1Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
How to Implement TPS / Lean
Executive Overview
Marek Piatkowski – February 2017
CAPABILITIES
DEVELOPMENT
Sustainable
improvement
capabilities in
all people at
all levels
PROCESS
IMPROVEMENT
Continuous,
real, practical
changes to
improve the
way the work
is done
Responsible
Leadership
LEAN
TRANSFORMATION
- Value Driven Purpose -
MANAGEMENT
SYSTEM
Basic Thinking, Acceptance, Mindset and Awareness
PDCA – PROBLEMS SOLVING – GEMBA - SCIENCE
WHAT PROBLEMS DO WE NEED TO SOLVE?
Thinkingwin, Win, WIN
2Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Introduction - Marek Piatkowski
 Professional Background
 Toyota Motor Manufacturing Canada (TMMC) - Cambridge, Ontario from
1987-1994
 TPS/Lean Transformation Consulting - since 1994
 Professional Affiliations
 TWI Network – John Shook, Founder
 Lean Enterprise Institute (LEI) – Jim Womack
 Lean Enterprise Academy (LEA) – Daniel Jones
 CCM/CAINTRA – Monterrey, Mexico
 SME, AME, ASQ, CME
 Lean Manufacturing Solutions - Toronto, Canada
http://twi-network.com
3Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
4Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
The Most Studied Company in the World
5Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Toyota
Production
System
(TPS)
6Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Toyota’s Philosophy - People
 The Toyota Production System (TPS) itself is based on the belief that the company
that ignores human respect will not endure
 People – a company’s greatest asset is its people. Toyota does as much as possible
to take care of the employees, recognizing first and foremost the importance of job
security
 People enjoy their work when it involves trying out their own ideas, mastering new
skills and making visible contributions
 Teamwork is a foundation of TPS – all employees are required to participate and to
follow rules and principles of TPS
 Operators who are the most knowledgeable of any manufacturing operation are
people who perform that job daily – their involvement is critical to the success of
implementation of TPS
 “Good Thinking, Good Product” – employees are expected to contribute to the
improvement of their own work.
Sakichi Toyoda
Founder of Toyota
7Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Stability
GOAL: Highest Quality, Lowest Cost, Shortest Lead Time
1. Stable Manufacturing Processes
2. 100% Quality Parts
Heijunka Standardized Work Kaizen
Just-in-Time Jidoka
Stopthe line
and fix
the Problem
Separate man’s
workfrom
machine’s work
Continuous
Flow
Takt Time
Pull System
The Toyota House
Toyota
Production
System
(TPS)
9
Production should take place with a
little inventory as possible,
preferably only the one component that
is to be processed or assembled next.
10Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Toyota Production System (TPS)
We never asked Toyota how did they build their
house of TPS?
Taiichi Ohno
Credited with realizing
the concept of the
Toyota Production
System.
11Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
What is Lean Transformation?
Lean Transformation
of
Tools and Methodologies
Lean Transformation
of how we
Think and Manage
Lean does not work for us
GOAL: Highest Quality, Lowest Cost, Shortest Lead Time
Operational Stability
Continuous
Flow
Takt Time
Pull System
Heijunka Standardized Work Kaizen
Stop and
fix the
Problem
Separate
man’s
work from
machine’s
work
Jidoka
The Toyota House
Just-in-Time
GOAL: Highest Quality, Lowest Cost, Shortest Lead Time
Operational Stability
Continuous
Flow
Takt Time
Pull System
Heijunka Standardized Work Kaizen
Stop and
fix the
Problem
Separate
man’s
work from
machine’s
work
Jidoka
The Toyota House
Just-in-Time
12Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Chairman of Toyota Motor Corp. and former
President of Toyota Motor Manufacturing, KY
and Toyota Motor Corp.
Toyota’s Chairman
Fujio Cho
Three Keys to Lean Leadership
 Go See
 “Senior Management must spend time
on the front lines”
 Ask Why
 “Use the “Why” techinques daily.”
 Show Respect
 “Respect your people.”
13Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Chairman of Toyota Motor Corp. and former
President of Toyota Motor Manufacturing, KY
and Toyota Motor Corp.
Toyota’s Chairman
Fujio Cho
“Many good companies have respect for
individuals and practice Kaizen and other TPS
tools. But what is important is having all
elements together as a management system.
It must be practiced every day in a very
consistent matter – not is spurs – in a concrete
way on the shop floor.”
14Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Lean Transformation in Manufacturing
Life in Manufacturing
consists of solving
problems and
implementing solutions.
15Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Toyota’s Philosophy – Manager’s Role
 In a true TPS environment decision making process should be made at the lowest
possible level of the organization.
 Simple, effective solutions are the most effective
 A manager’s or supervisor’s role consists of leading problem
solving activities in a multi-skilled, cross-functional team
environment
 Managers role is to make sure that for everything that we do there is a well defined
standard process
 Continuous Improvement (Kaizen) activities are management responsibilities.
16Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Two Types of Problems
Sub-standard performance,
abnormal situation
New Standard
New Challenge
1. Daily problems:
deviation from normality
breakdown
quick fixes
2. Long term improvements:
new company objectives
new expectations
looking for a better long term solution
17Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
CAPABILITIES
DEVELOPMENT
Sustainable
improvement
capabilities in
all people at
all levels
PROCESS
IMPROVEMENT
Continuous,
real, practical
changes to
improve the
way the work
is done
Responsible
Leadership
- Value Driven Purpose -
MANAGEMENT
SYSTEM
Basic Thinking, Acceptance, Mindset and Awareness
PDCA – PROBLEMS SOLVING – GEMBA - SCIENCE
WHAT PROBLEMS DO WE NEED TO SOLVE?
LEAN
TRANSFORMATION
2016
18Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
What is a Problem ?
 A problem is defined as any variation (abnormality) between the actual situation
and the standard (Caused Gap) or desired situation (Created Gap)
 Problem solving activity is an effort to reduce or eliminate such a variation
 All problems must be defined in terms of numbers or data
 Key Performance Indicators - KPIs
it is not a problem if you cannot define it as a number
“In God we Trust, everyone
else bring data”
Dr. E. Deming
SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
19Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
?
I know Lean
Engineering driven
Hobby driven
Knowledge Driven
“So what ?“
Kanban
Leveled
schedule
Supermarket
SMED
PullTPMHeijunka
Jidoka
VSM
Lean Transformation
20Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
?
I know Lean
Engineering driven
Hobby driven
Knowledge Driven
“So what ?“
Kanban
Leveled
schedule
Supermarket
SMED
PullTPMHeijunka
Jidoka
VSM
Business NEEDS driven
1. USE KPIs to understand your Current
Status
2. Set goals and objectives
3. Start solving problems
4. Check progress
and measure
results
B
A
True North
Lean Transformation
21Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
KPI
KPI
100%
Target – Key Performance Indicators (KPIs)
SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
22Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Levels of Support
 Level I – Meeting Customer Requirements
 The company/ supplier does not meet Customer’s expectations
 Main focus – root cause analysis and improvement of Quality and Delivery KPIs
 Level II – Creating Operational Stability
 The company/supplier meets minimum Customer requirements
 Processes are not stable and predictable
 Root Cause analysis of all six KPIs – Safety, Quality, Delivery, Performance, Cost and
People
 Level III – Process Improvements
 The company/supplier meets minimum Customer requirements
 Process are stable and predictable
 KKKKKK – root cause analysis and process Kaizen of all six KPIs
1
2
3
SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
K.P.I.
Customer
Safety ___
Quality ___
Delivery ___
Performance ___
Cost ___
People ___
Scorecard or or21 3
1 - Does not have (process/system) 2 - Has it, but does not use effectively 3 - Has it and uses it.
K.P.I.
Supplier
Safety ___
Quality ___
Delivery ___
Performance ___
Cost ___
People ___
Scorecard or or21 3
Assessment
Survey Tool
Quality
Delivery
Compare and
evaluate
Assess and
Evaluate
Performance
Tracking
Prod. Weeks
OTD-%
C/M
Today
14 15 16 17 18 19 20 21 22
Prod. Weeks
PPM
C/M
Today
Clarify the Problem
Initial Problem Perception
(Large, vague, complicated problem)
The "Real" Problem
Locate Area /
Point of Cause
PoC
Direct Cause
Why ?
Cause
Cause
Cause
Cause
Countermeasure
Root Cause
Why ?
Why ?
Why ?
Why ?
Cause
Investigation
Grasp the
Situation
5 W hy ?
Investigation of
Root Cause
Basic Cause & Effect
Investigation
Problem ID
Root Cause Analysis
Support Methodology – Level I
Current Condition: The Company does NOT meet Customer expectations - Quality and Delivery
1
2
SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
1 - Does not have (process/system) 2 - Has it, but does not use effectively 3 - Has it and uses it.
