ERP 101
Engineering Revisions and Engineering Change Orders (ECO)
David Bush
Senior Manufacturing Consultant,
Rootstock
The ERP 101 Webinar Series
Date Topic
Aug 2, 2016 An Introduction to ERP for Manufacturing
Aug 16, 2016 Engineering – Learn how to create Part Master Records and Bills of Material
Aug 30, 2016 Engineering – Learn how Change Orders and/or Revisions ensures that ERP system data is
accurate and up-to-date
Oct 11, 2016 Shop Floor – Explore how ERP is used to create and maintain Work Centers, Routings and
Procedures
TBA Shop Floor – See how scheduling the Shop Floor through ERP controls Labor and Machines
TBA Procurement – Link your Vendors and Purchased Parts via ERP
TBA MRP – Step though an overview of this vital ERP subset
TBA Sales – See how you can link your Customers and Products via ERP
TBA Manufacturing Accounting – An overview using standard cost
TBA Manufacturing Accounting – An overview using weighted cost
Meet Our Speakers
David Bush
Senior Manufacturing Consultant,
Rootstock
• 30+ years of manufacturing and MRP/ERP
systems experience
• Previously at General Microcircuits,
Consona Corporation, Relevant Business
Systems, Inc
A Recap
• In the last episode, we discussed:
– Part Numbers
• Format
• Description
• UOM
• Source
• Type
• Using Parts to Create Bills of Material
A Recap
• Bills of Material (BOM)
– Multiple Levels
– Components, Sub Assemblies, Reference Items, Tools and Fixtures
– Scrap factors and Set-up Quantities
All of this is used by MRP to calculate material needs
In This Episode
• What additional considerations could affect material planning?
– We have our part numbers, and we’ve put them together in a bom.
• We’ve identified the quantity required to build the next higher assembly.
• We’ve adjusted that quantity by various factors.
– What happens when change occurs?
• New styles offered
• Safety features added
• Parts no longer available
How do we control changes that affect MRP?
Handling Change that Affects MRP
• Revisions
• Engineering Change Orders
What Is an Engineering Revision?
• An alpha-numeric code that identifies a specific change or adjustment to a
part. F/E, Rev 0, Rev A, Rev A1, etc.
• A documented change to a part, subassembly or final assembly
– May be minor or significant but does not affect form, fit or function (revised
parts are interchangeable)
– May be prompted by sales, engineering design or availability from vendor.
– Formal method required by company to control the change and it’s possible
effects
What Does an Engineering Revision Control?
• Revisions typically include Pending, Released and Implemented
statuses.
• How is each Revision used?
• Department sign-offs typically done outside of the system under
Revision control.
• System only recognizes Implemented Status, so
– Why use Pending and Released status at all?
– What benefits come from controlling these statuses?
– Revision Status tells MRP what to plan.
– Revisions may happen at any level of a bom from purchased parts to
finished goods.
What Does an Engineering Revision Control?
• What if the revision is to add and/or delete parts, rather than
change existing parts. How is that handled?
• Part no longer available for purchase, replaced with new part.
• New options added and others deleted.
– Revision still required, but now the date feature of Revisions comes into
play. Add Revision Date and Delete Revision Date.
Example: Part A is being replaced by Part B. A revision is needed for
both parts.. Part A will have a ‘Delete’ Revision and part B will have
an ‘Add’ Revision, both with same date. Let’s look at our bicycle for
an example of how and why this might be done.
Lets Look At An Example
• Braking system redesigned due to
problem with brake pads.
• New fiber pads will replace the
old rubber pads on this purchased
assembly.
How would Revision control be used,
and what issues would need to be
handled?
Changes to Purchased Sub-Assembly
• 1. Is new part number required or can it be
handled via Revision Control?
• 2. Create Revision at the purchased part
(brake assembly) level.
• 3. Determine how change will affect existing
stock and purchase orders. Will they:
– A. Be used up and then switch to new assy?
– B. Be scrapped?
– C. Be reworked by you or the vendor?
An Important Consideration
• Revision Control does not control physical inventory.. that is
done at the part number level, not part number/revision.
• So, it is possible to have different revisions in inventory of the
same item.
• This must be handled by material control.
• The ERP system MAY track revisions in inventory, but we’ll
discuss that option during the webinar on physical inventory.
What if MORE Control is Required?
• What if informal sign-offs won’t cut it? Now we move to
Engineering Change Orders (ECO).
– ECO’s work in conjunction with Revision Control to provide a more
formal system to handle change.
– Main difference between ECO and Revisions is a formal sign-off by
various departments BEFORE the change can be implemented.
• A. - Pending, Released and Implemented Status remain, but at ECO level
instead of Revision.
• B. - Individuals are typically given the ability within the ERP system to create
and maintain ECO’s.
• C. Sign-offs are required (again, within the system by those given that ability)
by Engineering, Material Control, Purchasing and possibly other
departments.
In Review
• Change is INEVITABLE and the ERP system is designed to
handle it via Revisions and ECOs.
• Revision Control is a less formal method, but still requires
status changes and implementation/deletion dates.
• ECO’s incorporate all of the features of Revision Control, but
add a more formal system of sign-offs within the ERP system.
ECO’s become the controlling mechanism.
Where Do We Go From Here?
• Shop Floor Control
– Work Centers
– Processes
– Operations
– Sub-contract Operations
– Setup and Run Considerations
– Scheduling Labor and/or Machines
Q&A
www.rootstock.com
888.524.0123
marketing@rootstock.com
The ERP 101 Webinar Series
Date Topic
Aug 2, 2016 An Introduction to ERP for Manufacturing
Aug 16, 2016 Engineering – Learn how to create Part Master Records and Bills of Material
Aug 30, 2016 Engineering – Learn how Change Orders and/or Revisions ensures that ERP system data is
accurate and up-to-date
Oct 11, 2016 Shop Floor – Explore how ERP is used to create and maintain Work Centers, Routings and
Procedures
TBA Shop Floor – See how scheduling the Shop Floor through ERP controls Labor and Machines
TBA Procurement – Link your Vendors and Purchased Parts via ERP
TBA MRP – Step though an overview of this vital ERP subset
TBA Sales – See how you can link your Customers and Products via ERP
TBA Manufacturing Accounting – An overview using standard cost
TBA Manufacturing Accounting – An overview using weighted cost
Sign Up Now

