4.1.2 Systematics
Being used to master the multitude of documents
or activities mentioned in Project structures
 3 examples will describe the application
of these systematics:
 Project manual
 Revision service
 Correspondence system
Project Manual
•To guarantee professional project planning and execution.
•all activities required
for execution within the
framework of a project
& documentation to be
prepared, are arranged
according to an in -
house system.
•planning packages
not feasible for the
present project
have to be deleted
•filing of and access to
documents
made easier
shall be
for the
employees involved by
applying directory
structure for computer
files or a systematics
for the description of
files.
Correspondence system
• Numerous numbers of letters, facsimiles, minutes of
meeting, memoranda are exchanged between employer,
contractor and subcontractors.
• Email correspondence has increased but traditional post
should be retained as written documentation.
• To guarantee clarity and easy access:
incoming or outgoing letter will consecutively
numbered.
document number linked with a filing system or the
systematics of the project manual.
Example:
• Complete outgoing correspondence will be filed in EDP-register called “Project Nam
Correspondence”.
• This register contain 1 sub-register (company’s name) for each company.
• This sub-register contains 3 further sub-registers:
 Letters (denoted as L)
 Facsimiles (denoted as F)
 Minutes of meeting (denoted as M)
• Registers individual documents may named as
COMPANYNAME-001B.DOC
Revision service
Modifications of already existing project documents
The original draft usually gets the revision no. 0 with
each revision numbers are counted up.
The revision line of the respective document indicates
which revision is concerned.
The meticulous tracing of modifications and thus of
revisions is of utmost importance for the execution of
projects
Example
•Sub – contractor informs the project engineer it would be better to
mount the brackets of the heat exchanger 15 cm higher due to
processing reasons.
•Sub - contractor changes the production drawing and sends it to the
plant manufacturer as revision no.1 after the project engineer
gives his approval.
•If the plant manufacturer forgets to furnish the layout planner
with a copy, design in the system layout will be based on revision
0 of the heat exchanger.
•With the latest revision being unnoticed the assembly will end in
disaster.
7
Cost Monitoring
1] Project management is required to prepare a monthly
order report :
forecast in which the looming technical, commercial
or schedule problems.
2] Cost Calculation:
compares the actual costs with the cost objectives of
the preliminary costing of the project.
Significant deviations: cause the problems like
schedule delay, increasing the staff.
3] Claims Management: extra costs will be assessed
addendum negotiations on additions, omissions or
claims
Continue…
Prepare the order report:
•current state of development
meetings
regular project
•function control instrument (detect risks)
•the conflict situation the project management has
to cope with becomes clear.
Time Scheduling/Monitoring of Dates
Execution process in plant manufacturing is made
up of a large number of individual processes. The
beginning of many processes is contingent on
previous activities having been completed with a
certain result.
During the assembly phase, events are the
physical availability of certain equipment and the
completion of assembly work. Thus the
inevitable chronology of processes is
characteristic of the whole process period.
The scheduling of project chronologies and their
explicit depiction are essential objectives of time
scheduling or workflow scheduling.
Time Scheduling/Monitoring of Dates
Missed deadlines will result in liquidated
damages, extended project duration, and directly
increase in employment costs.
Gantt Charts are set up to list the activities one
below the other, resulting in the period of time
required for the completion of the activity from
the beginning and the end of this activity.
The relevant EDP ‐ programs are used for setting
up time schedules and the planning of resources.
Important Time Schedules
Time Schedules
E/MC ‐ Technology
Manufacturing and
assembly of the
piping
Assembly work flow
Project planning
phase
Detail engineering
Commissioning
Procurement of the
components
Erection phase
Framework Time Schedule
Time Schedule for Component Procurement
KKKK6024
Time Schedule for Commissioning
Computers in Plant manufacturing
Office
Applications
Basic software
of system
engineering
Databases
retrieved for
various process
calculations
Spreadsheet
analysis program
Used for all kinds
