ELECTRICAL & INSTRUMENTATION SUPERINTENDENT
ABHINESH THOMAS
E-mail: abhinesh43@gmail.com
Contact no.: + 971567706160
CARRIER OBJECTIVE: To work in a challenging environment and use my knowledge and skills for the benefit of
my organization
EDUCATIONAL QUALIFICATION: B. Tech in Applied Electronics & Instrumentation from M.G University Kerala,
India in 2004-2008
PRESENT OCCUPATION: Presently working as an E&I Superintendent at Global Process Systems, Abu Dhabi
with a total experience of 8 Years
PREVIOUS COMPANIES:
SLNO
COMPANY NAME DESIGNATION RESPONSIBILITY DURATION
1 Global Process Systems
(Al Jaber Group)
E&I Superintendent
Team-2 Engineers,4 foremans,60 Technicians
Projects
a)Onshore& Offshore Modularized Process Facilities
b)Full FPSO Topside modules
c)Early production facilities
e)Oil/Gas/Water separation & Stabilization
f) Gas processing facilities
g)E-House
h)Modular compression solutions
1 Year 3
Months
2 Emirate Float Glass
(Dubai Investment
Group)
E&I Engineer
Team- 4 engineers and 40 Technicians.
Projects
a) Oil/Gas Processing and metering skids.
b) Power distribution systems
c) Control and instrumentation systems
d) Captive power plant.
e)Telecommunication and CCTV
f) E-House
4 Years,
6 Month
3 St. Gobain Group Project Engineer
Projects
a) Oil/Gas Processing and metering skids.
b) Power distribution systems
c) Control and instrumentation systems
d) Captive power plant.
1 Year 2
Months
4 T.G Constructions
(Bharath Petroleum Sub
Contractor)
Jr. Engineer
Projects
a)Onshore& Offshore Modularized Process Facilities
b) Early production facilities
c) Oil/Gas/Water separation & Stabilization
d) Gas processing facilities
e) Naphtha Storage facility Expansion.
f) E-House
1 year
PROJECTS
INSTALLATION, PRE-COMMISSIONING AND COMMISSIONING OF
1) E House and Power distribution
2) PLC, DCS, SCADA Control system integration.
3) Onshore& Offshore Modularized Process Facilities
4) Full FPSO Topside modules
5) Early production facilities
6) Oil/Gas/Water separation & Stabilization
7) Gas processing facilities
8) Modular compression solutions
9) Captive power plants
10) Fire detection & Control systems
11) Manufacturing Plants
FABRICATION, ASSEMBLY, PRE-COMMISSIONING & COMMISSIONING
· Provide safety, quality and schedule supervision for all permanent and temporary plant EC&I equipment
installation and erection, which includes but is not limited to, conduit installation, cable tray installation,
grounding and cathodic protection systems, cable pulling, cable terminations, cable epoxy splicing, junction
box installation, panel installation, security systems, distribution control systems (DCS), control room
installation, instrument calibration, instrument installation and connection, building small power and
lighting, building IT systems, checkout and test of all wires.
· Co-ordination for kick off meeting, monthly progress review meeting, close out report checking as built
documents/drawings, survey changes, field changes / spares etc
· Update of P&ID’s with as build’s and submission to engineering department
· Review of Commissioning sequence and plan, development of detailed commissioning procedures for
DCS loop checking, DCS, ESD and PLC logic test, test forms and Ready for Start-up for systems. In
collaboration with others departments and vendor’s representatives,
· where necessary, convert vendors procedures, check list and forms for commissioning accordingly to
company commissioning plan, submission to management for approval
· Provide support to the senior construction manager for the review of contractor construction methods,
materials, equipment, technical queries and work sequences.
· Provide support to the senior construction manager for the co-ordination of the space allocation
programme requests for access to contractors.
· Provide support to the senior construction manager to facilitate all interface and progress meetings with
contractors, stakeholders as well as producing all necessary, relevant progress reports.
· Co-ordinate movement of contractor’s equipment, laydown areas on site and access and egress routes.
· Take the necessary initiatives aiming at establishing, implementing and maintaining the supervision of EC&I
construction activities to ensure timely project completion.
· Convey and present ideas for the overall project benefit to support goals and objectives.
· Recommend stoppage of work when the required (quality or safety) of work operations are in doubt in
order to ensure work excellence and ethics regarding safety measures.
