SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
SUB-STRUCTURE (ALL PROVISIONAL)
GROUNDWORK
A Removing trees from site 1.5 - 3.0m girth including,
grubbing up roots, disposal of materials, and filling voids - no.
B Clear site of bushes, scrub, undergrowth, hedges and
trees < 600mm girth. 80 m
2
EXCAVATING
C Excavating topsoil for preservation, 150mm average
depth. 80 m
2
D Excavating trenches for foundation; width > 0.50m, and
maximum depth <1.50m 30 m
3
DISPOSAL
E Removal surplus excavated materials to spoil heap
100m from site. 8 m
3
F Clear away excavated topsoil to a temporary spoil
heap 100m from site. 8 m
3
G Filling and compacting to excavations average thick-
ness > 0.25m, with selected materials arising from the
excavations. 20 m
3
H Approved well compacted laterite filling to make up
levels, average thickness < 0.25m. 20 m
3
I Hardcore ditto. 20 m3
Total Sub-structure 1
Cityscape Associates
19 Kairaba Avenue Page 1 of 7 Bill 5
SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
SURFACE TREATMENTS
A Levelling and compacting bottoms of excavations to
receive concrete 22 m
2
B "Dursban TC" antitermite treatment to faces and bottom
of excavations. 125 m2
2. IN - SITU CONCRETE
FOUNDATIONS
C Plain in-situ concrete grade C20 - Screened gravel in foundations
poured against earth. 4 m
3
REINFORCED
D
Reinforced in-situ concrete grade C25 - Basalt aggregate in columns of
foundations and ground beam 3 m
3
E Plain in-situ concrete grade C20 - Screened gravel in floor bed, thick-
ness 200mm, poured on unblinded hard-core. 16 m3
F
In-situ concrete grade C25 - Basalt aggregate for pad, constructed on 500mm
sand bedding and surrounding with polyeterine material or equivalent against
vibrations. 6 m3
FORMWORK
G Plain vertical formwork to sides of foundations columns. 150 m
H Ditto to sides of floor bed. 100 m
REINFORCEMENT
I 12mm ditto - pads, columns and ground beam 700 m
J Mild steel links reinforcement 6mm diameter bar 300 m
3. MASONRY
BLOCKWALLING
K 150mm thick solid sandcrete vertical blockwalling
bedded and jointed in cement mortar 1:6 mix. 66 m
2
SUNDRY ITEMS FOR BLOCKWALLING
L 1000 (gauge) polythene sheet horizontal damp-proof-
course laid in concrete, width > 225mm 78 m
2
Total Sub-structure 2
4. SURFACE FINISHES
RENDERED COATINGS
M 12mm thick cement and sand (1:3) rendering on
blockwork in one coat, width > 300mm. 28 m
2
PAINTING
N Prepare and apply one undercoat and two finishing
coats of emulsion paint on general surfaces, girth
> 300mm. 56 m
2
Total Sub-structure 3
Total Sub-structure 1
Total Sub-structure 2
Total Sub-structure 3
Total Sub-structure
Cityscape Associates
19 Kairaba Avenue Page 2 of 7 Bill 5
SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
SUPER - STRUCTURE
IN - SITU - CONCRETE
IN - SITU - CONCRETE
A Reinforced in-situ concrete grade C25 - Basalt aggregate in
lintels at ground floors. 1 m
3
B Reinforced in-situ concrete grade C25 - Basalt aggregate in
columns, roof slab and parapet wall. 20 m3
C Reinforced in-situ concrete grade C25 - Basalt aggregate in
roof slab beams. 1 m
3
FORMWORK FOR IN-SITU CONCRETE
D Sawn timber formwork to rectangular beams for,
lintels and roof beams. 70 m
2
Sawn timber formwork to rectangular columns, height
E to soffits < 5.00m and soffit of roof slab. 140 m2
REINFORCEMENT FOR IN SITU CONCRETE
THE FOLLOWING IN HIGH YIELD BENT RE--
INFORCEMENT BARS, AND INCLUDING HOOKS,
TYING WIRE AND SPACERS:
F 12mm diameter in columns. 220 m
G 10mm diameter in lintel. 180 m
H 12mm diameter in main beam to roof slab. 264 m
I 6mm diameter mild steel links 410 m
J 10mm diameter in suspended roof slab 1600 m
MASONRY
BLOCK - WALLING
K 150mm thick hollow sandcrete block vertical blockwork
bedded and jointed in cement mortar ( 1:4 ) mix. 200 m
2
L Louvre or breeze blocks 150mm thick sandcrete block vertical blockwork
bedded and jointed in cement mortar ( 1:4 ) mix. 7 m
2
Total Concrete work and blockwork
Cityscape Associates
19 Kairaba Avenue Page 3 of 7 Bill 5
SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
WINDOWS / DOORS
Metal framed glazed window.