of
correspondence,
integrated index,
classification
system
CAD/CAE
Project Planning
Phase
‐ plant concept
modeling
‐ Arrangement
of components
in system
‐ piping layout
‐ cost assessment
of piping
packages
Execution Phase
‐ P&ID
‐ layout design
‐ piping plans
CAD/CAE linked to
component
catalogues, 3‐
dimensional
models,
Example:
Computational
FEM/
Pipe Stress
Analysis
Applied on
progress of
stress &
deformation in
branched piping
systems
Components
disassembled
into multitude
of small units
called finite
elements, cover
the modeled
component like
net or skeleton
framing
Process
Simulation
Used for
planning &
layout of
processes in
entire systems /
plant units
Calculation of
procedural basic
operation
mainly in
chemical &
thermal process
engineering
Software in
E/MC‐
technology
Types of
software:
‐ Control loop
‐ Control
technology
(provided by
supplier of
control
equipment)
‐ Preparation of
continuous
function chart
‐ E‐engineering
Others
‐ Databases
‐ Documentation
systems
‐ Time scheduling
‐ maintenance &
repair software
Fluid Dynamics
interference check
•The authority approval provides a secure legal basis for the erection and
operation of process plants
•Approval process :
i) the legitimate interests of the public – i.e. the public in general
ii) the neighbors of the plant to be erected in particular
iii) employees of the operating company – as well as the issues of the plant
operator are examined
iv ) contact the relevant authorities of the respective country in due time
v) commission engineering agencies or a lawyer ’ s office specializing in the
field of authority engineering
•In case a new plant is to be erected and operated, it has to be verified at first
if an authority approval will be required. The statutory regulations and
conditions may vary considerably subject to the respective country.
APPROVAL PLANNING
Procurement
 Initially, component procurement is focused on the components
with the longest delivery times.
 Longer delivery times is considerably higher procurement costs.
 A quotation comparison is necessary to shortlist the
subcontractors.
 The commercial and technical conditions for the plant
manufacturer ’ s order at the subcontractor are also stipulated in
the form of a purchasing contract.
 The consequences of a subcontractor ’ s delay in delivery will be
excessively high costs.
• Long delivery time – have to order in due time.
• In early project phase piping and instrumentation diagrams as well
as detailed layout and piping plans – not yet exist.
• To specify the vessel data, following procedure possible:
– Number of connecting pipes assessed by PFD or with the first draft of
piping and instrumentation diagram.
– Nominal width of connecting pipes assessed – basis of the available
balancing or media data sheets. Doubt case – larger nominal width
chosen.
– Connecting pieces for measuring equipment of vessel approximately
determined. Normal atmospheric vessel – determined quite easily.
– Other nozzle : manhole, overflow pipe, emptying pipe, connection for
sample taking etc.
– All vessel section – additional reserve nozzles (different nominal width)
Vessels
– Position of nozzle – through their function or layout
– the contract with the subcontractor – nozzle modifications with regard
to their position are carried out free of charge and that additional
nozzles can be mounted up to a certain point in time (e.g. release of
production drawings).
• These procedure – at least inquiries to subcontractor in early
time
• The strength – related layout and the warranty regarding
corrosion, vessels do not require further function guaranties.
Vessels
 Pumps may require quite long delivery times
‐ designed by using non commercial materials
 Detailed calculation of the pressure drop requires the exact piping
dimensions & piping routes
 Some plant manufacturers decide to simply “assess” the pumps to
avoid this problem.
‐ the required pump head will be assessed on the basis of the layout and of the
operating data
 Another way of proceeding to avoid the problems:
‐ Preparation of P&ID
‐ Determination of piping classes
‐ Determination of nominal widths & nominal pressures
‐ Fitting concept
Pumps
 Drawing of P&ID is started immediately after the order placing and
parallel to the procurement of the components.
 Basic information
‐ All appliances and machinery, including motors
‐ All pipes or means of transport (conveyor belts)
‐ All pipe installations (valves & fittings) and moulded parts (tees)
 The database is sub‐divided into components or systems to ensure
a certain transparency of the total plant system
Process & Instrumentation Diagram
Thanks for Watching
Please follow me / SAJJAD KHUDHUR ABBAS