K.P.I.
Company
Safety ___
Quality ___
Delivery ___
Performance ___
Cost ___
People ___
Scorecard or or21 3
Assessment
Survey Tool
Safety
Quality
Delivery
Performance
Cost
People
Assess and
Evaluate
Performance
Tracking
Prod. Weeks
OTD-%
C/M
Today
14 15 16 17 18 19 20 21 22
Prod. Weeks
PPM
C/M
Today
Clarify the Problem
Initial Problem Perception
(Large, vague, complicated problem)
The "Real" Problem
Locate Area /
Point of Cause
PoC
Direct Cause
Why ?
Cause
Cause
Cause
Cause
Countermeasure
Root Cause
Why ?
Why ?
Why ?
Why ?
Cause
Investigation
Grasp the
Situation
5 W hy ?
Investigation of
Root Cause
Basic Cause & Effect
Investigation
Problem ID
Root Cause Analysis
2
3
2
3
2
2
Support Methodology – Level II
Current Condition: Processes are not stable and predictable
SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
1 - Does not have (process/system) 2 - Has it, but does not use effectively 3 - Has it and uses it.
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
Identifying Business
Needs
 Review and Assess Customer
KPIs – Quality and Delivery
 Which Internal KPIs need to be
addressed:
- Safety - Performance
- Quality - Cost
- Delivery - People
 Opportunities Analysis
 Target Conditions and
Milestones
Building the Foundation
Process Improvements
Cycle Time and Lead Time
Reductions
Sustain and Improve
 Creating Operational Stability –
Predictable Performance
 Root cause analysis of problems
 Visual Controls
 Roles and Responsibilities
 Heijunka – leveled production,
reduction of variation
 Standardized Work
 Training and Development of
Internal Change Agents
 Building TPS Pillars:
• JIT – creating continuous
flow of production
• Jidoka – stop the Line, fix
the problem
 Pull System - Information Flow
and Material Flow
 SMED – Set-up Reduction
 Information Centers
 SFM – Shop Floor
Management
 Team Leader based
Organization
 Takt Time - Operational
Transformation
 Layout improvements
 Manufacturing Work Cells
 TPM – Equipment
Maintenance
 Minimum lot sizes – single
piece flow
 Reduction of Inventory buffers
 Employee Engagement –
Quality Circles & Suggestion
Program
 Closing performance gaps
 Partnership with Suppliers
 Removing obstacles to the
flow of work
 Aligning decision-making
process to respond quickly to
changes and problems
 Flexible workforce -
multiskilled operator
 Self-directed Work Teams
 How to manage in a Lean
Environment
 Kaizen, Kaizen, Kaizen
Support Methodology – Level III
Step-by-Step Implementation of Lean Manufacturing
CAPABILITIES
DEVELOPMENT
Sustainable
improvement
capabilities in
all people at
all levels
PROCESS
IMPROVEMENT
Continuous,
real, practical
changes to
improve the
way the work
is done
Responsible
Leadership
LEAN
TRANSFORMATION
- Value Driven Purpose -
MANAGEMENT
SYSTEM
Basic Thinking, Acceptance, Mindset and Awareness
PDCA – PROBLEMS SOLVING – GEMBA - SCIENCE
WHAT PROBLEMS DO WE NEED TO SOLVE?
26Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Steven Spear
H. Kent Bowen
October 1999
27Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Decoding the DNA of TPS
 Four-year study of the Toyota Production System
 Inner workings of more than 40 plants in the United States, Europe, and Japan,
some operating according to the system, some not
 Studied both process and discrete manufacturers whose products ranged from
prefabricated housing, auto parts and final auto assembly, cell phones, and
computer printers to injection-molded plastics and aluminum extrusions
 Studied not only routine production work but also service functions like equipment
maintenance, workers’ training and supervision, logistics and materials handling,
and process design and redesign
28Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
How to Improve
 We found that the key to understand that the Toyota Production System creates a
community of scientists.
 Whenever Toyota defines a specification, it is establishing a set of hypotheses that
can then be tested. In other words, it is following the scientific method.
 To make any changes, Toyota uses a rigorous problem-solving process that requires
a detailed assessment of the current state of affairs and a plan to improvement
that is, in effect, an experimental test of the proposed changes.
