Name: LORY FRANCIS R. NAVOR
Address: # 70, BRGY. OAQUI # 3, LUNA, LA
UNION,
2518, PHILS.
Contact No: +63-918-4422341/+673-892-9586
E-mail: launiondogblack@yahoo.com
CAREER OBJECTIVES
To seek an Engineering position that would fit into my qualification, experience and profession. To continuously practice my
profession as a Mechanical Engineer in a good oil & gas engineering/construction/consultancy firm. Have a vast experience in
Piping Construction , technical documentation, quality records administration, preliminary as-built Engineering drawings and shop
drawings preparations, design coordination, piping and mechanical works construction supervision.
POST APPLIED FOR
Piping Engineer (FIELD/OFFICE)
Mechanical Engineer (FIELD/OFFICE)
QC Piping Inspector (GRE, CS, SS)
EMPLOYMENT DETAILS
Company: Adinin Works & Engineering Sdn. Bhd
Project: Brunei Shell Petroleum ORMC
Main Contractor: Aker Solution Sdn. Bhd.
Client: Brunei Shell Petroleum
Kuala Belait, Brunei Darussalam
(Feb. 17, 2014 - Present)
Position: JOB-CARD PIPING WORK PREPARATION ENGINEER (OFFSHORE PLATFORMS)
Job Description:
• Develop job cards for Fabrication, Installation, Maintenance and Removal of piping system in offshore with corresponds to the
norms of Brunei Shell Petroleum (BSP).
• Review isometric drawings of piping systems.
• Calculate man-hours required to finish the job cards onshore and offshore.
• Buddy Check finished job cards of other colleagues Offshore Plants Handled.
• Compilation of job cards including man-hours / construction narrative/work packs.
• Able to interpret engineering deliverables for piping, structural, insulation and produce a working tool (Work pack) to assist the
end user in the field Input to hydro-test work packs.
• HSE input to construction work packs.
• Familiar with the system SAP (System Analysis Program), MIPS (Method Integrated Project System).
• Prepare MTO and selection of piping, valves, & fittings, etc. commodities.
• Prepares work instruction and estimation of man-hour consumption for piping, mechanical, painting & scaffolding scope of work
by the used of MIPS (Method Integrated Project System)software for BSP ORMC.
• Execution of work lines for fabrication, installation, pressure testing & leak testing.
• Checking material coverage on the stock for the job.
• Liaise with other disciplines on design, construction, fabrication, and commissioning issues.
• Performs inter-discipline discussions to solve certain issues that require attention for the specific discipline.
• Provides technical data for the execution of works in fabrication and installation of new offshore platforms.
• Provides technical data for the maintenance and modification of offshore platforms.
• Details the sequence of piping job card to be performed in fabrication and offshore installation.
• Details the work sequence of structural job card to be performed in fabrication and offshore installations.
• Creates a detailed work sequence for hydro-testing of spools in fabrication yard.
• Creates a detailed work sequence for hydro-testing of spools in offshore installation.
• Checking the correct materials required needed in conformance with the clients standard.
• Creates mark-ups for the work scope in P&ID and isometric drawings.
• Ensuring timely delivery of input to hook-up engineering work packs.
Company: Hyundai Engineering & Co. Ltd.
Project: Oman Musandam Gas Plant
Main Contractor: Hyundai Engineeering & Co. Ltd
Client: Oman Oil Company Exploration & Production, L.L.C
Musandam, Sultanate of Oman
(Mar. 02, 2013 – Sept. 02, 2013)
Position: PIPING FIELD ENGINEER
Job Description:
• ASME B 31.3 – (Process Piping)
• ASME B 31.1 – (Power Piping)
• ASME B 31.8 – (Gas Transportation and Distribution Piping Systems)
• ASME B 31.4 – (Pipeline Transportation Systems for liquid Hydrocarbon or Liquid Hydrocarbons and other liquids)
• API 5L / ISO 3183 – (Specification for Line Pipe, API 1104 - Standard for welding pipeline and related facilities)
• API 6D / ISO 14313 – (Pipeline Valve)
• API 570 – (Piping Inspection Code: In-service Inspection, Repair, and Alteration of Piping Systems)
• Supervise all piping activities which include planning work preparation, work,
execution. Ensuring that the sub-contractor follow all piping general requirement to avoid and eliminates reworks involve in
testing, involve in testing, flushing, drying, re
statement, commissioning work. Mechanical check of test system, cleaning of punch,
testing re stamen, checking all system conformed or compliance with isometric drawing and P & ID. Test pack document.
Commissioning works for conforming to piping design
code reinstallation revision of pipe line, blinding and un-blinding of system limit for which