More Related Content

What's hot

Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and OperationsAchal Gupta
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installationswan saiful arini
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5shreyas Shah
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completionRonie Chu
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installations
laithu2908
 
Pcsu chapter 1
Pcsu chapter 1Pcsu chapter 1
Pcsu chapter 1
Nurul Faizah
 
Engineering
EngineeringEngineering
Engineering
Komalia
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
GSE Systems, Inc.
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
HIMADRI BANERJI
 
Episode 7 : iCON Basic Training
Episode 7 :  iCON Basic Training Episode 7 :  iCON Basic Training
Episode 7 : iCON Basic Training
SAJJAD KHUDHUR ABBAS
 

What's hot (19)

Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and Operations
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installations
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
vijay cv
vijay cvvijay cv
vijay cv
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installations
 
Resume_AG
Resume_AGResume_AG
Resume_AG
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Pcsu chapter 1
Pcsu chapter 1Pcsu chapter 1
Pcsu chapter 1
 
Engineering
EngineeringEngineering
Engineering
 
CV
CVCV
CV
 
Mohamed elsayed updated
Mohamed elsayed updatedMohamed elsayed updated
Mohamed elsayed updated
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
CV
CVCV
CV
 
Episode 7 : iCON Basic Training
Episode 7 :  iCON Basic Training Episode 7 :  iCON Basic Training
Episode 7 : iCON Basic Training
 

Viewers also liked

Project Execution Methodologies – Rising a Step Further
Project Execution Methodologies – Rising a Step FurtherProject Execution Methodologies – Rising a Step Further
Project Execution Methodologies – Rising a Step Further
SPEC INDIA
 
Episode 54 : CAPE Problem Formulations
Episode 54 : CAPE Problem FormulationsEpisode 54 : CAPE Problem Formulations
Episode 54 : CAPE Problem Formulations
SAJJAD KHUDHUR ABBAS
 
Episode 36 : What is Powder Technology?
Episode 36 :  What is Powder Technology?Episode 36 :  What is Powder Technology?
Episode 36 : What is Powder Technology?
SAJJAD KHUDHUR ABBAS
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
SAJJAD KHUDHUR ABBAS
 
Episode 53 : Computer Aided Process Engineering
Episode 53 :  Computer Aided Process EngineeringEpisode 53 :  Computer Aided Process Engineering
Episode 53 : Computer Aided Process Engineering
SAJJAD KHUDHUR ABBAS
 
Project Execution
Project ExecutionProject Execution
Project Execution
railengineer011
 
Episode 37 : SAMPLING
Episode 37 : SAMPLINGEpisode 37 : SAMPLING
Episode 37 : SAMPLING
SAJJAD KHUDHUR ABBAS
 
Episode 35 : Design Approach to Dilute Phase Pneumatic Conveying
Episode 35 :  Design Approach to Dilute Phase Pneumatic ConveyingEpisode 35 :  Design Approach to Dilute Phase Pneumatic Conveying
Episode 35 : Design Approach to Dilute Phase Pneumatic Conveying
SAJJAD KHUDHUR ABBAS
 
Episode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and AnalysisEpisode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and Analysis
SAJJAD KHUDHUR ABBAS
 
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
SAJJAD KHUDHUR ABBAS
 
Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
SAJJAD KHUDHUR ABBAS
 
Project Execution
Project ExecutionProject Execution
Project Execution
megat zainurul anuar
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
SAJJAD KHUDHUR ABBAS
 
Managing Project Execution
Managing Project ExecutionManaging Project Execution
Managing Project Executionpajames36
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
C K Vishwakarma
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
Ferdinand Importado, CPA, MBA
 
Project management
Project managementProject management
Project management
Satish Yadavalli
 

Viewers also liked (18)

Project Execution Methodologies – Rising a Step Further
Project Execution Methodologies – Rising a Step FurtherProject Execution Methodologies – Rising a Step Further
Project Execution Methodologies – Rising a Step Further
 
