This document provides details of the qualifications and work experience of Ninad A. Dhawle, an architect. It includes:
- Over 23 years of experience in roles including project management, design, consultation and quality audits for residential, commercial, institutional and industrial projects.
- Experience with firms nad Consultants, dna Erectors and INT-EXT Consultancy between 1994-2017 with a total project value of $25 million.
- Contact information and an abstract of an estimate for a proposed indoor sports hall project.
Presentation describes important designing parameters, reasons for formwork failures and prevention of such failures. It also touches upon remedial measures.
Modern construction formworks:-
1. Aluminium formwork
2. Precast system
3.Modular formwork
4.Tunnel formwork
5.Fiberglass shuttering
Description of each formwork with their advantages and disadvantages
Shuttering in concrete construction is used as a mould for a structure in which fresh concrete is poured to harden subsequently curing
It is a part of formwork, or you may call it as derivative of formwork. Shuttering is a vertical temporary arrangement which is arranged to bring concrete in a desired shape.orFormwork which supports vertical arrangement is known as shuttering.
APC has become one of the leading businesses of its type by providing professional service & advice. We are now one of the most successful suppliers of masonry products in Australia. APC personnel have a diverse knowledge of the products we sell. Our customers demand this!!
It is our focus to have every person in APC concentrate on exceeding customer needs & expectations. We achieve this by sourcing & appointing good quality products, new ideas, new styles, & new finishes; all at the value for money prices! When APC displays all of these products & ideas within the best displays around Australia, you have a chance to get an incredible shopping advantage. APC displays are landscaped, in situ, well maintained, well designed, & truly amazing!!
Presentation describes important designing parameters, reasons for formwork failures and prevention of such failures. It also touches upon remedial measures.
Modern construction formworks:-
1. Aluminium formwork
2. Precast system
3.Modular formwork
4.Tunnel formwork
5.Fiberglass shuttering
Description of each formwork with their advantages and disadvantages
Shuttering in concrete construction is used as a mould for a structure in which fresh concrete is poured to harden subsequently curing
It is a part of formwork, or you may call it as derivative of formwork. Shuttering is a vertical temporary arrangement which is arranged to bring concrete in a desired shape.orFormwork which supports vertical arrangement is known as shuttering.
APC has become one of the leading businesses of its type by providing professional service & advice. We are now one of the most successful suppliers of masonry products in Australia. APC personnel have a diverse knowledge of the products we sell. Our customers demand this!!
It is our focus to have every person in APC concentrate on exceeding customer needs & expectations. We achieve this by sourcing & appointing good quality products, new ideas, new styles, & new finishes; all at the value for money prices! When APC displays all of these products & ideas within the best displays around Australia, you have a chance to get an incredible shopping advantage. APC displays are landscaped, in situ, well maintained, well designed, & truly amazing!!
The PPT is prepared to create awareness in practicing civil engineers to minimize the mistakes in construction so as to enhance the stability and durability of structures
Colourmet Infratech Pvt. Ltd. is one of the India’;s fastest growing steel building solution company, situated in Pune. We design, manufacture, supply and erect Pre-Engineering Building Systems, complete roofing and wall cladding solutions. Colourmet Infratech Pvt. Ltd.is one of the few manufacturers in India to have a fully Integrated plant for Pre Engineered Building, Roof & Wall Panels, Z & C Purlin, Floor Deck Sheets etc. Colourmet has production capacity to produce total of 3000 tons/month of steel building. Adherence to the internationally accepted engineering practices in production, planning and control helps to keep up the delivery dates, products quality and efficient implementation. The experience, expertise and exposure that had been acquired over the years has enabled COLOURMET to diversify into providing turnkey contracting services to construction industries and offering single source responsibility involving complete pre-engineered building systems and solutions. COLOURMET is committed to provide the customer with the quality products and services. The COLOURMET excellence is reflected in the long list of satisfied customers.
Why Colourmet Infratech Pvt. Ltd.?
At COLOURMET, we ask this question at every stage of business execution and define all our actions to match, positively to the spirit of this question. This enables us to offer the best possible solution to our clients. The client-satisfaction helps COLOURMET to grow from the present level and enter the future with a head start.
