SlideShare a Scribd company logo
Kia Ora Work Portfolio.
Architect,
Ninad A. Dhawle
M. Arch. MBA, Ph.D (submitted),IOSH certified
nad Consultants. 2010-current
dna Erectors 2007-2010
INT-EXT Consultancy 1994-2007
9860675009
ninadad@gmail.com
1
Brief outlay: Work Experience
1994-2017. 23 years
Name of the
firm
Projects executed Work Profile Value
@ $
Period
nad
Consultants
•Institutional
•Commercial
•Consultancy
•Architectural
planning, designing
•Tendering
•Quality Audits
$10 m 2010-
Current
7years
dna Erectors •Commercial Projects
•Industrial Projects
•Construction
Project Management
•Estimation
$10m 2007-2010
3years
Int-Ext
Consultancy
•Residential
•Institutional
•Interior
•Client Handling
•Business
development
•Site Supervision
•Sub Contracting
$5 m 1994-2007
13years
$25 m 23 years
2
3
Residential .
48%
Commercial .
9%
Industrial. 5%
Interior. 14%
Institutional.
14%
Sports. 5%
Hospital. 5%
Projects
Residential
Commercial
Industrial
Interior
Institutional
Sports
Hospital
Projects List.
A B S T R A C T O F E S T I M A T E .
TECHNOLOGY, AMRAVATI NAME OF WORK: PROPOSESD INDOOR SPORTS HALL AT SIPNA COLLEGE OF
ENGINEERING AND TECHNOLOGY, AMRAVATI
Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT
BD.A3 Excavation for foundation in Hard Murum and boulders Excavation for foundation in Hard Murum and boulders
including removing the excavated materials upto a including removing the excavated materials upto a
distance of 50 meters, beyond the building area and distance of 50 meters, beyond the building area and
stacking or spreading as directed, preparing the bed for stacking or spreading as directed, preparing the bed for
the foundation and necessary back filling, ramming, the foundation and necessary back filling, ramming, 1.5 1.5 1.5 20
watering including shoring and strutting etc. complete. watering including shoring and strutting etc. complete.
A)Excluding Dewatering A)Excluding Dewatering
i. Lift upto 1.5 m. Cu.m 130.00 130.00 i. Lift upto 1.5 m.
BD.A11 Filling in plinth and floors with contractors approved Cu.m. 240.00 Filling in plinth and floors with contractors approved
material / murum / stone dust in 15cm. to 20cm. material / murum / stone dust in 15cm. to 20cm. 1.5 1.5 1.5 20
layers including watering and compaction complete. layers including watering and compaction complete.
Spec. No. : Bd.A. 11/Page No. 263 Spec. No. : Bd.A. 11/Page No. 263
(CSR item No.8, Page No.3) (CSR item No.8, Page No.3)
BDE.1A Providing and laying in situ, cement concrete Cu.m. 2500.00 Providing and laying in situ, cement concrete
M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for
foundation and bedding including plywood/steel foundation and bedding including plywood/steel 1.5 1.5 0.2 20
formwork bailing out water, compacting, finishing formwork bailing out water, compacting, finishing
uneven and honeycombed surface, curing etc. uneven and honeycombed surface, curing etc.
complete. The Cement Mortar 1:3 plaster is considered complete. The Cement Mortar 1:3 plaster is considered
for rendering uneven and honeycombed surface only. for rendering uneven and honeycombed surface only.
Newly laid concrete shall be covered by gunny bag, Newly laid concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering will not be plastic, tarpaulin etc. (Wooden centering will not be
allowed.) allowed.)
Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000)
(CSR item No.3, Page No.8) (CSR item No.3, Page No.8)
BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 135.79 488844
trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of
or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 19.8 22.85 0.15 2 135.79755
directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as
formwork compacting, roughening them if special finish directed including steel centering, plywood/steel
is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish
surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed
1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 135.79755
honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and
be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall
(Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc.
Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.)
(CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000)
(CSR item No.6, Page No.9)
BDF.5 Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of
for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 6 20 8.28
or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings
formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel
honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and
minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient
or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface
provided and curing etc. complete. Including use of or roughening the surface if special finish is to be
plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of
(Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer
Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The
M E A S U R E M E N T S H E E TNAME OF WORK : PROPOSED INDOOR SPORTS HALL AT SIPNA COLLEGE OF ENGENEERING
74k 102k 65k 41k
544k
326k
65k
1.08m
Estimate Fig. $
Estimate
Estimated cost of the few executed projects.
A B S T R A C T O F E S T I M A T E .
TECHNOLOGY, AMRAVATI
Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT TOT
BD.A3 Excavation for foundation in Hard Murum and boulders Excavation for foundation in Hard Murum and boulders
including removing the excavated materials upto a including removing the excavated materials upto a
distance of 50 meters, beyond the building area and distance of 50 meters, beyond the building area and
stacking or spreading as directed, preparing the bed for stacking or spreading as directed, preparing the bed for
the foundation and necessary back filling, ramming, the foundation and necessary back filling, ramming, 1.5 1.5 1.5 20
watering including shoring and strutting etc. complete. watering including shoring and strutting etc. complete.
A)Excluding Dewatering A)Excluding Dewatering
i. Lift upto 1.5 m. Cu.m 130.00 130.00 i. Lift upto 1.5 m.
BD.A11 Filling in plinth and floors with contractors approved Cu.m. 240.00 Filling in plinth and floors with contractors approved
material / murum / stone dust in 15cm. to 20cm. material / murum / stone dust in 15cm. to 20cm. 1.5 1.5 1.5 20
layers including watering and compaction complete. layers including watering and compaction complete.
Spec. No. : Bd.A. 11/Page No. 263 Spec. No. : Bd.A. 11/Page No. 263
(CSR item No.8, Page No.3) (CSR item No.8, Page No.3)
BDE.1A Providing and laying in situ, cement concrete Cu.m. 2500.00 Providing and laying in situ, cement concrete
M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for
foundation and bedding including plywood/steel foundation and bedding including plywood/steel 1.5 1.5 0.2 20
