SlideShare a Scribd company logo
This content is © of Estimating Service 2015. PRELIMINARIES / GENERAL CONDITIONS
Qty Unit Rate £ p
A PRELIMINARIES/GENERAL CONDITIONS
A40 Contractor's general cost items: Management
and staff
Site administrative staff
Provide general site supervision/administration
a Project Manager 10.00 week 378.80 3,788.00
A42 Contractor's general cost items: Services and
facilities
Provide the following services and facilities
Rubbish disposal
b Skips item 233.97 233.97
A44 Contractor's general cost items: Temporary
works
Scaffolding up to 10m high
Independent scaffolding
c Erect and subsequently dismantle 42.91 m2 15.32 657.38
Temporary screens
50 x 75mm sawn softwood weatherproof screens
(two uses) covered with roofing felt and lined with
d 13mm insulation board 10.02 m2 21.99 220.34
A45 Contractor's general cost items; Associated
with the works
e Defects after completion Item 167.12 167.12
f Delivery costs for slate cladding & paving Item 334.24 334.24
www.estimatingservice.co.uk To Collection £ 5,401.05
Page 1 / 1
This content is © of Estimating Service 2015. PRELIMINARIES / GENERAL CONDITIONS
Qty Unit Rate £ p
Collection
Total from Page 1 / 1 £ 5,401.05
www.estimatingservice.co.uk To Summary £ 5,401.05
Page 1 / 2
This content is © of Estimating Service 2015. EXISTING SITE / BUILDINGS / SERVICES
Qty Unit Rate £ p
C EXISTING SITE/BUILDINGS/SERVICES
C20 Demolition
Pulling down - including removal of debris
Demolish external brickwork walls in cement
mortar; disposal of debris off-site
a 2 x 102.5 mm thick skins forming cavity wall 3.46 m2 42.50 147.05
Pulling down with care - including removal of debris
Existing structures by hand
b Conservatory; dispose of debris off-site item 1001.47 1,001.47
c Porch; set aside for client item 155.98 155.98
Demolishing parts of timber structures
Softwood rails
d 25 x 150 mm 32.61 m 0.73 23.81
C90 Alterations - spot items
Removing fittings and fixtures
Doors including frame; dispose of debris off-site or
set
aside for re-use
e single door 2.00 nr 13.07 26.14
Windows; dispose of debris off-site or set aside for
re-use
f casement window 7.08 m2 19.89 140.82
Remove finishings
Walls, without backing
g plaster 3.46 m2 20.83 72.07
www.estimatingservice.co.uk To Collection £ 1,567.34
Page 1 / 3
This content is © of Estimating Service 2015. EXISTING SITE / BUILDINGS / SERVICES
Qty Unit Rate £ p
Collection
Total from Page 1 / 3 £ 1,567.34
www.estimatingservice.co.uk To Summary £ 1,567.34
Page 1 / 4
This content is © of Estimating Service 2015. GROUNDWORK
Qty Unit Rate £ p
D GROUNDWORK
D20 Excavating and filling
Excavating by machine
To reduce levels, maximum depth not exceeding
a 0.25 m 50.33 m3 29.56 1,487.75
Trenches, width over 0.30 m, maximum depth not
exceeding
b 2.00 m 9.11 m3 35.53 323.68
Excavating by hand
To reduce levels, maximum depth not exceeding
c 0.25 m; avaerage depth 0.15m 0.68 m3 23.40 15.91
Pits, maximum depth not exceeding
d 1.00 m 3.62 m3 26.80 97.02
Breaking out
Existing materials
e coated macadam or asphalt 4.18 m3 62.62 261.75
Existing hard pavings
f pavers or slabs and sub base up to 250 mm thick 30.82 m2 18.14 559.07
Disposal
Off site to tip average 15 km from site
g
loaded by grab wagon from spoil heaps; bulking
factor 1.25 84.91 m3 22.11 1,877.36
On site by hand
h
in spoil heaps; distance no greater than 50 m
from excavation 28.59 m3 5.27 150.67
Filling to make up levels
Imported MOT Type 1 material
i not exceeding 0.25 m 27.19 m3 64.04 1,741.25
Imported sand
j not exceeding 0.25 m 2.77 m3 52.54 145.54
Surface treatments
Compacting
k surface of filling 217.58 m2 0.51 110.97
l bottom of excavation 27.25 m2 0.51 13.90
Geotextiles
Membranes
m laid over ground 132.20 m2 1.62 214.16
www.estimatingservice.co.uk To Collection £ 6,999.03
Page 1 / 5
This content is © of Estimating Service 2015. GROUNDWORK
Qty Unit Rate £ p
Collection
Total from Page 1 / 5 £ 6,999.03
www.estimatingservice.co.uk To Summary £ 6,999.03
Page 1 / 6
This content is © of Estimating Service 2015. IN SITU CONCRETE / LARGE PRECAST CONCRETE
Qty Unit Rate £ p
E IN SITU CONCRETE/LARGE PRECAST CONCRETE
E10 Mixing/casting/curing in-situ concrete
Ready mixed concrete
Plain in situ concrete 1:2:4 - 20 mm aggregate
a foundations 5.14 m3 136.03 699.19
b beds, thickness not exceeding 150 mm 2.98 m3 137.12 408.62
c filling to hollow walls 1.80 m3 178.47 321.25
E41 Worked finishes/Cutting to in situ concrete
Worked finishes
Tamping by mechanical means
d level 27.25 m2 1.03 28.07
www.estimatingservice.co.uk To Collection £ 1,457.13
Page 1 / 7
This content is © of Estimating Service 2015. IN SITU CONCRETE / LARGE PRECAST CONCRETE
Qty Unit Rate £ p
Collection
Total from Page 1 / 7 £ 1,457.13
www.estimatingservice.co.uk To Summary £ 1,457.13
Page 1 / 8
This content is © of Estimating Service 2015. MASONRY
Qty Unit Rate £ p
F MASONRY
F10 Brick/Block walling
Class B engineering bricks in cement mortar 1:3
Walls
a 102.5 mm 4.14 m2 84.69 350.62
Precast concrete dense aggregate blocks to BS 6073
Walls, facework one side
b
100 mm solid; in gauged mortar 1:3; below DPC
level 31.79 m2 36.04 1,145.71
c
100 mm solid; in gauged mortar 1:4; above DPC
level 19.28 m2 35.29 680.39
Precast concrete lightweight aerated loadbearing
blocks to BS 6073
Walls, facework one side
d 100 mm 7N; above DPC level 16.44 m2 34.99 575.24
Forming cavities
50 - 100 mm cavities in hollow walls with 225 mm
wall-ties at 5 per
m2 using
e 3 mm vertical-twist ties 35.87 m2 1.95 69.95
Closing cavities
Thermabate cavity closers
f 150 mm cavity 4.80 m 9.84 47.23
Damp proof courses
Pitch polymer
g horizontal not exceeding 225 mm 2.93 m2 8.13 23.82
Cavity trays
Type W Cavity weep ventilator
h wall weep vent 32.00 nr 1.48 47.36
Polythene
i horizontal exceeding 225 mm 12.43 m2 11.72 145.68
Joint reinforcement
Mesh reinforcement in walls
j 64 mm 79.86 m 2.04 162.91
Proprietary items
Wall extension profiles, single flange, plugging and
screwing
k 100mm 11.36 m 10.13 115.08
www.estimatingservice.co.uk To Collection £ 3,363.99
Page 1 / 9
This content is © of Estimating Service 2015. MASONRY
Qty Unit Rate £ p
F MASONRY continued ...
F31 Precast concrete sills/lintels/copings/features
Padstones
Padstones bedded
a 215 x 225 x 150 mm 2.00 nr 27.59 55.18
www.estimatingservice.co.uk To Collection £ 55.18
Page 1 / 10
This content is © of Estimating Service 2015. MASONRY
Qty Unit Rate £ p
Collection
Total from Page 1 / 9 £ 3,363.99
Total from Page 1 / 10 £ 55.18
www.estimatingservice.co.uk To Summary £ 3,419.17
Page 1 / 11
This content is © of Estimating Service 2015. STRUCTURAL / CARCASSING METAL / TIMBER
Qty Unit Rate £ p
G STRUCTURAL/CARCASSING METAL/TIMBER
G10 Structural steel framing
Framing, fabrication
Fabricated steelwork
a columns less than 40 kg/m SHS 0.05 tonne 2168.52 108.43
b beams less than 40 kg/m 0.21 tonne 1859.13 390.42
Connections
c general steel connections 2.00 nr 63.34 126.68
Erection on site
d permanent erection 0.26 tonne 524.48 136.36
Surface treatments at fabrication workshop
e shot blasting & priming 8.51 m2 8.63 73.44
f 30 minute intumescent fire paint 8.51 m2 14.53 123.65
G20 Carpentry/Timber framing/First fixing
Impregnated sawn softwood - SC3 Grade
Floor members; sub-floor framing to decking
g 50 x 150mm 110.27 m 6.10 672.65
Wall or partition members
h 50 x 75mm 23.60 m 4.72 111.39
i
100 x 100mm; support posts to decking
sub-frame 67.00 m 10.95 733.65
Flat roof members
j 50 x 50mm 18.00 m 3.18 57.24
k 50 x 100mm 15.00 m 6.07 91.05
l 50 x 200mm 129.26 m 7.37 952.65
m 50 x 225mm 36.02 m 7.82 281.68
n 50 x 50mm angle fillets 16.00 m 3.09 49.44
o sawn softwood firrings 28.34 m 9.18 260.16
Eaves and verge boarding
WBP plywood
p 12mm Oak plywood - 75mm wide 15.00 m 7.21 108.15
q 12mm Oak plywood - 150mm wide 15.00 m 9.65 144.75
r 12mm Oak plywood - 600mm wide 15.00 m 20.76 311.40
s 24mm Softwood WBP plywood - 300mm wide 10.23 m 12.52 128.08
t 24mm Softwood WBP plywood - 400mm wide 15.00 m 14.04 210.60
Wrought Oak
u 150mm wide 3.56 m 16.80 59.81
v 300mm wide 6.13 m 26.35 161.53
www.estimatingservice.co.uk To Collection £ 5,293.20
Page 1 / 12
This content is © of Estimating Service 2015. STRUCTURAL / CARCASSING METAL / TIMBER