More Related Content

What's hot

Maintenance management
Maintenance managementMaintenance management
Maintenance management
Anupam Kumar
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
Sumit K Jha
 
A seminar report on mechanical designing software/tools
A seminar report on    mechanical designing software/toolsA seminar report on    mechanical designing software/tools
A seminar report on mechanical designing software/tools
mdnawab1995
 
WEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream MappingWEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream Mapping
GoLeanSixSigma.com
 
Human factor standards and usability (by Ed Israelski)
Human factor standards and usability (by Ed Israelski)Human factor standards and usability (by Ed Israelski)
Human factor standards and usability (by Ed Israelski)
Stella Tsank
 
Lean 6 sigma
Lean 6 sigmaLean 6 sigma
Lean 6 sigma
raju malani
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
Reff Ren
 
1. cad fundamental
1. cad fundamental1. cad fundamental
1. cad fundamental
Ratnadeepsinh Jadeja
 
Virtual manufacturing systems ppt
Virtual manufacturing systems pptVirtual manufacturing systems ppt
Virtual manufacturing systems ppt
Anusha Chethana
 
Defect analysis and prevention methods
Defect analysis and prevention methods Defect analysis and prevention methods
Defect analysis and prevention methods
deep sharma
 
Creo Demo
Creo DemoCreo Demo
Creo Demo
Narsimha murthy
 
Lecture # 08 Reverse Engineering
Lecture # 08 Reverse EngineeringLecture # 08 Reverse Engineering
Lecture # 08 Reverse Engineering
Solomon Tekeste
 