all instruction for carrying out works is under permit. Responsibility for job safety
analysis and implements strict rules and regulation.
• Assigned in fabrication and installation of pipe spool. Direct supervision and monitoring piping works and pipe support. Verify
and inspection of material to ensure it
confirm with project specification. Coordinated all disciplines in day to task. Control
schedule activities and give priority to critical areas. Make safety meeting and enforce
safety rules.
• Direct day to day task regarding installation of pipe support interpret plan and design of piping works, coordinates and control
activities, coordinates regarding plan.
• Specification, check and reviewing test pack. Preparation of system for hydro-testing /
Pneumatic test. Enforce safety rules and regulations.
• Under my direction, supervise and coordinates activities of workers engaged in fabrication and installation of piping works.
Ensure that all isometric drawing has been
reviewed and check against P & ID. Inspection of work in progress to determined
conformity with plan and specification. Suggest better ways of pursuing work
assignment to assignment to achieve more economical and efficient orientation. Enforce
safety rules.
• Under my direction, supervise and coordinates activities of worker and engaged in fabrication and installation of underground
and above ground piping. Determined the extend of work to be done, equipment and materials to be used. Assist in
preparation of
schedule work activities. Inspection of work progress. Provide technical resolution
inquires and field discrepancy report. Enforce safety and rules and regulation.
• Assigned in fabrication shop / pipe rack. Direct supervision of all piping activities.
Monitoring of extend of work completed. Coordinate and organizing of manpower according to its activities and equipment to
be used. Implementation of safety rules and regulation.
• Assigned in fabrication and installation of piping spool in underground piping and above ground piping taking material take off
and identification of material to be use.
Allocation of manpower and monitoring work activities. Enforce safety rules.
• Assigned in offsite area. Primary responsible, erection of piping spool and support. Including slug catcher and process pipe.
Getting safety permit coordinates with
operation where there is shutdown.
• Under my direct supervision coordinates manpower in installation of pipe spool.
Fit-up and welding of joints. Cleaning of punch A, B, C, . Taking material take off,
spooling, assign, monitoring work activities. Enforce safety rules.
• Assign in installation of spool, fit-up double ending of pipe around pie rack.
Installation of pipe support.
• Work in fabrication and installation of pipe spool. Hydro testing / leak testing.
Company: Daewoo E&C Company Ltd.
Project: PNG-LNG Project EPC-3
Main Contractor: Chiyoda-JGC Joint Venture (CJJV)
Client: Esso - ExxonMobil
Portion 152, Papa Lea-Lea Road, POM, Papua New Guinea
March 03, 2012 – Sept. 25, 2012
Position: PIPING ENGINEER (FIELD)
Job Description:
• ASME B 31.3 – (Process Piping)
• ASME B 31.1 – (Power Piping)
• ASME B 31.8 – (Gas Transportation and Distribution Piping Systems)
• ASME B 31.4 – (Pipeline Transportation Systems for liquid Hydrocarbon or Liquid Hydrocarbons and other liquids)
• API 5L / ISO 3183 – (Specification for Line Pipe, API 1104 - Standard for welding pipeline and related facilities)
• API 6D / ISO 14313 – (Pipeline Valves)
• API 570 – (Piping Inspection Code: In-service Inspection, Repair, and Alteration of Piping Systems)
• Responsible for the implementation of latest revision drawing and design change.
• Responsible for the preparation of “Material Requisition” for field materials.
• Responsible for the implementation of Standards
• Responsible for the pipe & spools inside cleaning by air blow.
• Responsible for the preparation of inspection record.
• Responsible for the preparation of inspection notice to QC inspector.
• Coordinating with QA/QC dept for quality approvals.
• Generating As Built drawings and coordinating with technical dept for client approval.
• Coordinating with fabrication shop on spool delivery.
• Coordinating with resources department on material delivery.
• Test packs preparation, gravity testing & pressure testing.
• Surveillance and monitoring of all piping activities, including but not limited to GRE, GRP and RTRP pipe.
• Laminations, saddle supports inspections, flange connections with pumps, valves, related CS pipes, backfilling, test pack
preparations etc.
• Verification of isometrics and as- built drawings.