Qty Unit Rate £ p
G STRUCTURAL/CARCASSING continued ...
G20 Carpentry/Timber framing/First continued ...
Metalwork
Speedy joist hangers
a 50mm 92.00 nr 3.47 319.24
b 100mm 4.00 nr 5.09 20.36
Galvanised steel straps
c
light duty wall plate strap; once bent; 1200 mm
long 6.00 nr 9.02 54.12
Bolts & Timber Connectors
d M12 bolt with nut; 130 mm long 73.00 nr 2.22 162.06
Anchor bolts
e M12 anchor bolt; 115 mm long 22.00 nr 3.23 71.06
www.estimatingservice.co.uk To Collection £ 626.84
Page 1 / 13
This content is © of Estimating Service 2015. STRUCTURAL / CARCASSING METAL / TIMBER
Qty Unit Rate £ p
Collection
Total from Page 1 / 12 £ 5,293.20
Total from Page 1 / 13 £ 626.84
www.estimatingservice.co.uk To Summary £ 5,920.04
Page 1 / 14
This content is © of Estimating Service 2015. CLADDING / COVERING
Qty Unit Rate £ p
H CLADDING/COVERING
H22 Composite decking
Ultra Shield Eco decking
a width exceeding 300 mm 40.79 m2 63.00 2,569.77
b width not exceeding 300 mm 32.74 m 19.47 637.45
H31 Metal profiled/flat sheet
cladding/covering/siding
RAL Aluminium cladding trims
RAL Aluminium cladding trims fixed to
timber/masonry/steel background
c fascia cladding, girth not exceeding 375mm 25.23 m 53.21 1,342.49
d
reveal cladding, girth not exceeding 180mm; bent
three times; to patio door reveals 13.32 m 35.55 473.53
e external angles for reveal cladding 2.00 nr 34.16 68.32
H71 Lead sheet coverings/flashings
Flashings, aprons
Code 4 lead, horizontal, 150 mm lapped joints,
fixing with lead clips and wedges
f 300 mm girth 13.80 m 22.93 316.43
www.estimatingservice.co.uk To Collection £ 5,407.99
Page 1 / 15
This content is © of Estimating Service 2015. CLADDING / COVERING
Qty Unit Rate £ p
Collection
Total from Page 1 / 15 £ 5,407.99
www.estimatingservice.co.uk To Summary £ 5,407.99
Page 1 / 16
This content is © of Estimating Service 2015. WATERPROOFING
Qty Unit Rate £ p
J WATERPROOFING
J40 Flexible sheet tanking/ damp proof
membranes
Tanking and damp proofing
Building paper underlay lapped 150 mm at joints
a horizontally 21.33 m2 2.57 54.82
Polythene medium weight sheet underlay lapped
150 mm at joints
b horizontally 26.06 m2 1.82 47.43
J42 Single layer Polymeric roof coverings
Sedum Landscape Roofing
c
to timber or metal decking; pitch not exceeding 5
degrees 28.04 m2 152.81 4,284.79
d kerb detail to Sedum roofing 9.20 m 36.37 334.60
e eaves detail to Sedum roofing 17.89 m 60.27 1,078.23
Sarnafil Waterproof Membrane
f
to timber or metal decking; pitch not exceeding 5
degrees 5.80 m2 35.54 206.13
g eaves detail to Sarnafil Waterproof Membrane 9.69 m 29.97 290.41
h Sarnafil rainwater outlet 3.00 nr 100.13 300.39
Tapered Insulation Board Underlays
i tapered PIR board; mechanically fastened 29.54 m2 69.12 2,041.80
www.estimatingservice.co.uk To Collection £ 8,638.61
Page 1 / 17
This content is © of Estimating Service 2015. WATERPROOFING
Qty Unit Rate £ p
Collection
Total from Page 1 / 17 £ 8,638.61
www.estimatingservice.co.uk To Summary £ 8,638.61
Page 1 / 18
This content is © of Estimating Service 2015. LININGS / SHEATHING / DRY PARTITIONING
Qty Unit Rate £ p
K LININGS/SHEATHING/DRY PARTITIONING
K20 Timber board
flooring/sheathing/linings/casings
Roof decking
WBP plywood
a 12mm WBP plywood exceeding 300 mm wide 10.89 m2 14.89 162.15
b 24mm WBP plywood exceeding 300 mm wide 29.54 m2 20.04 591.98
www.estimatingservice.co.uk To Collection £ 754.13
Page 1 / 19
This content is © of Estimating Service 2015. LININGS / SHEATHING / DRY PARTITIONING
Qty Unit Rate £ p
Collection
Total from Page 1 / 19 £ 754.13
www.estimatingservice.co.uk To Summary £ 754.13
Page 1 / 20
This content is © of Estimating Service 2015. WINDOWS / DOORS / STAIRS
Qty Unit Rate £ p
L WINDOWS/DOORS/STAIRS
L10 Windows/rooflights/screens/louvres
uPVC Windows
1 section windows - Anthracite Grey
a 400 x 790 mm fixed light window with cill 2.00 nr 171.25 342.50
b 1300 x 2280 mm fixed light window with cill 1.00 nr 596.92 596.92
3 section windows - Anthracite Grey
c
2470 x 2280 mm 3 section fixed light window with
toughened glazing 1.00 nr 1075.52 1,075.52
4 section windows - Anthracite Grey
d
2330 x 790 mm 4 section window with 2 side
hung opening lights and 2 fixed lights 1.00 nr 586.16 586.16
Roof Lights
Astroglaze flat fixed roof lights on timber kerb
(taken elsewhere)
e
2760 x 1360mm roof light providing 2600 x
1200mm clear opening 1.00 nr 2442.17 2,442.17
L20 Doors/shutters/hatches
uPVC Doors
Fully glazed doors - Anthracite Grey
f
1300 x 2280 mm fully glazed door with fully
glazed sidelight 1.00 nr 738.39 738.39
g 980 x 2100 mm fully glazed door 1.00 nr 520.38 520.38
Aluminium Doors
Sliding patio doors - RAL colour finish
h 3160 x 2400 mm 2 pane sliding door 1.00 nr 2489.47 2,489.47
i 5159 x 2400 mm 3 pane sliding door 1.00 nr 3848.59 3,848.59
www.estimatingservice.co.uk To Collection £ 12,640.10
Page 1 / 21
This content is © of Estimating Service 2015. WINDOWS / DOORS / STAIRS
Qty Unit Rate £ p
Collection
Total from Page 1 / 21 £ 12,640.10
www.estimatingservice.co.uk To Summary £ 12,640.10
Page 1 / 22
This content is © of Estimating Service 2015. SURFACE FINISHES
Qty Unit Rate £ p
M SURFACE FINISHES
M10 Cement sand/Concrete screeds/toppings
Cement and sand 1:3, work to floors
Screeded beds, level and to falls not exceeding 15
degrees from horizontal, over 300 mm wide
a 75 mm 21.33 m2 18.13 386.71
M20 Plastered/Rendered/Roughcast coatings
Gypsum plasterboard to BS 1230
Fixing with plaster dabs to masonry backgrounds
b 12.5 mm Plain Wallboard over 300 mm wide 18.19 m2 10.69 194.45
c
12.5 mm Plain Wallboard not exceeding 300 mm
wide 27.48 m 5.09 139.87
Fixing with screws to timber or steel stud framing
d 12.5 mm Plain Wallboard over 300 mm wide 5.09 m2 10.17 51.77
Fixing with screws to ceilings
e 12.5 mm Plain Wallboard over 300 mm wide 24.10 m2 11.01 265.34
Retarded hemihydrate gypsum ("Thistle") plasters to
BS 1191, Class B
3 mm board finish on walls or ceilings including
scrimming
joints
f over 300 mm wide 47.38 m2 8.31 393.73
g not exceeding 300 mm wide 27.48 m 4.20 115.42
Plastering sundries
Galvanised plaster beads
h thin coat angle bead 42.19 m 1.93 81.43
M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic
Slate cladding
Fixing with adhesive
i
30 mm thick slate cladding to walls; fix only;
supply of cladding taken elsewhere 20.01 m2 40.89 818.21
j supply of cladding item 4367.38 4,367.38
Floor Tiles
Fixing with adhesive
k over 300 mm wide 3.06 m2 79.72 243.94
M42 Engineered wooden flooring
Laminated flooring 10mm thick
l
laminated wooden flooring, over 300 mm wide;
supply of materials taken in PC Sums 22.83 m2 14.04 320.53
www.estimatingservice.co.uk To Collection £ 7,378.78
Page 1 / 23
This content is © of Estimating Service 2015. SURFACE FINISHES
Qty Unit Rate £ p
M SURFACE FINISHES continued ...
M60 Painting/Clear finishing
General surfaces
Two coats of Dulex coloured matt emulsion paint
over 300 mm girth
a smooth plaster 55.62 m2 4.58 254.74
Knot, prime, stop and paint one undercoat and one
coat of gloss
finish paint on joinery
b isolated surfaces, not exceeding 300 mm girth 7.88 m 1.79 14.11
General surfaces, externally
Knot, prime, stop and paint two undercoats and
one coat of gloss
finish paint on joinery
c over 300 mm girth 10.00 m2 7.76 77.60
d isolated surfaces, not exceeding 300 mm girth 6.63 m 2.94 19.49
One coat of Cetol HLS and two coats of Cetol Filter
7 on Joinery
e over 300 mm girth 9.00 m2 10.48 94.32
f isolated surfaces, not exceeding 300 mm girth 39.69 m 3.98 157.97
Glazed windows, screens and doors
Knot, prime, stop and paint two undercoats and
one coat of gloss
finish paint on joinery in panes, area
g over 1.00 m2 3.12 m2 6.55 20.44
www.estimatingservice.co.uk To Collection £ 638.66
Page 1 / 24
This content is © of Estimating Service 2015. SURFACE FINISHES
Qty Unit Rate £ p
Collection
Total from Page 1 / 23 £ 7,378.78
Total from Page 1 / 24 £ 638.66
www.estimatingservice.co.uk To Summary £ 8,017.44
Page 1 / 25
This content is © of Estimating Service 2015. BUILDING FABRIC SUNDRIES
Qty Unit Rate £ p
P BUILDING FABRIC SUNDRIES
P10 Sundry insulation/proofing work/fire stops