Effective Project Execution
Effective Project ExecutionEffective Project Execution
Effective Project Execution
 
Episode 54 : CAPE Problem Formulations
Episode 54 : CAPE Problem FormulationsEpisode 54 : CAPE Problem Formulations
Episode 54 : CAPE Problem Formulations
 
Episode 36 : What is Powder Technology?
Episode 36 :  What is Powder Technology?Episode 36 :  What is Powder Technology?
Episode 36 : What is Powder Technology?
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
 
Episode 53 : Computer Aided Process Engineering
Episode 53 :  Computer Aided Process EngineeringEpisode 53 :  Computer Aided Process Engineering
Episode 53 : Computer Aided Process Engineering
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Episode 37 : SAMPLING
Episode 37 : SAMPLINGEpisode 37 : SAMPLING
Episode 37 : SAMPLING
 
Episode 35 : Design Approach to Dilute Phase Pneumatic Conveying
Episode 35 :  Design Approach to Dilute Phase Pneumatic ConveyingEpisode 35 :  Design Approach to Dilute Phase Pneumatic Conveying
Episode 35 : Design Approach to Dilute Phase Pneumatic Conveying
 
Episode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and AnalysisEpisode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and Analysis
 
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
 
Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
 
Managing Project Execution
Managing Project ExecutionManaging Project Execution
Managing Project Execution
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
Project management
Project managementProject management
Project management
 

Similar to Episode 30 : Project Execution ( Part 1 )

PEPD MODULE 1.pdf
PEPD MODULE 1.pdfPEPD MODULE 1.pdf
PEPD MODULE 1.pdf
Lakshmikanth Thangavel
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)Benjan Amtipuesto
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
CCT International
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projectsD.Pawan Kumar
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control
akashpadole
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONmaheshvkat1972
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
Venkatesh N
 
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
KarenGedalanga
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali
 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
David H Moloney
 

Similar to Episode 30 : Project Execution ( Part 1 ) (20)

PEPD MODULE 1.pdf
PEPD MODULE 1.pdfPEPD MODULE 1.pdf
PEPD MODULE 1.pdf
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATION
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Karthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical EngineerKarthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical Engineer
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
 
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)
 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 

More from SAJJAD KHUDHUR ABBAS

PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
SAJJAD KHUDHUR ABBAS
 
Electric cars
Electric carsElectric cars
Electric cars
SAJJAD KHUDHUR ABBAS
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
SAJJAD KHUDHUR ABBAS
 
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
SAJJAD KHUDHUR ABBAS
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
SAJJAD KHUDHUR ABBAS
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
SAJJAD KHUDHUR ABBAS
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SAJJAD KHUDHUR ABBAS
 
Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)
SAJJAD KHUDHUR ABBAS
 
Episode 66 : Renewable Energy Technologies
Episode 66 :  Renewable Energy TechnologiesEpisode 66 :  Renewable Energy Technologies
Episode 66 : Renewable Energy Technologies
SAJJAD KHUDHUR ABBAS
 
Episode 65 : Membrane separation processes
Episode 65 :  Membrane separation processesEpisode 65 :  Membrane separation processes
Episode 65 : Membrane separation processes
SAJJAD KHUDHUR ABBAS
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SAJJAD KHUDHUR ABBAS
 
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
SAJJAD KHUDHUR ABBAS
 
Episode 60 : Pinch Diagram and Heat Integration
Episode 60 :  Pinch Diagram and Heat IntegrationEpisode 60 :  Pinch Diagram and Heat Integration
Episode 60 : Pinch Diagram and Heat Integration
SAJJAD KHUDHUR ABBAS
 
Episode 59 : Introduction of Process Integration
Episode 59 :  Introduction of Process IntegrationEpisode 59 :  Introduction of Process Integration
Episode 59 : Introduction of Process Integration
SAJJAD KHUDHUR ABBAS
 