Engineering Services Capabilities
Engineering Services CapabilitiesEngineering Services Capabilities
Engineering Services Capabilities
senthilkumaran
 
Application of Additive Manufacturing in Aerospace Industry
Application of Additive Manufacturing in Aerospace IndustryApplication of Additive Manufacturing in Aerospace Industry
Application of Additive Manufacturing in Aerospace Industry
Abhijeet Agarwal
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
Vetri Vezhan
 
84929481 value-engineering-case-study
84929481 value-engineering-case-study84929481 value-engineering-case-study
84929481 value-engineering-case-study
homeworkping3
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
Prabhu Bose
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
Operational Excellence Consulting
 
DFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and AssemblyDFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and Assembly
Sunith Guraddi
 
Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)
Hareesha N Gowda, Dayananda Sagar College of Engg, Bangalore
 

What's hot (20)

Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
A seminar report on mechanical designing software/tools
A seminar report on    mechanical designing software/toolsA seminar report on    mechanical designing software/tools
A seminar report on mechanical designing software/tools
 
WEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream MappingWEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream Mapping
 
Human factor standards and usability (by Ed Israelski)
Human factor standards and usability (by Ed Israelski)Human factor standards and usability (by Ed Israelski)
Human factor standards and usability (by Ed Israelski)
 
Lean 6 sigma
Lean 6 sigmaLean 6 sigma
Lean 6 sigma
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
 
1. cad fundamental
1. cad fundamental1. cad fundamental
1. cad fundamental
 
Virtual manufacturing systems ppt
Virtual manufacturing systems pptVirtual manufacturing systems ppt
Virtual manufacturing systems ppt
 
Defect analysis and prevention methods
Defect analysis and prevention methods Defect analysis and prevention methods
Defect analysis and prevention methods
 
Creo Demo
Creo DemoCreo Demo
Creo Demo
 
Lecture # 08 Reverse Engineering
Lecture # 08 Reverse EngineeringLecture # 08 Reverse Engineering
Lecture # 08 Reverse Engineering
 
Engineering Services Capabilities
Engineering Services CapabilitiesEngineering Services Capabilities
Engineering Services Capabilities
 
Application of Additive Manufacturing in Aerospace Industry
Application of Additive Manufacturing in Aerospace IndustryApplication of Additive Manufacturing in Aerospace Industry
Application of Additive Manufacturing in Aerospace Industry
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
 
84929481 value-engineering-case-study
84929481 value-engineering-case-study84929481 value-engineering-case-study
84929481 value-engineering-case-study
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
DFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and AssemblyDFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and Assembly
 
Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)
 

Viewers also liked

ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
Rootstock Software
 
Engineering Change
Engineering ChangeEngineering Change
Engineering Change
Kellan
 
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Rootstock Software
 
ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO)
ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO) ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO)
ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO)
Rootstock Software
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of Manufacturing
Rootstock Software
 
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
Rootstock Software
 
ERP 101: MRP - Step through an overview of this vital ERP subset
ERP 101: MRP - Step through an overview of this vital ERP subsetERP 101: MRP - Step through an overview of this vital ERP subset
ERP 101: MRP - Step through an overview of this vital ERP subset
Rootstock Software
 
Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with Aras
Aras
 
ERP 101- Introduction to ERP for Manufacturing & Distribution
ERP 101- Introduction to ERP for Manufacturing & DistributionERP 101- Introduction to ERP for Manufacturing & Distribution
ERP 101- Introduction to ERP for Manufacturing & Distribution
Rootstock Software
 
ERP 101: Inventory - Maintaining Accurate and Reliable Data
ERP 101: Inventory - Maintaining Accurate and Reliable DataERP 101: Inventory - Maintaining Accurate and Reliable Data
ERP 101: Inventory - Maintaining Accurate and Reliable Data
Rootstock Software
 
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERPERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
Rootstock Software
 
JPiere説明書 消費税-間接税編
JPiere説明書 消費税-間接税編JPiere説明書 消費税-間接税編
JPiere説明書 消費税-間接税編
Hideaki Hagiwara
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013
John Cachat
 
SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM) SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM)
KMR SOFTWARE SERVICES PVT LTD
 
branding strategy of Harley Davidson
branding strategy of Harley Davidson branding strategy of Harley Davidson
branding strategy of Harley Davidson
satheesh26
 
Change Management
Change ManagementChange Management
Change Management
Estragon
 
Engineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesEngineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best Practices
Shobhit Singhal
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy ppt
sonips
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT Slides
Yodhia Antariksa
 

Viewers also liked (19)

ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
 
Engineering Change
Engineering ChangeEngineering Change
Engineering Change
 
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
 
ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO)
ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO) ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO)
ERP 101 Series: Engineering Revisions and Engineering Change Order (ECO)
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of Manufacturing
 
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
 
ERP 101: MRP - Step through an overview of this vital ERP subset
ERP 101: MRP - Step through an overview of this vital ERP subsetERP 101: MRP - Step through an overview of this vital ERP subset
ERP 101: MRP - Step through an overview of this vital ERP subset
 
Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with Aras
 
ERP 101- Introduction to ERP for Manufacturing & Distribution
ERP 101- Introduction to ERP for Manufacturing & DistributionERP 101- Introduction to ERP for Manufacturing & Distribution
ERP 101- Introduction to ERP for Manufacturing & Distribution
 
ERP 101: Inventory - Maintaining Accurate and Reliable Data
ERP 101: Inventory - Maintaining Accurate and Reliable DataERP 101: Inventory - Maintaining Accurate and Reliable Data
ERP 101: Inventory - Maintaining Accurate and Reliable Data
 
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERPERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
 
JPiere説明書 消費税-間接税編
JPiere説明書 消費税-間接税編JPiere説明書 消費税-間接税編
JPiere説明書 消費税-間接税編
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013
 
SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM) SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM)
 
branding strategy of Harley Davidson
branding strategy of Harley Davidson branding strategy of Harley Davidson
branding strategy of Harley Davidson
 
Change Management
Change ManagementChange Management
Change Management
 
Engineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesEngineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best Practices
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy ppt
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT Slides
 

Similar to Engineering Revisions and Engineering Change Orders (ECO)

Project Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersProject Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many Manufacturers
Rootstock Software
 
NumeroUno Solution Presentation-Ver 1.0.pptx
NumeroUno Solution Presentation-Ver 1.0.pptxNumeroUno Solution Presentation-Ver 1.0.pptx
NumeroUno Solution Presentation-Ver 1.0.pptx
Sandeep617883
 
Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...
Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...
Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...
Rootstock Software
 
Production order - Murali krishna nookella
Production order - Murali krishna nookellaProduction order - Murali krishna nookella
Production order - Murali krishna nookella
murali nookella
 
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERPERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
eresource infotech pvt ltd
 
Sales – See how you can link your Customers and Products via ERP
Sales – See how you can link your Customers and Products via ERPSales – See how you can link your Customers and Products via ERP
Sales – See how you can link your Customers and Products via ERP
Rootstock Software
 
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITYMRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
OpusCapita
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
Ruhi Beri
 
IAM-EAM PPT.ppt
IAM-EAM PPT.pptIAM-EAM PPT.ppt
IAM-EAM PPT.ppt
NiteshSharma901236
 
Software configuration management in deep
Software configuration management in deepSoftware configuration management in deep
Software configuration management in deep
Fáber D. Giraldo
 
Ppc notes
Ppc notesPpc notes
Ppc notes
nagaraj03
 
PPC NOTES.pdf
PPC NOTES.pdfPPC NOTES.pdf
PPC NOTES.pdf
JanakKarki3
 
Scm
ScmScm
Configuration Management
Configuration ManagementConfiguration Management
Configuration Management
Saqib Raza
 
Optimize your Change Management Process
Optimize your Change Management ProcessOptimize your Change Management Process
Optimize your Change Management Process
Jason Goncalves
 