Insulating boards
Celotex Insulation Tuff-R range
a 100 mm 11.60 m2 17.62 204.39
Celotex Insulation Fast-R range
b 75 mm 42.08 m2 17.62 741.45
Celotex Insulation T-Break range
c 25 mm 1.49 m2 8.96 13.35
Cavity wall Insulation
Slab insulation to masonry walls
d 50 mm thick Celotex cavity insulation 35.87 m2 14.17 508.28
e 100 mm thick Celotex cavity insulation 35.97 m2 22.76 818.68
P20 Unframed isolated trims/skirtings/sundry items
Skirtings, picture rails, architraves and the like
Wrought softwood skirtings
f 25 x 150 mm Torus 7.88 m 5.39 42.47
www.estimatingservice.co.uk To Collection £ 2,328.62
Page 1 / 26
This content is © of Estimating Service 2015. BUILDING FABRIC SUNDRIES
Qty Unit Rate £ p
Collection
Total from Page 1 / 26 £ 2,328.62
www.estimatingservice.co.uk To Summary £ 2,328.62
Page 1 / 27
This content is © of Estimating Service 2015. PAVING / PLANTING / FENCING / SITE FURNITURE
Qty Unit Rate £ p
Q PAVING/PLANTING/FENCING/SITE FURNITURE
Q10 Kerbs/Edgings/Channels/paving accessories
kerbs, edgings and channels
Brickwork edging, bedding & pointing in cement
mortar (1:3); bedding and haunching in concrete
(1:2:4) - 20mm
a
100 x 215mm brick edging - curved - 300 x
150mm concrete bed 8.27 m 24.84 205.43
Q22 Coated macadam/Asphalt roads/pavings
Laying on prepared bases (taken elsewhere) and
rolling with an appropriate roller
b 60 mm thick binder course 108.72 m2 14.08 1,530.78
Q23 Gravel/Hoggin/Woodchip roads/pavings
Resin Bound Pavings
Permeable fully mixed decorative aggregate paving;
laid to macadam base course (taken elsewhere);
18 mm thick with 6 mm aggregate
c total area 100-300 m2 132.20 m2 57.93 7,658.35
Q25 Slab/Brick/Sett/Cobble pavings
Slate paving
30 mm thick slate, 50 mm sand base, bedding in
cement mortar (1:3), level and to falls only, slate
size,
d 600 x 400mm 1.20 m2 10.27 12.32
e 800 x 400mm 4.80 m2 12.80 61.44
f 1200 x 400mm 2.88 m2 20.00 57.60
g supply of paving item 4010.86 4,010.86
Slate edgings
30 mm thick slate held in place with sawn softwood
stacks
h 890 x 150mm 45.00 nr 5.60 252.00
i supply of edgings item 2005.43 2,005.43
Q30 Seeding/Turfing
Artifical Grass
To prepared hardcore and sand blinded bases by
others
j
"As Good As Grass" artifical turf including timber
sub-frame 88.96 m2 44.57 3,964.95
www.estimatingservice.co.uk To Collection £ 19,759.15
Page 1 / 28
This content is © of Estimating Service 2015. PAVING / PLANTING / FENCING / SITE FURNITURE
Qty Unit Rate £ p
Q PAVING/PLANTING/FENCING/SITE continued ...
Q40 Fencing
Stainless Steel fencing
Stainless Steel rope and fittings
a 6 mm diameter item 1774.48 1,774.48
www.estimatingservice.co.uk To Collection £ 1,774.48
Page 1 / 29
This content is © of Estimating Service 2015. PAVING / PLANTING / FENCING / SITE FURNITURE
Qty Unit Rate £ p
Collection
Total from Page 1 / 28 £ 19,759.15
Total from Page 1 / 29 £ 1,774.48
www.estimatingservice.co.uk To Summary £ 21,533.63
Page 1 / 30
This content is © of Estimating Service 2015. DISPOSAL SYSTEMS
Qty Unit Rate £ p
R DISPOSAL SYSTEMS
R10 Rainwater pipework/gutters
Lindab rainwater system
Rainwater pipes
a 75mm steel downpipe 5.48 m 16.74 91.74
Fittings for rainwater pipes
Gutters
b 136mm square gutter 27.69 m 17.61 487.62
Fittings for rainwater gutters
c 136mm square gutter 90 degree external angle 4.00 nr 68.94 275.76
d 136mm square gutter outlet 2.00 nr 27.91 55.82
e 136mm square gutter stop end 4.00 nr 12.59 50.36
R12 Drainage below ground
Manholes
Manhole Covers
f 750 x 600 x 100 mm recessed manhole cover 1.00 nr 145.04 145.04
www.estimatingservice.co.uk To Collection £ 1,106.34
Page 1 / 31
This content is © of Estimating Service 2015. DISPOSAL SYSTEMS
Qty Unit Rate £ p
Collection
Total from Page 1 / 31 £ 1,106.34
www.estimatingservice.co.uk To Summary £ 1,106.34
Page 1 / 32
This content is © of Estimating Service 2015. MECHANICAL HEATING / COOLING / REFRIGERATION
Qty Unit Rate £ p
T MECHANICAL HEATING/COOLING/REFRIGERATION
SYSTEMS
T32 Low temperature hot water heating (small
scale)
Central heating points
Copper pipework and fittings; includes chasing out
background, cutting mortices and making good
finishes; radiators, towel rails and TVR's taken
elsewhere
a central heating service point 1.00 nr 428.91 428.91
T33 Under floor heating
Under floor heating; flow and return pipewwork at
300mm centres; pipe fixings; flow and return
manifolds and zone actuators; wiring block; includes
fixing in position, secondary pumps, mixing valves
and thermostats
b Screeded floors up to 50 m2 22.83 m2 59.73 1,363.64
www.estimatingservice.co.uk To Collection £ 1,792.55
Page 1 / 33
This content is © of Estimating Service 2015. MECHANICAL HEATING / COOLING / REFRIGERATION
Qty Unit Rate £ p
Collection
Total from Page 1 / 33 £ 1,792.55
www.estimatingservice.co.uk To Summary £ 1,792.55
Page 1 / 34
This content is © of Estimating Service 2015. ELECTRICAL SUPPLY / POWER / LIGHTING SYSTEMS
Qty Unit Rate £ p
V ELECTRICAL SUPPLY/POWER LIGHTING
SYSTEMS
V21 General lighting
Lighting circuits
a 1.5mm twin and earth lighting circuit 18.66 m 6.10 113.83
b junction box for lighting circuit 1.00 nr 7.71 7.71
Light switches
c 1-Gang, 1-Way: Light switch: White 6.00 nr 61.71 370.26
Luminaries
d downlighter; Stainless Steel 19.00 nr 66.74 1,268.06
e external light with PIR 2.00 nr 65.48 130.96
V22 General Low Voltage power
Power circuits
f 2.5mm twin and earth power circuit 18.66 m 11.86 221.31
g junction box for LV power circuit 1.00 nr 7.71 7.71
Power points
With PVC insulated and sheathed cables in houses
or flats, installed in floor cavities and roof voids,
protected by steel or PVC channels in walls
h 1-Gang switched socket outlet; White 1.00 nr 74.18 74.18
i 2-Gang switched socket outlet; White 4.00 nr 76.04 304.16
j 1-Gang external switched socket outlet 1.00 nr 77.58 77.58
k non-illuminated fused spur 1.00 nr 71.30 71.30
V23 Smoke/Heat/Gas alarms
Smoke alarms
l hard wired smoke alarm 1.00 nr 78.38 78.38
Heat alarms
m hard wired heat alarm 1.00 nr 78.38 78.38
V24 Telecoms and Data
TV, FM/DAB service points
n TV point 1.00 nr 32.28 32.28
V25 Intercomms and Door Bells
Door bells
o door bell and chime box 1.00 nr 55.73 55.73
V91 Works associated with Electrical installations
Opening up
p
lifting floorboards to allow electric installation
works, replacing existing boards on completion of
works 2.00 m2 34.29 68.58
www.estimatingservice.co.uk To Collection £ 2,960.40
Page 1 / 35
This content is © of Estimating Service 2015. ELECTRICAL SUPPLY / POWER / LIGHTING SYSTEMS
Qty Unit Rate £ p
Collection
Total from Page 1 / 35 £ 2,960.40
www.estimatingservice.co.uk To Summary £ 2,960.40
Page 1 / 36
This content is © of Estimating Service 2015. PC SUMS
Qty Unit Rate £ p
Z PC SUMS
PC Sums associated with the project
a
forming steps to frontage; requirements to be
discussed with client item 310.92 310.92
b Underground storm water drainage item 414.56 414.56
c supply of laminated wooden flooring and underlay 23.00 m2 19.43 446.89
www.estimatingservice.co.uk To Collection £ 1,172.37
Page 1 / 37
This content is © of Estimating Service 2015. PC SUMS
Qty Unit Rate £ p
Collection
Total from Page 1 / 37 £ 1,172.37
www.estimatingservice.co.uk To Summary £ 1,172.37
Page 1 / 38
This content is © of Estimating Service 2015.
Qty Unit Rate £ p
Summary
PRELIMINARIES / GENERAL CONDITIONS Page 1 / 2 £ 5,401.05
EXISTING SITE / BUILDINGS / SERVICES Page 1 / 4 £ 1,567.34
GROUNDWORK Page 1 / 6 £ 6,999.03
IN SITU CONCRETE / LARGE PRECAST ... Page 1 / 8 £ 1,457.13
MASONRY Page 1 / 11 £ 3,419.17
STRUCTURAL / CARCASSING METAL ... Page 1 / 14 £ 5,920.04
CLADDING / COVERING Page 1 / 16 £ 5,407.99
WATERPROOFING Page 1 / 18 £ 8,638.61
LININGS / SHEATHING / DRY ... Page 1 / 20 £ 754.13
WINDOWS / DOORS / STAIRS Page 1 / 22 £ 12,640.10
SURFACE FINISHES Page 1 / 25 £ 8,017.44
BUILDING FABRIC SUNDRIES Page 1 / 27 £ 2,328.62
PAVING / PLANTING / FENCING / SITE ... Page 1 / 30 £ 21,533.63
DISPOSAL SYSTEMS Page 1 / 32 £ 1,106.34
MECHANICAL HEATING / COOLING / ... Page 1 / 34 £ 1,792.55
ELECTRICAL SUPPLY / POWER / ... Page 1 / 36 £ 2,960.40
PC SUMS Page 1 / 38 £ 1,172.37
www.estimatingservice.co.uk Total for Bill £ 91,115.92
Page 1 / 39