Episode 58 : Tools Integration Examples
Episode 58 :  Tools Integration ExamplesEpisode 58 :  Tools Integration Examples
Episode 58 : Tools Integration Examples
SAJJAD KHUDHUR ABBAS
 
Episode 56 : Simulation for design and analysis
Episode 56 :  Simulation for design and analysis Episode 56 :  Simulation for design and analysis
Episode 56 : Simulation for design and analysis
SAJJAD KHUDHUR ABBAS
 
Episode 55 : Conceptual Process Synthesis-Design
Episode 55 :  Conceptual Process Synthesis-DesignEpisode 55 :  Conceptual Process Synthesis-Design
Episode 55 : Conceptual Process Synthesis-Design
SAJJAD KHUDHUR ABBAS
 
Episode 52 : Flow sheeting Case Study
Episode 52 :  Flow sheeting Case StudyEpisode 52 :  Flow sheeting Case Study
Episode 52 : Flow sheeting Case Study
SAJJAD KHUDHUR ABBAS
 
Episode 51 : Integrated Process Simulation
Episode 51 : Integrated Process Simulation Episode 51 : Integrated Process Simulation
Episode 51 : Integrated Process Simulation
SAJJAD KHUDHUR ABBAS
 
Episode 50 : Simulation Problem Solution Approaches Convergence Techniques S...
Episode 50 :  Simulation Problem Solution Approaches Convergence Techniques S...Episode 50 :  Simulation Problem Solution Approaches Convergence Techniques S...
Episode 50 : Simulation Problem Solution Approaches Convergence Techniques S...
SAJJAD KHUDHUR ABBAS
 

More from SAJJAD KHUDHUR ABBAS (20)

PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
 
Electric cars
Electric carsElectric cars
Electric cars
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
 
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
 
Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)
 
Episode 66 : Renewable Energy Technologies
Episode 66 :  Renewable Energy TechnologiesEpisode 66 :  Renewable Energy Technologies
Episode 66 : Renewable Energy Technologies
 
Episode 65 : Membrane separation processes
Episode 65 :  Membrane separation processesEpisode 65 :  Membrane separation processes
Episode 65 : Membrane separation processes
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
 
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
 
Episode 60 : Pinch Diagram and Heat Integration
Episode 60 :  Pinch Diagram and Heat IntegrationEpisode 60 :  Pinch Diagram and Heat Integration
Episode 60 : Pinch Diagram and Heat Integration
 
Episode 59 : Introduction of Process Integration
Episode 59 :  Introduction of Process IntegrationEpisode 59 :  Introduction of Process Integration
Episode 59 : Introduction of Process Integration
 
Episode 58 : Tools Integration Examples
Episode 58 :  Tools Integration ExamplesEpisode 58 :  Tools Integration Examples
Episode 58 : Tools Integration Examples
 
Episode 56 : Simulation for design and analysis
Episode 56 :  Simulation for design and analysis Episode 56 :  Simulation for design and analysis
Episode 56 : Simulation for design and analysis
 
Episode 55 : Conceptual Process Synthesis-Design
Episode 55 :  Conceptual Process Synthesis-DesignEpisode 55 :  Conceptual Process Synthesis-Design
Episode 55 : Conceptual Process Synthesis-Design
 
Episode 52 : Flow sheeting Case Study
Episode 52 :  Flow sheeting Case StudyEpisode 52 :  Flow sheeting Case Study
Episode 52 : Flow sheeting Case Study
 
Episode 51 : Integrated Process Simulation
Episode 51 : Integrated Process Simulation Episode 51 : Integrated Process Simulation
Episode 51 : Integrated Process Simulation
 
Episode 50 : Simulation Problem Solution Approaches Convergence Techniques S...
Episode 50 :  Simulation Problem Solution Approaches Convergence Techniques S...Episode 50 :  Simulation Problem Solution Approaches Convergence Techniques S...
Episode 50 : Simulation Problem Solution Approaches Convergence Techniques S...
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Episode 30 : Project Execution ( Part 1 )

