Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
1. Name: LORY FRANCIS R. NAVOR
Address: # 70, BRGY. OAQUI # 3, LUNA, LA
UNION,
2518, PHILS.
Contact No: +63-918-4422341/+673-892-9586
E-mail: launiondogblack@yahoo.com
CAREER OBJECTIVES
To seek an Engineering position that would fit into my qualification, experience and profession. To continuously practice my
profession as a Mechanical Engineer in a good oil & gas engineering/construction/consultancy firm. Have a vast experience in
Piping Construction , technical documentation, quality records administration, preliminary as-built Engineering drawings and shop
drawings preparations, design coordination, piping and mechanical works construction supervision.
POST APPLIED FOR
Piping Engineer (FIELD/OFFICE)
Mechanical Engineer (FIELD/OFFICE)
QC Piping Inspector (GRE, CS, SS)
EMPLOYMENT DETAILS
Company: Adinin Works & Engineering Sdn. Bhd
Project: Brunei Shell Petroleum ORMC
Main Contractor: Aker Solution Sdn. Bhd.
Client: Brunei Shell Petroleum
Kuala Belait, Brunei Darussalam
(Feb. 17, 2014 - Present)
Position: JOB-CARD PIPING WORK PREPARATION ENGINEER (OFFSHORE PLATFORMS)
2. Job Description:
• Develop job cards for Fabrication, Installation, Maintenance and Removal of piping system in offshore with corresponds to the
norms of Brunei Shell Petroleum (BSP).
• Review isometric drawings of piping systems.
• Calculate man-hours required to finish the job cards onshore and offshore.
• Buddy Check finished job cards of other colleagues Offshore Plants Handled.
• Compilation of job cards including man-hours / construction narrative/work packs.
• Able to interpret engineering deliverables for piping, structural, insulation and produce a working tool (Work pack) to assist the
end user in the field Input to hydro-test work packs.
• HSE input to construction work packs.
• Familiar with the system SAP (System Analysis Program), MIPS (Method Integrated Project System).
• Prepare MTO and selection of piping, valves, & fittings, etc. commodities.
• Prepares work instruction and estimation of man-hour consumption for piping, mechanical, painting & scaffolding scope of work
by the used of MIPS (Method Integrated Project System)software for BSP ORMC.
• Execution of work lines for fabrication, installation, pressure testing & leak testing.
• Checking material coverage on the stock for the job.
• Liaise with other disciplines on design, construction, fabrication, and commissioning issues.
• Performs inter-discipline discussions to solve certain issues that require attention for the specific discipline.
• Provides technical data for the execution of works in fabrication and installation of new offshore platforms.
• Provides technical data for the maintenance and modification of offshore platforms.
• Details the sequence of piping job card to be performed in fabrication and offshore installation.
• Details the work sequence of structural job card to be performed in fabrication and offshore installations.
• Creates a detailed work sequence for hydro-testing of spools in fabrication yard.
• Creates a detailed work sequence for hydro-testing of spools in offshore installation.
• Checking the correct materials required needed in conformance with the clients standard.
• Creates mark-ups for the work scope in P&ID and isometric drawings.
• Ensuring timely delivery of input to hook-up engineering work packs.
Company: Hyundai Engineering & Co. Ltd.
Project: Oman Musandam Gas Plant
Main Contractor: Hyundai Engineeering & Co. Ltd
Client: Oman Oil Company Exploration & Production, L.L.C
Musandam, Sultanate of Oman
(Mar. 02, 2013 – Sept. 02, 2013)
Position: PIPING FIELD ENGINEER
Job Description:
• ASME B 31.3 – (Process Piping)
• ASME B 31.1 – (Power Piping)
• ASME B 31.8 – (Gas Transportation and Distribution Piping Systems)
3. • ASME B 31.4 – (Pipeline Transportation Systems for liquid Hydrocarbon or Liquid Hydrocarbons and other liquids)
• API 5L / ISO 3183 – (Specification for Line Pipe, API 1104 - Standard for welding pipeline and related facilities)
• API 6D / ISO 14313 – (Pipeline Valve)
• API 570 – (Piping Inspection Code: In-service Inspection, Repair, and Alteration of Piping Systems)
• Supervise all piping activities which include planning work preparation, work,
execution. Ensuring that the sub-contractor follow all piping general requirement to avoid and eliminates reworks involve in
testing, involve in testing, flushing, drying, re
statement, commissioning work. Mechanical check of test system, cleaning of punch,
testing re stamen, checking all system conformed or compliance with isometric drawing and P & ID. Test pack document.
