1. Unit Qty
Operator Helper Labour Mason Shovel Digger Roller Compactor
1 Excavation for foundation pits in normal ground m3 150 1 1 1
2 Excavation for foundations in strips/trenches in normal ground m3 130 1 1 1
3 Hand excavation in normal ground upto 1.5m lift m3 3 1
4 Foundation bed levelling & compaction m2 90 2 1
5 Backfilling in 150mm layers in buildings below slab on grade m3 180 2 1 0.75 1
6 Backfilling around building in 150mm layers m3 200 2 1 0.75 1
1 Plain concrete / Block walls m3 5
2 Hard Rock/ Reinforced concrete m3 2
3 Concrete paving m2 100
4 Asphalt & Subase m2 16
5 Pile Head Cutting - 300 mm Dia No 5
6 Pile Head Cutting - 600 mm Dia No 5
Labour Mason
1 Waterproofing Membrane m2
2 Polythene Sheets m2
3 Protection Screed m2
4 Tower Crane Erection No
1 Columns (Square or Rectangular) m2 14
2 Wall shutter m2 22
3 Beam Bottom m2 14
4 Beam Sides m2 20
5 Stair case /steps m2 8
Concrete Breaker
LABOR EQUIPMENT
RESOURCES - LABOR AND EQUIPMENT
1
LABOR AND EQUIPMENT PRODUCTIVITY
Rapid Breaker
Sr. No. ITEM
8 HRS
PRODUCTIVITY
EXCAVATION & EARTHWORKS
DISMANTLING & DISPOSAL (Manual)
1
1
1
1
2
Waterproofer
Wood Cutting Machine
1
1
2
1
Shutter Making Carpenter Helper
MISCELLANEOUS
1
1
1
1
1
1
1
1
1
1
1
Labour
2
2
2
1
1
1
Page 1 of 1
2. Unit Qty
1 Water Supply Pipes (PEX) LM
2 Water Supply Pipes (PRP) LM
3 Valves & Accessories of varying diameter No
4 Water Booster Pumpset No 2
5 Water Transfer Pumpset No
6 Water Treatment with Accessories No
7 Storage Tank No
8 Water Heater No 3
9 Water Meter No
10 Waste Water Drainage Pipes & Fittings below grade LM
11 Waste Water Drainage Pipes & Fittings above grade LM
12 Sump Pumpset No
13 Drains & Grating No
14 W/C - Asian No 2
15 W/C - Western No 3
16 Shower set No
17 Urinal No
18 MOP sink No
19 Bidet No 3
1 Chilled water Piping LM 25
2 Chilled water Pipes Insulation with Canvase Cloth LM 20
3 Duct Work with Insulation m2
10
4 Fresh Air Handling Units (FAHU) Installation No 1
5 Fan Coil Units (FCU) Installation No 2
6 Exhaust Fan Installaion No 2
7 Dampers & Control No
8 Grills & Diffusers Installation No 8
9 Closed Control Units No
10 Chemical Dosing No
11 Chilled Water Pump No
12 BMS No
PLUMBING & DRAINAGE Plumber Helper
MEP LABOR PRODUCTIVITY
Sr. No. ITEM
8 HRS
PRODUCTIVITY LABOR
1 1
1
1
1 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
HVAC WORKS AC Technician Helper
Page 1 of 2
3. Unit Qty
MEP LABOR PRODUCTIVITY
Sr. No. ITEM
8 HRS
PRODUCTIVITY LABOR
1 Duct Laying LM 50
2 P.V.C Conduits Layings LM 200
3 G.I Conduits Layings LM 50
4 Cable Pulling ( 10 to 50 Sq mm ) LM 100
5 Cable Pulling ( 50 to 90 Sq mm ) LM 50
6 Cable Pulling ( 100 to 200 Sq mm ) LM 30
7 Cable Pulling ( 200 Sq mm and Above ) LM 30
8 Cable Trays (100mm-300mm ) i/c Support System LM 50
9 Cable Trays (300mm-600mm) i/c Support System LM 40
10 Cable Trays (600mm-900mm) i/c Support System LM 30
11 Wiring LM 300
12 Termination No 50
13 DB Installation No 2
14 MDB/SMDB Installation No 1
15 LV Panels Installation No
16 Motor Control Centres No
17 Sockets Installation No 80
18 Switches Installation No 80
19 Light Fixtures Installation No 50
20 Earthing System No
21 Generator set No
22 Main Cable Laying LM
22 CCTV System No
23 Telephone Equipment Installation No 5
1 Piping Network LM
2 Fire Hose Cabinets No