A 1800mm x 2000mm 8 no.
B Provide and fix burglar bars to the above sliding windows item
Pressed steel glazed door framed in 40 x 40 x 2mm SHS with
C 1.5mm thick steel plate and including cylinder lock (3000 X 4000mm) 1 no.
on rollers
WATER INSTALLATION
water supply pipes to building, including excavated trenches
average depth 750mm sand bedding and pipe ducts with bends
J Polythene 25mm. 30 m
Copper pipe, 15mm water supply pipe and fittings, fixed to wall
with clips, (complete with elbows and Tees.)
K Copper Pipe. Item
Total Windows and Doors
Cityscape Associates
19 Kairaba Avenue Page 4 of 7 Bill 5
SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
ELECTRICAL SUPPLY / POWER LIGHTING SYSTEMS
The following in concealed conduit straight PVC pipe 19mm diameter
in chases through blockwork / concrete work and including conduit
accessories; conduit boxes and the like; fixing, bending, cutting,
screwing and jointing; determining routes; draw wires, draw cables,
and the like; and components for earth continuity. Electrical components such
as lighting, switches, sockets, bulbs etc must be watertight and meet the
applicable standards for facilities where explosive gases are in use
A Socket outlet 2P + T / 16A-240V projection explosive atmosphere (flameproof)
with 2.5mm2 cross sectional area cables. 3 no.
Lighting outlets with 1.5mm2 cross sectional area
cables.
B UPVC conduits (final circuit) Item
C Flameproof 10A single stage ignition switch (One gang one way switch) 2 no.
D Flameproof 10A single stage ignition switch (Three gang switch) 3 no.
E Flameproof luminary 1x36w fluorescent for explosive atmosphere 7 no.
G Flameproof luminary 1x36w fluoresent 4 no.
J Provide and fix Electric box for explosive atmosphere 1 no.
K Wiring to all points Item
L Independent earth rod conductor 2 no.
M Allow for testing of electrical installations item
O Change over switch and accessories to accommodate all connections 1 no.
Total Electrical
Cityscape Associates
19 Kairaba Avenue Page 5 of 7 Bill 5
SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
SURFACE FINISHES
RENDERING AND SCREEDING
WALLS
A 12mm cement and sand (1:3 ) rendering on block and concrete
work on all internal and external wall surfaces 400 m
2
FLOORS
B 50mm thick cement and sand ( 1:4 ) floated bed to
receive finishing. 80 m
2
PAINTING
E Prepare and apply one undercoat and two finishing coats of
emulsion paint on general surfaces. 450 m
2
F Allow for painting of metal surfaces (doors &burgular bars with one
undercoat and two finishing coats of oil paint item
Total Finishes and Decorations
Cityscape Associates
19 Kairaba Avenue Page 6 of 7 Bill 5
SHELTER FOR PILOT BALOON
Item Description Qty Unit Rate D B
ELEMENTAL COST SUMMARY
A SUBSTRUCTURE - FOUNDATION TO GROUND FLOOR SLAB
B SUPERSTRUCTURE - CONCRETEWORK AND BLOCKWORK
C DOORS AND WINDOWS
D ELECTRICAL INSTALLATIONS
E FINISHINGS AND DECORATIONS
TOTAL GENERATOR HOUSE TO SUMMARY PAGE -
Cityscape Associates
19 Kairaba Avenue Page 7 of 7 Bill 5

Bo q for shelter