More Related Content

What's hot

ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
Kai Yun Pang
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
Est
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
Timun Loh
 
ECA form
ECA formECA form
ECA form
Arissa Loh
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
Est
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
xingxin_GOh
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
Dayat Mohamad
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
Kheng Hoe Advocates
 
PP1 report
PP1 reportPP1 report
PP1 report
Doreen Yeo
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
ahmong4
 
Guide for Construction Contract Administrators
Guide for Construction Contract AdministratorsGuide for Construction Contract Administrators
Guide for Construction Contract Administrators
Sarah Fox
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
Tantish QS, UTM
 

What's hot (20)

ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
ECA form
ECA formECA form
ECA form
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Car park bq
Car park bqCar park bq
Car park bq
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Guide for Construction Contract Administrators
Guide for Construction Contract AdministratorsGuide for Construction Contract Administrators
Guide for Construction Contract Administrators
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 

Similar to SMM7 Bill of Quantities

Schedule of Works Bill
Schedule of Works BillSchedule of Works Bill
Schedule of Works BillNatalie Reid
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
study of self-compacting concrete for economical construction
study of self-compacting concrete for economical constructionstudy of self-compacting concrete for economical construction
study of self-compacting concrete for economical construction
Tejas6957
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportNatalie Reid
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
Canberra Institute of technology
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Builder Sample
Builder SampleBuilder Sample
Builder SampleHai Nguyen
 
Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
Bricks & Blocks brochure
Bricks & Blocks brochureBricks & Blocks brochure
Bricks & Blocks brochure
kristenjames
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
ssuserd43de8
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Canberra Institute of technology
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
Canberra Institute of technology
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
Canberra Institute of technology
 
Design and planning of hostel building by vijayan
Design and planning of hostel building by vijayanDesign and planning of hostel building by vijayan
Design and planning of hostel building by vijayan
Vijayan S
 
Mmup questionnaire 6
Mmup questionnaire 6Mmup questionnaire 6
Mmup questionnaire 6
Omar Selim
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
Canberra Institute of technology
 
Truline Plastic Piling Specifications 2014
Truline Plastic Piling Specifications 2014Truline Plastic Piling Specifications 2014
Truline Plastic Piling Specifications 2014
The Hammerman Equipment Plastic Piling Co. Ltd
 

Similar to SMM7 Bill of Quantities (20)

Schedule of Works Bill
Schedule of Works BillSchedule of Works Bill
Schedule of Works Bill
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
study of self-compacting concrete for economical construction
study of self-compacting concrete for economical constructionstudy of self-compacting concrete for economical construction
study of self-compacting concrete for economical construction
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Bricks & Blocks brochure
Bricks & Blocks brochureBricks & Blocks brochure
Bricks & Blocks brochure
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Design and planning of hostel building by vijayan
Design and planning of hostel building by vijayanDesign and planning of hostel building by vijayan
Design and planning of hostel building by vijayan
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
Mmup questionnaire 6
Mmup questionnaire 6Mmup questionnaire 6
Mmup questionnaire 6
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Truline Plastic Piling Specifications 2014
Truline Plastic Piling Specifications 2014Truline Plastic Piling Specifications 2014
Truline Plastic Piling Specifications 2014
 