· Ensure that the EC&I construction work is performed in the safest and professional manner to meet overall
project objectives in compliance with relevant policies and regulations.
· Supervise the EC&I construction work progress and its alignment with the quality requirements as specified
by the engineering design to ensure that objectives are met in a timely manner.
· Support the theme of plan-do-check-act process; reflect this in department procedures, processes and
execution of the works.
ENGINEERING
· Provide expertise advice on all instrument engineering deliverables such as design basis, specification, data sheets,
instrument index, I/O schedule, logic diagram, cable / JB schedule, etc.
· Carryout sizing calculations for control valves, safety valves and flow elements.
· Prepare Fire & Gas deliverables.
· Co-ordinate with other disciplines and review other discipline deliverables.
· Prepare control system block diagram
· Provide inputs and review detailed drawings such as cable layout, instrument installation, process / pneumatic hook-
up, interconnection diagram, loop diagram, wiring diagram, etc. prepared by instrument designers.
· Attend meetings with client / vendor and clarify their queries as applicable.
· Reviewing various Instruments / Control system vendors offer, prepare technical clarification and prepare Technical
Bid Evaluation report.
· Review and provide comments on various instruments / control system / mechanical package vendor deliverables.
ESTIMATION & PROPOSALS
· Assist Estimating Manager in developing and maintaining the Standard Estimating Manual comprise of standard
procedure, work instructions for estimators, formats, checklists and standard norms for E&I
· Prepare/review as necessary, the following;
• Basis of Estimate documents;
• Contingency Analysis;
• Benchmarks based on historic data generated from previous bids or projects for similar jobs;
• Checklists for discussion in Bid & Client meetings.
· Prepare/review MTO’s (if required) and float RFQ’s through Procurement Department.
· Prepare/review technical and commercial evaluation of all vendor quotations to ensure compliance and competency.
· To actively participate in all bid clarification meetings and prepare/review bid clarifications as required.
· Complete analysis of bid to ensure compliance with standard, statutory & client requirements.
HANDS-ON AND MANAGERIAL EXPERIENCE WITH A BROAD RANGE OF ELECTRICAL AND INSTRUMENTATION
EQUIPMENT’S
Electrical Control and Instrumentation Others
1. HV, MV and LV Breakers (ABB,
Siemens)
2. Power and distribution
Transformers
3. Protection relays
4. Diesel generators, UPS
5. RTPFC systems
6. Motors, Drives, Soft starters.
7.VFD(Siemens, ABB, Emerson
control techniques, Lenze vector
control, Allen Bradley power flex)
1.DCS (Siemens PCS 7)
2.PLC -Allen Bradley (Control logix,
compact logix)
3.PLC -Siemens ( S7 300, S7 400)
4.SCADA (Citect, Wonder ware)
5.Robots (Manufacturer: KUKA
Germany)
6.Field instrumentation:
Transmitters, Sensors, Position
switches, Actuators,
7. Temperature, Level, Flow &
Pressure control systems.
1.EPABX
2. Fire detection &fighting systems.
3.HVAC control systems
4.Cathodic protection in
underground pipe lines
5. QA & QC lab equipment’s
maintenance.
6.Gas Analyzers
7.Condition monitoring
8.Process monitoring camera and
CCTV camera
· Troubleshooting and proposing solutions for electrical equipment problems
· Identifying root causes and solutions for instrumentation and control systems problems
· Coordination with outside maintenance organizations for specialist (suppliers’) assistance
· Organizing predictive/preventive maintenance and routine servicing schedules
· Contributing to the set-up and operation of maintenance/spare parts organization, including budget allocations.
INDUSTRIAL TRAINING.
· Allen Bradley PLC by prolific systems
· AUTO CAD
COMPUTER SKILLS:
· Operating System and applications: WINDOWS 8, 7, XP,
· MS office
· Language : C, C++
· Software :AUTO CAD, Allen Bradley logix 5000
PERSONAL QUALITIES:
· Good leadership Skills
· Good practical and technical skills, problem-solving capabilities
· Communication skills, ensuring solid understanding in a multi-cultural environment
· Management of a varied workload
PERSONAL DETAILS:
Name : Abhinesh Thomas
Date of Birth : 22 July 1986.
Sex : Male.
Marital Status : Married.
Nationality : Indian.
Languages Known : English, Hindi and Malayalam
Hobbies : Games, Cooking & Music.