formwork bailing out water, compacting, finishing formwork bailing out water, compacting, finishing
uneven and honeycombed surface, curing etc. uneven and honeycombed surface, curing etc.
complete. The Cement Mortar 1:3 plaster is considered complete. The Cement Mortar 1:3 plaster is considered
for rendering uneven and honeycombed surface only. for rendering uneven and honeycombed surface only.
Newly laid concrete shall be covered by gunny bag, Newly laid concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering will not be plastic, tarpaulin etc. (Wooden centering will not be
allowed.) allowed.)
Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000)
(CSR item No.3, Page No.8) (CSR item No.3, Page No.8)
BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 135.79 488844
trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of
or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 19.8 22.85 0.15 2 135.798
directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as
formwork compacting, roughening them if special finish directed including steel centering, plywood/steel
is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish
surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed
1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 135.798
honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and
be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall
(Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc.
Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.)
(CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000)
(CSR item No.6, Page No.9)
BDF.5 Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of
for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 6 20 8.28
or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings
formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel
honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and
minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient
or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface
provided and curing etc. complete. Including use of or roughening the surface if special finish is to be
plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of
(Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer
Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The
uneven and honeycombed surface only. Newly laid Cement Mortar 1:3 plaster is considered for rendering
M E A S U R E M E N T S H E E TNAME OF WORK : PROPOSED INDOOR SPORTS HALL AT GAVAI COLLEGE OF ENGENEERING AND TECHNOLOGY, DARAPUR, AMRAVATI
NAME OF WORK : PROPOSED INDOOR SPORTS HALL AT GAVAI COLLEGE OF ENGENEERING AND TECHNOLOGY, DARAPUR, AMRAVATI
A B S T R A C T O F E S T I M A T E .
NAME OF WORK : PROPOSED LIBRARY BUILDING AT DARAPUR, TQ, DARYAPUR, DIST. AMRAVATI. MEASUREMENT SHEET
Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT TOT
BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 1.75 6300 0
trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of 8.9 0.23 0.1 1 0.205
or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 26.7 0.23 0.1 1 0.614
directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as 6.8 0.23 0.1 1 0.156
formwork compacting, roughening them if special finish directed including steel centering, plywood/steel 7.93 0.23 0.1 1 0.182
is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish 9.73 0.23 0.1 1 0.224
surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed 16.1 0.23 0.1 1 0.37
1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 1.752 1.75
honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and
be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall
(Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc.
Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.)
(CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000)
(CSR item No.6, Page No.9)
BDF.5 Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of
for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 3.65 27 6.8 6.8
or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings
formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel
honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and
minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient
or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface
provided and curing etc. complete. Including use of or roughening the surface if special finish is to be
plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of
(Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer
Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The
uneven and honeycombed surface only. Newly laid Cement Mortar 1:3 plaster is considered for rendering
concrete shall be covered by gunny bag, plastic, uneven and honeycombed surface only. Newly laid
tarpaulin etc. (Wooden centering will not be allowed). concrete shall be covered by gunny bag, plastic,
a) For C.C.M-20 Cu.m. 5350.00 6.799 36374.65 tarpaulin etc. (Wooden centering will not be allowed).
b) For C.C.M-25 Cu.m. 5450.00 a) For C.C.M-20
Spec.No.: Bd.F.5/Page No. 300/I.S. 456(2000) b) For C.C.M-25
(CSR item No.3, Page No.11-12) Spec.No.: Bd.F.5/Page No. 300/I.S. 456(2000)
(CSR item No.3, Page No.11-12)
BDF.6A Providing and casting in situ cement concrete of
required grade of trap / granite /quartzite /gneiss metal Providing and casting in situ cement concrete of
for R.C.C. beams and lintels as per detailed design and required grade of trap / granite /quartzite /gneiss metal 26.7 0.23 0.3 2 3.685
drawings or as directed,including steel centering, for R.C.C. beams and lintels as per detailed design and 8.9 0.23 0.3 9 5.527
plywood/steel formwork steel props, compaction, drawings or as directed,including steel centering, 9.93 0.23 0.3 3 2.056
finishing uneven and honeycombed surface with plywood/steel formwork steel props, compaction, 7.93 0.23 0.3 1 0.547
C.M.1:3 of sufficient minimum thickness to give a finishing uneven and honeycombed surface with 6.7 0.23 0.3 1 0.462
smooth and even surface or roughening if special finish C.M.1:3 of sufficient minimum thickness to give a 12.28 12.3
is to be provided and curing etc. complete. Including smooth and even surface or roughening if special finish
use of plastisizer wherever necessary as directed by is to be provided and curing etc. complete. Including
Engineer-In-charge (Excluding reinforcement, including use of plastisizer wherever necessary as directed by
cover block). The Cement Mortar 1:3 plaster is Engineer-In-charge (Excluding reinforcement, including
considered for rendering uneven and honeycombed cover block). The Cement Mortar 1:3 plaster is
surface only. Newly laid concrete shall be covered by considered for rendering uneven and honeycombed
gunny bag, plastic, tarpaulin etc. surface only. Newly laid concrete shall be covered by