• Inspection and document review of GRE, GRP and RTRP pipes, spools, pipe supports on site and with manufacturer.
• Responsible to review as-built drawings for compliance with issued for construction drawings as related to piping.
• To supervise and monitor the site laminators/adhesive bonded jointers work force through general foreman and supervisors,
monitoring the work to complete the work as per project method statement/specifications.
• To supervise and ensure proper storage & handling of pipes, fittings fiberglass/resin/chemicals materials are regulated and
practiced as per project specs.
• Torque inspection of flanges as per manufacturer’s requirement.
• Execution of assigned work as per relevant methodology and work instruction/specification.. Ensure that defined efficiency and
quality standards of work are achieved and improved. Highlight/escalate technical and production issues to Team Leader.
Execution of Turnkey project comprising of as-built and proposed drawings of Piping, Mechanical Equipment’s and Structural
drawings by referring P&ID’s and Converting of manual drawings of P&ID’s.
Company: Rezayat Company Limited
P.O Box 90, Al Khobar, Kingdom of Saudi Arabia
Contractor to: Saudi Aramco (Saudi Arabian Oil Company)
Al-Hassa /Udhailiyah Project
Feb. 26, 2009 – May 01, 2011
Position: UNDER-GROUND PIPING ENGINEER (FIELD)
Job Description:
• Study project design basis such as scope of work, overall project schedule, basic design data, client specification, client
standard drawing, existing drawings and plot plans.
• Reviewed contract requirements for project execution; organized the preparation of the Technical Document Register (TDR),
identify requirements and scope of work; reviewed specifications Process Data Sheets (PDS), Piping Material Specification
(PMS), Piping and Instrument Diagrams (P&ID), plot plans, & General Achievement Drawings.
• Conduct site survey as per actual reference given in engineering design drawings especially in site layouts, and
water/sewerage pipe underground facilities to monitor progress of work.
• Monitored the preparation of conceptual lay-outs and design; obtained inputs from other engineering disciplines through the
“Want List” document, i.e mechanical data sheets, and foundation sizing equipment lay-out, instrument specifications and other
necessary data; guided the preparation of pipe wall thickness calculation and Reinforcement Pad (RP) calculations.
• Performed support & assistance to direct supervisors on technical & non-technical issues.
• Prepared general engineering designs, for piping isometric material take-off field line checking at site and P&ID’s to be update.
• Responsible about technical query from project require, field change design modification and to update work progress.
• Updated pipe line tracing according to actual survey at site and update P&ID’s
• Supervised Mechanical, Electrical, Instrumentation, Civil & Structural works for Saudi Aramco Project.
• Supervised, costs/estimate for the excavation of underground raw, sweet, & sewage Water leak of Saudi Aramco facilities.
• Responsible in preparation of plot plans, equipment layouts, preparation of BOM, material specifications, MR’s & Purchase
Requisitions, piping specially items, data sheets.
• Preferably with background in 3D operation & review capability & multi-project/Multi-disciplinary administration. Experience
handling of NAVISWORKS FREEDOM 2012, AUTOCAD 2012, CHVAC, AUTODESK VIZ 2004, piping equipment
modeling including piping routing, extraction of isometrics, piping CAD & support drawings.
COSTING AND ESTIMATION
• Knowledge of using SAP for creating Minor Maintenance Ticket (MMT), NOTIFICATION, ordering of materials from Material
yard (DPC) needed to be used for the maintenance of the plant.
• Reviews tender documents & prepares initial tender assessment form. Reads tender drawings and do Material take Off.
• Read; interpret blueprints, technical drawings, schematics, and computer generated reports.
• Follows up contract award and allocation of responsibility, initiate sub-contracts (if applicable) and purchase orders in
accordance with the Company Procedures.
• Estimates man hours/man days required to carry out all the works in company’s scope.
• Reviews Release Purchase Orders/Contract Documents & Comments, if required before passing to the project manager for
billing.
• Establish and coordinate the maintenance and safety procedures, service schedules and supply of materials required to
maintain machines and equipment in the prescribed condition.
HVAC SYSTEMS
• Can lead for the cleaning of condenser tubes on chillers, i.e. applying chemicals, Roding using mechanical Roding.
• Knowledge in instrument installation.