 With anything less than such a scientific rigor, change at Toyota would amount to
little more than random trial and error – a blindfolded walk through life.
Who, What, Where,
When, Why and How
Clarify the Problem
Initial Problem Perception
(Large, vague, complicated problem)
The "Real" Problem
Locate Area /
Point of Cause
PoC
Direct Cause
Why ?
Cause
Cause
Cause
Cause
Countermeasure
Root Cause
Why ?
Why ?
Why ?
Why ?
Cause
Investigation
Grasp the
Situation
5 Why ?
Investigation of
Root Cause
Basic Cause & Effect
Investigation
Grasp the
Situation
Cause
Investigation
Basic Cause &
Effect Investigation
Ask Why 5 times?
Investigation of
Root Cause
29Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
How to Improve
 Identifying problems is just a first step. For people to consistently make effective
changes, they must know how to change and who is responsible for making the
changes.
 Toyota explicitly teaches people how to improve, not expecting them to learn strictly
from personal experience. That’s where the rule for improvement comes in.
 Any improvement to production activities, to connection between worker and
machines, or the pathways must be made in accordance with the scientific method,
under the guidance of a teacher, and the lowest possible organizational level.
 To make changes, people are expected to present the explicit logic of the hypothesis.
 Frontline workers make the improvements to their own jobs, and their supervisors
provide direction and assistance as teachers.
30Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
“Secret” of Toyota’s Success
 To understand Toyota’s success, you have to unravel the paradox – you have to see
that the rigid specification is the very thing that makes the flexibility and creativity
possible.
 The unspoken knowledge that underlies the Toyota Production System can be
captured in four basic rules
 These rules guide the design, operation, and improvement of every activity,
connection, and pathway for every product and service
31Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
TPS System Rules
Rule 2:
Every customer-supplier
connection must be direct, and
there must be a unmistakable yes-
or-no way to send requests and
receive responses
Rule 1:
All work shall be highly specified
(standardized) as to content,
sequence, timing and outcome
Rule 3:
The pathway for every product and
service must be simple and direct –
flow
Rule 4:
Any improvement must be made in
accordance with the scientific
method, under the guidance of a
teacher, at the lowest possible level
in the organization
1999
32Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Using scientific
methods to
Solve Problems
Use Scientific Problem Solving
to dig beyond symptoms of
common causes
Does your company
use Lean Tools and
Methodologies to
Solve Problems?
Addressing this is more effective than jumping to solutions and launching hundreds of project
33Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Knowledge and Skills
To know, to understand the meaning
correctly and to be able to teach
Lean Knowledge
Kanban, Pull system, Jidoka,
Supermarket, 5S, TPM, SMED,
JIT, Kaizen, STW, SOS, WCT,
FTQ, PPM, Takt Time, etc …
I know this!
Lean Skills
Be able to solve problems and advance
the organization by using Lean
Knowledge properly
Use Lean knowledge to motivate
people, achieve results, reduce
costs, improve the operation and
address business needs
Can you Play a
Violin?
34Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Solving Problems
35Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
36Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Implementation of Lean – The Six Steps Approach
Step 1 – Sort out as many quality problems as you can, as well as downtime or other
instability problems. Make sure that you ship 100% on time to your Customers. Get
Engineers to worry seriously about internal scrap.
Step 2 – Make sure the flow of parts through the system is as continuous as possible,
which involves setting up the U-calls and making market locations, avoiding variations
in the operator’s work cycle.
Step 3 – Introduce Standardized Work and make sure the pace of work stabilizes
through the various processes
Step 4 – Start pulling, so that no parts or material move forward until they are called
for. Start looking at production schedule and eventually replace production weekly or
daily orders with some type of frequent signal, like Kanban card.
Step 5 – Even out the production flow by reducing batch sizes, increasing the rhythm
of internal deliveries, and leveling your internal demand.
Step 6 – And when you accomplish all that and everything works perfectly you pull
resources out and start again.
37Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Changing the World. One Transformation at a time
This presentation is an intellectual property of W3 Group Canada Inc.
