B semantics repository
Benefits of Cloud B2B 
Integration
Offers Scalability & Flexibility 
OpenText Confidential. ©2014 All Rights Reserved. 31 
 B2B environments can be expanded or 
contracted depending on the needs of the 
business 
 Allows new B2B functionality to be 
deployed very quickly from a central 
location 
 Global nature of cloud based B2B 
environments allows remote plants or 
offices to be brought online with ease
OpenText Confidential. ©2014 All Rights Reserved. 32 
Simplifies Connectivity 
 The cloud offers any-to-any mediation 
between different B2B communication or 
document standards 
 Modern and legacy standards can be 
utilised within the cloud 
 Regional standards can be embraced 
within the cloud, thus providing seamless 
connectivity anywhere in the world
Provides End-to-End Visibility 
OpenText Confidential. ©2014 All Rights Reserved. 33 
 Cloud based B2B environments provide 
end-to-end visibility of global business 
transactions 
 Provides a single view of B2B transactions 
flowing between global trading partners 
 Customer shipments can be monitored 
seamlessly across multi-modal logistics 
networks and border control agencies
Improves Trading Partner Collaboration 
OpenText Confidential. ©2014 All Rights Reserved. 34 
 All trading partners can be connected to the 
cloud with ease using a mix of quick to 
deploy, simple to use web tools 
 The cloud removes the collaboration 
barriers between trading partners in 
developed and emerging markets 
 All trading partners using the cloud 
environment can be administered through a 
central contact database
Simplifies Integration to Business Systems 
OpenText Confidential. ©2014 All Rights Reserved. 35 
 Integration to numerous business systems 
takes place through a single cloud 
environment 
 The quality of data entering ERP or other 
business systems can be proactively 
monitored via the cloud 
 Numerous implementation templates and 
best practices from previous integration 
projects can be delivered through the cloud
Mark Morley | mmorley@opentext.com 
Copyright © OpenText Corporation. All rights reserved. 
twitter.com/opentext 
facebook.com/opentext 
linkedin.com/company/opentext 
W www.opentext.com

Introduction to Cloud B2B Integration

  • 1.
    Introduction to CloudB2B Integration
  • 2.
    B2B Outlook –Getting Very Cloudy The Cloud is not hype, it is real and here today! Productivity gains lie outside the enterprise B2B challenges and the hunt for ROI OpenText Confidential. ©2014 All Rights Reserved. 2
  • 3.
    CIOs are EmbracingCloud Computing OpenText Confidential. ©2014 All Rights Reserved. 3  Following divestiture from Ford, Jaguar Land Rover (JLR) had 18Tb of emails to extract from Ford’s Microsoft Exchange Server  JLR’s CIO saw this as an opportunity to do things differently  Adoption of cloud based applications has helped to simplify their ICT/B2B infrastructure "The strategy will be one of simplification, standardisation and modernisation. Where I can deem services and technology as being commodity I will seek to externalise, outsource or place them in the cloud." CIO, JLR Link to Article
  • 4.
    Significant Investment inCloud Infrastructures OpenText Confidential. ©2014 All Rights Reserved. 4 Google invests $850M in its data centre infrastructure Apple invests $1Billion in North Carolina data centre Microsoft invests $500M in Dublin based data centre
  • 5.
    Evolution of BusinessIntegration Enterprise Community Management Customer Data Integration Supply Chain Visibility Web-Based Portals Sense and Respond Mainframe ASP SaaS Cloud Computing OpenText Confidential. ©2014 All Rights Reserved. 5 Enterprise Application integration Cross-Enterprise Integration 1995 Strategic/Competitive Customer Centric 2000 Organisation Critical Department Specific 2005 2010 2015 Unisys Integration Business Intelligence Secure Web Services RFID and EPC Sales Force Automation Enterprise Resource Planning Business Process Mgmt Business Activity Monitoring
  • 6.
    What is CloudComputing?
  • 7.