3 Fire Extinguishers and Cabinets No
4 Sprinklers No
5 Valves & Accessories No
6 Fire Protection Pumpset No
7 Fire gas Suppression System No
8 Fire Alarm Control Panel No
9 Smoke & Heat Detectors No
10 Monitor Module No
11 Control Module No
12 Voice Evacuation System No
1 1
1 1
1 1
1
1 1
1
ELECTRICAL WORKS Electrician Helper
1 1
3 5
3 5
4 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
FIRE FIGHTING & FIRE ALARM SYSTEM Fire Fighters Helper
Page 2 of 2
4. Unit Qty
Carpenter Steel Fixer Con Mason Helper
1
a Formwork m
2
40 1 1
b Concrete m
3
20 2 3
2
a Formwork m
2
25 1 1
b Concrete m
3
40 2 3
3
a Formwork m
2
30 2 2
b Reinforcement (fabrication & fix) kg 170 1
c Concrete m
3
55 2 2
4
a Formwork m
2
25 2 2
b Reinforcement (fabrication & fix) kg 170 1
c Concrete m
3
55 2 2
5
a Formwork m
2
25 2 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m
3
20 1 2
6
a Formwork m
2
30 2 1
b Reinforcement (fabrication & fix) kg 180 1
c Concrete m
3
20 2 2
7
a Formwork & Joints m
2
of slab 200 2 1
b Mesh Reinforcement m
2
300 2
c Bar Reinforcement (fabrication & fix) kg 250 1
d Concrete - Trowel finished m
3
40 2 3
8
a Formwork m
2
30 3 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m
3
18 1 2
d De-Shuttering m
2
9
a Formwork m
2
b Reinforcement (fabrication & fix) kg
c Concrete m
3
d De-Shuttering m
2
10
a Formwork m
2
14 2 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m
3
9 1 2
d De-Shuttering m
2
8 HRS
PRODUCTIVITY
Slab on grade
CONCRETE WORKS
Strip footings
Tie Beams
Pedestals (Neck Columns)
LABOR PRODUCTIVITY
LABOR
PCC below footings
Column footings / Pile Caps
PCC below slab on grade
Sr. No. ITEM
Shear Walls
Retaining Walls
Columns upto 0.5 sqm in area (using fabricated forms)
Page 1 of 5
5. Unit Qty
8 HRS
PRODUCTIVITY
LABOR PRODUCTIVITY
LABOR
Sr. No. ITEM
Carpenter Steel Fixer Con Mason Helper
11
a Formwork m
2
20 2 2
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m
3
15 1 2
d De-Shuttering m
2
12
a Formwork m
2
15 1 1
b Reinforcement (fabrication & fix) kg 200 1
c Concrete m
3
75 3 3
d De-Shuttering m
2
13
a Formwork m
2
b Reinforcement (fabrication & fix) kg
c Concrete m
3
d De-Shuttering m
2
14
a Formwork m
2
20 2 2
b Reinforcement (fabrication & fix) kg 175 1
c Concrete m
3
12 1 1
15
a Formwork m
2
12 1 1
b Reinforcement (fabrication & fix) kg 180 1
c Concrete m
3
50 3 3
16
a Formwork m
2
15 1 1
b Reinforcement (fabrication & fix) kg 170 1
c Concrete m
3
20 1 1
17
a Formwork m
2
b Reinforcement (fabrication & fix) kg
c Concrete m
3
18
a Formwork m
2
8 1 1
b Reinforcement (fabrication & fix) kg 180 1
c Concrete m
3
5 1 1
Parapets
Cantilevers
Ramps
Stairs
Lintels
Slabs (Hourdy)
Beams
Slabs (Solid)
CONCRETE WORKS
Page 2 of 5
6. Unit Qty
8 HRS
PRODUCTIVITY
LABOR PRODUCTIVITY
LABOR
Sr. No. ITEM
1 200 mm Blockwork m
2
12
1 100 mm Blockwork with pointing m
2
15
2 150 mm Blockwork with pointing m
2
3 200 mm Blockwork with pointing m
2
10
4 250 mm Blockwork with pointing m
2
1 250 mm Blockwork with pointing m
2
2 200 mm Blockwork with pointing m
2
16
3 200 mm blockwork in non-straight walls with pointing m
2
12
4 150 mm Blockwork with pointing m
2
5 150 mm blockwork in non-straight walls with pointing m
2
6 100 mm blockwork in straight walls with pointing m
2
18