Beautifying Inventory and Service Levels at a Cosmetics Company
Beautifying Inventory and Service Levels at a Cosmetics CompanyBeautifying Inventory and Service Levels at a Cosmetics Company
Beautifying Inventory and Service Levels at a Cosmetics Company
Tristan Wiggill
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
JeyanthiR
 
Om lect 01(r0-may08)_operations strategy_mms_bharti_sies
Om lect 01(r0-may08)_operations strategy_mms_bharti_siesOm lect 01(r0-may08)_operations strategy_mms_bharti_sies
Om lect 01(r0-may08)_operations strategy_mms_bharti_sies
videoaakash15
 
Inventory management
Inventory managementInventory management
Inventory management
RajThakuri
 
Principles of management – mgt101
Principles of management – mgt101Principles of management – mgt101
Principles of management – mgt101
Fallahchay Ali
 

Similar to Engineering Revisions and Engineering Change Orders (ECO) (20)

Project Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersProject Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many Manufacturers
 
NumeroUno Solution Presentation-Ver 1.0.pptx
NumeroUno Solution Presentation-Ver 1.0.pptxNumeroUno Solution Presentation-Ver 1.0.pptx
NumeroUno Solution Presentation-Ver 1.0.pptx
 
Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...
Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...
Discover Rootstock ERP: Practical Tips to Manage Manufacturing Quality Across...
 
Production order - Murali krishna nookella
Production order - Murali krishna nookellaProduction order - Murali krishna nookella
Production order - Murali krishna nookella
 
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERPERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
 
Sales – See how you can link your Customers and Products via ERP
Sales – See how you can link your Customers and Products via ERPSales – See how you can link your Customers and Products via ERP
Sales – See how you can link your Customers and Products via ERP
 
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITYMRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
IAM-EAM PPT.ppt
IAM-EAM PPT.pptIAM-EAM PPT.ppt
IAM-EAM PPT.ppt
 
Software configuration management in deep
Software configuration management in deepSoftware configuration management in deep
Software configuration management in deep
 
Ppc notes
Ppc notesPpc notes
Ppc notes
 
PPC NOTES.pdf
PPC NOTES.pdfPPC NOTES.pdf
PPC NOTES.pdf
 
Scm
ScmScm
Scm
 
Configuration Management
Configuration ManagementConfiguration Management
Configuration Management
 
Optimize your Change Management Process
Optimize your Change Management ProcessOptimize your Change Management Process
Optimize your Change Management Process
 
Beautifying Inventory and Service Levels at a Cosmetics Company
Beautifying Inventory and Service Levels at a Cosmetics CompanyBeautifying Inventory and Service Levels at a Cosmetics Company
Beautifying Inventory and Service Levels at a Cosmetics Company
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
Om lect 01(r0-may08)_operations strategy_mms_bharti_sies
Om lect 01(r0-may08)_operations strategy_mms_bharti_siesOm lect 01(r0-may08)_operations strategy_mms_bharti_sies
Om lect 01(r0-may08)_operations strategy_mms_bharti_sies
 
Inventory management
Inventory managementInventory management
Inventory management
 
Principles of management – mgt101
Principles of management – mgt101Principles of management – mgt101
Principles of management – mgt101
 

More from Rootstock Software

Is Your ERP Ready for the Age of Personalization?
Is Your ERP Ready for the Age of Personalization?Is Your ERP Ready for the Age of Personalization?
Is Your ERP Ready for the Age of Personalization?
Rootstock Software
 
Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018
Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018
Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018
Rootstock Software
 
Discover Rootstock ERP - How to Survive and Thrive in High Growth Mode
Discover Rootstock ERP - How to Survive and Thrive in High Growth ModeDiscover Rootstock ERP - How to Survive and Thrive in High Growth Mode
Discover Rootstock ERP - How to Survive and Thrive in High Growth Mode
Rootstock Software
 
Discover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid Them
Discover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid ThemDiscover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid Them
Discover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid Them
Rootstock Software
 
Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...
Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...
Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...
Rootstock Software
 
Discover RootScan
Discover RootScan Discover RootScan
Discover RootScan
Rootstock Software
 
ERP 101: Tracking Costs Using ERP
ERP 101: Tracking Costs Using ERPERP 101: Tracking Costs Using ERP
ERP 101: Tracking Costs Using ERP
Rootstock Software
 

More from Rootstock Software (7)

Is Your ERP Ready for the Age of Personalization?
Is Your ERP Ready for the Age of Personalization?Is Your ERP Ready for the Age of Personalization?
Is Your ERP Ready for the Age of Personalization?
 
Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018
Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018
Discover Rootstock ERP: Top Manufacturing Trends to Watch in 2018
 
Discover Rootstock ERP - How to Survive and Thrive in High Growth Mode
Discover Rootstock ERP - How to Survive and Thrive in High Growth ModeDiscover Rootstock ERP - How to Survive and Thrive in High Growth Mode
Discover Rootstock ERP - How to Survive and Thrive in High Growth Mode
 
Discover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid Them
Discover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid ThemDiscover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid Them
Discover Rootstock ERP - Top 5 Inventory Mistakes and How to Avoid Them
 
Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...
Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...
Succeed with Rootstock - Pro-Tech Replaces Spreadsheets and Old Software with...
 
Discover RootScan
Discover RootScan Discover RootScan
Discover RootScan
 
ERP 101: Tracking Costs Using ERP
ERP 101: Tracking Costs Using ERPERP 101: Tracking Costs Using ERP
ERP 101: Tracking Costs Using ERP
 

Recently uploaded

DDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systemsDDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systems
Gerardo Pardo-Castellote
 
SMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API ServiceSMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API Service
Yara Milbes
 
Hand Rolled Applicative User Validation Code Kata
Hand Rolled Applicative User ValidationCode KataHand Rolled Applicative User ValidationCode Kata
Hand Rolled Applicative User Validation Code Kata
Philip Schwarz
 
SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024
Hironori Washizaki
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j
 
OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024
OpenMetadata
 
LORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOM
LORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOMLORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOM
LORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOM
lorraineandreiamcidl
 
Transform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR SolutionsTransform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR Solutions
TheSMSPoint
 
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of CodeA Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
Aftab Hussain
 
KuberTENes Birthday Bash Guadalajara - Introducción a Argo CD
KuberTENes Birthday Bash Guadalajara - Introducción a Argo CDKuberTENes Birthday Bash Guadalajara - Introducción a Argo CD
KuberTENes Birthday Bash Guadalajara - Introducción a Argo CD
rodomar2
 
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
kalichargn70th171
 
Oracle Database 19c New Features for DBAs and Developers.pptx
Oracle Database 19c New Features for DBAs and Developers.pptxOracle Database 19c New Features for DBAs and Developers.pptx
Oracle Database 19c New Features for DBAs and Developers.pptx
Remote DBA Services
 
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
Łukasz Chruściel
 
UI5con 2024 - Keynote: Latest News about UI5 and it’s Ecosystem
UI5con 2024 - Keynote: Latest News about UI5 and it’s EcosystemUI5con 2024 - Keynote: Latest News about UI5 and it’s Ecosystem
UI5con 2024 - Keynote: Latest News about UI5 and it’s Ecosystem
Peter Muessig
 
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian CompaniesE-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
Quickdice ERP
 
E-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet DynamicsE-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet Dynamics
Hornet Dynamics
 
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissancesAtelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Neo4j
 
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI AppAI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
Google
 
Artificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension FunctionsArtificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension Functions
Octavian Nadolu
 
Empowering Growth with Best Software Development Company in Noida - Deuglo
Empowering Growth with Best Software  Development Company in Noida - DeugloEmpowering Growth with Best Software  Development Company in Noida - Deuglo
Empowering Growth with Best Software Development Company in Noida - Deuglo
Deuglo Infosystem Pvt Ltd
 

Recently uploaded (20)

DDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systemsDDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systems
 
SMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API ServiceSMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API Service
 
