GENSOL ENGINEERING PVT. LTD
www.gensol.in
Indian Solar Rooftop PV – A Bright
Investment
Rooftop Overview - Focus to Indian Scenario
Gensol Group
Jawaharlal
Nehru
National
Solar
Mission
Atal
Innovation
Mission
Make in
India
Smart
Cities
Mission
24X7
Power for
all
Ujjawal
DISCOM
Assurance
Yojana
Supportive GoI Missions & Initiatives for Rooftop PV Solar
India’s total installed solar capacity is estimated to have reached 21.65 GW as on June 2018. This includes 19.65 GW of utility
scale (90%) and 2 GW (Approx.) of rooftop solar capacity (10%).
Source – CER, 2018
Indian rooftop solar market growing at over 80% annually.
Industrial & Commercial are more attractive
relative to residential segments
Gensol Group
Assessment Parameters Industrial Commercial Residential
Attractiveness
Regulatory Support
Tariff Parity
Opportunity Potential in 2022
Realizable Opp. Size in 2022
Overall Attractiveness
TariffAttractiveness
Net tariff
differential
between the
existing variable
tariff for that sub-
segment and
potential solar
tariff in year 1 in
that state for a
15% IRR
OpportunityPotential
Rooftop solar
market
opportunity size
(MW)
Current
penetration (as a
% of potential)
PolicySupport
Specific elements
of state solar
policy that are
beneficial to a
developer:
- Subsidies &
incentives
- Strength of
intent
0 1000 2000 3000 4000 5000
Lakshadweep
Arunachal Pradesh
Meghalaya
Nagaland
Tripura
Puducherry
Goa
Assam
Uttarakhand
Chhattisgarh
Kerala
Odisha
Haryana
Punjab
West Bengal
Karnataka
Gujarat
Uttar Pradesh
Year Wise NSM Rooftop Target for all States
2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Rooftop Attractiveness Evaluation -Methodology
Gensol Group
Gensol has carried out assessment from solar investor's and customer’s point of view to portray attractiveness of rooftop segment
for both industrial and commercial segments and to understand project economics.
1) State
Prioritization
2) Estimation of
Solar PV Plant
Capacity
3) Energy
Prediction For 1
MW Rooftop
(RT) Solar PV
System
4) Identification
Of Grid Tariff for
Industrial &
Commercial
Consumers
5) Financial
Analysis - LCOE,
EIRR, PIRR And
Payback
Periods.
Results
And
Sensitivity
Scenarios
The following methodology has been adopted for evaluation:
Financial
Pillars Of
Solar Project
Methodology & Assumptions
Gensol Group
All States in
India - 29
Well Defined
Solar Policy -
21
Net Metering
Policy - 20
Solar Radiation>5
kWh/m2) -15
State Prioritization Criteria1
Priority 1
Commercial - MH, TN, RJ, KA & DL
Industrial - MH, TN, RJ & DL; KA and RJ
Priority 2
Commercial - UP, PB, TS & OR
Industrial - KA, UP, PB, & TS
PV Capacity Estimation2
Solar PV Capacity has been estimated to be 1 MW to understand the project
economics on common base.
Methodology & Assumptions
Gensol Group
Solar Energy Estimation3
Grid Tariff Comparison4
Financial Assumptions5
Energy generation from 1 MW RT solar PV plant estimated for
following project configuration:
• Module - 325 kW Polycrystalline (Tier 1)
• Inverter- 50 kW String Inverters (Tier 1)
• Concrete Roofs (RCC ) with Pitch - 7 meters
• Tilt angle – 17 to 26 degrees on based on optimisation
• Azimuth- 0 deg. (True South )
Grid tariff selection methodology
• HT Tariff slab
• HT consumers (industrial & commercial) -11/33kV
• Weighted average calculated for State wise latest tariff orders
• Electricity duty included in grid tariffs
• Fuel charges not considered.