A) Including supporting system ( steel centering) gunny bag, plastic, tarpaulin etc.
a) For C.C.M-20 Cu.m. 5000.00 12.27 61350 A) Including supporting system ( steel centering)
b) For C.C.M-25 Cu.m. 5100.00 a) For C.C.M-20
A) Excluding supporting system b) For C.C.M-25
a) For C.C.M-20 Cu.m. 4500.00 A) Excluding supporting system
b) For C.C.M-25 Cu.m. 4600.00 a) For C.C.M-20
Spec.No.: Bd.F.6/Page No.300/I.S. 456 (2000) b) For C.C.M-25
NAME OF WORK: PROPOSESD LIBRARY BUILDING AT DARAPUR,TQ.DARYAPUR,DIST.AMT.
SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI
Abstract sheet for Acid Oil work
1 Excavation for the foundation :- 124.32 Cum 100.00 12432.00
2 Filling 0.00 Cum 400.00 0.00
3 P.c.c. 1:2:4 6.58 Cum 1150.00 7562.40
4 Brick Masonary 34.99 Cum 1700.00 59486.40
5 Casting of R.c.c. Footing 3.20 Cum 2090.00 6688.00
6 Casting of R.c.c. Columns 1.37 Cum 2090 2867.48
Total 89036.28
In Words :- Eighty Nine Thousand Thirty six only
For-
DNA ERECTORS
Unit AmountRate
DNA ERECTORS, PUNE
Sr.No. Particulars Quantity
SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI
Abstract sheet for Cooling Tower work
1 Excavation for the foundation :- 79.05 Cum 100.00 7905.00
2 Filling 16.83 Cum 400.00 6730.80
3 P.c.c. 1:2:4 26.05 Cum 1150.00 29959.80
4 Casting of Raft 34.36 Cum 2090.00 71816.58
5 Casting of Retaining Wall 11.81 Cum 2090.00 24678.72
Total 141090.90
Unit AmountRate
DNA ERECTORS, PUNE
Sr.No. Particulars Quantity
BHASKA
nad consultancy
2010-17
4
ProjectsEstimated/ Tendered and
Executed.
5
Few
Project
Pharmacy
College
College
Auditorium,600
seating capacity.
Boys and Sports
Hostel.
Library Building
Scope of
Work
Conceptualization,
Planning, Designing
Estimation and
tendering
Quality audits.
Conceptualization,
Planning, Drawing
Designing,
Detailing
Estimations and
Specification
Tendering.
Conceptualization,
Planning, Drawing
Designing
Estimation
Supervision
Quality Audits
Conceptualization,
Planning, Drawing
Designing
Estimation
Quality supervision.
Area 43,345 Sq.Fts. 13051 Sq.Fts 10178 Sq. Fts 15200sq.fts
Cost $1.5m @ $391k $325k @ $456k
Date Nov. 2016 May 2017 Oct 2016 March 2017
2010- current 7 years
nad Consultants: An Architectural Consultancy firm,
providing Architectural and Construction Services to Institutions.
2007-2010 3 years
dna Erectors, Project management Firm
Executed Commercial Projects / Industrial Projects. Projects executed worth $10m
6
Few Project Commercial multiplex.
Scope of Work Project Execution management
Reading Technical Drawings
Checking Rebar Structural Designs.
SchedulingCPM/PERT
Financing
Material and labour management
Technical and legal compliances
Regulatory and statutory and
Environmental compliances
Liaison with legal and statutory
authorities
Dispute Resolution.
Area 167000 sq. fts.
Cost $5m
Date August 2009
dna Erectors
2007- 10
7
Industrial Projects..
Few Project Industrial Project.
Sub Contracting
Type of work
Done
 Cooling Tower
 ETP.
 Oil Tank
 Sludge tank
 Silos
Scope of Work Project Management
Reading Technical Drawings
Checking Structural Designs.
SchedulingCPM/PERT
Financing
Material and labour management
Dispute Resolution.
Area 167000 sq. fts.
Cost $5m
Date August 2009
SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI
Abstract sheet for Acid Oil work
1 Excavation for the foundation :- 124.32 Cum 100.00 12432.00
2 Filling 0.00 Cum 400.00 0.00
3 P.c.c. 1:2:4 6.58 Cum 1150.00 7562.40
4 Brick Masonary 34.99 Cum 1700.00 59486.40
5 Casting of R.c.c. Footing 3.20 Cum 2090.00 6688.00
6 Casting of R.c.c. Columns 1.37 Cum 2090 2867.48
Total 89036.28
In Words :- Eighty Nine Thousand Thirty six only
For-
DNA ERECTORS
Unit AmountRate
DNA ERECTORS, PUNE
Sr.No. Particulars Quantity
 Project management
techniques of CPM/PERT
extensively used.
 Reading Drawing
 Projecting work freezing for
execution
 2 – 8 hours working shifts
Scope:
 Site cleaning
 Site Demarcating
 Excavation
 Drilling of hard rocks
 Concrete Skeleton work
 Brick and masonry work
 Fittings HVAC
dna Erectors
2007- 10
8
Scope of Work Executed.
Machines Used.
 Concrete Mixers
 Putzmeister Concrete Pumping
machine
 Hydraulic pumps for Tensioning
 Excavators
 Trucks and Loaders
 Bar bending and Cutting
 Vibrators, Pullies, Crane
dna Erectors
2007- 10
9
On-Site Concrete pour and
Machineries Used.
Concrete Pour and Batching plant
On- site
Labor and material management for
concrete work
 Concrete Mix determination
 Material Procurements
 Training and orientation for machine
and equipment operators.
Design Check for rebar and Post
Tensioning.
 Laying of PT Strands
 Rebaring layout technical checks.
Achievement:
 Concrete of min 3000 psi required, we got
3500 in 7 days psi on site.
10
Rebar and Scaffolding and Shuttering
Shuttering and Scaffolding Erection
Cup lock System:
 Use of Props, Spans
 Cup lock System
 Wood and
 Iron steel stanchions
systems used
Material testing Lab Set-up On
Site:
 Sand Testing for bulking
 Aggregate for Cracking and Flaking
 Cement for Lime content
 Concrete slump testing for
Compressive strength
 Steel testing for tensile.
dna Erectors
2007- 10
11
On site Material testing & CSR
Health Safety and CSR Initiatives:
 Monthly medical Check-up of laborers.
 Heat reducing techniques used in
designing labor camps
 Monthly meals for Labors Organized
 Good worker felicitated
 Work as a team
Mr. Muduli Sub contractor, with his Bike
as a reward for, in time completion
1994- 2007 13 years
INT-EXT Consultancy
Work Profile
 Client handling
 Business development
 Architectural Drawing and
designing
 Negotiating
 Sub- contracting
 Estimation and Specifications
 Banking and financing
 On-site supervision
 Project completion and Closure.
Projects Executed :
 Residential,
 Interiors,
 Site Planning,
 Layout planning,
 Schools
 Colleges
 Sports infrastructure
 Hospitals.
Int-Ext Consultancy : A proprietary Architectural consultancy firm
12
Int-Ext Consultancy
1994-2007
13
Residences and Interiors
Projects Apartment
schemes.
Small industrial
sheds.
Residences
Residential
Commercial
spaces.
Valuations Valuations
$1 to 5 m
$1m
Special
Technical
Inputs
Earthquack
Resistance Design
Demolition,
Rebuild
Carpentry and
Joinery work,
Steel Fabrication
False POP ceiling
Electrification
Plumbing
HVAC
14
Chief Architect
Site Engineer
Site SupervisorSite Supervisor
Site labor Site labor
Administration
Business Structure and statutory
Registrations
 PAN No. DNA Erectors:AEBPD1179C
 Personal Identity No. 5996 2549 4081
 Member of Council of Architects, India
 CA/1994/17262
 Associate Member of Indian Institutes of Architects
India( IIA) Regd. No.-19627
 Member of International Youth Hostels.
Thanks.
Architect,
Ninad A. Dhawle
M. Arch. MBA, Ph.D (submitted),IOSH certified
nad Consultants. 2010-current
dna Erectors 2007-2010
INT-EXT Consultancy 1994-2007
9860675009
ninadad@gmail.com
15
tēnā rawa atu koe