Besser brickal
Besser brickalBesser brickal
Besser brickal
 

SMM7 Bill of Quantities

  • 1. This content is © of Estimating Service 2015. PRELIMINARIES / GENERAL CONDITIONS Qty Unit Rate £ p A PRELIMINARIES/GENERAL CONDITIONS A40 Contractor's general cost items: Management and staff Site administrative staff Provide general site supervision/administration a Project Manager 10.00 week 378.80 3,788.00 A42 Contractor's general cost items: Services and facilities Provide the following services and facilities Rubbish disposal b Skips item 233.97 233.97 A44 Contractor's general cost items: Temporary works Scaffolding up to 10m high Independent scaffolding c Erect and subsequently dismantle 42.91 m2 15.32 657.38 Temporary screens 50 x 75mm sawn softwood weatherproof screens (two uses) covered with roofing felt and lined with d 13mm insulation board 10.02 m2 21.99 220.34 A45 Contractor's general cost items; Associated with the works e Defects after completion Item 167.12 167.12 f Delivery costs for slate cladding & paving Item 334.24 334.24 www.estimatingservice.co.uk To Collection £ 5,401.05 Page 1 / 1
  • 2. This content is © of Estimating Service 2015. PRELIMINARIES / GENERAL CONDITIONS Qty Unit Rate £ p Collection Total from Page 1 / 1 £ 5,401.05 www.estimatingservice.co.uk To Summary £ 5,401.05 Page 1 / 2
  • 3. This content is © of Estimating Service 2015. EXISTING SITE / BUILDINGS / SERVICES Qty Unit Rate £ p C EXISTING SITE/BUILDINGS/SERVICES C20 Demolition Pulling down - including removal of debris Demolish external brickwork walls in cement mortar; disposal of debris off-site a 2 x 102.5 mm thick skins forming cavity wall 3.46 m2 42.50 147.05 Pulling down with care - including removal of debris Existing structures by hand b Conservatory; dispose of debris off-site item 1001.47 1,001.47 c Porch; set aside for client item 155.98 155.98 Demolishing parts of timber structures Softwood rails d 25 x 150 mm 32.61 m 0.73 23.81 C90 Alterations - spot items Removing fittings and fixtures Doors including frame; dispose of debris off-site or set aside for re-use e single door 2.00 nr 13.07 26.14 Windows; dispose of debris off-site or set aside for re-use f casement window 7.08 m2 19.89 140.82 Remove finishings Walls, without backing g plaster 3.46 m2 20.83 72.07 www.estimatingservice.co.uk To Collection £ 1,567.34 Page 1 / 3
  • 4. This content is © of Estimating Service 2015. EXISTING SITE / BUILDINGS / SERVICES Qty Unit Rate £ p Collection Total from Page 1 / 3 £ 1,567.34 www.estimatingservice.co.uk To Summary £ 1,567.34 Page 1 / 4
  • 5. This content is © of Estimating Service 2015. GROUNDWORK Qty Unit Rate £ p D GROUNDWORK D20 Excavating and filling Excavating by machine To reduce levels, maximum depth not exceeding a 0.25 m 50.33 m3 29.56 1,487.75 Trenches, width over 0.30 m, maximum depth not exceeding b 2.00 m 9.11 m3 35.53 323.68 Excavating by hand To reduce levels, maximum depth not exceeding c 0.25 m; avaerage depth 0.15m 0.68 m3 23.40 15.91 Pits, maximum depth not exceeding d 1.00 m 3.62 m3 26.80 97.02 Breaking out Existing materials e coated macadam or asphalt 4.18 m3 62.62 261.75 Existing hard pavings f pavers or slabs and sub base up to 250 mm thick 30.82 m2 18.14 559.07 Disposal Off site to tip average 15 km from site g loaded by grab wagon from spoil heaps; bulking factor 1.25 84.91 m3 22.11 1,877.36 On site by hand h in spoil heaps; distance no greater than 50 m from excavation 28.59 m3 5.27 150.67 Filling to make up levels Imported MOT Type 1 material i not exceeding 0.25 m 27.19 m3 64.04 1,741.25 Imported sand j not exceeding 0.25 m 2.77 m3 52.54 145.54 Surface treatments Compacting k surface of filling 217.58 m2 0.51 110.97 l bottom of excavation 27.25 m2 0.51 13.90 Geotextiles Membranes m laid over ground 132.20 m2 1.62 214.16 www.estimatingservice.co.uk To Collection £ 6,999.03 Page 1 / 5
  • 6. This content is © of Estimating Service 2015. GROUNDWORK Qty Unit Rate £ p Collection Total from Page 1 / 5 £ 6,999.03 www.estimatingservice.co.uk To Summary £ 6,999.03 Page 1 / 6
  • 7. This content is © of Estimating Service 2015. IN SITU CONCRETE / LARGE PRECAST CONCRETE Qty Unit Rate £ p E IN SITU CONCRETE/LARGE PRECAST CONCRETE E10 Mixing/casting/curing in-situ concrete Ready mixed concrete Plain in situ concrete 1:2:4 - 20 mm aggregate a foundations 5.14 m3 136.03 699.19 b beds, thickness not exceeding 150 mm 2.98 m3 137.12 408.62 c filling to hollow walls 1.80 m3 178.47 321.25 E41 Worked finishes/Cutting to in situ concrete Worked finishes Tamping by mechanical means d level 27.25 m2 1.03 28.07 www.estimatingservice.co.uk To Collection £ 1,457.13 Page 1 / 7
  • 8. This content is © of Estimating Service 2015. IN SITU CONCRETE / LARGE PRECAST CONCRETE Qty Unit Rate £ p Collection Total from Page 1 / 7 £ 1,457.13 www.estimatingservice.co.uk To Summary £ 1,457.13 Page 1 / 8
  • 9. This content is © of Estimating Service 2015. MASONRY Qty Unit Rate £ p F MASONRY F10 Brick/Block walling Class B engineering bricks in cement mortar 1:3 Walls a 102.5 mm 4.14 m2 84.69 350.62 Precast concrete dense aggregate blocks to BS 6073 Walls, facework one side b 100 mm solid; in gauged mortar 1:3; below DPC level 31.79 m2 36.04 1,145.71 c 100 mm solid; in gauged mortar 1:4; above DPC level 19.28 m2 35.29 680.39 Precast concrete lightweight aerated loadbearing blocks to BS 6073 Walls, facework one side d 100 mm 7N; above DPC level 16.44 m2 34.99 575.24 Forming cavities 50 - 100 mm cavities in hollow walls with 225 mm wall-ties at 5 per m2 using e 3 mm vertical-twist ties 35.87 m2 1.95 69.95 Closing cavities Thermabate cavity closers f 150 mm cavity 4.80 m 9.84 47.23 Damp proof courses Pitch polymer g horizontal not exceeding 225 mm 2.93 m2 8.13 23.82 Cavity trays Type W Cavity weep ventilator h wall weep vent 32.00 nr 1.48 47.36 Polythene i horizontal exceeding 225 mm 12.43 m2 11.72 145.68 Joint reinforcement Mesh reinforcement in walls j 64 mm 79.86 m 2.04 162.91 Proprietary items Wall extension profiles, single flange, plugging and screwing k 100mm 11.36 m 10.13 115.08 www.estimatingservice.co.uk To Collection £ 3,363.99 Page 1 / 9
  • 10. This content is © of Estimating Service 2015. MASONRY Qty Unit Rate £ p F MASONRY continued ... F31 Precast concrete sills/lintels/copings/features Padstones Padstones bedded a 215 x 225 x 150 mm 2.00 nr 27.59 55.18 www.estimatingservice.co.uk To Collection £ 55.18 Page 1 / 10
  • 11. This content is © of Estimating Service 2015. MASONRY Qty Unit Rate £ p Collection Total from Page 1 / 9 £ 3,363.99 Total from Page 1 / 10 £ 55.18 www.estimatingservice.co.uk To Summary £ 3,419.17 Page 1 / 11
  • 12. This content is © of Estimating Service 2015. STRUCTURAL / CARCASSING METAL / TIMBER Qty Unit Rate £ p G STRUCTURAL/CARCASSING METAL/TIMBER G10 Structural steel framing Framing, fabrication Fabricated steelwork a columns less than 40 kg/m SHS 0.05 tonne 2168.52 108.43 b beams less than 40 kg/m 0.21 tonne 1859.13 390.42 Connections c general steel connections 2.00 nr 63.34 126.68 Erection on site d permanent erection 0.26 tonne 524.48 136.36 Surface treatments at fabrication workshop e shot blasting & priming 8.51 m2 8.63 73.44 f 30 minute intumescent fire paint 8.51 m2 14.53 123.65 G20 Carpentry/Timber framing/First fixing Impregnated sawn softwood - SC3 Grade Floor members; sub-floor framing to decking g 50 x 150mm 110.27 m 6.10 672.65 Wall or partition members h 50 x 75mm 23.60 m 4.72 111.39 i 100 x 100mm; support posts to decking sub-frame 67.00 m 10.95 733.65 Flat roof members j 50 x 50mm 18.00 m 3.18 57.24 k 50 x 100mm 15.00 m 6.07 91.05 l 50 x 200mm 129.26 m 7.37 952.65 m 50 x 225mm 36.02 m 7.82 281.68 n 50 x 50mm angle fillets 16.00 m 3.09 49.44 o sawn softwood firrings 28.34 m 9.18 260.16 Eaves and verge boarding WBP plywood p 12mm Oak plywood - 75mm wide 15.00 m 7.21 108.15 q 12mm Oak plywood - 150mm wide 15.00 m 9.65 144.75 r 12mm Oak plywood - 600mm wide 15.00 m 20.76 311.40 s 24mm Softwood WBP plywood - 300mm wide 10.23 m 12.52 128.08 t 24mm Softwood WBP plywood - 400mm wide 15.00 m 14.04 210.60 Wrought Oak u 150mm wide 3.56 m 16.80 59.81 v 300mm wide 6.13 m 26.35 161.53 www.estimatingservice.co.uk To Collection £ 5,293.20 Page 1 / 12