DECLARATION:
I hereby declare that the above statements are true to the best of my knowledge.
Date: 30-03-2016
Place: Abu Dhabi (ABHINESH THOMAS).

CV

  • 1.
    ELECTRICAL & INSTRUMENTATIONSUPERINTENDENT ABHINESH THOMAS E-mail: abhinesh43@gmail.com Contact no.: + 971567706160 CARRIER OBJECTIVE: To work in a challenging environment and use my knowledge and skills for the benefit of my organization EDUCATIONAL QUALIFICATION: B. Tech in Applied Electronics & Instrumentation from M.G University Kerala, India in 2004-2008 PRESENT OCCUPATION: Presently working as an E&I Superintendent at Global Process Systems, Abu Dhabi with a total experience of 8 Years PREVIOUS COMPANIES: SLNO COMPANY NAME DESIGNATION RESPONSIBILITY DURATION 1 Global Process Systems (Al Jaber Group) E&I Superintendent Team-2 Engineers,4 foremans,60 Technicians Projects a)Onshore& Offshore Modularized Process Facilities b)Full FPSO Topside modules c)Early production facilities e)Oil/Gas/Water separation & Stabilization f) Gas processing facilities g)E-House h)Modular compression solutions 1 Year 3 Months 2 Emirate Float Glass (Dubai Investment Group) E&I Engineer Team- 4 engineers and 40 Technicians. Projects a) Oil/Gas Processing and metering skids. b) Power distribution systems c) Control and instrumentation systems d) Captive power plant. e)Telecommunication and CCTV f) E-House 4 Years, 6 Month 3 St. Gobain Group Project Engineer Projects a) Oil/Gas Processing and metering skids. b) Power distribution systems c) Control and instrumentation systems d) Captive power plant. 1 Year 2 Months 4 T.G Constructions (Bharath Petroleum Sub Contractor) Jr. Engineer Projects a)Onshore& Offshore Modularized Process Facilities b) Early production facilities c) Oil/Gas/Water separation & Stabilization d) Gas processing facilities e) Naphtha Storage facility Expansion. f) E-House 1 year
  • 2.
    PROJECTS INSTALLATION, PRE-COMMISSIONING ANDCOMMISSIONING OF 1) E House and Power distribution 2) PLC, DCS, SCADA Control system integration. 3) Onshore& Offshore Modularized Process Facilities 4) Full FPSO Topside modules 5) Early production facilities 6) Oil/Gas/Water separation & Stabilization 7) Gas processing facilities 8) Modular compression solutions 9) Captive power plants 10) Fire detection & Control systems 11) Manufacturing Plants FABRICATION, ASSEMBLY, PRE-COMMISSIONING & COMMISSIONING · Provide safety, quality and schedule supervision for all permanent and temporary plant EC&I equipment installation and erection, which includes but is not limited to, conduit installation, cable tray installation, grounding and cathodic protection systems, cable pulling, cable terminations, cable epoxy splicing, junction box installation, panel installation, security systems, distribution control systems (DCS), control room installation, instrument calibration, instrument installation and connection, building small power and lighting, building IT systems, checkout and test of all wires. · Co-ordination for kick off meeting, monthly progress review meeting, close out report checking as built documents/drawings, survey changes, field changes / spares etc · Update of P&ID’s with as build’s and submission to engineering department · Review of Commissioning sequence and plan, development of detailed commissioning procedures for DCS loop checking, DCS, ESD and PLC logic test, test forms and Ready for Start-up for systems. In collaboration with others departments and vendor’s representatives, · where necessary, convert vendors procedures, check list and forms for commissioning accordingly to company commissioning plan, submission to management for approval · Provide support to the senior construction manager for the review of contractor construction methods, materials, equipment, technical queries and work sequences. · Provide support to the senior construction manager for the co-ordination of the space allocation programme requests for access to contractors. · Provide support to the senior construction manager to facilitate all interface and progress meetings with contractors, stakeholders as well as producing all necessary, relevant progress reports. · Co-ordinate movement of contractor’s equipment, laydown areas on site and access and egress routes. · Take the necessary initiatives aiming at establishing, implementing and maintaining the supervision of EC&I construction activities to ensure timely project completion. · Convey and present ideas for the overall project benefit to support goals and objectives. · Recommend stoppage of work when the required (quality or safety) of work operations are in doubt in order to ensure work excellence and ethics regarding safety measures. · Ensure that the EC&I construction work is performed in the safest and professional manner to meet overall project objectives in compliance with relevant policies and regulations. · Supervise the EC&I construction work progress and its alignment with the quality requirements as specified by the engineering design to ensure that objectives are met in a timely manner. · Support the theme of plan-do-check-act process; reflect this in department procedures, processes and execution of the works.