  • 1. SAJJAD KHUDHUR ABBAS Ceo , Founder & Head of SHacademy Chemical Engineering , Al-Muthanna University, Iraq Oil & Gas Safety and Health Professional – OSHACADEMY Trainer of Trainers (TOT) - Canadian Center of Human Development Episode 30 : Project Execution ( Part 1 )
  • 2. 4.1.2 Systematics Being used to master the multitude of documents or activities mentioned in Project structures  3 examples will describe the application of these systematics:  Project manual  Revision service  Correspondence system
  • 3. Project Manual •To guarantee professional project planning and execution. •all activities required for execution within the framework of a project & documentation to be prepared, are arranged according to an in - house system. •planning packages not feasible for the present project have to be deleted •filing of and access to documents made easier shall be for the employees involved by applying directory structure for computer files or a systematics for the description of files.
  • 4. Correspondence system • Numerous numbers of letters, facsimiles, minutes of meeting, memoranda are exchanged between employer, contractor and subcontractors. • Email correspondence has increased but traditional post should be retained as written documentation. • To guarantee clarity and easy access: incoming or outgoing letter will consecutively numbered. document number linked with a filing system or the systematics of the project manual.
  • 5. Example: • Complete outgoing correspondence will be filed in EDP-register called “Project Nam Correspondence”. • This register contain 1 sub-register (company’s name) for each company. • This sub-register contains 3 further sub-registers:  Letters (denoted as L)  Facsimiles (denoted as F)  Minutes of meeting (denoted as M) • Registers individual documents may named as COMPANYNAME-001B.DOC
  • 6. Revision service Modifications of already existing project documents The original draft usually gets the revision no. 0 with each revision numbers are counted up. The revision line of the respective document indicates which revision is concerned. The meticulous tracing of modifications and thus of revisions is of utmost importance for the execution of projects
  • 7. Example •Sub – contractor informs the project engineer it would be better to mount the brackets of the heat exchanger 15 cm higher due to processing reasons. •Sub - contractor changes the production drawing and sends it to the plant manufacturer as revision no.1 after the project engineer gives his approval. •If the plant manufacturer forgets to furnish the layout planner with a copy, design in the system layout will be based on revision 0 of the heat exchanger. •With the latest revision being unnoticed the assembly will end in disaster. 7
  • 8. Cost Monitoring 1] Project management is required to prepare a monthly order report : forecast in which the looming technical, commercial or schedule problems. 2] Cost Calculation: compares the actual costs with the cost objectives of the preliminary costing of the project. Significant deviations: cause the problems like schedule delay, increasing the staff. 3] Claims Management: extra costs will be assessed addendum negotiations on additions, omissions or claims
  • 9. Continue… Prepare the order report: •current state of development meetings regular project •function control instrument (detect risks) •the conflict situation the project management has to cope with becomes clear.
  • 10. Time Scheduling/Monitoring of Dates Execution process in plant manufacturing is made up of a large number of individual processes. The beginning of many processes is contingent on previous activities having been completed with a certain result. During the assembly phase, events are the physical availability of certain equipment and the completion of assembly work. Thus the inevitable chronology of processes is characteristic of the whole process period. The scheduling of project chronologies and their explicit depiction are essential objectives of time scheduling or workflow scheduling.
  • 11. Time Scheduling/Monitoring of Dates Missed deadlines will result in liquidated damages, extended project duration, and directly increase in employment costs. Gantt Charts are set up to list the activities one below the other, resulting in the period of time required for the completion of the activity from the beginning and the end of this activity. The relevant EDP ‐ programs are used for setting up time schedules and the planning of resources.
  • 12. Important Time Schedules Time Schedules E/MC ‐ Technology Manufacturing and assembly of the piping Assembly work flow Project planning phase Detail engineering Commissioning Procurement of the components Erection phase
  • 14. Time Schedule for Component Procurement KKKK6024
  • 15. Time Schedule for Commissioning
