WHAT IS SAFEGUARDS ?
A preventive measure taken for any predictable
activities or action.
• ENVIRONMENTAL SAFEGUARDS
• SOCIAL SAFEGUARDS
• ROAD SAFETY SAFEGUARDS
What is Environment ?
• The relationship between Living organism and its
surrounding atmosphere where Abiotic and Biotic factors
influence their life.
Why we study this ?
Because
• Its affecting our Projects and daily routine life.
• Its affecting direct and indirect of developmental
activities.
• Its helping sustainable development.
Objectives of Environmental Study
• To ensure that the project is environmentally
sound and sustainable
• To maximize the positive impacts
• To minimize the adverse impacts
• To inform stakeholders and involve them in processes
• Develop alternative options and mitigation plans to
minimize the risks
What we study in Rural road environment?
• When we talk about any development than its very important to
consider the microenvironment of that area and protect by the
developmental activities.
• The concept behind that rural area is undisturbed zone and their
micro environment is balanced in comparison to urban area.
• We are trying to conserve local biodiversity i.e. Trees, Pond, animals,
birds and indigenous people.
• We study the patch in each Chanage features at both side from the
center line of the road during transect walk.
• We also provides the best possible solutions if any environmental
loss at the alignment.
• We sensitize the villagers/community to help us and balancing their
local environment through various awareness programmes.
Environmental Aspects Covered during
Transect walk
• Climate
• Forest
• Trees along the road
• Water bodies
• Flood Prone area
• Flora and fauna
• Land use
• Cultural properties
• Type of village and its amenities
HOW TO RECORD THE
ENVIRONEMNTAL
FEATURES
1. Prescribed Formats
2. Community
consultation
3. Interview
4. Field visits
5. Self assessment
 Funding agencies
 NATIONAL
• NRRDA/MPRRDA
 INTERNATIONAL
• ADB/WB/Others
It is also based on the project features and clients
Initial Environmental Examination (IEE)
Temperature High: °C (May) Low: °C (Dec)
Humidity High: (Aug) Low: % (Dec)
Rainfall
Rainy Season
mm/year
to
Road Name:
Block Name:
District Name:
Total Length of the Road:
1.Climatic Conditions
RURAL ROADS: ENVIRONMENTAL CHECKLIST
1. Location of the Road and Generic description of Environment
SN. Parameter/ Component Ye
s
No Explanation
1. Are there any areas with landslide or erosion
problems along the road?
(If yes, indicate the location (right or left side)
and the chainage)
No part of the project road lies in hilly terrain prone to
landslide or erosion. However, sufficient cross
drainage structures will be constructed to avoid any
erosion.
( ) No Secondary Information is available and
Local Community is not aware of this matter
2. Are there any lakes/swamps beside the
road?
(If yes, list them indicating the location (right or left
side) and the chainage)
Ch-
3. Are there any nallas/streams/rivers etc.
along/crossing the road?
(If yes, list them indicating the location (right,
left or crossing) and the chainage
Ch-
4. Are there problems of water stagnation and
other drainage issues on or near the road?
(If yes, mention chainage)
( ) No Secondary Information is available and Local
Community is not aware of this matter
5. Is the area along the project
road prone to flooding? (If yes, mention flood
level and frequency)
( ) No Secondary Information is available and Local
Community is not aware of this matter
1. Specific description of the Road Environment
(Note: Questions number 1, 4, 5, 7 and 8 must be answered after discussions with the local community people)
6. Are there any trees with a dbh of 30 cm or
more within 10 m on either side from the
center line of the road alignment?
(If yes attach list of trees indicating the location
(right or left side)and the chainage)
Total Tree No. Attachment I.
7. Along the road and within
100m of the road shoulder,
are there any faunal habitat areas, faunal
breeding ground, bird migration area, or other
similar areas?
(If yes, specify details of habitat with chainage)
No faunal habitat, breeding ground etc. is found within
100 m of the road shoulder.
( ) No Secondary Information is available and Local Community
is not aware of this matter
8. Along the road and within
100m of the road shoulder
is there any evidence of floral and faunal
species that are classified as endangered
species?
No rare, endangered or threatened species were found
within 100 m of the road shoulder.
( ) No Secondary Information Available and Local Community is
not aware of this matter
9. Are there any utility structures within 10 m on
either side from the center line of the road
alignment?
(If yes, attach list with chainage)
There is no few utility structures found as listed in
Attachment II.
10. Are there any religious, cultural or community
structures/buildings within 10 m on either side
from the center line of the road alignment?
(If yes attach list with chainage)
Few religious cultural or community structures/buildings
were found as listed in Attachment III.
SN Consultation Activities Yes No Remarks
1. Consultation with local community
was conducted before finalizing the
alignment.
(Attach list of people met and dates)
2. Any suggestion received
in finalizing the alignment
3. If suggestions received, were they
incorporated into the design?
D. Public Consultation
Attachment I
List of Trees
Chainage (m) Left Right
0 - 200 - -
TOTAL - -
Attachment II
List of Utilities
Chainage (m) Left Right
00-200 - -
Attachment III
List of Community Structures
Chainage (m) Left Right
00-200 - -
Left
Chainage
(m)
Right
8 to 10m 6 to 8m 4 to 6m 2 to 4m 0 to 2m 0 to 2m 2 to 4m 4 to 6m 6 to 8m 8 to 10m
Attachment IV
Attachment V
Photo Plates
Chainage (m)
Existing
Land Width
(m)
Additional Land
Required
Losses Type of loss
Village
Remarks/
Suggestions
From To LHS RHS LHS RHS LHS RHS
Chainage wise Transect Walk Findings
Environmental Management Plan
(EMaP)
EMP consists of set of mitigation, monitoring and
institutional measures to be taken during pre-
construction, construction and operation stages to
reduce adverse environmental impacts.
Why EMP Implementation?
Prevent and reduce the negative environmental impacts
by economically feasible mitigation measures because
EMP has been included as part of contract documents.
Transect walk – strip plan
15
Water body cross along the road
Labour Camp
Tree Plantation
Utility Shifting
Transect walk Consultation
Community Consultation
THANKS