    Security-as-a-Service OpenText Confidential.©2014 All Rights Reserved. 7 What is Cloud Computing? Platform-as-a-Service Managed Video-as-a-Service Software-as-a-Service SaaS Integration-as-a-Service Data-as-a-Service IaaS DaaS Infrastructure-as-a-Service Everything-as-a-Service Computing-as-a-Service Hardware-as-a-Service Database-as-a-Service Anything-as-a-Service Voice-as-a-Service HaaS XaaS Ruby Cloud Platform-as-a-Service
  • 8.
    Definition of CloudComputing A standardised IT capability (services, software or infrastructure) delivered via internet technologies in a pay-per-use, self-service way Cloud services are shared services, under virtualised management, accessible over the internet A style of computing where massively scalable IT-related capabilities are provided “as a service” using internet technologies to multiple external customers OpenText Confidential. ©2014 All Rights Reserved. 8
  • 9.
    Characteristics of aCloud Environment OpenText Confidential. ©2014 All Rights Reserved. 9  Dynamic- One of the keys to cloud computing is on-demand provisioning  Massively Scalable- The service must react immediately to your needs  Multi-Tenant- Cloud computing, by its nature, delivers shared services
  • 10.
    Characteristics of aCloud Environment OpenText Confidential. ©2014 All Rights Reserved. 10  Self-Service - As a user, you can use the service as you require  Per-Usage Based Pricing Model - You should only ever pay for the amount of service you consume  IP-Based Architecture - Cloud architectures are based on virtualised, internet based technologies
  • 11.
    OpenText Confidential. ©2014All Rights Reserved. 11 Types of Cloud  Public Cloud – Available to the general public or large industry group and is owned by an organisation selling cloud services  Community Cloud – Shared by several organisations and supports a specific community that has shared concerns  Private Cloud – Operated solely for an organisation or company  Hybrid Cloud – Combination of two of the above, they remain unique entities but are bound together by standardised technologies
  • 12.
    Migrating Your Businessto the Cloud Strategy Maintenance OpenText Confidential. ©2014 All Rights Reserved. 12 HR CRM SCM ERP By Application By Geography By Process Planning Testing Implementation
  • 13.
    Three Layers ofCloud Computing
  • 14.
    Three Layers ofCloud Computing Business Applications Application Infrastructure Compute & Storage OpenText Confidential. ©2014 All Rights Reserved. 14
  • 15.
    OpenText Confidential. ©2014All Rights Reserved. 15 Infrastructure-as-a-Service  Delivers computer infrastructure, typically platform virtualisation as a service. Its an evolution of virtual private server offerings  Includes servers, memory and storage that allow a customer to scale up or down as required  Infrastructure can be used by customers to run their own software with only the amount of resource that is needed at a given moment in time
  • 16.
    OpenText Confidential. ©2014All Rights Reserved. 16 Platform-as-a-Service  Delivers a computing platform and/or solution stack as a service, often consuming cloud infrastructure and sustaining cloud applications.  Allows users to use the clouds to develop new applications without the need to have the software or infrastructure purchased in-house  Essentially provides anything to support how a company builds and delivers web applications and services in the cloud
  • 17.
    PaaS: A NewContinent Emerging  By 2015, cloud-based solutions will be growing at a faster rate than on-premises solutions  By 2015, most enterprises will have part of their run-the-business software functionally executing in the cloud, using PaaS  By 2015, most enterprises using PaaS services or technologies will have a hybrid environment in which internal and external services are combined OpenText Confidential. ©2014 All Rights Reserved. 17
  • 18.
    From Both Largeand Small Companies OpenText Confidential. ©2014 All Rights Reserved. 18
  • 19.
    OpenText Confidential. ©2014All Rights Reserved. 19 Software-as-a-Service  Delivers software over internet without the need to install applications on the customer’s own computers  SaaS applications are run from one centralised location, which means that the software can be accessed from any location over the internet  Centralised management of applications helps to simplify maintenance  Applications consumed on a pay-as-you-go basis
  • 20.
    Benefits of CloudInfrastructures
  • 21.
    Benefits of CloudBased B2B Integration OpenText Confidential. ©2014 All Rights Reserved. 21 Global Accessibility Low Cost Consistent User Experience Scalability Easy to Maintain Rapid Deployment Flexibility Central Authentication
  • 22.