More Related Content

What's hot

Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
sabnisajit
 
From work & shuttering
From work & shutteringFrom work & shuttering
From work & shuttering
hamidgujjar
 
Formwork
FormworkFormwork
Formwork
Rahul
 
Formwork
FormworkFormwork
Steel formwork
Steel formworkSteel formwork
Steel formwork
Musahiddin Md Zainal
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Fromwork
FromworkFromwork
Fromwork
Jayant Mewara
 
A collection of articles on concrete formwork design and construction
A collection of articles on concrete formwork design and constructionA collection of articles on concrete formwork design and construction
A collection of articles on concrete formwork design and construction
Byron Smith
 
Costruction ppt
Costruction pptCostruction ppt
Costruction ppt
Swathey1995
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2
Gali Suresh
 
Formwork
FormworkFormwork
Formwork
kajol panchal
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
ktx500
 
Concrete framework
Concrete frameworkConcrete framework
Concrete frameworkJustin Myint
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
adarshkaushik6
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
Andhra University
 
Versaloc
VersalocVersaloc
Versaloc
kristenjames
 

What's hot (19)

Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
From work & shuttering
From work & shutteringFrom work & shuttering
From work & shuttering
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Formwork
FormworkFormwork
Formwork
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Fromwork
FromworkFromwork
Fromwork
 
A collection of articles on concrete formwork design and construction
A collection of articles on concrete formwork design and constructionA collection of articles on concrete formwork design and construction
A collection of articles on concrete formwork design and construction
 
Costruction ppt
Costruction pptCostruction ppt
Costruction ppt
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2
 
Formwork
FormworkFormwork
Formwork
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
 
Concrete framework
Concrete frameworkConcrete framework
Concrete framework
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
 
Versaloc
VersalocVersaloc
Versaloc
 

Similar to Niand work profile

Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
IRJET Journal
 
Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6
Chris Bridges
 
RCC-.pdf
RCC-.pdfRCC-.pdf
RCC-.pdf
NehaPaliwal31
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
RCC
RCCRCC
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
Stephen Nzima
 
