The document discusses the areas of responsibility for materials management. It describes materials management as the process for managing all materials through a factory from receiving to shipping finished goods. The key areas of responsibility identified include customer orders, production planning and scheduling, purchasing parts warehouses, material deliveries, production line storage, work in process inventory, inventory control, finished goods warehouses, and shipping. Examples and questions are provided for each area to understand how well defined and standardized the processes are.
One of the fundamental methodologies of TPS (Toyota Production System) which we also know as Lean Transformation is understanding and elimination of 7 types of Waste. This presentation is in introduction to 7 types of Waste.
One of the fundamental methodologies of TPS (Toyota Production System) which we also know as Lean Transformation is understanding and elimination of 7 types of Waste. This presentation is in introduction to 7 types of Waste.
Introduction to principles of 5S - one of the fundamentals of Lean Transformation. 5S is also a very good leadership test to see if you are ready for Lean Transformation
Introduction to principles of 5S - one of the fundamentals of Lean Transformation. 5S is also a very good leadership test to see if you are ready for Lean Transformation
Lean six sigma - Waste elimination (Yellow Belt)Abhay Yadav
Lean Six Sigma is a methodology that relies on a collaborative team effort to improve performance by systematically removing waste; combining lean manufacturing/lean enterprise and Six Sigma to eliminate the eight kinds of waste (muda): defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, extra-processing
Here is my definition of Toyota Production System based on my 30 years experience working for Toyota Manufacturing and helping companies all over the World with Lean Transformation.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
CSCMP 2014: Using S&OP to Improve Enterprise ResiliencyAlyssaVallie
The supply chain is an increasing complex system. Leaders use Sales and Operations Planning to drive data-driven business discussions while laggards catch orders and manage transactions. Learn successful S&OP strategies to improve enterprise resiliency and how this creates a tight and reliable pattern of delivering costs while managing inventory cycles.
COMIT / Fiatech Conference 2014, The Crystal, London
Efficiency Through Digital Projects
Presented by Ray Topping from Fiatech. This project when launched attracted a great deal of interest from across the capital projects world. This project is being led by Shell.
Integrated Materials Management.
Similar to Materials Management - Areas of Responsibilities - TPS Model (20)
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
4. 4Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
What is Materials Management?
Material Management is a process describing, with great precision, how every part,
every component, every type of a material is managed through out a factory from the
Receiving Dock to the moment when a final product is shipped to the Customer
Materials Management Organization is responsible for:
1. Managing Raw Materials (Purchased Parts) – how they are ordered from the
Suppliers, how they are delivered to our site, how they are received and stored
2. Scheduling Production – providing Production Lines with Production Plans.
Controlling and monitoring execution of these plans to assure on-time deliveries.
3. Material Movement (Material Flow) – a well defined and standardized delivery
process for moving materials between warehouses and production lines. Assuring
that Production Lines have the necessary material to execute Production Plans
4. Managing Finished Goods – how Finished Product is received, stored and shipped
to the Customer to meet 100% on-time-deliveries.
5. 5Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Supply Chain Management
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
6. 6Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
8. 8Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
9. 9Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Production
Planning
Who (which department) is responsible for Planning Production?
Are production plans based on a forecast or real orders?
How frequently are production plans distributed?
Do they change? How often?
Do planners check availability of parts and machines before planning production?
13. 13Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
14. 14Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Purchased
Parts
Warehouse
Is there a centralized Purchased Parts warehouse?
Is it clean, well defined, Standardized and organized?
Is it easy to tell who is responsible for the warehouse?
Is it easy to find parts in the warehouse
Is there a methodology for delivering parts to the factory?
19. 19Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
20. 20Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Material
Deliveries
Is there a well defined process for delivering materials to production lines?
Is it easy to understand and follow?
Is it clear to understand who is responsible for delivering materials?
Are there roles and responsibilities well defined?
Is it safe and reliable?
21. 21Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Material
Deliveries
Is there a structure to material deliveries?
Are the procedures and guidelines?
Is there a process in place?
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
Sat
Lift
Assy
Short
Plg
Assy
Short
Plg
Assy
12 mm
Assy
2 hr
921
Lift
Assy
T-Car
Lift
Assy
2 hr2 hr
2 hr
T-Car
Plg.
Assy
ACI
Lift
Assy
ACI
Lift
Assy
ACI
Plg
Assy
Short
Assy
2 hr
2 hr
2 hr
2 hr
2 hr 2 hr 2 hr 2 hr 2 hr 2 hr 2 hr
2 hr
2 hr
2 hr
2 hr
2 hr
2 hr
3 day
3 day
3 day
3 day
842
Plg
Asst
Sat
Plg
Assy
846
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Plg
Assy
Cevt.
Ball
Storage
“D”
Rec.
Insp
“A”
952
Spring
“B”
972
Brutor
Area
“C”
11 mm
Assy
DAH
Assy2 hr
2 hr
2 hr 2 carts
800 ofmatl.
1 hr 45 min in a tour
Proposed value stream small components toassy. lines
12 mm
Assy
I
921
Lift
Assy
T-Car
Lift
Assy
II
I
T-Car
Plg.
Assy
ACI
Lift
Assy
ACI
Lift
Assy
ACI
Plg
Assy
Short
Assy
I
I
I
I
I I I I I I I
I
I
I
I
I
I
I
I
I
I
842
Plg
Asst
Sat
Plg
Assy
846
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
Sat
Lift
Assy
Short
Plg
Assy
Short
Plg
Assy
Cevt.
Ball
Storage
“D”
Rec.