No parts of this document can be copied or reproduced
without written permission from:
Marek Piatkowski
W3 Group Canada Inc.
iPhone: 416-235-2631
Cell: 248-207-0416
Marek.Piatkowski@rogers.com
http://twi-network.com
Thinkingwin, Win, WIN
38Marek.Piatkowski@Rogers.com
How to Implement
Lean/TPS
Executive Overview
Thinkingwin, Win, WIN
Presentations in this
Workshop
1. Log in to:
www.slideshare.net
2. Type in my name in
search area:
Marek Piatkowski
3. Select a presentation you
want to see
4. Learn and Enjoy

How to implement lean - Executive overview

  • 1.
    1Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN How to Implement TPS / Lean Executive Overview Marek Piatkowski – February 2017 CAPABILITIES DEVELOPMENT Sustainable improvement capabilities in all people at all levels PROCESS IMPROVEMENT Continuous, real, practical changes to improve the way the work is done Responsible Leadership LEAN TRANSFORMATION - Value Driven Purpose - MANAGEMENT SYSTEM Basic Thinking, Acceptance, Mindset and Awareness PDCA – PROBLEMS SOLVING – GEMBA - SCIENCE WHAT PROBLEMS DO WE NEED TO SOLVE? Thinkingwin, Win, WIN
  • 2.
    2Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Introduction - Marek Piatkowski  Professional Background  Toyota Motor Manufacturing Canada (TMMC) - Cambridge, Ontario from 1987-1994  TPS/Lean Transformation Consulting - since 1994  Professional Affiliations  TWI Network – John Shook, Founder  Lean Enterprise Institute (LEI) – Jim Womack  Lean Enterprise Academy (LEA) – Daniel Jones  CCM/CAINTRA – Monterrey, Mexico  SME, AME, ASQ, CME  Lean Manufacturing Solutions - Toronto, Canada http://twi-network.com
  • 3.
  • 4.
    4Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN The Most Studied Company in the World
  • 5.
    5Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Toyota Production System (TPS)
  • 6.
    6Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Toyota’s Philosophy - People  The Toyota Production System (TPS) itself is based on the belief that the company that ignores human respect will not endure  People – a company’s greatest asset is its people. Toyota does as much as possible to take care of the employees, recognizing first and foremost the importance of job security  People enjoy their work when it involves trying out their own ideas, mastering new skills and making visible contributions  Teamwork is a foundation of TPS – all employees are required to participate and to follow rules and principles of TPS  Operators who are the most knowledgeable of any manufacturing operation are people who perform that job daily – their involvement is critical to the success of implementation of TPS  “Good Thinking, Good Product” – employees are expected to contribute to the improvement of their own work. Sakichi Toyoda Founder of Toyota
  • 7.
    7Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Stability GOAL: Highest Quality, Lowest Cost, Shortest Lead Time 1. Stable Manufacturing Processes 2. 100% Quality Parts Heijunka Standardized Work Kaizen Just-in-Time Jidoka Stopthe line and fix the Problem Separate man’s workfrom machine’s work Continuous Flow Takt Time Pull System The Toyota House Toyota Production System (TPS)
  • 9.
    9 Production should takeplace with a little inventory as possible, preferably only the one component that is to be processed or assembled next.
  • 10.
    10Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Toyota Production System (TPS) We never asked Toyota how did they build their house of TPS? Taiichi Ohno Credited with realizing the concept of the Toyota Production System.
  • 11.
    11Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN What is Lean Transformation? Lean Transformation of Tools and Methodologies Lean Transformation of how we Think and Manage Lean does not work for us GOAL: Highest Quality, Lowest Cost, Shortest Lead Time Operational Stability Continuous Flow Takt Time Pull System Heijunka Standardized Work Kaizen Stop and fix the Problem Separate man’s work from machine’s work Jidoka The Toyota House Just-in-Time GOAL: Highest Quality, Lowest Cost, Shortest Lead Time Operational Stability Continuous Flow Takt Time Pull System Heijunka Standardized Work Kaizen Stop and fix the Problem Separate man’s work from machine’s work Jidoka The Toyota House Just-in-Time
  • 12.
    12Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Chairman of Toyota Motor Corp. and former President of Toyota Motor Manufacturing, KY and Toyota Motor Corp. Toyota’s Chairman Fujio Cho Three Keys to Lean Leadership  Go See  “Senior Management must spend time on the front lines”  Ask Why  “Use the “Why” techinques daily.”  Show Respect  “Respect your people.”
  • 13.