Vision - Speed, Quality and Value
That, COLOURMET’;s a one-stop-shop solution for all roofing needs;
COLOURMET -strives always to establish and maintain the market leadership;
COLOURMET is committed to provide the best and the cost-effective solution to give customers value for their money;
That, COLOURMET is devoted to continuously update its material and process technologies to the international standards.
Superior Technology
Fastest Delivery
Site Service
Quality Materials
Fast Quotation
International Quality Standards
Proven Track Record.
As a business owner in Delaware, staying on top of your tax obligations is paramount, especially with the annual deadline for Delaware Franchise Tax looming on March 1. One such obligation is the annual Delaware Franchise Tax, which serves as a crucial requirement for maintaining your company’s legal standing within the state. While the prospect of handling tax matters may seem daunting, rest assured that the process can be straightforward with the right guidance. In this comprehensive guide, we’ll walk you through the steps of filing your Delaware Franchise Tax and provide insights to help you navigate the process effectively.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Remote sensing and monitoring are changing the mining industry for the better. These are providing innovative solutions to long-standing challenges. Those related to exploration, extraction, and overall environmental management by mining technology companies Odisha. These technologies make use of satellite imaging, aerial photography and sensors to collect data that might be inaccessible or from hazardous locations. With the use of this technology, mining operations are becoming increasingly efficient. Let us gain more insight into the key aspects associated with remote sensing and monitoring when it comes to mining.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
1. Kia Ora Work Portfolio.
Architect,
Ninad A. Dhawle
M. Arch. MBA, Ph.D (submitted),IOSH certified
nad Consultants. 2010-current
dna Erectors 2007-2010
INT-EXT Consultancy 1994-2007
9860675009
ninadad@gmail.com
1
2. Brief outlay: Work Experience
1994-2017. 23 years
Name of the
firm
Projects executed Work Profile Value
@ $
Period
nad
Consultants
•Institutional
•Commercial
•Consultancy
•Architectural
planning, designing
•Tendering
•Quality Audits
$10 m 2010-
Current
7years
dna Erectors •Commercial Projects
•Industrial Projects
•Construction
Project Management
•Estimation
$10m 2007-2010
3years
Int-Ext
Consultancy
•Residential
•Institutional
•Interior
•Client Handling
•Business
development
•Site Supervision
•Sub Contracting
$5 m 1994-2007
13years
$25 m 23 years
2
4. A B S T R A C T O F E S T I M A T E .
TECHNOLOGY, AMRAVATI NAME OF WORK: PROPOSESD INDOOR SPORTS HALL AT SIPNA COLLEGE OF
ENGINEERING AND TECHNOLOGY, AMRAVATI
Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT
BD.A3 Excavation for foundation in Hard Murum and boulders Excavation for foundation in Hard Murum and boulders
including removing the excavated materials upto a including removing the excavated materials upto a
distance of 50 meters, beyond the building area and distance of 50 meters, beyond the building area and
stacking or spreading as directed, preparing the bed for stacking or spreading as directed, preparing the bed for
the foundation and necessary back filling, ramming, the foundation and necessary back filling, ramming, 1.5 1.5 1.5 20
watering including shoring and strutting etc. complete. watering including shoring and strutting etc. complete.
A)Excluding Dewatering A)Excluding Dewatering
i. Lift upto 1.5 m. Cu.m 130.00 130.00 i. Lift upto 1.5 m.
BD.A11 Filling in plinth and floors with contractors approved Cu.m. 240.00 Filling in plinth and floors with contractors approved
material / murum / stone dust in 15cm. to 20cm. material / murum / stone dust in 15cm. to 20cm. 1.5 1.5 1.5 20
layers including watering and compaction complete. layers including watering and compaction complete.
