MRP
• BOM (Product Structure)
• MPS
• Inventory Records
Problem Information Summary
Indented BOM

Lowest Level Codes

Inventory Records

Item

Code

OH

LT

A

0

0

1

I

1

40

1

II

1

15

2

1

3

10

3

3

2

2

20

4

4(2)

3

2

15

1

1

4

2

30

2

a

4

10

3

b

3

10

3

A
I

1
a
2
II

a
b
MPS for end item A
0

1

2

3

4

5

GR

OH

POR

6

20

0

0

0

0

0

0

20

7

8

100

9
LOT SIZING
• Lot-for-Lot Technique
• EOQ Approach
• Minimum Cost Per Period Approach (Silver
Meal Heuristic)
• Least Unit Cost Approach
• Periodic Order Quantity Approach
LOT SIZING PROBLEM
0

OH

POR

35

2

3

4

5

6

7

8

9

10

35

GR

1

30

40

0

10

40

30

0

30

55

0

0

0

0

0

0

0

0

0

0
LOT SIZING
Holding costs = $2/unit/week
Setup costs = $200
Gross Req average per week = 27
Lead time = 1 week