Hand Rolled Applicative User Validation Code Kata
Hand Rolled Applicative User ValidationCode KataHand Rolled Applicative User ValidationCode Kata
Hand Rolled Applicative User Validation Code Kata
 
SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
 
OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024
 
LORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOM
LORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOMLORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOM
LORRAINE ANDREI_LEQUIGAN_HOW TO USE ZOOM
 
Transform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR SolutionsTransform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR Solutions
 
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of CodeA Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
 
KuberTENes Birthday Bash Guadalajara - Introducción a Argo CD
KuberTENes Birthday Bash Guadalajara - Introducción a Argo CDKuberTENes Birthday Bash Guadalajara - Introducción a Argo CD
KuberTENes Birthday Bash Guadalajara - Introducción a Argo CD
 
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
 
Oracle Database 19c New Features for DBAs and Developers.pptx
Oracle Database 19c New Features for DBAs and Developers.pptxOracle Database 19c New Features for DBAs and Developers.pptx
Oracle Database 19c New Features for DBAs and Developers.pptx
 
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
 
UI5con 2024 - Keynote: Latest News about UI5 and it’s Ecosystem
UI5con 2024 - Keynote: Latest News about UI5 and it’s EcosystemUI5con 2024 - Keynote: Latest News about UI5 and it’s Ecosystem
UI5con 2024 - Keynote: Latest News about UI5 and it’s Ecosystem
 
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian CompaniesE-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
 
E-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet DynamicsE-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet Dynamics
 
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissancesAtelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissances
 
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI AppAI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
 
Artificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension FunctionsArtificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension Functions
 
Empowering Growth with Best Software Development Company in Noida - Deuglo
Empowering Growth with Best Software  Development Company in Noida - DeugloEmpowering Growth with Best Software  Development Company in Noida - Deuglo
Empowering Growth with Best Software Development Company in Noida - Deuglo
 

Engineering Revisions and Engineering Change Orders (ECO)