    Traditional IT versusCloud Computing Traditional IT Cloud Computing OpenText Confidential. ©2014 All Rights Reserved. 22 Speed to market Enterprise applications take months or years to design, code, test and deploy Cloud provider is responsible for on-going development and clients simply use the most up to date application available Speed to Value Applications may need to be de-bugged and continually upgraded Cloud providers conduct all development and testing leaving the client to simply benefit from its usage Speed to ROI Even with significant capital investment, many companies never get to realise the expected ROI Subscription based model allows a client to pay for the service they actually use and is a highly predictable operational expense Managing TCO Cost of on-going support and maintenance can be over five times the initial license fee All on-going support and maintenance costs are rolled into the subscription fee Managing Innovation Technology deployment is always at least one step behind the business need, eg a system has to be developed based on the business need Cloud applications allow companies to quickly scale up solutions to business issues using ‘plug and play’ modules which can be utilised as and when required
  • 23.
    Financial Benefits ofCloud Computing Factor On-premise Cloud-Computing Expenditure Capital expenditure Operating expense Type OpenText Confidential. ©2014 All Rights Reserved. 23 Cash Flow Servers and software are purchased up front Payments are made as the service is provided Financial Risk Entire financial risk is taken upfront, with uncertain return Financial risk is taken monthly and is matched to return Income Statement Maintenance and depreciated capital expense Maintenance expense only Balance Sheet Software and hardware are carried as a long-term capital asset Nothing appears on the balance sheet
  • 24.
    Not Forgetting theGreen Benefits of Cloud Environments... Lower power consumption requirements Less computer/network equipment packaging to dispose of Minimises travel requirements for IT implementation teams Increased availability of information on lower power devices Less paper flowing across the supply chain OpenText Confidential. ©2014 All Rights Reserved. 24
  • 25.
  • 26.
    OpenText Confidential. ©2014All Rights Reserved. 26 Cloud Service Brokerage “The future of cloud computing will be permeated with the notion of brokers negotiating relationships between providers of cloud services and the service customers”
  • 27.
    OpenText™ Trading Grid™Provides a Single Integration Point Into the Enterprise OpenText Confidential. ©2014 All Rights Reserved. 27
  • 28.
    OpenText™ Active Community Improving Collaboration Across the Supply Chain OpenText Confidential. ©2014 All Rights Reserved. 28
  • 29.
    The Cloud ProvidesIT with Rapid Access to Built-In Expertise and Capabilities OpenText Confidential. ©2014 All Rights Reserved. 29 Business Context  Ability to Introspect and Breakdown Messages in to Structured Objects  Pre-defined document standards  Business user interfaces Process Orchestration  Manages end-to-end information flow with conditions and visibility, and coordinates access to shared services  Tailored Visibility Data Enrichment  Compute services for transformation  Operational Business Rules and Data Quality  Extensive libraries Identity and Control  Pre-wired integration pairs  Global B2B semantics repository
  • 30.
    Benefits of CloudB2B Integration
  • 31.
    Offers Scalability &Flexibility OpenText Confidential. ©2014 All Rights Reserved. 31  B2B environments can be expanded or contracted depending on the needs of the business  Allows new B2B functionality to be deployed very quickly from a central location  Global nature of cloud based B2B environments allows remote plants or offices to be brought online with ease
  • 32.
    OpenText Confidential. ©2014All Rights Reserved. 32 Simplifies Connectivity  The cloud offers any-to-any mediation between different B2B communication or document standards  Modern and legacy standards can be utilised within the cloud  Regional standards can be embraced within the cloud, thus providing seamless connectivity anywhere in the world
  • 33.
    Provides End-to-End Visibility OpenText Confidential. ©2014 All Rights Reserved. 33  Cloud based B2B environments provide end-to-end visibility of global business transactions  Provides a single view of B2B transactions flowing between global trading partners  Customer shipments can be monitored seamlessly across multi-modal logistics networks and border control agencies
  • 34.
