BILL NO. 3 : 1 unit Multipurpose Hall QTY UNIT RATE AMOUNT
(RM) (RM)
INTERNAL WALL FINISHES
Cement and sand (1:6) as described internal plastering
finished
with a steel trowel:-
A 19mm Thick to walls and columns. 728 M2
Cement and sand (1:3) beds and backings; screeded finish;
to receive ceramic tiles:-
B 19mm Thick to walls and columns. 89 M2
200mm x 250mm x 7mm Thick "White Horse" or approved
equivalent glazed ceramic wall tiles of approved pattern and
colour;
laid on cement and sand (1:3) backings (measured separately)
as described and pointing in neat white cement as described:-
C To walls and columns. 89 M2
Painting
Prepare and apply one coat of "ICI" primer and two coats of
"Nippon Super Martex" emulsion paint or approved
equivalent to:-
D Plastered walls and columns. 728 M2
INTERNAL WALL FINISHES
GENERAL TO SUMMARY
B 3/ 1
Prepared by HII PAI LING

More Related Content

What's hot

Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors
Luke D'Arcy
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-listJeanne Hoo
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
Lee Pei Gie
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
Est
 
6) int walls finishes query
6) int walls finishes query6) int walls finishes query
6) int walls finishes queryJeanne Hoo
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows마 이환
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Ibs score
Ibs scoreIbs score
Ibs score
Afiq Knick
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
ahmong4
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure
Faculty of fine arts -Cairo. Egypt.
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
hlksd
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
Timun Loh
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 

What's hot (20)

Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
6) int walls finishes query
6) int walls finishes query6) int walls finishes query
6) int walls finishes query
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Ibs score
Ibs scoreIbs score
Ibs score
 
BQ
BQBQ
BQ
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure
 
Boq sample
Boq sampleBoq sample
Boq sample
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 

Viewers also liked

Measurement 2 assignment cover pages
Measurement 2 assignment cover pagesMeasurement 2 assignment cover pages
Measurement 2 assignment cover pagesJeanne Hoo
 
Building services-power-point
Building services-power-pointBuilding services-power-point
Building services-power-pointJeanne Hoo
 
Introduction to law assignment
Introduction to law assignmentIntroduction to law assignment
Introduction to law assignment
Jeanne Hoo
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
Jeanne Hoo
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
Jeanne Hoo
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
Chiety Lasim
 

Viewers also liked (6)

Measurement 2 assignment cover pages
Measurement 2 assignment cover pagesMeasurement 2 assignment cover pages
Measurement 2 assignment cover pages
 
Building services-power-point
Building services-power-pointBuilding services-power-point
Building services-power-point
 
Introduction to law assignment
Introduction to law assignmentIntroduction to law assignment
Introduction to law assignment
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
 

Similar to 5) int walls finishes bq

Item
ItemItem
Item
lohwenjun
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
Arthur Wilson
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimationimaduddin91
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
ssuserd43de8
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
Stephen Nzima
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimationimaduddin91
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
Mohd Danish
 
brickwork, plastering and waterproofing
brickwork, plastering and waterproofingbrickwork, plastering and waterproofing
brickwork, plastering and waterproofing
RamkumarKumar9
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
Mohd Danish
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
Dr. Ninad Dhawle
 
CETCON wall care
CETCON wall careCETCON wall care
CETCON wall care
Devrajsinh Gohil
 
Presentation about White Cement
Presentation about White CementPresentation about White Cement
Presentation about White Cement
Wagdi Alrufaei
 

Similar to 5) int walls finishes bq (20)

Item
ItemItem
Item
 
Office building new
Office building newOffice building new
Office building new
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
 
3D
3D3D
3D
 
brickwork, plastering and waterproofing
brickwork, plastering and waterproofingbrickwork, plastering and waterproofing
brickwork, plastering and waterproofing
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
CETCON wall care
CETCON wall careCETCON wall care
CETCON wall care
 
Presentation about White Cement
Presentation about White CementPresentation about White Cement
Presentation about White Cement
 

More from Jeanne Hoo

Financial Management - Financial Ratio Formula
Financial Management - Financial Ratio FormulaFinancial Management - Financial Ratio Formula
Financial Management - Financial Ratio Formula
Jeanne Hoo
 
Management Science
Management Science Management Science
Management Science
Jeanne Hoo
 
Int walls element to list
Int walls element   to listInt walls element   to list
Int walls element to listJeanne Hoo
 
Ext walls-to-list
Ext walls-to-listExt walls-to-list
Ext walls-to-listJeanne Hoo
 
Ext wall-finishes-1-to
Ext wall-finishes-1-toExt wall-finishes-1-to
Ext wall-finishes-1-toJeanne Hoo
 
8) ext wall-finishes-1-query
8) ext wall-finishes-1-query8) ext wall-finishes-1-query
8) ext wall-finishes-1-queryJeanne Hoo
 
7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bq7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bqJeanne Hoo
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-queryJeanne Hoo
 
3) ext walls-bq
3) ext walls-bq3) ext walls-bq
3) ext walls-bqJeanne Hoo
 
1) int walls element bq
1) int walls element   bq1) int walls element   bq
1) int walls element bqJeanne Hoo
 
2) int walls element query sheet
2) int walls element   query sheet2) int walls element   query sheet
2) int walls element query sheetJeanne Hoo
 

More from Jeanne Hoo (11)

Financial Management - Financial Ratio Formula
Financial Management - Financial Ratio FormulaFinancial Management - Financial Ratio Formula
Financial Management - Financial Ratio Formula
 
Management Science
Management Science Management Science
Management Science
 
Int walls element to list
Int walls element   to listInt walls element   to list
Int walls element to list
 
Ext walls-to-list
Ext walls-to-listExt walls-to-list
Ext walls-to-list
 
Ext wall-finishes-1-to
Ext wall-finishes-1-toExt wall-finishes-1-to
Ext wall-finishes-1-to
 
8) ext wall-finishes-1-query
8) ext wall-finishes-1-query8) ext wall-finishes-1-query
8) ext wall-finishes-1-query
 
7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bq7) ext wall-finishes-1-bq
7) ext wall-finishes-1-bq
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-query
 
3) ext walls-bq
3) ext walls-bq3) ext walls-bq
3) ext walls-bq
 
1) int walls element bq
1) int walls element   bq1) int walls element   bq
1) int walls element bq
 
2) int walls element query sheet
2) int walls element   query sheet2) int walls element   query sheet
2) int walls element query sheet
 

5) int walls finishes bq

  • 1. ITE M BILL NO. 3 : 1 unit Multipurpose Hall QTY UNIT RATE AMOUNT (RM) (RM) INTERNAL WALL FINISHES Cement and sand (1:6) as described internal plastering finished with a steel trowel:- A 19mm Thick to walls and columns. 728 M2 Cement and sand (1:3) beds and backings; screeded finish; to receive ceramic tiles:- B 19mm Thick to walls and columns. 89 M2 200mm x 250mm x 7mm Thick "White Horse" or approved equivalent glazed ceramic wall tiles of approved pattern and colour; laid on cement and sand (1:3) backings (measured separately) as described and pointing in neat white cement as described:- C To walls and columns. 89 M2 Painting Prepare and apply one coat of "ICI" primer and two coats of "Nippon Super Martex" emulsion paint or approved equivalent to:- D Plastered walls and columns. 728 M2 INTERNAL WALL FINISHES GENERAL TO SUMMARY B 3/ 1
  • 2. Prepared by HII PAI LING