Spec. No. : Bd.A. 11/Page No. 263 Spec. No. : Bd.A. 11/Page No. 263
(CSR item No.8, Page No.3) (CSR item No.8, Page No.3)
BDE.1A Providing and laying in situ, cement concrete Cu.m. 2500.00 Providing and laying in situ, cement concrete
M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for
foundation and bedding including plywood/steel foundation and bedding including plywood/steel 1.5 1.5 0.2 20
formwork bailing out water, compacting, finishing formwork bailing out water, compacting, finishing
uneven and honeycombed surface, curing etc. uneven and honeycombed surface, curing etc.
complete. The Cement Mortar 1:3 plaster is considered complete. The Cement Mortar 1:3 plaster is considered
for rendering uneven and honeycombed surface only. for rendering uneven and honeycombed surface only.
Newly laid concrete shall be covered by gunny bag, Newly laid concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering will not be plastic, tarpaulin etc. (Wooden centering will not be
allowed.) allowed.)
Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000)
(CSR item No.3, Page No.8) (CSR item No.3, Page No.8)
BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 135.79 488844
trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of
or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 19.8 22.85 0.15 2 135.79755
directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as
formwork compacting, roughening them if special finish directed including steel centering, plywood/steel
is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish
surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed
1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 135.79755
honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and
be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall
(Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc.
Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.)
(CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000)
(CSR item No.6, Page No.9)
BDF.5 Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of
for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 6 20 8.28
or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings
formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel
honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and
minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient
or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface
provided and curing etc. complete. Including use of or roughening the surface if special finish is to be
plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of
(Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer
Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The
M E A S U R E M E N T S H E E TNAME OF WORK : PROPOSED INDOOR SPORTS HALL AT SIPNA COLLEGE OF ENGENEERING
74k 102k 65k 41k
544k
326k
65k
1.08m
Estimate Fig. $
Estimate
Estimated cost of the few executed projects.
A B S T R A C T O F E S T I M A T E .
TECHNOLOGY, AMRAVATI
Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT TOT
BD.A3 Excavation for foundation in Hard Murum and boulders Excavation for foundation in Hard Murum and boulders
including removing the excavated materials upto a including removing the excavated materials upto a
distance of 50 meters, beyond the building area and distance of 50 meters, beyond the building area and
stacking or spreading as directed, preparing the bed for stacking or spreading as directed, preparing the bed for
the foundation and necessary back filling, ramming, the foundation and necessary back filling, ramming, 1.5 1.5 1.5 20
watering including shoring and strutting etc. complete. watering including shoring and strutting etc. complete.
A)Excluding Dewatering A)Excluding Dewatering
i. Lift upto 1.5 m. Cu.m 130.00 130.00 i. Lift upto 1.5 m.
BD.A11 Filling in plinth and floors with contractors approved Cu.m. 240.00 Filling in plinth and floors with contractors approved
material / murum / stone dust in 15cm. to 20cm. material / murum / stone dust in 15cm. to 20cm. 1.5 1.5 1.5 20
layers including watering and compaction complete. layers including watering and compaction complete.
Spec. No. : Bd.A. 11/Page No. 263 Spec. No. : Bd.A. 11/Page No. 263
(CSR item No.8, Page No.3) (CSR item No.8, Page No.3)
BDE.1A Providing and laying in situ, cement concrete Cu.m. 2500.00 Providing and laying in situ, cement concrete
M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for
foundation and bedding including plywood/steel foundation and bedding including plywood/steel 1.5 1.5 0.2 20
formwork bailing out water, compacting, finishing formwork bailing out water, compacting, finishing
uneven and honeycombed surface, curing etc. uneven and honeycombed surface, curing etc.
complete. The Cement Mortar 1:3 plaster is considered complete. The Cement Mortar 1:3 plaster is considered
for rendering uneven and honeycombed surface only. for rendering uneven and honeycombed surface only.
Newly laid concrete shall be covered by gunny bag, Newly laid concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering will not be plastic, tarpaulin etc. (Wooden centering will not be
allowed.) allowed.)
Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000)
(CSR item No.3, Page No.8) (CSR item No.3, Page No.8)
BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 135.79 488844
trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of
or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 19.8 22.85 0.15 2 135.798
directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as
formwork compacting, roughening them if special finish directed including steel centering, plywood/steel
is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish
surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed
1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 135.798
honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and
be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall
(Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc.
Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.)
(CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000)
(CSR item No.6, Page No.9)
BDF.5 Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of
for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 6 20 8.28
or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings
formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel
honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and
minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient
or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface
provided and curing etc. complete. Including use of or roughening the surface if special finish is to be
plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of
(Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer
Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The
uneven and honeycombed surface only. Newly laid Cement Mortar 1:3 plaster is considered for rendering
M E A S U R E M E N T S H E E TNAME OF WORK : PROPOSED INDOOR SPORTS HALL AT GAVAI COLLEGE OF ENGENEERING AND TECHNOLOGY, DARAPUR, AMRAVATI
NAME OF WORK : PROPOSED INDOOR SPORTS HALL AT GAVAI COLLEGE OF ENGENEERING AND TECHNOLOGY, DARAPUR, AMRAVATI
A B S T R A C T O F E S T I M A T E .
NAME OF WORK : PROPOSED LIBRARY BUILDING AT DARAPUR, TQ, DARYAPUR, DIST. AMRAVATI. MEASUREMENT SHEET
Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT TOT
BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 1.75 6300 0
trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of 8.9 0.23 0.1 1 0.205
or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 26.7 0.23 0.1 1 0.614
directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as 6.8 0.23 0.1 1 0.156
formwork compacting, roughening them if special finish directed including steel centering, plywood/steel 7.93 0.23 0.1 1 0.182
is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish 9.73 0.23 0.1 1 0.224
surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed 16.1 0.23 0.1 1 0.37
1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 1.752 1.75
honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and
be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall
(Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc.
Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.)
(CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000)
(CSR item No.6, Page No.9)
BDF.5 Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of
for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 3.65 27 6.8 6.8
or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings
formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel
honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and
minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient
or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface
provided and curing etc. complete. Including use of or roughening the surface if special finish is to be
plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of
(Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer
Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The
uneven and honeycombed surface only. Newly laid Cement Mortar 1:3 plaster is considered for rendering
concrete shall be covered by gunny bag, plastic, uneven and honeycombed surface only. Newly laid
tarpaulin etc. (Wooden centering will not be allowed). concrete shall be covered by gunny bag, plastic,
a) For C.C.M-20 Cu.m. 5350.00 6.799 36374.65 tarpaulin etc. (Wooden centering will not be allowed).
b) For C.C.M-25 Cu.m. 5450.00 a) For C.C.M-20
Spec.No.: Bd.F.5/Page No. 300/I.S. 456(2000) b) For C.C.M-25
(CSR item No.3, Page No.11-12) Spec.No.: Bd.F.5/Page No. 300/I.S. 456(2000)
(CSR item No.3, Page No.11-12)
BDF.6A Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite /gneiss metal Providing and casting in situ cement concrete of
for R.C.C. beams and lintels as per detailed design and required grade of trap / granite /quartzite /gneiss metal 26.7 0.23 0.3 2 3.685
drawings or as directed,including steel centering, for R.C.C. beams and lintels as per detailed design and 8.9 0.23 0.3 9 5.527
plywood/steel formwork steel props, compaction, drawings or as directed,including steel centering, 9.93 0.23 0.3 3 2.056
finishing uneven and honeycombed surface with plywood/steel formwork steel props, compaction, 7.93 0.23 0.3 1 0.547
C.M.1:3 of sufficient minimum thickness to give a finishing uneven and honeycombed surface with 6.7 0.23 0.3 1 0.462
smooth and even surface or roughening if special finish C.M.1:3 of sufficient minimum thickness to give a 12.28 12.3
is to be provided and curing etc. complete. Including smooth and even surface or roughening if special finish
use of plastisizer wherever necessary as directed by is to be provided and curing etc. complete. Including
Engineer-In-charge (Excluding reinforcement, including use of plastisizer wherever necessary as directed by
cover block). The Cement Mortar 1:3 plaster is Engineer-In-charge (Excluding reinforcement, including
considered for rendering uneven and honeycombed cover block). The Cement Mortar 1:3 plaster is
surface only. Newly laid concrete shall be covered by considered for rendering uneven and honeycombed
gunny bag, plastic, tarpaulin etc. surface only. Newly laid concrete shall be covered by
A) Including supporting system ( steel centering) gunny bag, plastic, tarpaulin etc.
