MRP II - eresource ERP for
Manufacturing
2
Manufacturing Resource Planning
•MRP II by itself is the original modality of what we know now as ERP
•MRP
•MRP II is one of the evolution stages of eresource ERP and covers all the resources in a
manufacturing compnay
•MRP II module in eresource ERP helps to maintain a neat agenda for the manner in which the
resources are to be allocated without any confusion
•eresource MRP provides formal plans for each part numbercomponent,or finished good
3
The BOM components in eresource support the use of the Bill of Material
in form of tree structure.
BOM can be generated in the following forms:
Structure of BOM
Bill Of
Material
Forms
Material
BOM
Equipment
BOM
Order Based
BOM
4
Material 1
EQUIPMENT
Assembly 2Assembly 1Material 3Material 2
Material 4 Material 6Material 5
Material BMaterial A
Level 1
Level 2
Level 3
EQUIPMENT
Types of BOM
• Single level BOM
• Multi-level BOM
5
Single Level Bill Of Material
Only subordinate components can be captured that are immediately required
(not components of component)to manufacture product.
6
Multi Level Bill Of Material
• The multiple BOM concept aids the
management of a variety of similar BOMs.
• Common components of similar BOMs are
recorded in a 'Single Level BOM-M'
7
Standard BOM
while making new standard BOM eresource ERP gives provision of copy any
standard BOM from existing BOM
8
Order Based BOM
In eresource ERP the provision is there to create a BOM against the
sales order of any customer.
9
Engineering Change Request
eresource ERP gives you provision of Revision of BOM which is called ECR. W
selection of any item this form gives you provision to zoom in the BOM by click on
View BOM.
10
Engineering Change Request
• This module allows you to establish controls and manage the process of
making changes to documents and drawings,parts, BOM and routing, work
orders, and projects.
11
Registered Office:
eresource Infotech Private Limited,
TMA House 1st floor, Road No. 16,
Plot No. 6,Wagle Estate ,Thane (West)
Tel: +91 22 41118000 to +91 22 41118050 (50 Lines)
www.eresourceerp.com | http://nfra.eresourceerp.com/
Dubai
P O Box 52034, Dubai UAE
Mobile Number: 0097155 9018499
Email: sn@eresourceinfotech.com

eresource ERP Manufacturing

  • 1.
    1 MRP II -eresource ERP for Manufacturing
  • 2.
    2 Manufacturing Resource Planning •MRPII by itself is the original modality of what we know now as ERP •MRP •MRP II is one of the evolution stages of eresource ERP and covers all the resources in a manufacturing compnay •MRP II module in eresource ERP helps to maintain a neat agenda for the manner in which the resources are to be allocated without any confusion •eresource MRP provides formal plans for each part numbercomponent,or finished good
  • 3.
    3 The BOM componentsin eresource support the use of the Bill of Material in form of tree structure. BOM can be generated in the following forms: Structure of BOM Bill Of Material Forms Material BOM Equipment BOM Order Based BOM
  • 4.
    4 Material 1 EQUIPMENT Assembly 2Assembly1Material 3Material 2 Material 4 Material 6Material 5 Material BMaterial A Level 1 Level 2 Level 3 EQUIPMENT Types of BOM • Single level BOM • Multi-level BOM
  • 5.
    5 Single Level BillOf Material Only subordinate components can be captured that are immediately required (not components of component)to manufacture product.
  • 6.
    6 Multi Level BillOf Material • The multiple BOM concept aids the management of a variety of similar BOMs. • Common components of similar BOMs are recorded in a 'Single Level BOM-M'
  • 7.
    7 Standard BOM while makingnew standard BOM eresource ERP gives provision of copy any standard BOM from existing BOM
  • 8.
    8 Order Based BOM Ineresource ERP the provision is there to create a BOM against the sales order of any customer.
  • 9.
    9 Engineering Change Request eresourceERP gives you provision of Revision of BOM which is called ECR. W selection of any item this form gives you provision to zoom in the BOM by click on View BOM.
  • 10.
    10 Engineering Change Request •This module allows you to establish controls and manage the process of making changes to documents and drawings,parts, BOM and routing, work orders, and projects.
  • 11.
    11 Registered Office: eresource InfotechPrivate Limited, TMA House 1st floor, Road No. 16, Plot No. 6,Wagle Estate ,Thane (West) Tel: +91 22 41118000 to +91 22 41118050 (50 Lines) www.eresourceerp.com | http://nfra.eresourceerp.com/ Dubai P O Box 52034, Dubai UAE Mobile Number: 0097155 9018499 Email: sn@eresourceinfotech.com