Insp
“A”
952
Spring
“B”
972
Brutor
Area
“C”
11 mm
Assy
DAH
AssyI
I
Supermarket
Roller
Sup.
DAH
Supl.
Rec. Insp
Penny
Vendor
Sup.
12 mm
11 mm
Sup.
T-Car
Janet
ACI
Sup.
GF
Manuf.
Services
“Milk Run” Condition
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
Sat
Lift
Assy
Short
Plg
Assy
Short
Plg
Assy
12 mm
Assy
2 hr
921
Lift
Assy
T-Car
Lift
Assy
2 hr2 hr
2 hr
T-Car
Plg.
Assy
ACI
Lift
Assy
ACI
Lift
Assy
ACI
Plg
Assy
Short
Assy
2 hr
2 hr
2 hr
2 hr
2 hr 2 hr 2 hr 2 hr 2 hr 2 hr 2 hr
2 hr
2 hr
2 hr
2 hr
2 hr
2 hr
3 day
3 day
3 day
3 day
842
Plg
Asst
Sat
Plg
Assy
846
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Plg
Assy
Cevt.
Ball
Storage
“D”
Rec.
Insp
“A”
952
Spring
“B”
972
Brutor
Area
“C”
11 mm
Assy
DAH
Assy2 hr
2 hr
2 hr 2 carts
800 ofmatl.
1 hr 45 min in a tour
Proposed value stream small components toassy. lines
12 mm
Assy
I
921
Lift
Assy
T-Car
Lift
Assy
II
I
T-Car
Plg.
Assy
ACI
Lift
Assy
ACI
Lift
Assy
ACI
Plg
Assy
Short
Assy
I
I
I
I
I I I I I I I
I
I
I
I
I
I
I
I
I
I
842
Plg
Asst
Sat
Plg
Assy
846
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
Sat
Lift
Assy
Short
Plg
Assy
Short
Plg
Assy
Cevt.
Ball
Storage
“D”
Rec.
Insp
“A”
952
Spring
“B”
972
Brutor
Area
“C”
11 mm
Assy
DAH
AssyI
I
Supermarket
Roller
Sup.
DAH
Supl.
Rec. Insp
Penny
Vendor
Sup.
12 mm
11 mm
Sup.
T-Car
Janet
ACI
Sup.
GF
Manuf.
Services
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
Sat
Lift
Assy
Short
Plg
Assy
Short
Plg
Assy
12 mm
Assy
2 hr
921
Lift
Assy
T-Car
Lift
Assy
2 hr2 hr
2 hr
T-Car
Plg.
Assy
ACI
Lift
Assy
ACI
Lift
Assy
ACI
Plg
Assy
Short
Assy
2 hr
2 hr
2 hr
2 hr
2 hr 2 hr 2 hr 2 hr 2 hr 2 hr 2 hr
2 hr
2 hr
2 hr
2 hr
2 hr
2 hr
3 day
3 day
3 day
3 day
842
Plg
Asst
Sat
Plg
Assy
846
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Plg
Assy
Cevt.
Ball
Storage
“D”
Rec.
Insp
“A”
952
Spring
“B”
972
Brutor
Area
“C”
11 mm
Assy
DAH
Assy2 hr
2 hr
2 hr 2 carts
800 ofmatl.
1 hr 45 min in a tour
Proposed value stream small components toassy. lines
12 mm
Assy
I
921
Lift
Assy
T-Car
Lift
Assy
II
I
T-Car
Plg.
Assy
ACI
Lift
Assy
ACI
Lift
Assy
ACI
Plg
Assy
Short
Assy
I
I
I
I
I I I I I I I
I
I
I
I
I
I
I
I
I
I
842
Plg
Asst
Sat
Plg
Assy
846
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Plg
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
842
Lift
Assy
Sat
Lift
Assy
Short
Plg
Assy
Short
Plg
Assy
Cevt.
Ball
Storage
“D”
Rec.
Insp
“A”
952
Spring
“B”
972
Brutor
Area
“C”
11 mm
Assy
DAH
AssyI
I
Supermarket
Sup.
DAH
Supl.
Rec. Insp
Penny
Vendor
Sup.
12 mm
11 mm
Sup.
T-Car
Janet
ACI
Sup.
GF
Manuf.
Services
Original Condition
27. 27Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
28. 28Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Production
Line Storage
Is material stored on designated racks or is it simply placed on the floor?
Are the inventory levels controlled?
Is the material easy to find or do operators have to look for it?
Is well identified and easy to find?
Is it clear who is responsible for replenishing line materials?
Is 5S followed?
34. 34Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
41. 41Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
47. 47Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
55. 55Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
57. 57Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Are materials pre-staged prior to shipping?
Is there a staging area used to prepare load and find shortage prior to shipping?
Is the next load staged at a fixed time before shipping?
Are shipping responsibilities clearly defined?
Is a shipping schedule available and easy to see?
Shipping
Pre-Staging
62. 62Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Materials Management – Areas of Responsibilities
Customer Orders
Production Plans/Schedules
Purchased Parts (Raw Material) Warehouse
Material Deliveries
Production Line Storage
Work-in-Process (WIP) Inventory Storage
Inventory Control
Finished Goods Warehouse
Shipping
63. 63Marek.Piatkowski@Rogers.com
Materials
Management
Areas of
Responsibilities
Thinkingwin, Win, WIN
Changing the World. One Transformation at a time
This presentation is an intellectual property of W3 Group Canada Inc.
No parts of this document can be copied or reproduced
without written permission from:
Marek Piatkowski
W3 Group Canada Inc.
iPhone: 416-235-2631
Cell: 248-207-0416
Marek.Piatkowski@rogers.com
http://twi-network.com