  • 1.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B SUB-STRUCTURE (ALL PROVISIONAL) GROUNDWORK A Removing trees from site 1.5 - 3.0m girth including, grubbing up roots, disposal of materials, and filling voids - no. B Clear site of bushes, scrub, undergrowth, hedges and trees < 600mm girth. 80 m 2 EXCAVATING C Excavating topsoil for preservation, 150mm average depth. 80 m 2 D Excavating trenches for foundation; width > 0.50m, and maximum depth <1.50m 30 m 3 DISPOSAL E Removal surplus excavated materials to spoil heap 100m from site. 8 m 3 F Clear away excavated topsoil to a temporary spoil heap 100m from site. 8 m 3 G Filling and compacting to excavations average thick- ness > 0.25m, with selected materials arising from the excavations. 20 m 3 H Approved well compacted laterite filling to make up levels, average thickness < 0.25m. 20 m 3 I Hardcore ditto. 20 m3 Total Sub-structure 1 Cityscape Associates 19 Kairaba Avenue Page 1 of 7 Bill 5
  • 2.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B SURFACE TREATMENTS A Levelling and compacting bottoms of excavations to receive concrete 22 m 2 B "Dursban TC" antitermite treatment to faces and bottom of excavations. 125 m2 2. IN - SITU CONCRETE FOUNDATIONS C Plain in-situ concrete grade C20 - Screened gravel in foundations poured against earth. 4 m 3 REINFORCED D Reinforced in-situ concrete grade C25 - Basalt aggregate in columns of foundations and ground beam 3 m 3 E Plain in-situ concrete grade C20 - Screened gravel in floor bed, thick- ness 200mm, poured on unblinded hard-core. 16 m3 F In-situ concrete grade C25 - Basalt aggregate for pad, constructed on 500mm sand bedding and surrounding with polyeterine material or equivalent against vibrations. 6 m3 FORMWORK G Plain vertical formwork to sides of foundations columns. 150 m H Ditto to sides of floor bed. 100 m REINFORCEMENT I 12mm ditto - pads, columns and ground beam 700 m J Mild steel links reinforcement 6mm diameter bar 300 m 3. MASONRY BLOCKWALLING K 150mm thick solid sandcrete vertical blockwalling bedded and jointed in cement mortar 1:6 mix. 66 m 2 SUNDRY ITEMS FOR BLOCKWALLING L 1000 (gauge) polythene sheet horizontal damp-proof- course laid in concrete, width > 225mm 78 m 2 Total Sub-structure 2 4. SURFACE FINISHES RENDERED COATINGS M 12mm thick cement and sand (1:3) rendering on blockwork in one coat, width > 300mm. 28 m 2 PAINTING N Prepare and apply one undercoat and two finishing coats of emulsion paint on general surfaces, girth > 300mm. 56 m 2 Total Sub-structure 3 Total Sub-structure 1 Total Sub-structure 2 Total Sub-structure 3 Total Sub-structure Cityscape Associates 19 Kairaba Avenue Page 2 of 7 Bill 5
  • 3.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B SUPER - STRUCTURE IN - SITU - CONCRETE IN - SITU - CONCRETE A Reinforced in-situ concrete grade C25 - Basalt aggregate in lintels at ground floors. 1 m 3 B Reinforced in-situ concrete grade C25 - Basalt aggregate in columns, roof slab and parapet wall. 20 m3 C Reinforced in-situ concrete grade C25 - Basalt aggregate in roof slab beams. 1 m 3 FORMWORK FOR IN-SITU CONCRETE D Sawn timber formwork to rectangular beams for, lintels and roof beams. 70 m 2 Sawn timber formwork to rectangular columns, height E to soffits < 5.00m and soffit of roof slab. 140 m2 REINFORCEMENT FOR IN SITU CONCRETE THE FOLLOWING IN HIGH YIELD BENT RE-- INFORCEMENT BARS, AND INCLUDING HOOKS, TYING WIRE AND SPACERS: F 12mm diameter in columns. 220 m G 10mm diameter in lintel. 180 m H 12mm diameter in main beam to roof slab. 264 m I 6mm diameter mild steel links 410 m J 10mm diameter in suspended roof slab 1600 m MASONRY BLOCK - WALLING K 150mm thick hollow sandcrete block vertical blockwork bedded and jointed in cement mortar ( 1:4 ) mix. 200 m 2 L Louvre or breeze blocks 150mm thick sandcrete block vertical blockwork bedded and jointed in cement mortar ( 1:4 ) mix. 7 m 2 Total Concrete work and blockwork Cityscape Associates 19 Kairaba Avenue Page 3 of 7 Bill 5
