Layout and General Arrangement Drawings Description
Overall Plant Layout
Water Distribution Pipeline Layout
Storm water drainage layout
Internal road layout
CCTV camera layout
Overall Plant Grading and Leveling Plan
Foundation Marking Plan
Cable Trench Layout (indicating Details of cable route for Power &
Communication Cables)
Layout of Inverter & Transformer block (Inverter Stand)
Layout for Balance of Plant systems, (Weather Stations, Earthing, Lightening
protection, surge protection etc.)
Bill of Material for Mechanical Components
Civil Related Drawings and documents
Detail Of Solar Field Compound wall
Detail Of Solar Field Entry Gate
Details of RCC Foundation, Plan, Section and Side view details for MCR.
RCC Foundations Construction Design Document
Details of RCC Foundation, Plan, Section and Side view details for Inverter
room
Design Document for bolts, base plates, etc used in structure, foundation of
Inverter and Control room
Details of truss structure for Inverter room if any
Outdoor Transformer Foundation detail
Control Room Building Architectural Plan, Sections & Elevations
Control Room Building Foundation & Column Details
Control Room Building Plinth Beam Details
Control Room Building Lintel Cum Sunshade Detail
Control Room Building Roof Beam & Slab Detail
Cable Trench Cross Section for Inverter, and Control Room
Bar Bending Schedule
Sectional View, Dimensional and parts details of the Structure
Design document for Mounting Structure (STAAD and ANSI analysis reports)

Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd

1
Gensol: List of Drawings & Documents

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Mounting Structure Drawing
In plant road WBM road cross section
Cross section of Bitumen road
Main Control Room & Plant Switchyard GA Details
Bill of material for Civil items
Cross Section of Drains
Design document of Drain
Earthing Pit Design
Lightning Arrestor Foundation and Design
Street Lighting Foundation and Design
Concrete schedule
Earthwork schedule
Plumbing and Sanitary Drawings
Painting Specifications
Flooring Specifications
Soak Pit
Septic Tank
Water wash pumps and Pipes
Water Proofing specifications
Foundation Design for Transmission Tower
Transmission Tower Structure Design
GA Of Double Pole Structure And Foundation For Transmission Line
Detail of Stub and Cleats for tower
Design basis Report for Transmission Line
Proposed Corridor of Transmission Line
Design of Water Tank for Module Cleaning
Water tank plan, cross section and detail design
Earth Wire GTP along with Drum Drawing

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Electrical Drawings and documents
Principle SLD for DC system
DC Cable Schedule
Crimping/ Termination hardware schedule (DC)
Module Technical detail
Inverter Technical detail
DC Cable derating sheet and GTP
Principle SLD for AC system
Main AC Distribution Board SLD
HT & LT Cable Sizing Calculations and cable schedule
Termination hardware schedule (AC)
Transmission Line and Bus Bar Conductor sizing
Bus Rating Calulation
Earthing Calculations for inverter and control room
Lightning protection calculation

Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd

2
Gensol: List of Drawings & Documents

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

1
2
3
4
5
6
7
8
9
10
11

Inverter Room Equipment Layout
Main Control Room Equipment Layout
Inverter and Control room earthing calculation
Inverter and Control room earthing details
Road lighting detail
Typical Cable tray details
HT and LT panel drawing
Outdoor/Indoor breaker drawing
Battery and UPS design calculation
Battery and UPS datasheets
Auxiliary power SLD
DCDB SLD
C & R schemes, relay setting calculations,relay coordination schemes
DBR for Transmission system,component
specifications(Cabling,Conductors,insulators,lightening arrestors,structures
and structure earthing)
Equipment Earthing
Alarms and Trip list
Inverter duty/ power transformer GTP and GA drawing
GA Drawing for Auxiliary Transformer
Technical Datasheet for Junction Boxes
Technical Datasheet for all connectors etc.
Technical Datasheet for all Components of Earthing System
Technical Datasheet for all Components of Lightening protection system
Bill Of material for Electrical Components (incl. cables, JB's etc.)
Technical Datasheet for Tariff Meter (Incl. details of CT's PT's etc.)
Installation Guide for Inverters
Installation Guide for PV Solar Modules and Other Electrical Components
Factory Test Reports of all equipments.
Test Certificates (Incl. UL/IEC/TUV/ISO certificates) for all components
Monitoring Systems
SCADA Architecture Single Line Diagram
Communication Cable Schedule
Signal attenuation calculations
Technical Datasheet for all Testing Instruments (Weather monitoring
instruments)
SCADA/Plant Control and Monitoring system drawing
Data Communication to SLDC/utility/PEDA
I/O lists,Servers & operator workstation configuration
Fire sensors,Fire alarm system
CCTV Architecture
CCTV Camera Coverage Plan
CCTV Cable Schedule

Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd

3
Gensol: List of Drawings & Documents

12
13
14
15
16

Technical Datasheet for SCADA
Project Implementation schedule
Permits and Clearances Required
Generation and Shading Analysis
Yield Report

1
2
3
4
5

Other Documents
FQPs,MQPs
Check Lists
Acceptance Criteria
Performance Test Plans
Commisioning Protocols

Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd

4

Drawings & Documents Required for Solar Projects

  • 1.
    Gensol: List ofDrawings & Documents List of Drawings & Documents S. No. 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Layout and General Arrangement Drawings Description Overall Plant Layout Water Distribution Pipeline Layout Storm water drainage layout Internal road layout CCTV camera layout Overall Plant Grading and Leveling Plan Foundation Marking Plan Cable Trench Layout (indicating Details of cable route for Power & Communication Cables) Layout of Inverter & Transformer block (Inverter Stand) Layout for Balance of Plant systems, (Weather Stations, Earthing, Lightening protection, surge protection etc.) Bill of Material for Mechanical Components Civil Related Drawings and documents Detail Of Solar Field Compound wall Detail Of Solar Field Entry Gate Details of RCC Foundation, Plan, Section and Side view details for MCR. RCC Foundations Construction Design Document Details of RCC Foundation, Plan, Section and Side view details for Inverter room Design Document for bolts, base plates, etc used in structure, foundation of Inverter and Control room Details of truss structure for Inverter room if any Outdoor Transformer Foundation detail Control Room Building Architectural Plan, Sections & Elevations Control Room Building Foundation & Column Details Control Room Building Plinth Beam Details Control Room Building Lintel Cum Sunshade Detail Control Room Building Roof Beam & Slab Detail Cable Trench Cross Section for Inverter, and Control Room Bar Bending Schedule Sectional View, Dimensional and parts details of the Structure Design document for Mounting Structure (STAAD and ANSI analysis reports) Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd 1
  • 2.
    Gensol: List ofDrawings & Documents 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Mounting Structure Drawing In plant road WBM road cross section Cross section of Bitumen road Main Control Room & Plant Switchyard GA Details Bill of material for Civil items Cross Section of Drains Design document of Drain Earthing Pit Design Lightning Arrestor Foundation and Design Street Lighting Foundation and Design Concrete schedule Earthwork schedule Plumbing and Sanitary Drawings Painting Specifications Flooring Specifications Soak Pit Septic Tank Water wash pumps and Pipes Water Proofing specifications Foundation Design for Transmission Tower Transmission Tower Structure Design GA Of Double Pole Structure And Foundation For Transmission Line Detail of Stub and Cleats for tower Design basis Report for Transmission Line Proposed Corridor of Transmission Line Design of Water Tank for Module Cleaning Water tank plan, cross section and detail design Earth Wire GTP along with Drum Drawing 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Electrical Drawings and documents Principle SLD for DC system DC Cable Schedule Crimping/ Termination hardware schedule (DC) Module Technical detail Inverter Technical detail DC Cable derating sheet and GTP Principle SLD for AC system Main AC Distribution Board SLD HT & LT Cable Sizing Calculations and cable schedule Termination hardware schedule (AC) Transmission Line and Bus Bar Conductor sizing Bus Rating Calulation Earthing Calculations for inverter and control room Lightning protection calculation Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd 2
  • 3.
    Gensol: List ofDrawings & Documents 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 1 2 3 4 5 6 7 8 9 10 11 Inverter Room Equipment Layout Main Control Room Equipment Layout Inverter and Control room earthing calculation Inverter and Control room earthing details Road lighting detail Typical Cable tray details HT and LT panel drawing Outdoor/Indoor breaker drawing Battery and UPS design calculation Battery and UPS datasheets Auxiliary power SLD DCDB SLD C & R schemes, relay setting calculations,relay coordination schemes DBR for Transmission system,component specifications(Cabling,Conductors,insulators,lightening arrestors,structures and structure earthing) Equipment Earthing Alarms and Trip list Inverter duty/ power transformer GTP and GA drawing GA Drawing for Auxiliary Transformer Technical Datasheet for Junction Boxes Technical Datasheet for all connectors etc. Technical Datasheet for all Components of Earthing System Technical Datasheet for all Components of Lightening protection system Bill Of material for Electrical Components (incl. cables, JB's etc.) Technical Datasheet for Tariff Meter (Incl. details of CT's PT's etc.) Installation Guide for Inverters Installation Guide for PV Solar Modules and Other Electrical Components Factory Test Reports of all equipments. Test Certificates (Incl. UL/IEC/TUV/ISO certificates) for all components Monitoring Systems SCADA Architecture Single Line Diagram Communication Cable Schedule Signal attenuation calculations Technical Datasheet for all Testing Instruments (Weather monitoring instruments) SCADA/Plant Control and Monitoring system drawing Data Communication to SLDC/utility/PEDA I/O lists,Servers & operator workstation configuration Fire sensors,Fire alarm system CCTV Architecture CCTV Camera Coverage Plan CCTV Cable Schedule Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd 3
  • 4.
    Gensol: List ofDrawings & Documents 12 13 14 15 16 Technical Datasheet for SCADA Project Implementation schedule Permits and Clearances Required Generation and Shading Analysis Yield Report 1 2 3 4 5 Other Documents FQPs,MQPs Check Lists Acceptance Criteria Performance Test Plans Commisioning Protocols Gensol Engineering Pvt Ltd. | Gensol Consultants Pvt Ltd 4