Dos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfDos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdf
vhjadhav
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
ssuserd43de8
 
Catlogue
CatlogueCatlogue
Catlogue
Maxpromotion
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quick
kristenjames
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimationimaduddin91
 
rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodologyGautam Sharma
 
IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...
IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...
IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...
IRJET Journal
 
Concrete Road
Concrete RoadConcrete Road
Concrete RoadKp Ahm
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
Yolanda Sewpersad
 

Similar to Niand work profile (20)

2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6
 
RCC-.pdf
RCC-.pdfRCC-.pdf
RCC-.pdf
 
E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
RCC
RCCRCC
RCC
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
Dos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfDos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdf
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
Catlogue
CatlogueCatlogue
Catlogue
 
Final Document
Final DocumentFinal Document
Final Document
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quick
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
 
rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodology
 
Car park bq
Car park bqCar park bq
Car park bq
 
IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...
IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...
IRJET- Experimental Investigation on Compressive Strength of Cement Mortar us...
 
Concrete Road
Concrete RoadConcrete Road
Concrete Road
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 

Recently uploaded

Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 

Recently uploaded (20)

Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 

Niand work profile

  • 1. Kia Ora Work Portfolio. Architect, Ninad A. Dhawle M. Arch. MBA, Ph.D (submitted),IOSH certified nad Consultants. 2010-current dna Erectors 2007-2010 INT-EXT Consultancy 1994-2007 9860675009 ninadad@gmail.com 1
  • 2. Brief outlay: Work Experience 1994-2017. 23 years Name of the firm Projects executed Work Profile Value @ $ Period nad Consultants •Institutional •Commercial •Consultancy •Architectural planning, designing •Tendering •Quality Audits $10 m 2010- Current 7years dna Erectors •Commercial Projects •Industrial Projects •Construction Project Management •Estimation $10m 2007-2010 3years Int-Ext Consultancy •Residential •Institutional •Interior •Client Handling •Business development •Site Supervision •Sub Contracting $5 m 1994-2007 13years $25 m 23 years 2
  • 3. 3 Residential . 48% Commercial . 9% Industrial. 5% Interior. 14% Institutional. 14% Sports. 5% Hospital. 5% Projects Residential Commercial Industrial Interior Institutional Sports Hospital Projects List.
  • 4. A B S T R A C T O F E S T I M A T E . TECHNOLOGY, AMRAVATI NAME OF WORK: PROPOSESD INDOOR SPORTS HALL AT SIPNA COLLEGE OF ENGINEERING AND TECHNOLOGY, AMRAVATI Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT BD.A3 Excavation for foundation in Hard Murum and boulders Excavation for foundation in Hard Murum and boulders including removing the excavated materials upto a including removing the excavated materials upto a distance of 50 meters, beyond the building area and distance of 50 meters, beyond the building area and stacking or spreading as directed, preparing the bed for stacking or spreading as directed, preparing the bed for the foundation and necessary back filling, ramming, the foundation and necessary back filling, ramming, 1.5 1.5 1.5 20 watering including shoring and strutting etc. complete. watering including shoring and strutting etc. complete. A)Excluding Dewatering A)Excluding Dewatering i. Lift upto 1.5 m. Cu.m 130.00 130.00 i. Lift upto 1.5 m. BD.A11 Filling in plinth and floors with contractors approved Cu.m. 240.00 Filling in plinth and floors with contractors approved material / murum / stone dust in 15cm. to 20cm. material / murum / stone dust in 15cm. to 20cm. 1.5 1.5 1.5 20 layers including watering and compaction complete. layers including watering and compaction complete. Spec. No. : Bd.A. 11/Page No. 263 Spec. No. : Bd.A. 11/Page No. 263 (CSR item No.8, Page No.3) (CSR item No.8, Page No.3) BDE.1A Providing and laying in situ, cement concrete Cu.m. 2500.00 Providing and laying in situ, cement concrete M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for foundation and bedding including plywood/steel foundation and bedding including plywood/steel 1.5 1.5 0.2 20 formwork bailing out water, compacting, finishing formwork bailing out water, compacting, finishing uneven and honeycombed surface, curing etc. uneven and honeycombed surface, curing etc. complete. The Cement Mortar 1:3 plaster is considered complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be plastic, tarpaulin etc. (Wooden centering will not be allowed.) allowed.) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) (CSR item No.3, Page No.8) (CSR item No.3, Page No.8) BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 135.79 488844 trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 19.8 22.85 0.15 2 135.79755 directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as formwork compacting, roughening them if special finish directed including steel centering, plywood/steel is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed 1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 135.79755 honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall (Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc. Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.) (CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (CSR item No.6, Page No.9) BDF.5 Providing and casting in situ cement concrete of required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 6 20 8.28 or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface provided and curing etc. complete. Including use of or roughening the surface if special finish is to be plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of (Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The M E A S U R E M E N T S H E E TNAME OF WORK : PROPOSED INDOOR SPORTS HALL AT SIPNA COLLEGE OF ENGENEERING 74k 102k 65k 41k 544k 326k 65k 1.08m Estimate Fig. $ Estimate Estimated cost of the few executed projects. A B S T R A C T O F E S T I M A T E . TECHNOLOGY, AMRAVATI Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT TOT BD.A3 Excavation for foundation in Hard Murum and boulders Excavation for foundation in Hard Murum and boulders including removing the excavated materials upto a including removing the excavated materials upto a distance of 50 meters, beyond the building area and distance of 50 meters, beyond the building area and stacking or spreading as directed, preparing the bed for stacking or spreading as directed, preparing the bed for the foundation and necessary back filling, ramming, the foundation and necessary back filling, ramming, 1.5 1.5 1.5 20 watering including shoring and strutting etc. complete. watering including shoring and strutting etc. complete. A)Excluding Dewatering A)Excluding Dewatering i. Lift upto 1.5 m. Cu.m 130.00 130.00 i. Lift upto 1.5 m. BD.A11 Filling in plinth and floors with contractors approved Cu.m. 240.00 Filling in plinth and floors with contractors approved material / murum / stone dust in 15cm. to 20cm. material / murum / stone dust in 15cm. to 20cm. 1.5 1.5 1.5 20 layers including watering and compaction complete. layers including watering and compaction complete. Spec. No. : Bd.A. 11/Page No. 263 Spec. No. : Bd.A. 11/Page No. 263 (CSR item No.8, Page No.3) (CSR item No.8, Page No.3) BDE.1A Providing and laying in situ, cement concrete Cu.m. 2500.00 Providing and laying in situ, cement concrete M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for M-10/(1:3:6) of trap/granite/quartzite/gneiss metal for foundation and bedding including plywood/steel foundation and bedding including plywood/steel 1.5 1.5 0.2 20 formwork bailing out water, compacting, finishing formwork bailing out water, compacting, finishing uneven and honeycombed surface, curing etc. uneven and honeycombed surface, curing etc. complete. The Cement Mortar 1:3 plaster is considered complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be plastic, tarpaulin etc. (Wooden centering will not be allowed.) allowed.) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) Spec. No. : Bd.E. 1/Page No. 287/I.S. 456 (2000) (CSR item No.3, Page No.8) (CSR item No.3, Page No.8) BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 135.79 488844 trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 19.8 22.85 0.15 2 135.798 directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as formwork compacting, roughening them if special finish directed including steel centering, plywood/steel is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed 1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 135.798 honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall (Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc. Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.) (CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (CSR item No.6, Page No.9) BDF.5 Providing and casting in situ cement concrete of required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 6 20 8.28 or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface provided and curing etc. complete. Including use of or roughening the surface if special finish is to be plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of (Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The uneven and honeycombed surface only. Newly laid Cement Mortar 1:3 plaster is considered for rendering M E A S U R E M E N T S H E E TNAME OF WORK : PROPOSED INDOOR SPORTS HALL AT GAVAI COLLEGE OF ENGENEERING AND TECHNOLOGY, DARAPUR, AMRAVATI NAME OF WORK : PROPOSED INDOOR SPORTS HALL AT GAVAI COLLEGE OF ENGENEERING AND TECHNOLOGY, DARAPUR, AMRAVATI A B S T R A C T O F E S T I M A T E . NAME OF WORK : PROPOSED LIBRARY BUILDING AT DARAPUR, TQ, DARYAPUR, DIST. AMRAVATI. MEASUREMENT SHEET Sr No DETAILS UNIT RATE QTY AMOUNT S.NO DETAILS L B D/HT NOSQNT TOT BDE.3 Providing and casting in situ cement concrete M-15 of Cu.m. 3600.00 1.75 6300 0 trap/ granite/quartzite/gneiss metal for coping to plinth Providing and casting in situ cement concrete M-15 of 8.9 0.23 0.1 1 0.205 or parapet, moulded or chamfered as per drawing or as trap/ granite/quartzite/gneiss metal for coping to plinth 26.7 0.23 0.1 1 0.614 directed including steel centering, plywood/steel or parapet, moulded or chamfered as per drawing or as 6.8 0.23 0.1 1 0.156 formwork compacting, roughening them if special finish directed including steel centering, plywood/steel 7.93 0.23 0.1 1 0.182 is to be provided, finishing uneven and honeycombed formwork compacting, roughening them if special finish 9.73 0.23 0.1 1 0.224 surface and curing etc. complete. The Cement Mortar is to be provided, finishing uneven and honeycombed 16.1 0.23 0.1 1 0.37 1:3 plaster is considered for rendering uneven and surface and curing etc. complete. The Cement Mortar 1.752 1.75 honeycombed surface only. Newly laid concrete shall 1:3 plaster is considered for rendering uneven and be covered by gunny bag, plastic, tarpaulin etc. honeycombed surface only. Newly laid concrete shall (Wooden centering will not be allowed.) be covered by gunny bag, plastic, tarpaulin etc. Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (Wooden centering will not be allowed.) (CSR item No.6, Page No.9) Spec. No. : Bd.E. 3/Page No. 288/I.S. 456 (2000) (CSR item No.6, Page No.9) BDF.5 Providing and casting in situ cement concrete of required grade of trap / granite /quartzite/ gneiss metal Providing and casting in situ cement concrete of for R.C.C. columns as per detailed design and drawings required grade of trap / granite /quartzite/ gneiss metal 0.3 0.23 3.65 27 6.8 6.8 or as directed, including steel centering, plywood/steel for R.C.C. columns as per detailed design and drawings formwork, compaction, finishing uneven and or as directed, including steel centering, plywood/steel honeycombed surface with C.M. 1:3 of sufficient formwork, compaction, finishing uneven and minimum thickness to give a smooth and even surface honeycombed surface with C.M. 1:3 of sufficient or roughening the surface if special finish is to be minimum thickness to give a smooth and even surface provided and curing etc. complete. Including use of or roughening the surface if special finish is to be plastisizer wherever necessary as directed by Engineer provided and curing etc. complete. Including use of (Excluding reinforcement, including cover block). The plastisizer wherever necessary as directed by Engineer Cement Mortar 1:3 plaster is considered for rendering (Excluding reinforcement, including cover block). The uneven and honeycombed surface only. Newly laid Cement Mortar 1:3 plaster is considered for rendering concrete shall be covered by gunny bag, plastic, uneven and honeycombed surface only. Newly laid tarpaulin etc. (Wooden centering will not be allowed). concrete shall be covered by gunny bag, plastic, a) For C.C.M-20 Cu.m. 5350.00 6.799 36374.65 tarpaulin etc. (Wooden centering will not be allowed). b) For C.C.M-25 Cu.m. 5450.00 a) For C.C.M-20 Spec.No.: Bd.F.5/Page No. 300/I.S. 456(2000) b) For C.C.M-25 (CSR item No.3, Page No.11-12) Spec.No.: Bd.F.5/Page No. 300/I.S. 456(2000) (CSR item No.3, Page No.11-12) BDF.6A Providing and casting in situ cement concrete of required grade of trap / granite /quartzite /gneiss metal Providing and casting in situ cement concrete of for R.C.C. beams and lintels as per detailed design and required grade of trap / granite /quartzite /gneiss metal 26.7 0.23 0.3 2 3.685 drawings or as directed,including steel centering, for R.C.C. beams and lintels as per detailed design and 8.9 0.23 0.3 9 5.527 plywood/steel formwork steel props, compaction, drawings or as directed,including steel centering, 9.93 0.23 0.3 3 2.056 finishing uneven and honeycombed surface with plywood/steel formwork steel props, compaction, 7.93 0.23 0.3 1 0.547 C.M.1:3 of sufficient minimum thickness to give a finishing uneven and honeycombed surface with 6.7 0.23 0.3 1 0.462 smooth and even surface or roughening if special finish C.M.1:3 of sufficient minimum thickness to give a 12.28 12.3 is to be provided and curing etc. complete. Including smooth and even surface or roughening if special finish use of plastisizer wherever necessary as directed by is to be provided and curing etc. complete. Including Engineer-In-charge (Excluding reinforcement, including use of plastisizer wherever necessary as directed by cover block). The Cement Mortar 1:3 plaster is Engineer-In-charge (Excluding reinforcement, including considered for rendering uneven and honeycombed cover block). The Cement Mortar 1:3 plaster is surface only. Newly laid concrete shall be covered by considered for rendering uneven and honeycombed gunny bag, plastic, tarpaulin etc. surface only. Newly laid concrete shall be covered by A) Including supporting system ( steel centering) gunny bag, plastic, tarpaulin etc. a) For C.C.M-20 Cu.m. 5000.00 12.27 61350 A) Including supporting system ( steel centering) b) For C.C.M-25 Cu.m. 5100.00 a) For C.C.M-20 A) Excluding supporting system b) For C.C.M-25 a) For C.C.M-20 Cu.m. 4500.00 A) Excluding supporting system b) For C.C.M-25 Cu.m. 4600.00 a) For C.C.M-20 Spec.No.: Bd.F.6/Page No.300/I.S. 456 (2000) b) For C.C.M-25 NAME OF WORK: PROPOSESD LIBRARY BUILDING AT DARAPUR,TQ.DARYAPUR,DIST.AMT. SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI Abstract sheet for Acid Oil work 1 Excavation for the foundation :- 124.32 Cum 100.00 12432.00 2 Filling 0.00 Cum 400.00 0.00 3 P.c.c. 1:2:4 6.58 Cum 1150.00 7562.40 4 Brick Masonary 34.99 Cum 1700.00 59486.40 5 Casting of R.c.c. Footing 3.20 Cum 2090.00 6688.00 6 Casting of R.c.c. Columns 1.37 Cum 2090 2867.48 Total 89036.28 In Words :- Eighty Nine Thousand Thirty six only For- DNA ERECTORS Unit AmountRate DNA ERECTORS, PUNE Sr.No. Particulars Quantity SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI Abstract sheet for Cooling Tower work 1 Excavation for the foundation :- 79.05 Cum 100.00 7905.00 2 Filling 16.83 Cum 400.00 6730.80 3 P.c.c. 1:2:4 26.05 Cum 1150.00 29959.80 4 Casting of Raft 34.36 Cum 2090.00 71816.58 5 Casting of Retaining Wall 11.81 Cum 2090.00 24678.72 Total 141090.90 Unit AmountRate DNA ERECTORS, PUNE Sr.No. Particulars Quantity BHASKA nad consultancy 2010-17 4 ProjectsEstimated/ Tendered and Executed.