  • 3.
    ENGINEERING · Provide expertiseadvice on all instrument engineering deliverables such as design basis, specification, data sheets, instrument index, I/O schedule, logic diagram, cable / JB schedule, etc. · Carryout sizing calculations for control valves, safety valves and flow elements. · Prepare Fire & Gas deliverables. · Co-ordinate with other disciplines and review other discipline deliverables. · Prepare control system block diagram · Provide inputs and review detailed drawings such as cable layout, instrument installation, process / pneumatic hook- up, interconnection diagram, loop diagram, wiring diagram, etc. prepared by instrument designers. · Attend meetings with client / vendor and clarify their queries as applicable. · Reviewing various Instruments / Control system vendors offer, prepare technical clarification and prepare Technical Bid Evaluation report. · Review and provide comments on various instruments / control system / mechanical package vendor deliverables. ESTIMATION & PROPOSALS · Assist Estimating Manager in developing and maintaining the Standard Estimating Manual comprise of standard procedure, work instructions for estimators, formats, checklists and standard norms for E&I · Prepare/review as necessary, the following; • Basis of Estimate documents; • Contingency Analysis; • Benchmarks based on historic data generated from previous bids or projects for similar jobs; • Checklists for discussion in Bid & Client meetings. · Prepare/review MTO’s (if required) and float RFQ’s through Procurement Department. · Prepare/review technical and commercial evaluation of all vendor quotations to ensure compliance and competency. · To actively participate in all bid clarification meetings and prepare/review bid clarifications as required. · Complete analysis of bid to ensure compliance with standard, statutory & client requirements. HANDS-ON AND MANAGERIAL EXPERIENCE WITH A BROAD RANGE OF ELECTRICAL AND INSTRUMENTATION EQUIPMENT’S Electrical Control and Instrumentation Others 1. HV, MV and LV Breakers (ABB, Siemens) 2. Power and distribution Transformers 3. Protection relays 4. Diesel generators, UPS 5. RTPFC systems 6. Motors, Drives, Soft starters. 7.VFD(Siemens, ABB, Emerson control techniques, Lenze vector control, Allen Bradley power flex) 1.DCS (Siemens PCS 7) 2.PLC -Allen Bradley (Control logix, compact logix) 3.PLC -Siemens ( S7 300, S7 400) 4.SCADA (Citect, Wonder ware) 5.Robots (Manufacturer: KUKA Germany) 6.Field instrumentation: Transmitters, Sensors, Position switches, Actuators, 7. Temperature, Level, Flow & Pressure control systems. 1.EPABX 2. Fire detection &fighting systems. 3.HVAC control systems 4.Cathodic protection in underground pipe lines 5. QA & QC lab equipment’s maintenance. 6.Gas Analyzers 7.Condition monitoring 8.Process monitoring camera and CCTV camera
  • 4.
    · Troubleshooting andproposing solutions for electrical equipment problems · Identifying root causes and solutions for instrumentation and control systems problems · Coordination with outside maintenance organizations for specialist (suppliers’) assistance · Organizing predictive/preventive maintenance and routine servicing schedules · Contributing to the set-up and operation of maintenance/spare parts organization, including budget allocations. INDUSTRIAL TRAINING. · Allen Bradley PLC by prolific systems · AUTO CAD COMPUTER SKILLS: · Operating System and applications: WINDOWS 8, 7, XP, · MS office · Language : C, C++ · Software :AUTO CAD, Allen Bradley logix 5000 PERSONAL QUALITIES: · Good leadership Skills · Good practical and technical skills, problem-solving capabilities · Communication skills, ensuring solid understanding in a multi-cultural environment · Management of a varied workload PERSONAL DETAILS: Name : Abhinesh Thomas Date of Birth : 22 July 1986. Sex : Male. Marital Status : Married. Nationality : Indian. Languages Known : English, Hindi and Malayalam Hobbies : Games, Cooking & Music. DECLARATION: I hereby declare that the above statements are true to the best of my knowledge. Date: 30-03-2016 Place: Abu Dhabi (ABHINESH THOMAS).