7 100 mm blockwork in non-straight walls with pointing m
2
14
1 Cover Block m
2
9
2 Cutting & Chasing m
2
2 Block shifting GF to 3rd Floor No 240
1 Plastering Accessories fixing m
2
60
2 Internal Plaster 12mm thick on walls m
2
16
3 Internal Plaster 12mm thick on ceilings m
2
12
4 External Plaster 16mm thick (upto 3m high) m
2
5 External Plaster 16mm thick (over 3m high) m
2
6 External Plaster 19mm thick (upto 3m high) m
2
20
7 External Plaster 19mm thick (over 3m high) m
2
18
8 External plaster -Rush coat m
2
100
9 Compressed Plaster m
2
60
10 Sub frame fixing No 5
11 Tyroline over plastered or fare face concrete surface m
2
175
1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1 1
PLASTER Plaster Mason Helper
1 1
1
BLOCK WORK Block Mason Helper
1
1
1
1
2
2
2
2
Sub-Structure - Solid Blocks
Super-Structure (upto 3m height) - Solid Blocks
Super-Structure (upto 3m height) - Hollow Blocks
Miscellaneous
1 1
1
1
2
2
Page 3 of 5
7. Unit Qty
8 HRS
PRODUCTIVITY
LABOR PRODUCTIVITY
LABOR
Sr. No. ITEM
1 Ceramic Floor Tiles m
2
20
2 Ceramic Wall Tiles m
2
18
3 Ceramic Tile Skirting LM 40
4 Ceramic floor / wall tiles grouting m
2
32
5 Ceramic claustra work m
2
6
6 Granite/Marble threshold No 10
7 Granite/Marble Floor Tiles m
2
10
8 Granite/Marble Wall Tiles m
2
9 Terrazzo Tiles m
2
20
10 Terrazzo Skirting LM 40
11 Terrazzo Treads & Risers LM 30
12 Floor Screed 50mm thick m
2
27
13 Interlocking Pavers m
2
48
14 Kerbstone m 56
1 Suspension System m
2
35
2 Ceiling Tiles m
2
60
3 Gypsum Ceiling & Cornish (i/c Suspension System) m
2
2.5
4 Dry wall partition m
2
20
1 Prime Coat m
2
200
2 Surface preparation for paint m
2
80
3 Paint 1st Coat - brush application (Emulsion Paint) m
2
100
4 Paint 2nd Coat - brush application (Emulsion Paint) m
2
100
5 Paint 1st Coat - roller application (Emulsion paint) m
2
125
6 Paint 2nd Coat - roller application (Emulsion Paint) m
2
125
7 Paint 1st Coat - brush application (Enamel Paint) m
2
60
8 Paint 2nd Coat - brush application (Enamel Paint) m
2
60
9 Paint 1st Coat - roller application (Enamel Paint) m
2
95
10 Paint 2nd Coat - roller application (Enamel Paint) m
2
70
11 Epoxy Paint on Floors per coat m
2
50
12 Bitumen paint for waterpoofing single coat m
2
50
13 Stucco Paint m
2
TILING WORK Tiler Helper
FALSE CEILING Ceiler Helper
1 1
1 1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
1
1 1
1
1
1
1 1
1 1
1 1
1 1
1
1
PAINT WORK Painter Helper
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
1
1
1
Page 4 of 5
8. Unit Qty
8 HRS
PRODUCTIVITY
LABOR PRODUCTIVITY
LABOR
Sr. No. ITEM
1 Wooden frames fixing for openings upto 5 m
2
nos 8
2 Wooden door shutters fixing (incl hardware) nos 5
3 Wooden Pergola m
2
4 Wooden Vanities nos
5 Kitchen Cabinets nos
6 Wardrobes nos
7 Handrail LM
1 Steel Frames fixing for openings upto 5 m
2
nos 8
2 Steel Shutter fixing nos 5
3 Handrail and Balustrade LM 8
4 Glazed Balustrade with Stainless steel handrail LM 6
5 Structural Steel Columns and Beams kg
6 Wardrobes nos
7 Passanger Lifts nos
1 Aluminium doors for openings upto 5 m
2
nos 8
2 Aluminium windows (glazed) nos 6
3 Glazed Curtain Walling m
2
4 Aluminium Louvers nos
5 Aluminium Cladding m
2
6 Skylights m
2
WOOD WORKS
METAL WORKS
ALUMINIUM WORKS
Joiner Helper
Metal Workers Helper
Aluminium Workers
1 1
1 2
2
2
1
1
2
2