• Familiar in various/different type of piping material and it’s properties i.e. carbon steel, stainless steel, glass reinforced pipe
(RTR), Glass Reinforced Epoxy Pipe, etc.
• Familiar for the fabrication & installation of glass reinforced pipe i.e. thrust block, temporary support, etc.
• Can design, calculate the pipe size, length as per given pressure
• Familiar in piping, general arrangement drawings & isometric.
SERVICE UTILITIES SYSTEM
• Sewage pipe line installation.
• Water pipe line installation.
• Plumbing works.
• Supervised, costs/estimate unplug sewerage line of Saudi Aramco Homeownership Area for the repair/cleaning using
Mechanical Roding and Hydro jetting Machine
Company: FLUID TECH. & ENVT’L. MANAGEMENT INC.
Rm, 404 Diamond Finance Bldg. # 603 Edsa, Cubao, Quezon City
Feb. 2008 – Sept. 2008
Position: STAFF ENGINEER
Job Description:
Process/plant design & construction of Sewage Treatment Plant & Waste Water Treatment Plant.
Operation & maintenance of Sewage Treatment Plant & Waste Water Treatment plant.
Operation & maintenance of boilers & process Water Purification (R.O.D.I , H2O Softener).
EDUCATIONAL ATTAINMENT
Tertiary / College FEATI University 2002 - 2006
Helios St. Sta. Cruz, Manila
Bachelor of Science Mechanical Engineering
High School OANARI National High School 1998 - 2002
Oaqui # 4, Luna, La Union 2518 Phils.
Elementary Oaqui Elementary School 1993 - 1998
Oaqui # 4, Luna, La Union 2518 Phils.
PERSONAL DATA
Age : 29 Years Old
Date of Birth : January 13, 1986
Place of Birth : Luna, La Union
Nationality : Filipino
Religion : Roman Catholic
Civil Status : Single
Weight : 55 Kg
Height : 5’6”
Passport No. : EB2951618
Others : Saudi Arabia driving
license (4219759)
GOVERNMENT EXAMINATION
Mechanical Engineering Board Examination
Date : 16 October 2007
Board Passed Rating : 73.50%
Licensed Number : 69131
Accredited Association : PSME
ACHIEVEMENTS
Certificate of Appreciation
East ORMC Turnaround Team
For your dedication, commitment and support to complete and deliver CPCA07 (PLATFORMS) 2014 Turnaround successfully
safely.
Brunei Shell Petroleum, ORMC
April 2014
Certificate of Appreciation
SA / CR Community Services Department
Abqiaq Utilities Division
Al-Hasa Utility Operations Unit
Box # 6190, Mubarraz, Saudi Aramco
April 25, 2011
Certificate of Achievement
For practicing defensive driving in Saudi Aramco
(No violations or motor vehicle accidents for 90 days)
Southern Area Central Region
Community Services Department, Saudi Aramco
April 26, 2011
The 4
th
Metrology Competition (Basic)
Philippine Country Level
Mitutoyo Asia Pacific Pte. Ltd.
July 18, 2006
SEMINARS / WORKSHOP ATTAINDED
Computer-Aided Design of Heating, Ventilating and Air-Conditioning
CRESENT TECHNOLOGIES
Don Lorenzo bldg. 889 P. Paredes St. Sampaloc Manila
November 16, 2003
The Technology of Non-Destructive Testing Methods
Audio-Visual Room
Feati University
Helios St. Sta. Cruz, Manila
February 23, 2005
Symposium on Industrial Automation
Festo Didactic Training Center
Sucat, Parañaque City
August 11, 2005
Metals Identification and Selection
Metals Industry Research and Development Center (MIRDC)
Dept. of Science and Technology (DOST)
March 3, 2006
Basic Computer-Aided Design
Metals Industry Research and Development Center (MIRDC)
Dept. of Science and Technology (DOST)
March 3, 2006
Dimensional Metrology 1 – Basic Measurement
Metals Industry Research and Development Center (MIRDC)
Dept. of Science and Technology (DOST)
July 12-14, 2006
Research and Regulating Activities and Services of Philippine
Nuclear Research Institute
Dept. of Science and Technology (DOST)
In celebration of National Chemical Engineering Week 2006
Chemical Engineering Department
FEATI University
Helios St. Sta. Cruz, Manila
Sept. 21, 2006
Certificate on AKIMS
Aker Solutions Sdn. Bhd.
Kuala Belait, Brunei Darussalam
May 23, 2014
SPECIAL SKILLS
Computer Technician
PC Repair, PC Assembly, PC Troubleshooting, PC Installation
CHARACTER REFERENCES
Atty. Edilberto F. Fermil
National Police Commission (Regional Director 12)
Koronadal City, South Cotabato
Cell. #: +639177108140
Dr. Ricardo E. Nocilo
M.D. MHA, Site Medical Officer Int'l
SOS, China
Cell. #: +639217372768
Mr. Jonny Lie
Discipline Lead – Piping /Mechanical Group
Aker Solutions Sdn. Bhd
Lot 41 & 42 Tapak Perundistrian Daerah Belait, Jalan Setia Diraja, Kuala Belait KA 3131
Cell #: +673-7189960
I certify that all my statement from the above mention are true and correct to the best of my knowledge and belief. I agree that if
gainfully employed, any misrepresentation(s) and or omission(s) of facts shall justify my qualification, dismissal or repatriation from work.
Lory Francis R. Navor