a) For C.C.M-20 Cu.m. 5000.00 12.27 61350 A) Including supporting system ( steel centering)
b) For C.C.M-25 Cu.m. 5100.00 a) For C.C.M-20
A) Excluding supporting system b) For C.C.M-25
a) For C.C.M-20 Cu.m. 4500.00 A) Excluding supporting system
b) For C.C.M-25 Cu.m. 4600.00 a) For C.C.M-20
Spec.No.: Bd.F.6/Page No.300/I.S. 456 (2000) b) For C.C.M-25
NAME OF WORK: PROPOSESD LIBRARY BUILDING AT DARAPUR,TQ.DARYAPUR,DIST.AMT.
SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI
Abstract sheet for Acid Oil work
1 Excavation for the foundation :- 124.32 Cum 100.00 12432.00
2 Filling 0.00 Cum 400.00 0.00
3 P.c.c. 1:2:4 6.58 Cum 1150.00 7562.40
4 Brick Masonary 34.99 Cum 1700.00 59486.40
5 Casting of R.c.c. Footing 3.20 Cum 2090.00 6688.00
6 Casting of R.c.c. Columns 1.37 Cum 2090 2867.48
Total 89036.28
In Words :- Eighty Nine Thousand Thirty six only
For-
DNA ERECTORS
Unit AmountRate
DNA ERECTORS, PUNE
Sr.No. Particulars Quantity
SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI
Abstract sheet for Cooling Tower work
1 Excavation for the foundation :- 79.05 Cum 100.00 7905.00
2 Filling 16.83 Cum 400.00 6730.80
3 P.c.c. 1:2:4 26.05 Cum 1150.00 29959.80
4 Casting of Raft 34.36 Cum 2090.00 71816.58
5 Casting of Retaining Wall 11.81 Cum 2090.00 24678.72
Total 141090.90
Unit AmountRate
DNA ERECTORS, PUNE
Sr.No. Particulars Quantity
BHASKA
nad consultancy
2010-17
4
ProjectsEstimated/ Tendered and
Executed.
5. 5
Few
Project
Pharmacy
College
College
Auditorium,600
seating capacity.
Boys and Sports
Hostel.
Library Building
Scope of
Work
Conceptualization,
Planning, Designing
Estimation and
tendering
Quality audits.
Conceptualization,
Planning, Drawing
Designing,
Detailing
Estimations and
Specification
Tendering.
Conceptualization,
Planning, Drawing
Designing
Estimation
Supervision
Quality Audits
Conceptualization,
Planning, Drawing
Designing
Estimation
Quality supervision.
Area 43,345 Sq.Fts. 13051 Sq.Fts 10178 Sq. Fts 15200sq.fts
Cost $1.5m @ $391k $325k @ $456k
Date Nov. 2016 May 2017 Oct 2016 March 2017
2010- current 7 years
nad Consultants: An Architectural Consultancy firm,
providing Architectural and Construction Services to Institutions.
6. 2007-2010 3 years
dna Erectors, Project management Firm
Executed Commercial Projects / Industrial Projects. Projects executed worth $10m
6
Few Project Commercial multiplex.
Scope of Work Project Execution management
Reading Technical Drawings
Checking Rebar Structural Designs.
SchedulingCPM/PERT
Financing
Material and labour management
Technical and legal compliances
Regulatory and statutory and
Environmental compliances
Liaison with legal and statutory
authorities
Dispute Resolution.
Area 167000 sq. fts.
Cost $5m
Date August 2009
7. dna Erectors
2007- 10
7
Industrial Projects..
Few Project Industrial Project.
Sub Contracting
Type of work
Done
Cooling Tower
ETP.
Oil Tank
Sludge tank
Silos
Scope of Work Project Management
Reading Technical Drawings
Checking Structural Designs.
SchedulingCPM/PERT
Financing
Material and labour management
Dispute Resolution.
Area 167000 sq. fts.