    13Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Chairman of Toyota Motor Corp. and former President of Toyota Motor Manufacturing, KY and Toyota Motor Corp. Toyota’s Chairman Fujio Cho “Many good companies have respect for individuals and practice Kaizen and other TPS tools. But what is important is having all elements together as a management system. It must be practiced every day in a very consistent matter – not is spurs – in a concrete way on the shop floor.”
  • 14.
    14Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Lean Transformation in Manufacturing Life in Manufacturing consists of solving problems and implementing solutions.
  • 15.
    15Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Toyota’s Philosophy – Manager’s Role  In a true TPS environment decision making process should be made at the lowest possible level of the organization.  Simple, effective solutions are the most effective  A manager’s or supervisor’s role consists of leading problem solving activities in a multi-skilled, cross-functional team environment  Managers role is to make sure that for everything that we do there is a well defined standard process  Continuous Improvement (Kaizen) activities are management responsibilities.
  • 16.
    16Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Two Types of Problems Sub-standard performance, abnormal situation New Standard New Challenge 1. Daily problems: deviation from normality breakdown quick fixes 2. Long term improvements: new company objectives new expectations looking for a better long term solution
  • 17.
    17Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN CAPABILITIES DEVELOPMENT Sustainable improvement capabilities in all people at all levels PROCESS IMPROVEMENT Continuous, real, practical changes to improve the way the work is done Responsible Leadership - Value Driven Purpose - MANAGEMENT SYSTEM Basic Thinking, Acceptance, Mindset and Awareness PDCA – PROBLEMS SOLVING – GEMBA - SCIENCE WHAT PROBLEMS DO WE NEED TO SOLVE? LEAN TRANSFORMATION 2016
  • 18.
    18Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN What is a Problem ?  A problem is defined as any variation (abnormality) between the actual situation and the standard (Caused Gap) or desired situation (Created Gap)  Problem solving activity is an effort to reduce or eliminate such a variation  All problems must be defined in terms of numbers or data  Key Performance Indicators - KPIs it is not a problem if you cannot define it as a number “In God we Trust, everyone else bring data” Dr. E. Deming SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
  • 19.
    19Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN ? I know Lean Engineering driven Hobby driven Knowledge Driven “So what ?“ Kanban Leveled schedule Supermarket SMED PullTPMHeijunka Jidoka VSM Lean Transformation
  • 20.
    20Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN ? I know Lean Engineering driven Hobby driven Knowledge Driven “So what ?“ Kanban Leveled schedule Supermarket SMED PullTPMHeijunka Jidoka VSM Business NEEDS driven 1. USE KPIs to understand your Current Status 2. Set goals and objectives 3. Start solving problems 4. Check progress and measure results B A True North Lean Transformation
  • 21.
    21Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN KPI KPI 100% Target – Key Performance Indicators (KPIs) SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
  • 22.
    22Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Levels of Support  Level I – Meeting Customer Requirements  The company/ supplier does not meet Customer’s expectations  Main focus – root cause analysis and improvement of Quality and Delivery KPIs  Level II – Creating Operational Stability  The company/supplier meets minimum Customer requirements  Processes are not stable and predictable  Root Cause analysis of all six KPIs – Safety, Quality, Delivery, Performance, Cost and People  Level III – Process Improvements  The company/supplier meets minimum Customer requirements  Process are stable and predictable  KKKKKK – root cause analysis and process Kaizen of all six KPIs 1 2 3 SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE
  • 23.
    K.P.I. Customer Safety ___ Quality ___ Delivery___ Performance ___ Cost ___ People ___ Scorecard or or21 3 1 - Does not have (process/system) 2 - Has it, but does not use effectively 3 - Has it and uses it. K.P.I. Supplier Safety ___ Quality ___ Delivery ___ Performance ___ Cost ___ People ___ Scorecard or or21 3 Assessment Survey Tool Quality Delivery Compare and evaluate Assess and Evaluate Performance Tracking Prod. Weeks OTD-% C/M Today 14 15 16 17 18 19 20 21 22 Prod. Weeks PPM C/M Today Clarify the Problem Initial Problem Perception (Large, vague, complicated problem) The "Real" Problem Locate Area / Point of Cause PoC Direct Cause Why ? Cause Cause Cause Cause Countermeasure Root Cause Why ? Why ? Why ? Why ? Cause Investigation Grasp the Situation 5 W hy ? Investigation of Root Cause Basic Cause & Effect Investigation Problem ID Root Cause Analysis Support Methodology – Level I Current Condition: The Company does NOT meet Customer expectations - Quality and Delivery 1 2 SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE 1 - Does not have (process/system) 2 - Has it, but does not use effectively 3 - Has it and uses it.