    Improves Trading PartnerCollaboration OpenText Confidential. ©2014 All Rights Reserved. 34  All trading partners can be connected to the cloud with ease using a mix of quick to deploy, simple to use web tools  The cloud removes the collaboration barriers between trading partners in developed and emerging markets  All trading partners using the cloud environment can be administered through a central contact database
  • 35.
    Simplifies Integration toBusiness Systems OpenText Confidential. ©2014 All Rights Reserved. 35  Integration to numerous business systems takes place through a single cloud environment  The quality of data entering ERP or other business systems can be proactively monitored via the cloud  Numerous implementation templates and best practices from previous integration projects can be delivered through the cloud
  • 36.
    Mark Morley |mmorley@opentext.com Copyright © OpenText Corporation. All rights reserved. twitter.com/opentext facebook.com/opentext linkedin.com/company/opentext W www.opentext.com

Editor's Notes

  • #3 Now many of today’s CIOs do not believe that cloud computing will be around for very long, or that it won’t add any value to their IT infrastructures, they think that cloud computing is just hype. However they are wrong, cloud computing environments are very real and they are becoming very disruptive, in a positive way, to how IT and B2B infrastructures are being deployed across the extended enterprise. Companies can experience significant productivity gains from external trading partners as they can all share and access the same applications and resources, thus bringing a single view of business transactions across your extended enterprise The cloud helps to address many B2B related challenges and allows ROI on newly deployed IT or B2B environments to be realised in a much shorter period of time.
  • #4 Over the last 24 months, many CIOs have dismissed the cloud as being hype, when in fact it is fundamentally changing the way in which companies manage their IT and B2B infrastructures. In 2008 the premium luxury car manufacturer Jaguar Land Rover were divested from their parent company Ford. JLR were faced with the challenge of separating and establishing their own IT and B2B infrastructures as quickly as possible. Their CIO at the time decided that the separation from Ford would be a good opportunity to move as many business applications as possible to the cloud. His forward thinking vision has led to JLR moving 18Tb of emails from an old Microsoft exchange server to a Google email hosted service. In addition, JLR decided to move many other services to a cloud based environment, including the management of their b2b infrastructure which is now running via a GXS Managed Services environment.
  • #5 To support the expected growth in cloud computing adoption by both consumers and enterprises around the world, many leading software and IT companies are starting to build huge data centres around the world. Google investing nearly a billion dollars in its data centre infrastructure in the first quarter of 2011 alone, Microsoft investing half a billion in their European data centre in Dublin and Apple investing a billion dollars in a new data centre in North Carolina in the U.S. If rumours are to be believed then Apple built this particular data centre 50% bigger than it needed to be just to show its competitors that it has serious intentions of being one of the largest providers of cloud based environments in the world.
  • #6 The area of business integration has been constantly evolving over the past twenty years. Changing economic conditions combined with a need to globalise business operations has changed the way in which companies both deploy IT infrastructures and integrate to back office business systems. In the mid-90s many business applications were hosted on a central mainframe computer where users got access to applications via the infamous green screen VDU terminals. As business applications became more complex over the years, there was a need to improve the way in which applications were integrated and delivered to the end user. In the late 1990s many application service providers started to appear, these were third party vendors who offered fully hosted applications. ASP environments then migrated to Software as a Service environments and this provided the first cornerstone of the three layer cloud computing environments that we know today. Cloud computing environments started to go mainstream in 2010 and according to the latest analyst studies they are going to be around for many years to come. The reason why cloud computing has become so popular is partly due to the underlying technology being used namely the ability to run multi-tenanted software environments and the virtualised nature of the actual server environments.
  • #7 So let me discuss the three key layers that make up a cloud computing environment....
  • #8 Cloud computing has become known by many different definitions, Platform as a service, integration as a service, computing as a service, hardware as a service and even everything as a service. Now even though today’s cloud environments can contain many of these components, analyst firms around the world have been trying to provide a definition of cloud computing that encompasses all the functionality that cloud computing environments offer today.