More Related Content

What's hot

Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad
 
Giridhar
GiridharGiridhar
Giridhar
Giridhar C
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016Nehal Deputy
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 

What's hot (20)

Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
MWI CV3
MWI CV3MWI CV3
MWI CV3
 
CV
CVCV
CV
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
C.V
C.VC.V
C.V
 
Giridhar
GiridharGiridhar
Giridhar
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
RESUME
RESUMERESUME
RESUME
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 

Similar to Lory Francis Navor - CV

CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
Varun Resume
Varun Resume Varun Resume
Varun Resume varun k
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
 
K PRAJIN RESUME - 2015
K PRAJIN  RESUME - 2015K PRAJIN  RESUME - 2015
K PRAJIN RESUME - 2015PRAJIN K
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi AhmadAhmad Hadi
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish Murugesan
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC SupervisorPranesh Kumar
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 

Similar to Lory Francis Navor - CV (20)

CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
resume piping
resume pipingresume piping
resume piping
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
K PRAJIN RESUME - 2015
K PRAJIN  RESUME - 2015K PRAJIN  RESUME - 2015
K PRAJIN RESUME - 2015
 
Mohammed Moosa CV
Mohammed Moosa CVMohammed Moosa CV
Mohammed Moosa CV
 
Resume_AG
Resume_AGResume_AG
Resume_AG
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
Resume
ResumeResume
Resume
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 