  • 24.
    K.P.I. Company Safety ___ Quality ___ Delivery___ Performance ___ Cost ___ People ___ Scorecard or or21 3 Assessment Survey Tool Safety Quality Delivery Performance Cost People Assess and Evaluate Performance Tracking Prod. Weeks OTD-% C/M Today 14 15 16 17 18 19 20 21 22 Prod. Weeks PPM C/M Today Clarify the Problem Initial Problem Perception (Large, vague, complicated problem) The "Real" Problem Locate Area / Point of Cause PoC Direct Cause Why ? Cause Cause Cause Cause Countermeasure Root Cause Why ? Why ? Why ? Why ? Cause Investigation Grasp the Situation 5 W hy ? Investigation of Root Cause Basic Cause & Effect Investigation Problem ID Root Cause Analysis 2 3 2 3 2 2 Support Methodology – Level II Current Condition: Processes are not stable and predictable SAFETY QUALITY DELIVERY PRODUCTIVITY COST PEOPLE 1 - Does not have (process/system) 2 - Has it, but does not use effectively 3 - Has it and uses it.
  • 25.
    STEP 1 STEP 2 STEP3 STEP 4 STEP 5 Identifying Business Needs  Review and Assess Customer KPIs – Quality and Delivery  Which Internal KPIs need to be addressed: - Safety - Performance - Quality - Cost - Delivery - People  Opportunities Analysis  Target Conditions and Milestones Building the Foundation Process Improvements Cycle Time and Lead Time Reductions Sustain and Improve  Creating Operational Stability – Predictable Performance  Root cause analysis of problems  Visual Controls  Roles and Responsibilities  Heijunka – leveled production, reduction of variation  Standardized Work  Training and Development of Internal Change Agents  Building TPS Pillars: • JIT – creating continuous flow of production • Jidoka – stop the Line, fix the problem  Pull System - Information Flow and Material Flow  SMED – Set-up Reduction  Information Centers  SFM – Shop Floor Management  Team Leader based Organization  Takt Time - Operational Transformation  Layout improvements  Manufacturing Work Cells  TPM – Equipment Maintenance  Minimum lot sizes – single piece flow  Reduction of Inventory buffers  Employee Engagement – Quality Circles & Suggestion Program  Closing performance gaps  Partnership with Suppliers  Removing obstacles to the flow of work  Aligning decision-making process to respond quickly to changes and problems  Flexible workforce - multiskilled operator  Self-directed Work Teams  How to manage in a Lean Environment  Kaizen, Kaizen, Kaizen Support Methodology – Level III Step-by-Step Implementation of Lean Manufacturing CAPABILITIES DEVELOPMENT Sustainable improvement capabilities in all people at all levels PROCESS IMPROVEMENT Continuous, real, practical changes to improve the way the work is done Responsible Leadership LEAN TRANSFORMATION - Value Driven Purpose - MANAGEMENT SYSTEM Basic Thinking, Acceptance, Mindset and Awareness PDCA – PROBLEMS SOLVING – GEMBA - SCIENCE WHAT PROBLEMS DO WE NEED TO SOLVE?
  • 26.
    26Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Steven Spear H. Kent Bowen October 1999
  • 27.
    27Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Decoding the DNA of TPS  Four-year study of the Toyota Production System  Inner workings of more than 40 plants in the United States, Europe, and Japan, some operating according to the system, some not  Studied both process and discrete manufacturers whose products ranged from prefabricated housing, auto parts and final auto assembly, cell phones, and computer printers to injection-molded plastics and aluminum extrusions  Studied not only routine production work but also service functions like equipment maintenance, workers’ training and supervision, logistics and materials handling, and process design and redesign
  • 28.