Commissioning works for conforming to piping design
code reinstallation revision of pipe line, blinding and un-blinding of system limit for which
all instruction for carrying out works is under permit. Responsibility for job safety
analysis and implements strict rules and regulation.
• Assigned in fabrication and installation of pipe spool. Direct supervision and monitoring piping works and pipe support. Verify
and inspection of material to ensure it
confirm with project specification. Coordinated all disciplines in day to task. Control
schedule activities and give priority to critical areas. Make safety meeting and enforce
safety rules.
• Direct day to day task regarding installation of pipe support interpret plan and design of piping works, coordinates and control
activities, coordinates regarding plan.
• Specification, check and reviewing test pack. Preparation of system for hydro-testing /
Pneumatic test. Enforce safety rules and regulations.
• Under my direction, supervise and coordinates activities of workers engaged in fabrication and installation of piping works.
Ensure that all isometric drawing has been
reviewed and check against P & ID. Inspection of work in progress to determined
conformity with plan and specification. Suggest better ways of pursuing work
assignment to assignment to achieve more economical and efficient orientation. Enforce
safety rules.
• Under my direction, supervise and coordinates activities of worker and engaged in fabrication and installation of underground
and above ground piping. Determined the extend of work to be done, equipment and materials to be used. Assist in
preparation of
schedule work activities. Inspection of work progress. Provide technical resolution
inquires and field discrepancy report. Enforce safety and rules and regulation.
• Assigned in fabrication shop / pipe rack. Direct supervision of all piping activities.
Monitoring of extend of work completed. Coordinate and organizing of manpower according to its activities and equipment to
be used. Implementation of safety rules and regulation.
• Assigned in fabrication and installation of piping spool in underground piping and above ground piping taking material take off
and identification of material to be use.
Allocation of manpower and monitoring work activities. Enforce safety rules.
• Assigned in offsite area. Primary responsible, erection of piping spool and support. Including slug catcher and process pipe.
Getting safety permit coordinates with
operation where there is shutdown.
• Under my direct supervision coordinates manpower in installation of pipe spool.
Fit-up and welding of joints. Cleaning of punch A, B, C, . Taking material take off,
spooling, assign, monitoring work activities. Enforce safety rules.
• Assign in installation of spool, fit-up double ending of pipe around pie rack.
Installation of pipe support.
• Work in fabrication and installation of pipe spool. Hydro testing / leak testing.
4. Company: Daewoo E&C Company Ltd.
Project: PNG-LNG Project EPC-3
Main Contractor: Chiyoda-JGC Joint Venture (CJJV)
Client: Esso - ExxonMobil
Portion 152, Papa Lea-Lea Road, POM, Papua New Guinea
March 03, 2012 – Sept. 25, 2012
Position: PIPING ENGINEER (FIELD)
Job Description:
• ASME B 31.3 – (Process Piping)
• ASME B 31.1 – (Power Piping)
• ASME B 31.8 – (Gas Transportation and Distribution Piping Systems)
• ASME B 31.4 – (Pipeline Transportation Systems for liquid Hydrocarbon or Liquid Hydrocarbons and other liquids)
• API 5L / ISO 3183 – (Specification for Line Pipe, API 1104 - Standard for welding pipeline and related facilities)
• API 6D / ISO 14313 – (Pipeline Valves)
• API 570 – (Piping Inspection Code: In-service Inspection, Repair, and Alteration of Piping Systems)
• Responsible for the implementation of latest revision drawing and design change.
• Responsible for the preparation of “Material Requisition” for field materials.
• Responsible for the implementation of Standards
• Responsible for the pipe & spools inside cleaning by air blow.
• Responsible for the preparation of inspection record.
• Responsible for the preparation of inspection notice to QC inspector.
• Coordinating with QA/QC dept for quality approvals.
• Generating As Built drawings and coordinating with technical dept for client approval.
• Coordinating with fabrication shop on spool delivery.
• Coordinating with resources department on material delivery.
• Test packs preparation, gravity testing & pressure testing.
• Surveillance and monitoring of all piping activities, including but not limited to GRE, GRP and RTRP pipe.
• Laminations, saddle supports inspections, flange connections with pumps, valves, related CS pipes, backfilling, test pack
preparations etc.
• Verification of isometrics and as- built drawings.
• Inspection and document review of GRE, GRP and RTRP pipes, spools, pipe supports on site and with manufacturer.
• Responsible to review as-built drawings for compliance with issued for construction drawings as related to piping.
• To supervise and monitor the site laminators/adhesive bonded jointers work force through general foreman and supervisors,
monitoring the work to complete the work as per project method statement/specifications.
5. • To supervise and ensure proper storage & handling of pipes, fittings fiberglass/resin/chemicals materials are regulated and
practiced as per project specs.