Lory Francis Navor - CV

  • 1. Name: LORY FRANCIS R. NAVOR Address: # 70, BRGY. OAQUI # 3, LUNA, LA UNION, 2518, PHILS. Contact No: +63-918-4422341/+673-892-9586 E-mail: launiondogblack@yahoo.com CAREER OBJECTIVES To seek an Engineering position that would fit into my qualification, experience and profession. To continuously practice my profession as a Mechanical Engineer in a good oil & gas engineering/construction/consultancy firm. Have a vast experience in Piping Construction , technical documentation, quality records administration, preliminary as-built Engineering drawings and shop drawings preparations, design coordination, piping and mechanical works construction supervision. POST APPLIED FOR Piping Engineer (FIELD/OFFICE) Mechanical Engineer (FIELD/OFFICE) QC Piping Inspector (GRE, CS, SS) EMPLOYMENT DETAILS Company: Adinin Works & Engineering Sdn. Bhd Project: Brunei Shell Petroleum ORMC Main Contractor: Aker Solution Sdn. Bhd. Client: Brunei Shell Petroleum Kuala Belait, Brunei Darussalam (Feb. 17, 2014 - Present) Position: JOB-CARD PIPING WORK PREPARATION ENGINEER (OFFSHORE PLATFORMS)
  • 2. Job Description: • Develop job cards for Fabrication, Installation, Maintenance and Removal of piping system in offshore with corresponds to the norms of Brunei Shell Petroleum (BSP). • Review isometric drawings of piping systems. • Calculate man-hours required to finish the job cards onshore and offshore. • Buddy Check finished job cards of other colleagues Offshore Plants Handled. • Compilation of job cards including man-hours / construction narrative/work packs. • Able to interpret engineering deliverables for piping, structural, insulation and produce a working tool (Work pack) to assist the end user in the field Input to hydro-test work packs. • HSE input to construction work packs. • Familiar with the system SAP (System Analysis Program), MIPS (Method Integrated Project System). • Prepare MTO and selection of piping, valves, & fittings, etc. commodities. • Prepares work instruction and estimation of man-hour consumption for piping, mechanical, painting & scaffolding scope of work by the used of MIPS (Method Integrated Project System)software for BSP ORMC. • Execution of work lines for fabrication, installation, pressure testing & leak testing. • Checking material coverage on the stock for the job. • Liaise with other disciplines on design, construction, fabrication, and commissioning issues. • Performs inter-discipline discussions to solve certain issues that require attention for the specific discipline. • Provides technical data for the execution of works in fabrication and installation of new offshore platforms. • Provides technical data for the maintenance and modification of offshore platforms. • Details the sequence of piping job card to be performed in fabrication and offshore installation. • Details the work sequence of structural job card to be performed in fabrication and offshore installations. • Creates a detailed work sequence for hydro-testing of spools in fabrication yard. • Creates a detailed work sequence for hydro-testing of spools in offshore installation. • Checking the correct materials required needed in conformance with the clients standard. • Creates mark-ups for the work scope in P&ID and isometric drawings. • Ensuring timely delivery of input to hook-up engineering work packs. Company: Hyundai Engineering & Co. Ltd. Project: Oman Musandam Gas Plant Main Contractor: Hyundai Engineeering & Co. Ltd Client: Oman Oil Company Exploration & Production, L.L.C Musandam, Sultanate of Oman (Mar. 02, 2013 – Sept. 02, 2013) Position: PIPING FIELD ENGINEER Job Description: • ASME B 31.3 – (Process Piping) • ASME B 31.1 – (Power Piping) • ASME B 31.8 – (Gas Transportation and Distribution Piping Systems)
  • 3. • ASME B 31.4 – (Pipeline Transportation Systems for liquid Hydrocarbon or Liquid Hydrocarbons and other liquids) • API 5L / ISO 3183 – (Specification for Line Pipe, API 1104 - Standard for welding pipeline and related facilities) • API 6D / ISO 14313 – (Pipeline Valve) • API 570 – (Piping Inspection Code: In-service Inspection, Repair, and Alteration of Piping Systems) • Supervise all piping activities which include planning work preparation, work, execution. Ensuring that the sub-contractor follow all piping general requirement to avoid and eliminates reworks involve in testing, involve in testing, flushing, drying, re statement, commissioning work. Mechanical check of test system, cleaning of punch, testing re stamen, checking all system conformed or compliance with isometric drawing and P & ID. Test pack document. Commissioning works for conforming to piping design code reinstallation revision of pipe line, blinding and un-blinding of system limit for which all instruction for carrying out works is under permit. Responsibility for job safety analysis and implements strict rules and regulation. • Assigned in fabrication and installation of pipe spool. Direct supervision and monitoring piping works and pipe support. Verify and inspection of material to ensure it confirm with project specification. Coordinated all disciplines in day to task. Control schedule activities and give priority to critical areas. Make safety meeting and enforce safety rules. • Direct day to day task regarding installation of pipe support interpret plan and design of piping works, coordinates and control activities, coordinates regarding plan. • Specification, check and reviewing test pack. Preparation of system for hydro-testing / Pneumatic test. Enforce safety rules and regulations. • Under my direction, supervise and coordinates activities of workers engaged in fabrication and installation of piping works. Ensure that all isometric drawing has been reviewed and check against P & ID. Inspection of work in progress to determined conformity with plan and specification. Suggest better ways of pursuing work assignment to assignment to achieve more economical and efficient orientation. Enforce safety rules. • Under my direction, supervise and coordinates activities of worker and engaged in fabrication and installation of underground and above ground piping. Determined the extend of work to be done, equipment and materials to be used. Assist in preparation of schedule work