  • 5. 5 Few Project Pharmacy College College Auditorium,600 seating capacity. Boys and Sports Hostel. Library Building Scope of Work Conceptualization, Planning, Designing Estimation and tendering Quality audits. Conceptualization, Planning, Drawing Designing, Detailing Estimations and Specification Tendering. Conceptualization, Planning, Drawing Designing Estimation Supervision Quality Audits Conceptualization, Planning, Drawing Designing Estimation Quality supervision. Area 43,345 Sq.Fts. 13051 Sq.Fts 10178 Sq. Fts 15200sq.fts Cost $1.5m @ $391k $325k @ $456k Date Nov. 2016 May 2017 Oct 2016 March 2017 2010- current 7 years nad Consultants: An Architectural Consultancy firm, providing Architectural and Construction Services to Institutions.
  • 6. 2007-2010 3 years dna Erectors, Project management Firm Executed Commercial Projects / Industrial Projects. Projects executed worth $10m 6 Few Project Commercial multiplex. Scope of Work Project Execution management Reading Technical Drawings Checking Rebar Structural Designs. SchedulingCPM/PERT Financing Material and labour management Technical and legal compliances Regulatory and statutory and Environmental compliances Liaison with legal and statutory authorities Dispute Resolution. Area 167000 sq. fts. Cost $5m Date August 2009
  • 7. dna Erectors 2007- 10 7 Industrial Projects.. Few Project Industrial Project. Sub Contracting Type of work Done  Cooling Tower  ETP.  Oil Tank  Sludge tank  Silos Scope of Work Project Management Reading Technical Drawings Checking Structural Designs. SchedulingCPM/PERT Financing Material and labour management Dispute Resolution. Area 167000 sq. fts. Cost $5m Date August 2009 SITE :- BHASKAR FOODS PVT.LTD.,AMRAVATI Abstract sheet for Acid Oil work 1 Excavation for the foundation :- 124.32 Cum 100.00 12432.00 2 Filling 0.00 Cum 400.00 0.00 3 P.c.c. 1:2:4 6.58 Cum 1150.00 7562.40 4 Brick Masonary 34.99 Cum 1700.00 59486.40 5 Casting of R.c.c. Footing 3.20 Cum 2090.00 6688.00 6 Casting of R.c.c. Columns 1.37 Cum 2090 2867.48 Total 89036.28 In Words :- Eighty Nine Thousand Thirty six only For- DNA ERECTORS Unit AmountRate DNA ERECTORS, PUNE Sr.No. Particulars Quantity
  • 8.  Project management techniques of CPM/PERT extensively used.  Reading Drawing  Projecting work freezing for execution  2 – 8 hours working shifts Scope:  Site cleaning  Site Demarcating  Excavation  Drilling of hard rocks  Concrete Skeleton work  Brick and masonry work  Fittings HVAC dna Erectors 2007- 10 8 Scope of Work Executed.
  • 9. Machines Used.  Concrete Mixers  Putzmeister Concrete Pumping machine  Hydraulic pumps for Tensioning  Excavators  Trucks and Loaders  Bar bending and Cutting  Vibrators, Pullies, Crane dna Erectors 2007- 10 9 On-Site Concrete pour and Machineries Used. Concrete Pour and Batching plant On- site Labor and material management for concrete work  Concrete Mix determination  Material Procurements  Training and orientation for machine and equipment operators.
  • 10. Design Check for rebar and Post Tensioning.  Laying of PT Strands  Rebaring layout technical checks. Achievement:  Concrete of min 3000 psi required, we got 3500 in 7 days psi on site. 10 Rebar and Scaffolding and Shuttering Shuttering and Scaffolding Erection Cup lock System:  Use of Props, Spans  Cup lock System  Wood and  Iron steel stanchions systems used
  • 11. Material testing Lab Set-up On Site:  Sand Testing for bulking  Aggregate for Cracking and Flaking  Cement for Lime content  Concrete slump testing for Compressive strength  Steel testing for tensile. dna Erectors 2007- 10 11 On site Material testing & CSR Health Safety and CSR Initiatives:  Monthly medical Check-up of laborers.  Heat reducing techniques used in designing labor camps  Monthly meals for Labors Organized  Good worker felicitated  Work as a team Mr. Muduli Sub contractor, with his Bike as a reward for, in time completion
  • 12. 1994- 2007 13 years INT-EXT Consultancy Work Profile  Client handling  Business development  Architectural Drawing and designing  Negotiating  Sub- contracting  Estimation and Specifications  Banking and financing  On-site supervision  Project completion and Closure. Projects Executed :  Residential,  Interiors,  Site Planning,  Layout planning,  Schools  Colleges  Sports infrastructure  Hospitals. Int-Ext Consultancy : A proprietary Architectural consultancy firm 12
  • 13. Int-Ext Consultancy 1994-2007 13 Residences and Interiors Projects Apartment schemes. Small industrial sheds. Residences Residential Commercial spaces. Valuations Valuations $1 to 5 m $1m Special Technical Inputs Earthquack Resistance Design Demolition, Rebuild Carpentry and Joinery work, Steel Fabrication False POP ceiling Electrification Plumbing HVAC
  • 14. 14 Chief Architect Site Engineer Site SupervisorSite Supervisor Site labor Site labor Administration Business Structure and statutory Registrations  PAN No. DNA Erectors:AEBPD1179C  Personal Identity No. 5996 2549 4081  Member of Council of Architects, India  CA/1994/17262  Associate Member of Indian Institutes of Architects India( IIA) Regd. No.-19627  Member of International Youth Hostels.
  • 15. Thanks. Architect, Ninad A. Dhawle M. Arch. MBA, Ph.D (submitted),IOSH certified nad Consultants. 2010-current dna Erectors 2007-2010 INT-EXT Consultancy 1994-2007 9860675009 ninadad@gmail.com 15 tēnā rawa atu koe