  • 4.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B WINDOWS / DOORS Metal framed glazed window. A 1800mm x 2000mm 8 no. B Provide and fix burglar bars to the above sliding windows item Pressed steel glazed door framed in 40 x 40 x 2mm SHS with C 1.5mm thick steel plate and including cylinder lock (3000 X 4000mm) 1 no. on rollers WATER INSTALLATION water supply pipes to building, including excavated trenches average depth 750mm sand bedding and pipe ducts with bends J Polythene 25mm. 30 m Copper pipe, 15mm water supply pipe and fittings, fixed to wall with clips, (complete with elbows and Tees.) K Copper Pipe. Item Total Windows and Doors Cityscape Associates 19 Kairaba Avenue Page 4 of 7 Bill 5
  • 5.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B ELECTRICAL SUPPLY / POWER LIGHTING SYSTEMS The following in concealed conduit straight PVC pipe 19mm diameter in chases through blockwork / concrete work and including conduit accessories; conduit boxes and the like; fixing, bending, cutting, screwing and jointing; determining routes; draw wires, draw cables, and the like; and components for earth continuity. Electrical components such as lighting, switches, sockets, bulbs etc must be watertight and meet the applicable standards for facilities where explosive gases are in use A Socket outlet 2P + T / 16A-240V projection explosive atmosphere (flameproof) with 2.5mm2 cross sectional area cables. 3 no. Lighting outlets with 1.5mm2 cross sectional area cables. B UPVC conduits (final circuit) Item C Flameproof 10A single stage ignition switch (One gang one way switch) 2 no. D Flameproof 10A single stage ignition switch (Three gang switch) 3 no. E Flameproof luminary 1x36w fluorescent for explosive atmosphere 7 no. G Flameproof luminary 1x36w fluoresent 4 no. J Provide and fix Electric box for explosive atmosphere 1 no. K Wiring to all points Item L Independent earth rod conductor 2 no. M Allow for testing of electrical installations item O Change over switch and accessories to accommodate all connections 1 no. Total Electrical Cityscape Associates 19 Kairaba Avenue Page 5 of 7 Bill 5
  • 6.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B SURFACE FINISHES RENDERING AND SCREEDING WALLS A 12mm cement and sand (1:3 ) rendering on block and concrete work on all internal and external wall surfaces 400 m 2 FLOORS B 50mm thick cement and sand ( 1:4 ) floated bed to receive finishing. 80 m 2 PAINTING E Prepare and apply one undercoat and two finishing coats of emulsion paint on general surfaces. 450 m 2 F Allow for painting of metal surfaces (doors &burgular bars with one undercoat and two finishing coats of oil paint item Total Finishes and Decorations Cityscape Associates 19 Kairaba Avenue Page 6 of 7 Bill 5
  • 7.
    SHELTER FOR PILOTBALOON Item Description Qty Unit Rate D B ELEMENTAL COST SUMMARY A SUBSTRUCTURE - FOUNDATION TO GROUND FLOOR SLAB B SUPERSTRUCTURE - CONCRETEWORK AND BLOCKWORK C DOORS AND WINDOWS D ELECTRICAL INSTALLATIONS E FINISHINGS AND DECORATIONS TOTAL GENERATOR HOUSE TO SUMMARY PAGE - Cityscape Associates 19 Kairaba Avenue Page 7 of 7 Bill 5