  • 16. Computers in Plant manufacturing Office Applications Basic software of system engineering Databases retrieved for various process calculations Spreadsheet analysis program Used for all kinds of correspondence, integrated index, classification system CAD/CAE Project Planning Phase ‐ plant concept modeling ‐ Arrangement of components in system ‐ piping layout ‐ cost assessment of piping packages Execution Phase ‐ P&ID ‐ layout design ‐ piping plans CAD/CAE linked to component catalogues, 3‐ dimensional models, Example: Computational FEM/ Pipe Stress Analysis Applied on progress of stress & deformation in branched piping systems Components disassembled into multitude of small units called finite elements, cover the modeled component like net or skeleton framing Process Simulation Used for planning & layout of processes in entire systems / plant units Calculation of procedural basic operation mainly in chemical & thermal process engineering Software in E/MC‐ technology Types of software: ‐ Control loop ‐ Control technology (provided by supplier of control equipment) ‐ Preparation of continuous function chart ‐ E‐engineering Others ‐ Databases ‐ Documentation systems ‐ Time scheduling ‐ maintenance & repair software Fluid Dynamics interference check
  • 17. •The authority approval provides a secure legal basis for the erection and operation of process plants •Approval process : i) the legitimate interests of the public – i.e. the public in general ii) the neighbors of the plant to be erected in particular iii) employees of the operating company – as well as the issues of the plant operator are examined iv ) contact the relevant authorities of the respective country in due time v) commission engineering agencies or a lawyer ’ s office specializing in the field of authority engineering •In case a new plant is to be erected and operated, it has to be verified at first if an authority approval will be required. The statutory regulations and conditions may vary considerably subject to the respective country. APPROVAL PLANNING
  • 18. Procurement  Initially, component procurement is focused on the components with the longest delivery times.  Longer delivery times is considerably higher procurement costs.  A quotation comparison is necessary to shortlist the subcontractors.  The commercial and technical conditions for the plant manufacturer ’ s order at the subcontractor are also stipulated in the form of a purchasing contract.  The consequences of a subcontractor ’ s delay in delivery will be excessively high costs.
  • 19. • Long delivery time – have to order in due time. • In early project phase piping and instrumentation diagrams as well as detailed layout and piping plans – not yet exist. • To specify the vessel data, following procedure possible: – Number of connecting pipes assessed by PFD or with the first draft of piping and instrumentation diagram. – Nominal width of connecting pipes assessed – basis of the available balancing or media data sheets. Doubt case – larger nominal width chosen. – Connecting pieces for measuring equipment of vessel approximately determined. Normal atmospheric vessel – determined quite easily. – Other nozzle : manhole, overflow pipe, emptying pipe, connection for sample taking etc. – All vessel section – additional reserve nozzles (different nominal width) Vessels
  • 20. – Position of nozzle – through their function or layout – the contract with the subcontractor – nozzle modifications with regard to their position are carried out free of charge and that additional nozzles can be mounted up to a certain point in time (e.g. release of production drawings). • These procedure – at least inquiries to subcontractor in early time • The strength – related layout and the warranty regarding corrosion, vessels do not require further function guaranties. Vessels
  • 21.  Pumps may require quite long delivery times ‐ designed by using non commercial materials  Detailed calculation of the pressure drop requires the exact piping dimensions & piping routes  Some plant manufacturers decide to simply “assess” the pumps to avoid this problem. ‐ the required pump head will be assessed on the basis of the layout and of the operating data  Another way of proceeding to avoid the problems: ‐ Preparation of P&ID ‐ Determination of piping classes ‐ Determination of nominal widths & nominal pressures ‐ Fitting concept Pumps
  • 22.  Drawing of P&ID is started immediately after the order placing and parallel to the procurement of the components.  Basic information ‐ All appliances and machinery, including motors ‐ All pipes or means of transport (conveyor belts) ‐ All pipe installations (valves & fittings) and moulded parts (tees)  The database is sub‐divided into components or systems to ensure a certain transparency of the total plant system Process & Instrumentation Diagram
  • 23. Thanks for Watching Please follow me / SAJJAD KHUDHUR ABBAS