  • #9 Now I expect you could ask ten different people to provide a definition of what they think cloud computing is and I expect you would get ten completely different answers. So why would analyst firms be any different. Numerous definitions have been released over the last few years, here are just three of them. Even though technically these all describe a cloud environment very well, I believe that the quote from Forrester provides one of the most succinct definitions available today, namely A standardised IT capability (services, software or infrastructure) delivered via internet technologies in a pay per use, self service way.
  • #10 Now rather than try to describe the cloud by way of a definition that no one can seem to agree on, why not define the cloud by its characteristics? For example, a cloud environment needs to be Dynamic – one of the keys to cloud computing is being able to size the on-demand provisioning Massively Scalable – the service must either expand or contract depending on the changing needs of your business Multi-tenant – cloud computing by its very nature delivers shared services to a global group of users
  • #11 In addition cloud based environments offer Self-service delivery of applications and content - so as a user, you can use the service as you require it Per-usage based pricing model – which means that you should only ever pay for the amount of service you actually consume. This is extremely useful if you are working on a project by project basis, you can effectively use the service as and when you actually need to use it. IP based architecture – cloud architectures are based on virtualised, internet based technologies, this alone has provided one of the key reasons why cloud computing environments have become so popular and has changed the way in which IT infrastructures are deployed.
  • #12 Now over the last couple of years, there have been a number of ways in which cloud environments have been deployed, each having differing levels of security applied to them and each offering different services to the users who are connected to these particular cloud environments. Public Cloud – Available to the general public or large industry group and is owned by an organisation selling cloud services Community Cloud – Shared by several organisations and supports a specific community that has shared concerns Private Cloud – Operated solely for an organisation or company Hybrid Cloud – Combination of two of the above, they remain unique entities but are bound together by standardised technologies
  • #13 Moving your IT or B2B infrastructure to the cloud does not happen over night and companies will make the move for various reasons. For example rather than moving an entire company to a cloud based infrastructure, the CIO might make the decision to move on a department by department basis. May be deploying a cloud based HR or CRM service first to see how the environment operates and whether internal business processes need to be extensively modified in anyway. In the second example a company may be looking to onboard new trading partners in a remote location or emerging market or alternatively they may be looking to establish a manufacturing or office facility in a new country and they need to get them online as soon as possible. The global nature of cloud based environments allows companies to scale up there businesses with ease. I will talk about this in more detail later. Finally, a CIO may take the decision to place an entire business process into the cloud. For example a reverse logistics process to improve the way in which customers return faulty goods to a repair shop or retailer. The way in which cloud environments are deployed is really down to the individual company concerned, there is no right or wrong way of doing this but it is possible to learn from companies such as GXS who have years of experience of deploying integration cloud platforms for many companies around the world.
  • #14 So let me discuss the three key layers that make up a cloud computing environment....
  • #15 Cloud computing environments typically comprise of three different layers. Infrastructure as a Service - IaaS, essentially provides the core backbone infrastructure onto which the rest of the cloud environment is built. For example companies such as Amazon and EMC will provide extensive compute and storage facilities Platform as a Service - PaaS, provides the infrastructure onto which the applications are developed, for example GXS Trading (the world’s largest integration cloud platform) is a good example of PaaS Software as a Service - SaaS, provides the core business applications that effectively plug into the cloud environment. These are typically web based in nature and are heavily optimised for operating across the internet and cloud based environments. SAP’s Business by Design and GXS Active Logistics are godo example of SaaS based applications.
  • #16 If we take a look at the first layer of the cloud computing stack, Infrastructure-as-a-Service This area of the cloud environment essentially delivers the computer infrastructure, typically platform virtualisation as a service. It is an evolution of virtual private server offerings and includes: Servers, memory and storage that allow a customer to scale up or down as required Infrastructure can be used by customers to run their own software with only the amount of resource that is needed at a given moment in time I guess you could compare Infrastructure-as-a-Service as the equivalent of utility supplies to a house, ie all houses need, gas, water, electricity connected to make them function correctly.
  • #17 Then moving onto Platform-as-a-Service, this delivers the computing platform and/or solution stack as a service. The PaaS environment will often consume cloud infrastructure and will sustain cloud applications. PaaS environments : Allow users to use the cloud to develop new applications without the need to have the software or infrastructure purchased in-house Essentially provides anything to support how a company builds and delivers web applications and services in the cloud Using the house analogy from the previous slide, PaaS could be considered as the foundations on to which you would then build your house.