  • 13. This content is © of Estimating Service 2015. STRUCTURAL / CARCASSING METAL / TIMBER Qty Unit Rate £ p G STRUCTURAL/CARCASSING continued ... G20 Carpentry/Timber framing/First continued ... Metalwork Speedy joist hangers a 50mm 92.00 nr 3.47 319.24 b 100mm 4.00 nr 5.09 20.36 Galvanised steel straps c light duty wall plate strap; once bent; 1200 mm long 6.00 nr 9.02 54.12 Bolts & Timber Connectors d M12 bolt with nut; 130 mm long 73.00 nr 2.22 162.06 Anchor bolts e M12 anchor bolt; 115 mm long 22.00 nr 3.23 71.06 www.estimatingservice.co.uk To Collection £ 626.84 Page 1 / 13
  • 14. This content is © of Estimating Service 2015. STRUCTURAL / CARCASSING METAL / TIMBER Qty Unit Rate £ p Collection Total from Page 1 / 12 £ 5,293.20 Total from Page 1 / 13 £ 626.84 www.estimatingservice.co.uk To Summary £ 5,920.04 Page 1 / 14
  • 15. This content is © of Estimating Service 2015. CLADDING / COVERING Qty Unit Rate £ p H CLADDING/COVERING H22 Composite decking Ultra Shield Eco decking a width exceeding 300 mm 40.79 m2 63.00 2,569.77 b width not exceeding 300 mm 32.74 m 19.47 637.45 H31 Metal profiled/flat sheet cladding/covering/siding RAL Aluminium cladding trims RAL Aluminium cladding trims fixed to timber/masonry/steel background c fascia cladding, girth not exceeding 375mm 25.23 m 53.21 1,342.49 d reveal cladding, girth not exceeding 180mm; bent three times; to patio door reveals 13.32 m 35.55 473.53 e external angles for reveal cladding 2.00 nr 34.16 68.32 H71 Lead sheet coverings/flashings Flashings, aprons Code 4 lead, horizontal, 150 mm lapped joints, fixing with lead clips and wedges f 300 mm girth 13.80 m 22.93 316.43 www.estimatingservice.co.uk To Collection £ 5,407.99 Page 1 / 15
  • 16. This content is © of Estimating Service 2015. CLADDING / COVERING Qty Unit Rate £ p Collection Total from Page 1 / 15 £ 5,407.99 www.estimatingservice.co.uk To Summary £ 5,407.99 Page 1 / 16
  • 17. This content is © of Estimating Service 2015. WATERPROOFING Qty Unit Rate £ p J WATERPROOFING J40 Flexible sheet tanking/ damp proof membranes Tanking and damp proofing Building paper underlay lapped 150 mm at joints a horizontally 21.33 m2 2.57 54.82 Polythene medium weight sheet underlay lapped 150 mm at joints b horizontally 26.06 m2 1.82 47.43 J42 Single layer Polymeric roof coverings Sedum Landscape Roofing c to timber or metal decking; pitch not exceeding 5 degrees 28.04 m2 152.81 4,284.79 d kerb detail to Sedum roofing 9.20 m 36.37 334.60 e eaves detail to Sedum roofing 17.89 m 60.27 1,078.23 Sarnafil Waterproof Membrane f to timber or metal decking; pitch not exceeding 5 degrees 5.80 m2 35.54 206.13 g eaves detail to Sarnafil Waterproof Membrane 9.69 m 29.97 290.41 h Sarnafil rainwater outlet 3.00 nr 100.13 300.39 Tapered Insulation Board Underlays i tapered PIR board; mechanically fastened 29.54 m2 69.12 2,041.80 www.estimatingservice.co.uk To Collection £ 8,638.61 Page 1 / 17
  • 18. This content is © of Estimating Service 2015. WATERPROOFING Qty Unit Rate £ p Collection Total from Page 1 / 17 £ 8,638.61 www.estimatingservice.co.uk To Summary £ 8,638.61 Page 1 / 18
  • 19. This content is © of Estimating Service 2015. LININGS / SHEATHING / DRY PARTITIONING Qty Unit Rate £ p K LININGS/SHEATHING/DRY PARTITIONING K20 Timber board flooring/sheathing/linings/casings Roof decking WBP plywood a 12mm WBP plywood exceeding 300 mm wide 10.89 m2 14.89 162.15 b 24mm WBP plywood exceeding 300 mm wide 29.54 m2 20.04 591.98 www.estimatingservice.co.uk To Collection £ 754.13 Page 1 / 19
  • 20. This content is © of Estimating Service 2015. LININGS / SHEATHING / DRY PARTITIONING Qty Unit Rate £ p Collection Total from Page 1 / 19 £ 754.13 www.estimatingservice.co.uk To Summary £ 754.13 Page 1 / 20
  • 21. This content is © of Estimating Service 2015. WINDOWS / DOORS / STAIRS Qty Unit Rate £ p L WINDOWS/DOORS/STAIRS L10 Windows/rooflights/screens/louvres uPVC Windows 1 section windows - Anthracite Grey a 400 x 790 mm fixed light window with cill 2.00 nr 171.25 342.50 b 1300 x 2280 mm fixed light window with cill 1.00 nr 596.92 596.92 3 section windows - Anthracite Grey c 2470 x 2280 mm 3 section fixed light window with toughened glazing 1.00 nr 1075.52 1,075.52 4 section windows - Anthracite Grey d 2330 x 790 mm 4 section window with 2 side hung opening lights and 2 fixed lights 1.00 nr 586.16 586.16 Roof Lights Astroglaze flat fixed roof lights on timber kerb (taken elsewhere) e 2760 x 1360mm roof light providing 2600 x 1200mm clear opening 1.00 nr 2442.17 2,442.17 L20 Doors/shutters/hatches uPVC Doors Fully glazed doors - Anthracite Grey f 1300 x 2280 mm fully glazed door with fully glazed sidelight 1.00 nr 738.39 738.39 g 980 x 2100 mm fully glazed door 1.00 nr 520.38 520.38 Aluminium Doors Sliding patio doors - RAL colour finish h 3160 x 2400 mm 2 pane sliding door 1.00 nr 2489.47 2,489.47 i 5159 x 2400 mm 3 pane sliding door 1.00 nr 3848.59 3,848.59 www.estimatingservice.co.uk To Collection £ 12,640.10 Page 1 / 21
  • 22. This content is © of Estimating Service 2015. WINDOWS / DOORS / STAIRS Qty Unit Rate £ p Collection Total from Page 1 / 21 £ 12,640.10 www.estimatingservice.co.uk To Summary £ 12,640.10 Page 1 / 22
  • 23. This content is © of Estimating Service 2015. SURFACE FINISHES Qty Unit Rate £ p M SURFACE FINISHES M10 Cement sand/Concrete screeds/toppings Cement and sand 1:3, work to floors Screeded beds, level and to falls not exceeding 15 degrees from horizontal, over 300 mm wide a 75 mm 21.33 m2 18.13 386.71 M20 Plastered/Rendered/Roughcast coatings Gypsum plasterboard to BS 1230 Fixing with plaster dabs to masonry backgrounds b 12.5 mm Plain Wallboard over 300 mm wide 18.19 m2 10.69 194.45 c 12.5 mm Plain Wallboard not exceeding 300 mm wide 27.48 m 5.09 139.87 Fixing with screws to timber or steel stud framing d 12.5 mm Plain Wallboard over 300 mm wide 5.09 m2 10.17 51.77 Fixing with screws to ceilings e 12.5 mm Plain Wallboard over 300 mm wide 24.10 m2 11.01 265.34 Retarded hemihydrate gypsum ("Thistle") plasters to BS 1191, Class B 3 mm board finish on walls or ceilings including scrimming joints f over 300 mm wide 47.38 m2 8.31 393.73 g not exceeding 300 mm wide 27.48 m 4.20 115.42 Plastering sundries Galvanised plaster beads h thin coat angle bead 42.19 m 1.93 81.43 M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic Slate cladding Fixing with adhesive i 30 mm thick slate cladding to walls; fix only; supply of cladding taken elsewhere 20.01 m2 40.89 818.21 j supply of cladding item 4367.38 4,367.38 Floor Tiles Fixing with adhesive k over 300 mm wide 3.06 m2 79.72 243.94 M42 Engineered wooden flooring Laminated flooring 10mm thick l laminated wooden flooring, over 300 mm wide; supply of materials taken in PC Sums 22.83 m2 14.04 320.53 www.estimatingservice.co.uk To Collection £ 7,378.78 Page 1 / 23
  • 24. This content is © of Estimating Service 2015. SURFACE FINISHES Qty Unit Rate £ p M SURFACE FINISHES continued ... M60 Painting/Clear finishing General surfaces Two coats of Dulex coloured matt emulsion paint over 300 mm girth a smooth plaster 55.62 m2 4.58 254.74 Knot, prime, stop and paint one undercoat and one coat of gloss finish paint on joinery b isolated surfaces, not exceeding 300 mm girth 7.88 m 1.79 14.11 General surfaces, externally Knot, prime, stop and paint two undercoats and one coat of gloss finish paint on joinery c over 300 mm girth 10.00 m2 7.76 77.60 d isolated surfaces, not exceeding 300 mm girth 6.63 m 2.94 19.49 One coat of Cetol HLS and two coats of Cetol Filter 7 on Joinery e over 300 mm girth 9.00 m2 10.48 94.32 f isolated surfaces, not exceeding 300 mm girth 39.69 m 3.98 157.97 Glazed windows, screens and doors Knot, prime, stop and paint two undercoats and one coat of gloss finish paint on joinery in panes, area g over 1.00 m2 3.12 m2 6.55 20.44 www.estimatingservice.co.uk To Collection £ 638.66 Page 1 / 24
  • 25. This content is © of Estimating Service 2015. SURFACE FINISHES Qty Unit Rate £ p Collection Total from Page 1 / 23 £ 7,378.78 Total from Page 1 / 24 £ 638.66 www.estimatingservice.co.uk To Summary £ 8,017.44 Page 1 / 25