• Torque inspection of flanges as per manufacturer’s requirement.
• Execution of assigned work as per relevant methodology and work instruction/specification.. Ensure that defined efficiency and
quality standards of work are achieved and improved. Highlight/escalate technical and production issues to Team Leader.
Execution of Turnkey project comprising of as-built and proposed drawings of Piping, Mechanical Equipment’s and Structural
drawings by referring P&ID’s and Converting of manual drawings of P&ID’s.
Company: Rezayat Company Limited
P.O Box 90, Al Khobar, Kingdom of Saudi Arabia
Contractor to: Saudi Aramco (Saudi Arabian Oil Company)
Al-Hassa /Udhailiyah Project
Feb. 26, 2009 – May 01, 2011
Position: UNDER-GROUND PIPING ENGINEER (FIELD)
Job Description:
• Study project design basis such as scope of work, overall project schedule, basic design data, client specification, client
standard drawing, existing drawings and plot plans.
• Reviewed contract requirements for project execution; organized the preparation of the Technical Document Register (TDR),
identify requirements and scope of work; reviewed specifications Process Data Sheets (PDS), Piping Material Specification
(PMS), Piping and Instrument Diagrams (P&ID), plot plans, & General Achievement Drawings.
• Conduct site survey as per actual reference given in engineering design drawings especially in site layouts, and
water/sewerage pipe underground facilities to monitor progress of work.
• Monitored the preparation of conceptual lay-outs and design; obtained inputs from other engineering disciplines through the
“Want List” document, i.e mechanical data sheets, and foundation sizing equipment lay-out, instrument specifications and other
necessary data; guided the preparation of pipe wall thickness calculation and Reinforcement Pad (RP) calculations.
• Performed support & assistance to direct supervisors on technical & non-technical issues.
• Prepared general engineering designs, for piping isometric material take-off field line checking at site and P&ID’s to be update.
• Responsible about technical query from project require, field change design modification and to update work progress.
• Updated pipe line tracing according to actual survey at site and update P&ID’s
• Supervised Mechanical, Electrical, Instrumentation, Civil & Structural works for Saudi Aramco Project.
• Supervised, costs/estimate for the excavation of underground raw, sweet, & sewage Water leak of Saudi Aramco facilities.
• Responsible in preparation of plot plans, equipment layouts, preparation of BOM, material specifications, MR’s & Purchase
Requisitions, piping specially items, data sheets.
• Preferably with background in 3D operation & review capability & multi-project/Multi-disciplinary administration. Experience
handling of NAVISWORKS FREEDOM 2012, AUTOCAD 2012, CHVAC, AUTODESK VIZ 2004, piping equipment
modeling including piping routing, extraction of isometrics, piping CAD & support drawings.
COSTING AND ESTIMATION
• Knowledge of using SAP for creating Minor Maintenance Ticket (MMT), NOTIFICATION, ordering of materials from Material
yard (DPC) needed to be used for the maintenance of the plant.
6. • Reviews tender documents & prepares initial tender assessment form. Reads tender drawings and do Material take Off.
• Read; interpret blueprints, technical drawings, schematics, and computer generated reports.
• Follows up contract award and allocation of responsibility, initiate sub-contracts (if applicable) and purchase orders in
accordance with the Company Procedures.
• Estimates man hours/man days required to carry out all the works in company’s scope.
• Reviews Release Purchase Orders/Contract Documents & Comments, if required before passing to the project manager for
billing.
• Establish and coordinate the maintenance and safety procedures, service schedules and supply of materials required to
maintain machines and equipment in the prescribed condition.
HVAC SYSTEMS
• Can lead for the cleaning of condenser tubes on chillers, i.e. applying chemicals, Roding using mechanical Roding.
• Knowledge in instrument installation.
• Familiar in various/different type of piping material and it’s properties i.e. carbon steel, stainless steel, glass reinforced pipe
(RTR), Glass Reinforced Epoxy Pipe, etc.
• Familiar for the fabrication & installation of glass reinforced pipe i.e. thrust block, temporary support, etc.
• Can design, calculate the pipe size, length as per given pressure
• Familiar in piping, general arrangement drawings & isometric.
SERVICE UTILITIES SYSTEM
• Sewage pipe line installation.
• Water pipe line installation.
• Plumbing works.
• Supervised, costs/estimate unplug sewerage line of Saudi Aramco Homeownership Area for the repair/cleaning using
Mechanical Roding and Hydro jetting Machine
Company: FLUID TECH. & ENVT’L. MANAGEMENT INC.