Investor profile
Commercial
/Industrial
Expected commissioning date 1-Jan-2019
DC Capacity of system (kWp) 1200
AC Capacity of system(kW) 1000
Exceedance probability P75
O&M expense for project during 1st year
(Rs/Wp)
0.40
Annual increase in O&M Cost 4.0%
Project Price per Watt peak (Wp) 40.0
Debt 70%
Equity 30%
Subsidy benefit excluded
Rate of interest of domestic bank loan 13%
Repayment period of domestic loan 10 years
Annual escalation in grid tariff 0.0%
Life of plant 25 years
Book depreciation rate (SLM) 5.28%
Normal depreciation rate for tax
calculations
15%
Corporate Tax 25-30%
Minimum Alternate Tax 20%
Analysis & Results6
LCOE
(Rs/kWh)
Equity IRR (%)
Project IRR
(%)
Payback
period (Years)
Industrial Sector –Attractiveness
Gensol Group
Industrial Buildings Scenario
Top Cities
(Rank Wise-
Payback period)
Specific Yield
(kWh/kWp/year)
Grid Tariff
(Rs./kWh)
LCOE
(Rs./kWh)
PIRR
(%)
EIRR
(%)
Payback period
(yrs)
New Delhi 1750 7.61 3.59 29.81% 50.27% 2.87
Pune 1720 7.63 3.99 28.32% 46.44% 3.06
Jaipur 1713 7.40 3.67 28.36% 46.38% 3.07
Bangalore 1685 7.32 3.73 27.61% 44.40% 3.18
Lucknow 1561 6.83 4.06 23.69% 34.53% 4.00
Hyderabad 1603 6.52 3.92 23.43% 33.89% 4.07
Chennai 1534 6.67 4.10 22.93% 32.72% 4.22
Bhopal 1606 6.33 3.92 22.75% 32.31% 4.27
Chandigarh 1654 5.75 3.80 21.31% 29.01% 4.78
Ahmedabad 1653 4.97 3.80 18.37% 22.82% 6.30
Bhubaneshwar 1488 4.70 4.23 15.49% 17.40% 8.75
Financial highlights for industrial rooftop solar projects:
Commercial Sector –Attractiveness
Gensol Group
Commercial Buildings Scenario
Top Cities
(Ranking Wise-
Payback period)
Specific Yield
(kWh/kWp/year
)
Grid Tariff
(Rs./kWh)
LCOE
(Rs./kWh)
PIRR
(%)
EIRR
(%)
Payback period
(yrs)
Pune 1720 13.85 3.99 52.01% 118.13% 1.66
Jaipur 1713 9.20 3.67 35.17% 65.44% 2.36
Bangalore 1685 9.12 3.73 34.31% 62.95% 2.43
New Delhi 1750 8.40 3.59 32.85% 58.77% 2.55
Lucknow 1561 8.65 4.06 29.96% 50.69% 2.85
Chennai 1534 8.40 4.10 28.85% 47.69% 3.00
Hyderabad 1603 7.42 3.92 26.65% 41.89% 3.34
Bhopal 1606 6.65 3.92 23.92% 35.07% 3.94
Chandigarh 1654 6.44 3.80 23.87% 34.95% 3.95
Ahmedabad 1653 5.40 3.80 20.00% 26.18% 5.36
Bhubaneshwar 1488 4.70 4.23 15.49% 17.40% 8.75
Financial highlights for commercial rooftop solar projects:
LCOE IRR Trends - Industrial Vs Commercial
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
Grid Tariff Vs Solar LCOE for Rooftop SPV
Grid Tariff
(Rs./kWh)
LCOE
(Rs./kWh)
Payback period
(yrs)
PIRR
(%)
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
Grid Tariff Vs Solar LCOE for Rooftop SPV
Grid Tariff
(Rs./kWh)
LCOE
(Rs./kWh)
Payback period
(yrs)
PIRR
(%)
Sensitivity Analysis – State-Wise
Gensol Group
Sensitivity analysis has been carried out for all the 11 states to understand the impact on a particular dependent variable like
project cost, tariff, O&M cost and interest rate under a given set of assumptions.
Sensitivity
Analysis
Project
Cost
±10%
Tariff
±5%
O&M Cost
±20%
Interest
Rate
±2%
4
3
2
1 New Delhi, Delhi
Pune, Maharashtra
Jaipur, Rajasthan
Bangalore, Karnataka
9
7
8 Hyderabad, Telangana
Chandigarh, Punjab
Lucknow, Uttar Pradesh
5 Ahmedabad, Gujarat
10 Chennai, Tamil Nadu
11 Bhubaneshwar, Orissa
6 Bhopal, MP 12 Results & Ranking
Click on cities to check the sensitivities
New Delhi - Sensitivity Analysis
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Delhi Industrial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Delhi Commercial - Sensitivity
PIRR (%) Payback period (yrs)
Pune, Maharashtra - Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Maharashtra Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Maharashtra Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Jaipur, Rajasthan - Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Rajasthan Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Rajasthan Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Bangalore, Karnataka - Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Karnataka Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Karnataka Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Ahmedabad, Gujarat - Sensitivity on Tariff (1)
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Gujarat Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Gujarat Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Hyderabad, Telangana- Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Telangana Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Telangana Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Chandigarh, Punjab - Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Punjab Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Punjab Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Bhopal, Madhya Pradesh- Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Madhya Pradesh Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Madhya Pradesh Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Lucknow, Uttar Pradesh - Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Uttar Pradesh Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Uttar Pradesh Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Chennai, Tamil Nadu - Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Tamil Nadu Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Tamil Nadu Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Bhubaneshwar, Odisha- Sensitivity on Tariff
Gensol Group
Industrial Buildings ScenarioCommercial Buildings Scenario Back
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Odisha Commercial - Sensitivity
PIRR (%) Payback period (yrs)
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
Tariff-5%
Tariff-2.5%
Tariff0%
Tariff+2.5%
Tariff+5%
Projectcost-10%
Projectcost-5%
Projectcost-0%
Projectcost+5%
Projectcost+10%
O&M-20%
O&M-10%
O&M0%
O&M+10%
O&M+20%
Interest-2%
Interest-1%
Interest0%
Interest+1%
Interest+2%
Odisha Industrial - Sensitivity
PIRR (%) Payback period (yrs)
Results and Recommendations
Gensol Group
Industrial
Ranking
New
Delhi
Jaipur Pune Bangalore Lucknow Hyderabad Chennai Bhopal Chandigarh Ahmedabad
Bhuvnesh
war
Commercia
l Ranking
Pune Jaipur Bangalore
New
Delhi
Lucknow Chennai Hyderabad Bhopal Chandigarh Ahmedabad
Bhuvnesh
war
1 2 3 4 5 6 7 8 9 1110
•Higher solar radiation in the location results in the lower solar Levelized Cost of Energy (LCOE) which
makes the project technically feasible;
•Higher the delta between grid tariff and solar LCOE or cost of generation in Rs/kWh, better the savings.