  • #18 Earlier this year the analyst firm Gartner released a report highlighting the importance of PaaS based environments and how by 2015 they are likely to have a huge impact on the way cloud based environments are built and deployed. For example by 2015, cloud-based solutions will be growing at a faster rate than on-premises solutions most enterprises will have part of their run-the-business software functionally executing in the cloud, using PaaS most enterprises using PaaS services or technologies will have a hybrid environment in which internal and external services are combined
  • #19 The great thing about cloud based environments is that it allows both large and small software providers to compete in the market on an almost equal footing. A number of software providers have moved their behind the firewall software applications into a hosted environment and they are able to offer a wealth of different solutions covering everything from business analytics, data integration, CRM, application security and much more. The cloud has single handedley changed the way in which software solutions are designed and delivered to companies.
  • #20 The final layer of the cloud, is the actual Software-as-a-Service application, essentially a fully hosted piece of software. SaaS has been around for a few years now and formed the first cornerstone of the cloud computing environments that we know today. They essentially deliver software over the internet without the need to install applications on the customer’s own computer. SaaS applications : are run from one centralised location, which means that the software can be accessed from any location over the internet The centralised management of applications helps to simplify maintenance Applications are consumed on a pay-as-you-go basis I suppose returning back to our house analogy one last time, SaaS applications could be considered as the various rooms that are built on the foundation of the house.
  • #21 So let me discuss some of the benefits of cloud computing....
  • #22 So how can cloud based B2B environments help manufacturing companies, well firstly It provides Global accessibility, as all applications are hosted by a central provider it means that anyone in your company or across your trading partner community can get access to your B2B tools using nothing more than a web browser. It also means that users will get a consistent user experience as well. Cloud environments also allow B2B infrastructures to be maintained much more efficiently, as applications are hosted centrally, it means that applications only have to upgraded once rather than on multiple servers, and everyone connected to the cloud platform then benefits from the newly upgraded environment. Cloud environments can be deployed very quickly, once again as software and services are installed by a vendor at a central location then it means that new applications can be deployed in a very short time frame and new users can be added to the environment with ease. Cloud environments really allow you to build flexibility into your B2B environment, getting access to new functionality as and when you require it. Cloud environments are low cost, rather than pay a software license fee, users pay on a month by month or project by project basis. This pay as you go way of working allows managers to get much better predictability of long terms IT or B2B related costs. Also, as you do not have to buy expensive servers to host any applications, it means that there is no capital expenditure and zero cost applied to your company’s balance sheet. In these uncertain financial times, cloud based environments allow companies to scale up or scale down their B2B needs very quickly, may be as a result of winning a new contract and a need to onboard new trading partners very quickly or needing to scale down operations due to a product coming near to retirement. Finally, cloud based environments provide an ideal way to manage a community of users with ease. Centralised management of usernames, passwords and contact details help to bring an extra layer of security to your B2B environment. In addition it allows users to be presented with just the information they need to do their work, ie a role based environment can be presented to a user depending upon their role and responsibilities within the business.
  • #23 In terms of comparing traditional IT infrastructures with cloud based environments, there are a number of notable differences, let me highlight a couple of the more important ones in this table. From a speed to market point of view, in the traditional IT environment, enterprise applications take months or years to design, code, test and deploy. From a cloud computing point of view the cloud provider is responsible for on-going development and clients simply use the most up to date application available. From a speed to ROI point of view, even with significant capital investment, many companies never get to realise the expected ROI. In cloud computing, the subscription based model allows a client to pay for the service that they actually use and is a highly predictable operational expense.