Rm, 404 Diamond Finance Bldg. # 603 Edsa, Cubao, Quezon City
Feb. 2008 – Sept. 2008
Position: STAFF ENGINEER
Job Description:
Process/plant design & construction of Sewage Treatment Plant & Waste Water Treatment Plant.
Operation & maintenance of Sewage Treatment Plant & Waste Water Treatment plant.
Operation & maintenance of boilers & process Water Purification (R.O.D.I , H2O Softener).
EDUCATIONAL ATTAINMENT
Tertiary / College FEATI University 2002 - 2006
Helios St. Sta. Cruz, Manila
Bachelor of Science Mechanical Engineering
7. High School OANARI National High School 1998 - 2002
Oaqui # 4, Luna, La Union 2518 Phils.
Elementary Oaqui Elementary School 1993 - 1998
Oaqui # 4, Luna, La Union 2518 Phils.
PERSONAL DATA
Age : 29 Years Old
Date of Birth : January 13, 1986
Place of Birth : Luna, La Union
Nationality : Filipino
Religion : Roman Catholic
Civil Status : Single
Weight : 55 Kg
Height : 5’6”
Passport No. : EB2951618
Others : Saudi Arabia driving
license (4219759)
GOVERNMENT EXAMINATION
Mechanical Engineering Board Examination
Date : 16 October 2007
Board Passed Rating : 73.50%
Licensed Number : 69131
Accredited Association : PSME
ACHIEVEMENTS
Certificate of Appreciation
East ORMC Turnaround Team
For your dedication, commitment and support to complete and deliver CPCA07 (PLATFORMS) 2014 Turnaround successfully
safely.
Brunei Shell Petroleum, ORMC
April 2014
8. Certificate of Appreciation
SA / CR Community Services Department
Abqiaq Utilities Division
Al-Hasa Utility Operations Unit
Box # 6190, Mubarraz, Saudi Aramco
April 25, 2011
Certificate of Achievement
For practicing defensive driving in Saudi Aramco
(No violations or motor vehicle accidents for 90 days)
Southern Area Central Region
Community Services Department, Saudi Aramco
April 26, 2011
The 4
th
Metrology Competition (Basic)
Philippine Country Level
Mitutoyo Asia Pacific Pte. Ltd.
July 18, 2006
SEMINARS / WORKSHOP ATTAINDED
Computer-Aided Design of Heating, Ventilating and Air-Conditioning
CRESENT TECHNOLOGIES
Don Lorenzo bldg. 889 P. Paredes St. Sampaloc Manila
November 16, 2003
The Technology of Non-Destructive Testing Methods
Audio-Visual Room
Feati University
Helios St. Sta. Cruz, Manila
February 23, 2005
Symposium on Industrial Automation
Festo Didactic Training Center
Sucat, Parañaque City
August 11, 2005
Metals Identification and Selection
Metals Industry Research and Development Center (MIRDC)
Dept. of Science and Technology (DOST)
March 3, 2006
Basic Computer-Aided Design
9. Metals Industry Research and Development Center (MIRDC)
Dept. of Science and Technology (DOST)
March 3, 2006
Dimensional Metrology 1 – Basic Measurement
Metals Industry Research and Development Center (MIRDC)
Dept. of Science and Technology (DOST)
July 12-14, 2006
Research and Regulating Activities and Services of Philippine
Nuclear Research Institute
Dept. of Science and Technology (DOST)
In celebration of National Chemical Engineering Week 2006
Chemical Engineering Department
FEATI University
Helios St. Sta. Cruz, Manila
Sept. 21, 2006
Certificate on AKIMS
Aker Solutions Sdn. Bhd.
Kuala Belait, Brunei Darussalam
May 23, 2014
SPECIAL SKILLS
Computer Technician
PC Repair, PC Assembly, PC Troubleshooting, PC Installation
CHARACTER REFERENCES
Atty. Edilberto F. Fermil
National Police Commission (Regional Director 12)
Koronadal City, South Cotabato
Cell. #: +639177108140
Dr. Ricardo E. Nocilo
M.D. MHA, Site Medical Officer Int'l
SOS, China
Cell. #: +639217372768
Mr. Jonny Lie
10. Discipline Lead – Piping /Mechanical Group
Aker Solutions Sdn. Bhd
Lot 41 & 42 Tapak Perundistrian Daerah Belait, Jalan Setia Diraja, Kuala Belait KA 3131
Cell #: +673-7189960
I certify that all my statement from the above mention are true and correct to the best of my knowledge and belief. I agree that if
gainfully employed, any misrepresentation(s) and or omission(s) of facts shall justify my qualification, dismissal or repatriation from work.
Lory Francis R. Navor