activities. Inspection of work progress. Provide technical resolution inquires and field discrepancy report. Enforce safety and rules and regulation. • Assigned in fabrication shop / pipe rack. Direct supervision of all piping activities. Monitoring of extend of work completed. Coordinate and organizing of manpower according to its activities and equipment to be used. Implementation of safety rules and regulation. • Assigned in fabrication and installation of piping spool in underground piping and above ground piping taking material take off and identification of material to be use. Allocation of manpower and monitoring work activities. Enforce safety rules. • Assigned in offsite area. Primary responsible, erection of piping spool and support. Including slug catcher and process pipe. Getting safety permit coordinates with operation where there is shutdown. • Under my direct supervision coordinates manpower in installation of pipe spool. Fit-up and welding of joints. Cleaning of punch A, B, C, . Taking material take off, spooling, assign, monitoring work activities. Enforce safety rules. • Assign in installation of spool, fit-up double ending of pipe around pie rack. Installation of pipe support. • Work in fabrication and installation of pipe spool. Hydro testing / leak testing.
  • 4. Company: Daewoo E&C Company Ltd. Project: PNG-LNG Project EPC-3 Main Contractor: Chiyoda-JGC Joint Venture (CJJV) Client: Esso - ExxonMobil Portion 152, Papa Lea-Lea Road, POM, Papua New Guinea March 03, 2012 – Sept. 25, 2012 Position: PIPING ENGINEER (FIELD) Job Description: • ASME B 31.3 – (Process Piping) • ASME B 31.1 – (Power Piping) • ASME B 31.8 – (Gas Transportation and Distribution Piping Systems) • ASME B 31.4 – (Pipeline Transportation Systems for liquid Hydrocarbon or Liquid Hydrocarbons and other liquids) • API 5L / ISO 3183 – (Specification for Line Pipe, API 1104 - Standard for welding pipeline and related facilities) • API 6D / ISO 14313 – (Pipeline Valves) • API 570 – (Piping Inspection Code: In-service Inspection, Repair, and Alteration of Piping Systems) • Responsible for the implementation of latest revision drawing and design change. • Responsible for the preparation of “Material Requisition” for field materials. • Responsible for the implementation of Standards • Responsible for the pipe & spools inside cleaning by air blow. • Responsible for the preparation of inspection record. • Responsible for the preparation of inspection notice to QC inspector. • Coordinating with QA/QC dept for quality approvals. • Generating As Built drawings and coordinating with technical dept for client approval. • Coordinating with fabrication shop on spool delivery. • Coordinating with resources department on material delivery. • Test packs preparation, gravity testing & pressure testing. • Surveillance and monitoring of all piping activities, including but not limited to GRE, GRP and RTRP pipe. • Laminations, saddle supports inspections, flange connections with pumps, valves, related CS pipes, backfilling, test pack preparations etc. • Verification of isometrics and as- built drawings. • Inspection and document review of GRE, GRP and RTRP pipes, spools, pipe supports on site and with manufacturer. • Responsible to review as-built drawings for compliance with issued for construction drawings as related to piping. • To supervise and monitor the site laminators/adhesive bonded jointers work force through general foreman and supervisors, monitoring the work to complete the work as per project method statement/specifications.
  • 5. • To supervise and ensure proper storage & handling of pipes, fittings fiberglass/resin/chemicals materials are regulated and practiced as per project specs. • Torque inspection of flanges as per manufacturer’s requirement. • Execution of assigned work as per relevant methodology and work instruction/specification.. Ensure that defined efficiency and quality standards of work are achieved and improved. Highlight/escalate technical and production issues to Team Leader. Execution of Turnkey project comprising of as-built and proposed drawings of Piping, Mechanical Equipment’s and Structural drawings by referring P&ID’s and Converting of manual drawings of P&ID’s. Company: Rezayat Company Limited P.O Box 90, Al Khobar, Kingdom of Saudi Arabia Contractor to: Saudi Aramco (Saudi Arabian Oil Company) Al-Hassa /Udhailiyah Project Feb. 26, 2009 – May 01, 2011 Position: UNDER-GROUND PIPING ENGINEER (FIELD) Job Description: • Study project design basis such as scope of work, overall project schedule, basic design data, client specification, client standard drawing, existing drawings and plot plans. • Reviewed contract requirements for project execution; organized the preparation of the Technical Document Register (TDR), identify requirements and scope of work; reviewed specifications Process Data Sheets (PDS), Piping Material Specification (PMS), Piping and Instrument Diagrams (P&ID), plot plans, & General Achievement Drawings. • Conduct site survey as per actual reference given in engineering design drawings especially in site layouts, and water/sewerage pipe underground facilities to monitor progress of work. • Monitored the preparation of conceptual lay-outs and design; obtained inputs from other engineering disciplines through the “Want List” document, i.e mechanical data sheets, and foundation sizing equipment lay-out, instrument specifications and other necessary data; guided the preparation of pipe wall thickness calculation and Reinforcement Pad (RP) calculations. • Performed support & assistance to direct supervisors on technical & non-technical issues. • Prepared general engineering designs, for piping isometric material take-off field line checking at site and P&ID’s to be update. • Responsible about technical query from project require, field change design modification and to update work progress. • Updated pipe line tracing according to actual survey at site and update P&ID’s • Supervised Mechanical, Electrical, Instrumentation, Civil & Structural works for Saudi Aramco Project. • Supervised, costs/estimate for the excavation of underground raw, sweet, & sewage Water leak of Saudi Aramco facilities. • Responsible in preparation of plot plans, equipment layouts, preparation of BOM, material specifications, MR’s & Purchase Requisitions, piping specially items, data sheets. • Preferably with background in 3D operation & review capability & multi-project/Multi-disciplinary administration. Experience handling of NAVISWORKS FREEDOM 2012, AUTOCAD 2012, CHVAC, AUTODESK VIZ 2004, piping equipment modeling including piping routing, extraction of isometrics, piping CAD & support drawings. COSTING AND ESTIMATION • Knowledge of using SAP for creating Minor Maintenance Ticket (MMT), NOTIFICATION, ordering of materials from Material yard (DPC) needed to be used for the maintenance of the plant.