  • 1. ERP 101 Engineering Revisions and Engineering Change Orders (ECO) David Bush Senior Manufacturing Consultant, Rootstock
  • 2. The ERP 101 Webinar Series Date Topic Aug 2, 2016 An Introduction to ERP for Manufacturing Aug 16, 2016 Engineering – Learn how to create Part Master Records and Bills of Material Aug 30, 2016 Engineering – Learn how Change Orders and/or Revisions ensures that ERP system data is accurate and up-to-date Oct 11, 2016 Shop Floor – Explore how ERP is used to create and maintain Work Centers, Routings and Procedures TBA Shop Floor – See how scheduling the Shop Floor through ERP controls Labor and Machines TBA Procurement – Link your Vendors and Purchased Parts via ERP TBA MRP – Step though an overview of this vital ERP subset TBA Sales – See how you can link your Customers and Products via ERP TBA Manufacturing Accounting – An overview using standard cost TBA Manufacturing Accounting – An overview using weighted cost
  • 3. Meet Our Speakers David Bush Senior Manufacturing Consultant, Rootstock • 30+ years of manufacturing and MRP/ERP systems experience • Previously at General Microcircuits, Consona Corporation, Relevant Business Systems, Inc
  • 4. A Recap • In the last episode, we discussed: – Part Numbers • Format • Description • UOM • Source • Type • Using Parts to Create Bills of Material
  • 5. A Recap • Bills of Material (BOM) – Multiple Levels – Components, Sub Assemblies, Reference Items, Tools and Fixtures – Scrap factors and Set-up Quantities All of this is used by MRP to calculate material needs
  • 6. In This Episode • What additional considerations could affect material planning? – We have our part numbers, and we’ve put them together in a bom. • We’ve identified the quantity required to build the next higher assembly. • We’ve adjusted that quantity by various factors. – What happens when change occurs? • New styles offered • Safety features added • Parts no longer available How do we control changes that affect MRP?
  • 7. Handling Change that Affects MRP • Revisions • Engineering Change Orders
  • 8. What Is an Engineering Revision? • An alpha-numeric code that identifies a specific change or adjustment to a part. F/E, Rev 0, Rev A, Rev A1, etc. • A documented change to a part, subassembly or final assembly – May be minor or significant but does not affect form, fit or function (revised parts are interchangeable) – May be prompted by sales, engineering design or availability from vendor. – Formal method required by company to control the change and it’s possible effects
  • 9. What Does an Engineering Revision Control? • Revisions typically include Pending, Released and Implemented statuses. • How is each Revision used? • Department sign-offs typically done outside of the system under Revision control. • System only recognizes Implemented Status, so – Why use Pending and Released status at all? – What benefits come from controlling these statuses? – Revision Status tells MRP what to plan. – Revisions may happen at any level of a bom from purchased parts to finished goods.
  • 10. What Does an Engineering Revision Control? • What if the revision is to add and/or delete parts, rather than change existing parts. How is that handled? • Part no longer available for purchase, replaced with new part. • New options added and others deleted. – Revision still required, but now the date feature of Revisions comes into play. Add Revision Date and Delete Revision Date. Example: Part A is being replaced by Part B. A revision is needed for both parts.. Part A will have a ‘Delete’ Revision and part B will have an ‘Add’ Revision, both with same date. Let’s look at our bicycle for an example of how and why this might be done.
  • 11. Lets Look At An Example • Braking system redesigned due to problem with brake pads. • New fiber pads will replace the old rubber pads on this purchased assembly. How would Revision control be used, and what issues would need to be handled?
  • 12. Changes to Purchased Sub-Assembly • 1. Is new part number required or can it be handled via Revision Control? • 2. Create Revision at the purchased part (brake assembly) level. • 3. Determine how change will affect existing stock and purchase orders. Will they: – A. Be used up and then switch to new assy? – B. Be scrapped? – C. Be reworked by you or the vendor?
  • 13. An Important Consideration • Revision Control does not control physical inventory.. that is done at the part number level, not part number/revision. • So, it is possible to have different revisions in inventory of the same item. • This must be handled by material control. • The ERP system MAY track revisions in inventory, but we’ll discuss that option during the webinar on physical inventory.
  • 14. What if MORE Control is Required? • What if informal sign-offs won’t cut it? Now we move to Engineering Change Orders (ECO). – ECO’s work in conjunction with Revision Control to provide a more formal system to handle change. – Main difference between ECO and Revisions is a formal sign-off by various departments BEFORE the change can be implemented. • A. - Pending, Released and Implemented Status remain, but at ECO level instead of Revision. • B. - Individuals are typically given the ability within the ERP system to create and maintain ECO’s. • C. Sign-offs are required (again, within the system by those given that ability) by Engineering, Material Control, Purchasing and possibly other departments.
  • 15. In Review • Change is INEVITABLE and the ERP system is designed to handle it via Revisions and ECOs. • Revision Control is a less formal method, but still requires status changes and implementation/deletion dates. • ECO’s incorporate all of the features of Revision Control, but add a more formal system of sign-offs within the ERP system. ECO’s become the controlling mechanism.
  • 16. Where Do We Go From Here? • Shop Floor Control – Work Centers – Processes – Operations – Sub-contract Operations – Setup and Run Considerations – Scheduling Labor and/or Machines
  • 18. The ERP 101 Webinar Series Date Topic Aug 2, 2016 An Introduction to ERP for Manufacturing Aug 16, 2016 Engineering – Learn how to create Part Master Records and Bills of Material Aug 30, 2016 Engineering – Learn how Change Orders and/or Revisions ensures that ERP system data is accurate and up-to-date Oct 11, 2016 Shop Floor – Explore how ERP is used to create and maintain Work Centers, Routings and Procedures TBA Shop Floor – See how scheduling the Shop Floor through ERP controls Labor and Machines TBA Procurement – Link your Vendors and Purchased Parts via ERP TBA MRP – Step though an overview of this vital ERP subset TBA Sales – See how you can link your Customers and Products via ERP TBA Manufacturing Accounting – An overview using standard cost TBA Manufacturing Accounting – An overview using weighted cost Sign Up Now