    28Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN How to Improve  We found that the key to understand that the Toyota Production System creates a community of scientists.  Whenever Toyota defines a specification, it is establishing a set of hypotheses that can then be tested. In other words, it is following the scientific method.  To make any changes, Toyota uses a rigorous problem-solving process that requires a detailed assessment of the current state of affairs and a plan to improvement that is, in effect, an experimental test of the proposed changes.  With anything less than such a scientific rigor, change at Toyota would amount to little more than random trial and error – a blindfolded walk through life. Who, What, Where, When, Why and How Clarify the Problem Initial Problem Perception (Large, vague, complicated problem) The "Real" Problem Locate Area / Point of Cause PoC Direct Cause Why ? Cause Cause Cause Cause Countermeasure Root Cause Why ? Why ? Why ? Why ? Cause Investigation Grasp the Situation 5 Why ? Investigation of Root Cause Basic Cause & Effect Investigation Grasp the Situation Cause Investigation Basic Cause & Effect Investigation Ask Why 5 times? Investigation of Root Cause
  • 29.
    29Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN How to Improve  Identifying problems is just a first step. For people to consistently make effective changes, they must know how to change and who is responsible for making the changes.  Toyota explicitly teaches people how to improve, not expecting them to learn strictly from personal experience. That’s where the rule for improvement comes in.  Any improvement to production activities, to connection between worker and machines, or the pathways must be made in accordance with the scientific method, under the guidance of a teacher, and the lowest possible organizational level.  To make changes, people are expected to present the explicit logic of the hypothesis.  Frontline workers make the improvements to their own jobs, and their supervisors provide direction and assistance as teachers.
  • 30.
    30Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN “Secret” of Toyota’s Success  To understand Toyota’s success, you have to unravel the paradox – you have to see that the rigid specification is the very thing that makes the flexibility and creativity possible.  The unspoken knowledge that underlies the Toyota Production System can be captured in four basic rules  These rules guide the design, operation, and improvement of every activity, connection, and pathway for every product and service
  • 31.
    31Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN TPS System Rules Rule 2: Every customer-supplier connection must be direct, and there must be a unmistakable yes- or-no way to send requests and receive responses Rule 1: All work shall be highly specified (standardized) as to content, sequence, timing and outcome Rule 3: The pathway for every product and service must be simple and direct – flow Rule 4: Any improvement must be made in accordance with the scientific method, under the guidance of a teacher, at the lowest possible level in the organization 1999
  • 32.
    32Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Using scientific methods to Solve Problems Use Scientific Problem Solving to dig beyond symptoms of common causes Does your company use Lean Tools and Methodologies to Solve Problems? Addressing this is more effective than jumping to solutions and launching hundreds of project
  • 33.
    33Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Knowledge and Skills To know, to understand the meaning correctly and to be able to teach Lean Knowledge Kanban, Pull system, Jidoka, Supermarket, 5S, TPM, SMED, JIT, Kaizen, STW, SOS, WCT, FTQ, PPM, Takt Time, etc … I know this! Lean Skills Be able to solve problems and advance the organization by using Lean Knowledge properly Use Lean knowledge to motivate people, achieve results, reduce costs, improve the operation and address business needs Can you Play a Violin?
  • 34.
    34Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Solving Problems
  • 35.
  • 36.
    36Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Implementation of Lean – The Six Steps Approach Step 1 – Sort out as many quality problems as you can, as well as downtime or other instability problems. Make sure that you ship 100% on time to your Customers. Get Engineers to worry seriously about internal scrap. Step 2 – Make sure the flow of parts through the system is as continuous as possible, which involves setting up the U-calls and making market locations, avoiding variations in the operator’s work cycle. Step 3 – Introduce Standardized Work and make sure the pace of work stabilizes through the various processes Step 4 – Start pulling, so that no parts or material move forward until they are called for. Start looking at production schedule and eventually replace production weekly or daily orders with some type of frequent signal, like Kanban card. Step 5 – Even out the production flow by reducing batch sizes, increasing the rhythm of internal deliveries, and leveling your internal demand. Step 6 – And when you accomplish all that and everything works perfectly you pull resources out and start again.
  • 37.
    37Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Changing the World. One Transformation at a time This presentation is an intellectual property of W3 Group Canada Inc. No parts of this document can be copied or reproduced without written permission from: Marek Piatkowski W3 Group Canada Inc. iPhone: 416-235-2631 Cell: 248-207-0416 Marek.Piatkowski@rogers.com http://twi-network.com Thinkingwin, Win, WIN
  • 38.
    38Marek.Piatkowski@Rogers.com How to Implement Lean/TPS ExecutiveOverview Thinkingwin, Win, WIN Presentations in this Workshop 1. Log in to: www.slideshare.net 2. Type in my name in search area: Marek Piatkowski 3. Select a presentation you want to see 4. Learn and Enjoy