This document provides a bill of quantities for the construction of a shelter for a pilot balloon. It includes items for the substructure, superstructure, doors and windows, electrical installations, and surface finishes. The substructure involves excavation, disposal of materials, hardcore filling, and a concrete floor bed. The superstructure includes reinforced concrete columns, beams, and a roof slab. It also involves block wall construction. Other items include windows, water pipes, electrical wiring and outlets, rendering, and painting. The total cost is summarized across the various elements of the shelter's construction.