Cost $5m
Date August 2009
SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI
Abstract sheet for Acid Oil work
1 Excavation for the foundation :- 124.32 Cum 100.00 12432.00
2 Filling 0.00 Cum 400.00 0.00
3 P.c.c. 1:2:4 6.58 Cum 1150.00 7562.40
4 Brick Masonary 34.99 Cum 1700.00 59486.40
5 Casting of R.c.c. Footing 3.20 Cum 2090.00 6688.00
6 Casting of R.c.c. Columns 1.37 Cum 2090 2867.48
Total 89036.28
In Words :- Eighty Nine Thousand Thirty six only
For-
DNA ERECTORS
Unit AmountRate
DNA ERECTORS, PUNE
Sr.No. Particulars Quantity
8. Project management
techniques of CPM/PERT
extensively used.
Reading Drawing
Projecting work freezing for
execution
2 – 8 hours working shifts
Scope:
Site cleaning
Site Demarcating
Excavation
Drilling of hard rocks
Concrete Skeleton work
Brick and masonry work
Fittings HVAC
dna Erectors
2007- 10
8
Scope of Work Executed.
9. Machines Used.
Concrete Mixers
Putzmeister Concrete Pumping
machine
Hydraulic pumps for Tensioning
Excavators
Trucks and Loaders
Bar bending and Cutting
Vibrators, Pullies, Crane
dna Erectors
2007- 10
9
On-Site Concrete pour and
Machineries Used.
Concrete Pour and Batching plant
On- site
Labor and material management for
concrete work
Concrete Mix determination
Material Procurements
Training and orientation for machine
and equipment operators.
10. Design Check for rebar and Post
Tensioning.
Laying of PT Strands
Rebaring layout technical checks.
Achievement:
Concrete of min 3000 psi required, we got
3500 in 7 days psi on site.
10
Rebar and Scaffolding and Shuttering
Shuttering and Scaffolding Erection
Cup lock System:
Use of Props, Spans
Cup lock System
Wood and
Iron steel stanchions
systems used
11. Material testing Lab Set-up On
Site:
Sand Testing for bulking
Aggregate for Cracking and Flaking
Cement for Lime content
Concrete slump testing for
Compressive strength
Steel testing for tensile.
dna Erectors
2007- 10
11
On site Material testing & CSR
Health Safety and CSR Initiatives:
Monthly medical Check-up of laborers.
Heat reducing techniques used in
designing labor camps
Monthly meals for Labors Organized
Good worker felicitated
Work as a team
Mr. Muduli Sub contractor, with his Bike
as a reward for, in time completion
12. 1994- 2007 13 years
INT-EXT Consultancy
Work Profile
Client handling
Business development
Architectural Drawing and
designing
Negotiating
Sub- contracting
Estimation and Specifications
Banking and financing
On-site supervision
Project completion and Closure.
Projects Executed :
Residential,
Interiors,
Site Planning,
Layout planning,
Schools
Colleges
Sports infrastructure
Hospitals.
Int-Ext Consultancy : A proprietary Architectural consultancy firm
12
13. Int-Ext Consultancy
1994-2007
13
Residences and Interiors
Projects Apartment
schemes.
Small industrial
sheds.
Residences
Residential
Commercial
spaces.
Valuations Valuations
$1 to 5 m
$1m
Special
Technical
Inputs
Earthquack
Resistance Design
Demolition,
Rebuild
Carpentry and
Joinery work,
Steel Fabrication
False POP ceiling
Electrification
Plumbing
HVAC
14. 14
Chief Architect
Site Engineer
Site SupervisorSite Supervisor
Site labor Site labor
Administration
Business Structure and statutory
Registrations
PAN No. DNA Erectors:AEBPD1179C
Personal Identity No. 5996 2549 4081
Member of Council of Architects, India
CA/1994/17262
Associate Member of Indian Institutes of Architects
India( IIA) Regd. No.-19627
Member of International Youth Hostels.
15. Thanks.
Architect,
Ninad A. Dhawle
M. Arch. MBA, Ph.D (submitted),IOSH certified
nad Consultants. 2010-current
dna Erectors 2007-2010
INT-EXT Consultancy 1994-2007
9860675009
ninadad@gmail.com
15