  • #24 From a Financial perspective, there are a number of differences between running on-premise versus hosted or cloud computing based environments. From an Expenditure Type point of view: on premise IT is a capital expenditure whilst in the cloud it is an operating expense Moving to Cash Flow: in a traditional IT environment servers and software are purchased up front whilst in the cloud payments are made as the service is provided In terms of Financial Risk: in a traditional IT environment the entire financial risk is taken upfront, with uncertain return whilst in the cloud financial risk is taken monthly and is matched to return On the Income Statement: traditional IT has maintenance and depreciated capital expenses whilst in the cloud there are maintenance expenses only Finally on the Balance Sheet: Software and hardware are carried as a long-term capital asset whilst in the cloud nothing appears on the balance sheet
  • #25 Cloud Computing environments offer many green benefits as well. Lower power consumption requirements - As Cloud based environments are hosted by an external vendor, this not only helps companies remove the cost of supporting an in-house data centre or server infrastructure but more importantly it can help to significantly reduce a company’s carbon footprint by reducing the power consumed to run the supporting utilities related infrastructures. Less computer/network equipment packaging to dispose of - Cloud computing based environments remove the need for buying and running extensive computer servers and other associated infrastructures. Therefore there is an opportunity to minimise the amount of wasteful packaging materials that are used to transport these pieces of equipment to an office or manufacturing location. Minimises travel requirements for IT implementation teams - As Cloud computing environments are hosted by an outside provider and are typically very easy to deploy, you can, in most cases, remove the need to send employees half way around the world as these environments can be brought online and monitored remotely. Increased availability of information on lower power devices - Cloud based environments allow users to access information using more power friendly mobile devices and also helps all trading partners to get access to one central source of information. This helps to minimize supply chain disruption and improve green related efficiencies of logistics carriers. Less paper flowing across the supply chain - Cloud based environments significantly reduce the amount of paper flowing across the extended enterprise, at the same time it encourages less technically capable trading partners to participate in your B2B program.
  • #26 So let me discuss the three key layers that make up a cloud computing environment....
  • #27 The introduction of different layers of the cloud combined with the different types of cloud such as private and community, means that it is becoming important to think about how these different cloud based services will be integrated together. The analyst firm Gartner introduced a concept known as Cloud Service Brokerage to help articulate how the different cloud services, enterprise IT systems and cloud consumers or users need to be connected to a centralised broker to ensure that communications within the cloud are routed to the correct location. Now by routed to the correct location I mean that information is passed to the correct trading partner or business application. I suppose you could consider the CSB to be a form of black box with information going in one side, being processed and then being delivered to the correct user or business system.
  • #30  So what does the cloud provide from a B2B perspective? From a business perspective it allows companies to deliver a standard set of tools for use by users across the extended enterprise and it allows them to utilise a series of pre-defined document standards. From a process orchestration point of view it allows you to improve information flow which in turn provides greater visibility into cross application transactions Data flowing through the cloud integration environment can be introspected to check for data quality and ensure that business documents comply with certain business standards before entering an ERP environment Finally as all users would be entering the cloud through a single environment, it means that authentication and security procedures can be standardised across the entire business
  • #32 So from a B2B integration point of view the cloud : Offers scalability and flexibility – B2B environments can be expanded or contracted depending on the needs of the business Allows new B2B functionality to be deployed very quickly from a central location Global nature of cloud based B2B environments allows remote plants or offices to be brought online with ease
  • #33 The cloud also helps to Simplify Connectivity The cloud offers any-to-any mediation between different B2B communication or document standards Modern and legacy standards can be utilised within the cloud Regional standards can be embraced within the cloud, thus providing seamless connectivity anywhere in the world
  • #34 The cloud also provides true end-to-end visibility Cloud based B2B environments provide end-to-end visibility of global business transactions Provides a single view of B2B transactions flowing between global trading partners Customer shipments can be monitored seamlessly across multi-modal logistics networks and border control agencies
  • #35 The cloud helps to improve Trading Partner Collaboration All trading partners can be connected to the cloud with ease using a mix of quick to deploy, simple to use web tools The cloud removes the collaboration barriers between trading partners in developed and emerging markets All trading partners using the cloud environment can be administered through a central contact database
  • #36 Finally the cloud helps to simplify integration to business systems Integration to numerous business systems takes place through a single cloud environment The quality of data entering ERP or other business systems can be proactively monitored via the cloud Numerous implementation templates and best practices from previous integration projects can be delivered through the cloud