  • 26. This content is © of Estimating Service 2015. BUILDING FABRIC SUNDRIES Qty Unit Rate £ p P BUILDING FABRIC SUNDRIES P10 Sundry insulation/proofing work/fire stops Insulating boards Celotex Insulation Tuff-R range a 100 mm 11.60 m2 17.62 204.39 Celotex Insulation Fast-R range b 75 mm 42.08 m2 17.62 741.45 Celotex Insulation T-Break range c 25 mm 1.49 m2 8.96 13.35 Cavity wall Insulation Slab insulation to masonry walls d 50 mm thick Celotex cavity insulation 35.87 m2 14.17 508.28 e 100 mm thick Celotex cavity insulation 35.97 m2 22.76 818.68 P20 Unframed isolated trims/skirtings/sundry items Skirtings, picture rails, architraves and the like Wrought softwood skirtings f 25 x 150 mm Torus 7.88 m 5.39 42.47 www.estimatingservice.co.uk To Collection £ 2,328.62 Page 1 / 26
  • 27. This content is © of Estimating Service 2015. BUILDING FABRIC SUNDRIES Qty Unit Rate £ p Collection Total from Page 1 / 26 £ 2,328.62 www.estimatingservice.co.uk To Summary £ 2,328.62 Page 1 / 27
  • 28. This content is © of Estimating Service 2015. PAVING / PLANTING / FENCING / SITE FURNITURE Qty Unit Rate £ p Q PAVING/PLANTING/FENCING/SITE FURNITURE Q10 Kerbs/Edgings/Channels/paving accessories kerbs, edgings and channels Brickwork edging, bedding & pointing in cement mortar (1:3); bedding and haunching in concrete (1:2:4) - 20mm a 100 x 215mm brick edging - curved - 300 x 150mm concrete bed 8.27 m 24.84 205.43 Q22 Coated macadam/Asphalt roads/pavings Laying on prepared bases (taken elsewhere) and rolling with an appropriate roller b 60 mm thick binder course 108.72 m2 14.08 1,530.78 Q23 Gravel/Hoggin/Woodchip roads/pavings Resin Bound Pavings Permeable fully mixed decorative aggregate paving; laid to macadam base course (taken elsewhere); 18 mm thick with 6 mm aggregate c total area 100-300 m2 132.20 m2 57.93 7,658.35 Q25 Slab/Brick/Sett/Cobble pavings Slate paving 30 mm thick slate, 50 mm sand base, bedding in cement mortar (1:3), level and to falls only, slate size, d 600 x 400mm 1.20 m2 10.27 12.32 e 800 x 400mm 4.80 m2 12.80 61.44 f 1200 x 400mm 2.88 m2 20.00 57.60 g supply of paving item 4010.86 4,010.86 Slate edgings 30 mm thick slate held in place with sawn softwood stacks h 890 x 150mm 45.00 nr 5.60 252.00 i supply of edgings item 2005.43 2,005.43 Q30 Seeding/Turfing Artifical Grass To prepared hardcore and sand blinded bases by others j "As Good As Grass" artifical turf including timber sub-frame 88.96 m2 44.57 3,964.95 www.estimatingservice.co.uk To Collection £ 19,759.15 Page 1 / 28
  • 29. This content is © of Estimating Service 2015. PAVING / PLANTING / FENCING / SITE FURNITURE Qty Unit Rate £ p Q PAVING/PLANTING/FENCING/SITE continued ... Q40 Fencing Stainless Steel fencing Stainless Steel rope and fittings a 6 mm diameter item 1774.48 1,774.48 www.estimatingservice.co.uk To Collection £ 1,774.48 Page 1 / 29
  • 30. This content is © of Estimating Service 2015. PAVING / PLANTING / FENCING / SITE FURNITURE Qty Unit Rate £ p Collection Total from Page 1 / 28 £ 19,759.15 Total from Page 1 / 29 £ 1,774.48 www.estimatingservice.co.uk To Summary £ 21,533.63 Page 1 / 30
  • 31. This content is © of Estimating Service 2015. DISPOSAL SYSTEMS Qty Unit Rate £ p R DISPOSAL SYSTEMS R10 Rainwater pipework/gutters Lindab rainwater system Rainwater pipes a 75mm steel downpipe 5.48 m 16.74 91.74 Fittings for rainwater pipes Gutters b 136mm square gutter 27.69 m 17.61 487.62 Fittings for rainwater gutters c 136mm square gutter 90 degree external angle 4.00 nr 68.94 275.76 d 136mm square gutter outlet 2.00 nr 27.91 55.82 e 136mm square gutter stop end 4.00 nr 12.59 50.36 R12 Drainage below ground Manholes Manhole Covers f 750 x 600 x 100 mm recessed manhole cover 1.00 nr 145.04 145.04 www.estimatingservice.co.uk To Collection £ 1,106.34 Page 1 / 31
  • 32. This content is © of Estimating Service 2015. DISPOSAL SYSTEMS Qty Unit Rate £ p Collection Total from Page 1 / 31 £ 1,106.34 www.estimatingservice.co.uk To Summary £ 1,106.34 Page 1 / 32
  • 33. This content is © of Estimating Service 2015. MECHANICAL HEATING / COOLING / REFRIGERATION Qty Unit Rate £ p T MECHANICAL HEATING/COOLING/REFRIGERATION SYSTEMS T32 Low temperature hot water heating (small scale) Central heating points Copper pipework and fittings; includes chasing out background, cutting mortices and making good finishes; radiators, towel rails and TVR's taken elsewhere a central heating service point 1.00 nr 428.91 428.91 T33 Under floor heating Under floor heating; flow and return pipewwork at 300mm centres; pipe fixings; flow and return manifolds and zone actuators; wiring block; includes fixing in position, secondary pumps, mixing valves and thermostats b Screeded floors up to 50 m2 22.83 m2 59.73 1,363.64 www.estimatingservice.co.uk To Collection £ 1,792.55 Page 1 / 33
  • 34. This content is © of Estimating Service 2015. MECHANICAL HEATING / COOLING / REFRIGERATION Qty Unit Rate £ p Collection Total from Page 1 / 33 £ 1,792.55 www.estimatingservice.co.uk To Summary £ 1,792.55 Page 1 / 34
  • 35. This content is © of Estimating Service 2015. ELECTRICAL SUPPLY / POWER / LIGHTING SYSTEMS Qty Unit Rate £ p V ELECTRICAL SUPPLY/POWER LIGHTING SYSTEMS V21 General lighting Lighting circuits a 1.5mm twin and earth lighting circuit 18.66 m 6.10 113.83 b junction box for lighting circuit 1.00 nr 7.71 7.71 Light switches c 1-Gang, 1-Way: Light switch: White 6.00 nr 61.71 370.26 Luminaries d downlighter; Stainless Steel 19.00 nr 66.74 1,268.06 e external light with PIR 2.00 nr 65.48 130.96 V22 General Low Voltage power Power circuits f 2.5mm twin and earth power circuit 18.66 m 11.86 221.31 g junction box for LV power circuit 1.00 nr 7.71 7.71 Power points With PVC insulated and sheathed cables in houses or flats, installed in floor cavities and roof voids, protected by steel or PVC channels in walls h 1-Gang switched socket outlet; White 1.00 nr 74.18 74.18 i 2-Gang switched socket outlet; White 4.00 nr 76.04 304.16 j 1-Gang external switched socket outlet 1.00 nr 77.58 77.58 k non-illuminated fused spur 1.00 nr 71.30 71.30 V23 Smoke/Heat/Gas alarms Smoke alarms l hard wired smoke alarm 1.00 nr 78.38 78.38 Heat alarms m hard wired heat alarm 1.00 nr 78.38 78.38 V24 Telecoms and Data TV, FM/DAB service points n TV point 1.00 nr 32.28 32.28 V25 Intercomms and Door Bells Door bells o door bell and chime box 1.00 nr 55.73 55.73 V91 Works associated with Electrical installations Opening up p lifting floorboards to allow electric installation works, replacing existing boards on completion of works 2.00 m2 34.29 68.58 www.estimatingservice.co.uk To Collection £ 2,960.40 Page 1 / 35
  • 36. This content is © of Estimating Service 2015. ELECTRICAL SUPPLY / POWER / LIGHTING SYSTEMS Qty Unit Rate £ p Collection Total from Page 1 / 35 £ 2,960.40 www.estimatingservice.co.uk To Summary £ 2,960.40 Page 1 / 36
  • 37. This content is © of Estimating Service 2015. PC SUMS Qty Unit Rate £ p Z PC SUMS PC Sums associated with the project a forming steps to frontage; requirements to be discussed with client item 310.92 310.92 b Underground storm water drainage item 414.56 414.56 c supply of laminated wooden flooring and underlay 23.00 m2 19.43 446.89 www.estimatingservice.co.uk To Collection £ 1,172.37 Page 1 / 37
  • 38. This content is © of Estimating Service 2015. PC SUMS Qty Unit Rate £ p Collection Total from Page 1 / 37 £ 1,172.37 www.estimatingservice.co.uk To Summary £ 1,172.37 Page 1 / 38
  • 39. This content is © of Estimating Service 2015. Qty Unit Rate £ p Summary PRELIMINARIES / GENERAL CONDITIONS Page 1 / 2 £ 5,401.05 EXISTING SITE / BUILDINGS / SERVICES Page 1 / 4 £ 1,567.34 GROUNDWORK Page 1 / 6 £ 6,999.03 IN SITU CONCRETE / LARGE PRECAST ... Page 1 / 8 £ 1,457.13 MASONRY Page 1 / 11 £ 3,419.17 STRUCTURAL / CARCASSING METAL ... Page 1 / 14 £ 5,920.04 CLADDING / COVERING Page 1 / 16 £ 5,407.99 WATERPROOFING Page 1 / 18 £ 8,638.61 LININGS / SHEATHING / DRY ... Page 1 / 20 £ 754.13 WINDOWS / DOORS / STAIRS Page 1 / 22 £ 12,640.10 SURFACE FINISHES Page 1 / 25 £ 8,017.44 BUILDING FABRIC SUNDRIES Page 1 / 27 £ 2,328.62 PAVING / PLANTING / FENCING / SITE ... Page 1 / 30 £ 21,533.63 DISPOSAL SYSTEMS Page 1 / 32 £ 1,106.34 MECHANICAL HEATING / COOLING / ... Page 1 / 34 £ 1,792.55 ELECTRICAL SUPPLY / POWER / ... Page 1 / 36 £ 2,960.40 PC SUMS Page 1 / 38 £ 1,172.37 www.estimatingservice.co.uk Total for Bill £ 91,115.92 Page 1 / 39