More Related Content

What's hot

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prateek Bansal
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
Bibhabasu Mohanty
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
Kumar
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
Intan Ayuna
 

What's hot (20)

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Social impact assessment
Social impact assessmentSocial impact assessment
Social impact assessment
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
 
Environment Social Health and Safety (ESHS) safeguard
Environment Social Health and Safety (ESHS) safeguardEnvironment Social Health and Safety (ESHS) safeguard
Environment Social Health and Safety (ESHS) safeguard
 
Environmental and social due diligence
Environmental and social due diligenceEnvironmental and social due diligence
Environmental and social due diligence
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA
EIAEIA
EIA
 
Provision in the project formulation for Environment for Road projects
Provision in the project formulation for Environment for Road projectsProvision in the project formulation for Environment for Road projects
Provision in the project formulation for Environment for Road projects
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIA
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Environment safeguard for Road projects
Environment safeguard for Road projectsEnvironment safeguard for Road projects
Environment safeguard for Road projects
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
 
Project Cycle and the World Bank Environmental and Social Framework (ESF)
Project Cycle and the World Bank Environmental and Social Framework (ESF)Project Cycle and the World Bank Environmental and Social Framework (ESF)
Project Cycle and the World Bank Environmental and Social Framework (ESF)
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
 

Similar to Environmental safeguards

Green Infrastructure for Regional Resilience
Green Infrastructure for Regional ResilienceGreen Infrastructure for Regional Resilience
Green Infrastructure for Regional Resilience
Arbor Day Foundation
 
Urban Watershed Forestry Concepts
Urban Watershed Forestry ConceptsUrban Watershed Forestry Concepts
Urban Watershed Forestry Concepts
watershedprotection
 
LivingStreets_TransportationPlan_HighRes
LivingStreets_TransportationPlan_HighResLivingStreets_TransportationPlan_HighRes
LivingStreets_TransportationPlan_HighRes
Mark Nolan, AICP
 

Similar to Environmental safeguards (20)

IEE,EMaP plan for Road projects
IEE,EMaP plan for Road projectsIEE,EMaP plan for Road projects
IEE,EMaP plan for Road projects
 
Urban streets
Urban streetsUrban streets
Urban streets
 
Technical Training.pptx
Technical Training.pptxTechnical Training.pptx
Technical Training.pptx
 
EIA & EIV
EIA & EIVEIA & EIV
EIA & EIV
 
Urban Greenery ways and means
Urban Greenery ways and meansUrban Greenery ways and means
Urban Greenery ways and means
 
AAHDP-JEMO-II_feb. 13.pptx
AAHDP-JEMO-II_feb. 13.pptxAAHDP-JEMO-II_feb. 13.pptx
AAHDP-JEMO-II_feb. 13.pptx
 
Green Infrastructure for Regional Resilience
Green Infrastructure for Regional ResilienceGreen Infrastructure for Regional Resilience
Green Infrastructure for Regional Resilience
 
Draft EIA 2020 - Good and Concerns
Draft EIA 2020 - Good and ConcernsDraft EIA 2020 - Good and Concerns
Draft EIA 2020 - Good and Concerns
 