  • 6. • Reviews tender documents & prepares initial tender assessment form. Reads tender drawings and do Material take Off. • Read; interpret blueprints, technical drawings, schematics, and computer generated reports. • Follows up contract award and allocation of responsibility, initiate sub-contracts (if applicable) and purchase orders in accordance with the Company Procedures. • Estimates man hours/man days required to carry out all the works in company’s scope. • Reviews Release Purchase Orders/Contract Documents & Comments, if required before passing to the project manager for billing. • Establish and coordinate the maintenance and safety procedures, service schedules and supply of materials required to maintain machines and equipment in the prescribed condition. HVAC SYSTEMS • Can lead for the cleaning of condenser tubes on chillers, i.e. applying chemicals, Roding using mechanical Roding. • Knowledge in instrument installation. • Familiar in various/different type of piping material and it’s properties i.e. carbon steel, stainless steel, glass reinforced pipe (RTR), Glass Reinforced Epoxy Pipe, etc. • Familiar for the fabrication & installation of glass reinforced pipe i.e. thrust block, temporary support, etc. • Can design, calculate the pipe size, length as per given pressure • Familiar in piping, general arrangement drawings & isometric. SERVICE UTILITIES SYSTEM • Sewage pipe line installation. • Water pipe line installation. • Plumbing works. • Supervised, costs/estimate unplug sewerage line of Saudi Aramco Homeownership Area for the repair/cleaning using Mechanical Roding and Hydro jetting Machine Company: FLUID TECH. & ENVT’L. MANAGEMENT INC. Rm, 404 Diamond Finance Bldg. # 603 Edsa, Cubao, Quezon City Feb. 2008 – Sept. 2008 Position: STAFF ENGINEER Job Description: Process/plant design & construction of Sewage Treatment Plant & Waste Water Treatment Plant. Operation & maintenance of Sewage Treatment Plant & Waste Water Treatment plant. Operation & maintenance of boilers & process Water Purification (R.O.D.I , H2O Softener). EDUCATIONAL ATTAINMENT Tertiary / College FEATI University 2002 - 2006 Helios St. Sta. Cruz, Manila Bachelor of Science Mechanical Engineering
  • 7. High School OANARI National High School 1998 - 2002 Oaqui # 4, Luna, La Union 2518 Phils. Elementary Oaqui Elementary School 1993 - 1998 Oaqui # 4, Luna, La Union 2518 Phils. PERSONAL DATA Age : 29 Years Old Date of Birth : January 13, 1986 Place of Birth : Luna, La Union Nationality : Filipino Religion : Roman Catholic Civil Status : Single Weight : 55 Kg Height : 5’6” Passport No. : EB2951618 Others : Saudi Arabia driving license (4219759) GOVERNMENT EXAMINATION Mechanical Engineering Board Examination Date : 16 October 2007 Board Passed Rating : 73.50% Licensed Number : 69131 Accredited Association : PSME ACHIEVEMENTS Certificate of Appreciation East ORMC Turnaround Team For your dedication, commitment and support to complete and deliver CPCA07 (PLATFORMS) 2014 Turnaround successfully safely. Brunei Shell Petroleum, ORMC April 2014
  • 8. Certificate of Appreciation SA / CR Community Services Department Abqiaq Utilities Division Al-Hasa Utility Operations Unit Box # 6190, Mubarraz, Saudi Aramco April 25, 2011 Certificate of Achievement For practicing defensive driving in Saudi Aramco (No violations or motor vehicle accidents for 90 days) Southern Area Central Region Community Services Department, Saudi Aramco April 26, 2011 The 4 th Metrology Competition (Basic) Philippine Country Level Mitutoyo Asia Pacific Pte. Ltd. July 18, 2006 SEMINARS / WORKSHOP ATTAINDED Computer-Aided Design of Heating, Ventilating and Air-Conditioning CRESENT TECHNOLOGIES Don Lorenzo bldg. 889 P. Paredes St. Sampaloc Manila November 16, 2003 The Technology of Non-Destructive Testing Methods Audio-Visual Room Feati University Helios St. Sta. Cruz, Manila February 23, 2005 Symposium on Industrial Automation Festo Didactic Training Center Sucat, Parañaque City August 11, 2005 Metals Identification and Selection Metals Industry Research and Development Center (MIRDC) Dept. of Science and Technology (DOST) March 3, 2006 Basic Computer-Aided Design
  • 9. Metals Industry Research and Development Center (MIRDC) Dept. of Science and Technology (DOST) March 3, 2006 Dimensional Metrology 1 – Basic Measurement Metals Industry Research and Development Center (MIRDC) Dept. of Science and Technology (DOST) July 12-14, 2006 Research and Regulating Activities and Services of Philippine Nuclear Research Institute Dept. of Science and Technology (DOST) In celebration of National Chemical Engineering Week 2006 Chemical Engineering Department FEATI University Helios St. Sta. Cruz, Manila Sept. 21, 2006 Certificate on AKIMS Aker Solutions Sdn. Bhd. Kuala Belait, Brunei Darussalam May 23, 2014 SPECIAL SKILLS Computer Technician PC Repair, PC Assembly, PC Troubleshooting, PC Installation CHARACTER REFERENCES Atty. Edilberto F. Fermil National Police Commission (Regional Director 12) Koronadal City, South Cotabato Cell. #: +639177108140 Dr. Ricardo E. Nocilo M.D. MHA, Site Medical Officer Int'l SOS, China Cell. #: +639217372768 Mr. Jonny Lie
  • 10. Discipline Lead – Piping /Mechanical Group Aker Solutions Sdn. Bhd Lot 41 & 42 Tapak Perundistrian Daerah Belait, Jalan Setia Diraja, Kuala Belait KA 3131 Cell #: +673-7189960 I certify that all my statement from the above mention are true and correct to the best of my knowledge and belief. I agree that if gainfully employed, any misrepresentation(s) and or omission(s) of facts shall justify my qualification, dismissal or repatriation from work. Lory Francis R. Navor