Impact of anthropogenic activities on the emergence and spread of zoonotic di...
Impact of anthropogenic activities on the emergence and spread of zoonotic di...Impact of anthropogenic activities on the emergence and spread of zoonotic di...
Impact of anthropogenic activities on the emergence and spread of zoonotic di...
 
lecture 1.ppt
lecture 1.pptlecture 1.ppt
lecture 1.ppt
 
Urban Watershed Forestry Concepts
Urban Watershed Forestry ConceptsUrban Watershed Forestry Concepts
Urban Watershed Forestry Concepts
 
WB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCPWB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCP
 
Urbanization.pptx
Urbanization.pptxUrbanization.pptx
Urbanization.pptx
 
2. Reviewing Biodiversity Assessments in EIAs in Myanmar
2. Reviewing Biodiversity Assessments in EIAs in Myanmar2. Reviewing Biodiversity Assessments in EIAs in Myanmar
2. Reviewing Biodiversity Assessments in EIAs in Myanmar
 
Tree stewards 02 11-2014
Tree stewards 02 11-2014Tree stewards 02 11-2014
Tree stewards 02 11-2014
 
4. Importance of City Planning - Dr. Toe Aung Ycdc
4. Importance of City Planning - Dr. Toe Aung Ycdc4. Importance of City Planning - Dr. Toe Aung Ycdc
4. Importance of City Planning - Dr. Toe Aung Ycdc
 
Roadless area initiative
Roadless area initiativeRoadless area initiative
Roadless area initiative
 
Deliverables per system Land Use Strategic Master Plans
Deliverables per system Land Use Strategic Master PlansDeliverables per system Land Use Strategic Master Plans
Deliverables per system Land Use Strategic Master Plans
 
LivingStreets_TransportationPlan_HighRes
LivingStreets_TransportationPlan_HighResLivingStreets_TransportationPlan_HighRes
LivingStreets_TransportationPlan_HighRes
 
Urban manegement final
Urban manegement finalUrban manegement final
Urban manegement final
 

Recently uploaded

Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
pcoow
 
Green house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptxGreen house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptx
ViniHema
 
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Open Access Research Paper
 

Recently uploaded (20)

Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
 
@@how to Join @occult for money ritual..☎️+2349022657119.
@@how to Join @occult for money ritual..☎️+2349022657119.@@how to Join @occult for money ritual..☎️+2349022657119.
@@how to Join @occult for money ritual..☎️+2349022657119.
 
Green house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptxGreen house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptx
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
Prevention and Control of Water Pollution
Prevention and Control of Water PollutionPrevention and Control of Water Pollution
Prevention and Control of Water Pollution
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
 
Bhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of deathBhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of death
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
Paper: Man and Environmental relationship
Paper: Man and Environmental relationshipPaper: Man and Environmental relationship
Paper: Man and Environmental relationship
 
Environmental Impact Assessment (EIA) in Nepal.pptx
Environmental Impact Assessment (EIA) in Nepal.pptxEnvironmental Impact Assessment (EIA) in Nepal.pptx
Environmental Impact Assessment (EIA) in Nepal.pptx
 
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
 
Major-Environmental-Problems and Proven Solutions.pdf
Major-Environmental-Problems and Proven Solutions.pdfMajor-Environmental-Problems and Proven Solutions.pdf
Major-Environmental-Problems and Proven Solutions.pdf
 

Environmental safeguards

  • 1. Presented By Dr. Deepak Kumar Tripathi Infrastructure Development Consultants EnvironmEntal SaFEGUarDS
  • 2. WHAT IS SAFEGUARDS ? A preventive measure taken for any predictable activities or action. • ENVIRONMENTAL SAFEGUARDS • SOCIAL SAFEGUARDS • ROAD SAFETY SAFEGUARDS
  • 3. What is Environment ? • The relationship between Living organism and its surrounding atmosphere where Abiotic and Biotic factors influence their life. Why we study this ? Because • Its affecting our Projects and daily routine life. • Its affecting direct and indirect of developmental activities. • Its helping sustainable development.
  • 4. Objectives of Environmental Study • To ensure that the project is environmentally sound and sustainable • To maximize the positive impacts • To minimize the adverse impacts • To inform stakeholders and involve them in processes • Develop alternative options and mitigation plans to minimize the risks
  • 5. What we study in Rural road environment? • When we talk about any development than its very important to consider the microenvironment of that area and protect by the developmental activities. • The concept behind that rural area is undisturbed zone and their micro environment is balanced in comparison to urban area. • We are trying to conserve local biodiversity i.e. Trees, Pond, animals, birds and indigenous people. • We study the patch in each Chanage features at both side from the center line of the road during transect walk. • We also provides the best possible solutions if any environmental loss at the alignment. • We sensitize the villagers/community to help us and balancing their local environment through various awareness programmes.
  • 6. Environmental Aspects Covered during Transect walk • Climate • Forest • Trees along the road • Water bodies • Flood Prone area • Flora and fauna • Land use • Cultural properties • Type of village and its amenities
  • 7. HOW TO RECORD THE ENVIRONEMNTAL FEATURES 1. Prescribed Formats 2. Community consultation 3. Interview 4. Field visits 5. Self assessment  Funding agencies  NATIONAL • NRRDA/MPRRDA  INTERNATIONAL • ADB/WB/Others It is also based on the project features and clients
  • 8. Initial Environmental Examination (IEE) Temperature High: °C (May) Low: °C (Dec) Humidity High: (Aug) Low: % (Dec) Rainfall Rainy Season mm/year to Road Name: Block Name: District Name: Total Length of the Road: 1.Climatic Conditions RURAL ROADS: ENVIRONMENTAL CHECKLIST
  • 9. 1. Location of the Road and Generic description of Environment
  • 10. SN. Parameter/ Component Ye s No Explanation 1. Are there any areas with landslide or erosion problems along the road? (If yes, indicate the location (right or left side) and the chainage) No part of the project road lies in hilly terrain prone to landslide or erosion. However, sufficient cross drainage structures will be constructed to avoid any erosion. ( ) No Secondary Information is available and Local Community is not aware of this matter 2. Are there any lakes/swamps beside the road? (If yes, list them indicating the location (right or left side) and the chainage) Ch- 3. Are there any nallas/streams/rivers etc. along/crossing the road? (If yes, list them indicating the location (right, left or crossing) and the chainage Ch- 4. Are there problems of water stagnation and other drainage issues on or near the road? (If yes, mention chainage) ( ) No Secondary Information is available and Local Community is not aware of this matter 5. Is the area along the project road prone to flooding? (If yes, mention flood level and frequency) ( ) No Secondary Information is available and Local Community is not aware of this matter 1. Specific description of the Road Environment (Note: Questions number 1, 4, 5, 7 and 8 must be answered after discussions with the local community people)
  • 11. 6. Are there any trees with a dbh of 30 cm or more within 10 m on either side from the center line of the road alignment? (If yes attach list of trees indicating the location (right or left side)and the chainage) Total Tree No. Attachment I. 7. Along the road and within 100m of the road shoulder, are there any faunal habitat areas, faunal breeding ground, bird migration area, or other similar areas? (If yes, specify details of habitat with chainage) No faunal habitat, breeding ground etc. is found within 100 m of the road shoulder. ( ) No Secondary Information is available and Local Community is not aware of this matter 8. Along the road and within 100m of the road shoulder is there any evidence of floral and faunal species that are classified as endangered species? No rare, endangered or threatened species were found within 100 m of the road shoulder. ( ) No Secondary Information Available and Local Community is not aware of this matter 9. Are there any utility structures within 10 m on either side from the center line of the road alignment? (If yes, attach list with chainage) There is no few utility structures found as listed in Attachment II. 10. Are there any religious, cultural or community structures/buildings within 10 m on either side from the center line of the road alignment? (If yes attach list with chainage) Few religious cultural or community structures/buildings were found as listed in Attachment III.
  • 12. SN Consultation Activities Yes No Remarks 1. Consultation with local community was conducted before finalizing the alignment. (Attach list of people met and dates) 2. Any suggestion received in finalizing the alignment 3. If suggestions received, were they incorporated into the design? D. Public Consultation Attachment I List of Trees Chainage (m) Left Right 0 - 200 - - TOTAL - - Attachment II List of Utilities Chainage (m) Left Right 00-200 - - Attachment III List of Community Structures Chainage (m) Left Right 00-200 - -
  • 13. Left Chainage (m) Right 8 to 10m 6 to 8m 4 to 6m 2 to 4m 0 to 2m 0 to 2m 2 to 4m 4 to 6m 6 to 8m 8 to 10m Attachment IV Attachment V Photo Plates Chainage (m) Existing Land Width (m) Additional Land Required Losses Type of loss Village Remarks/ Suggestions From To LHS RHS LHS RHS LHS RHS Chainage wise Transect Walk Findings
  • 14. Environmental Management Plan (EMaP) EMP consists of set of mitigation, monitoring and institutional measures to be taken during pre- construction, construction and operation stages to reduce adverse environmental impacts. Why EMP Implementation? Prevent and reduce the negative environmental impacts by economically feasible mitigation measures because EMP has been included as part of contract documents.
  • 15. Transect walk – strip plan 15
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. Water body cross along the road