Thus, higher the project IRR, equity IRR and lower will be the payback periods;
•Highly sensitive parameters are project cost & tariffs followed by interest rates;
•Least sensitive parameter is O&M cost; approx.. 0.10% of impact observed on the IRR on ±20%
variation;
•In almost all the states, higher PIRR is obtained as compared to domestic interest rate which makes
rooftop project financially viable;
•The impact of fiscal and financial incentives i.e., tax benefits, capital subsidy, depreciation benefits is
not substantial.
It has been analysed from the financial assessment and sensitivity that:
Gofor
Rooftop
Solar
GoGreen
Rankingonthebasisofhighest
PIRR,EIRRandpaybackperiod.
About Gensol
Solar Advisory Services Solar EPC Services Solar O&M Services
20,332 MW 95 MW 2200 MW
Gensol Group
Gensol provides concept to commissioning solar advisory, execution and operations services for Solar Projects in India and abroad.
150+ Advisors
Anmol Singh
Evangelist
+91 7698833311
anmoljaggi@gensol.in
Imran Naqvi
Head of Strategic Advisory
& Business Development
+91 9327016962
imrannaqvi@gensol.in
Gurpreet Singh
Head of Engineering &
Operations
+91 9725544301
gurpreetsingh@gensol.in
Puneet Singh Jaggi
Director
+91 9998025820
puneetjaggi@gensol.in
Pranay Mundra
President
+91 9850673664
pranaymundra@gensol.in
Shivya Singhal
Head of Supply Chain & Group
CFO
+91 9376703846
shivyasinghal@gensol.in
230+ Projects
70+ Engineers
170+ Projects
210+ Engineers
45+ Projects
Gensol is one of the leading consultants and system integrators for Solar Power Plants. We boast of a portfolio of over 6000 MW of Solar Photovoltaic Plants. Gensol is also a channel
partner to Ministry of New & Renewable Energy and installs kW scale Solar Rooftop systems on a turnkey basis with more than 42 MW of cumulative installations across the country.
The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavor to provide
accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one
should act on such information without appropriate professional advice after a thorough examination of the particular situation.
Email: solar@gensol.in | Web: www.gensol.in | Phone: +91 79 40068235 | Twitter: gensol_tweets
Gensol Engineering Pvt Ltd | Gensol Consultants Pvt Ltd | Solarig Gensol Utilities Pvt Ltd
Corporate Office
A2, 12th Floor Palladium, Opp. to Vodafone House , Corporate Road, Prahladnagar, Ahmedabad, Gujarat. India - 380015

Indian Solar Rooftop PV - A Bright Investment (21.08.18)

  • 1.
    GENSOL ENGINEERING PVT.LTD www.gensol.in Indian Solar Rooftop PV – A Bright Investment
  • 2.
    Rooftop Overview -Focus to Indian Scenario Gensol Group Jawaharlal Nehru National Solar Mission Atal Innovation Mission Make in India Smart Cities Mission 24X7 Power for all Ujjawal DISCOM Assurance Yojana Supportive GoI Missions & Initiatives for Rooftop PV Solar India’s total installed solar capacity is estimated to have reached 21.65 GW as on June 2018. This includes 19.65 GW of utility scale (90%) and 2 GW (Approx.) of rooftop solar capacity (10%). Source – CER, 2018 Indian rooftop solar market growing at over 80% annually.
  • 3.
    Industrial & Commercialare more attractive relative to residential segments Gensol Group Assessment Parameters Industrial Commercial Residential Attractiveness Regulatory Support Tariff Parity Opportunity Potential in 2022 Realizable Opp. Size in 2022 Overall Attractiveness TariffAttractiveness Net tariff differential between the existing variable tariff for that sub- segment and potential solar tariff in year 1 in that state for a 15% IRR OpportunityPotential Rooftop solar market opportunity size (MW) Current penetration (as a % of potential) PolicySupport Specific elements of state solar policy that are beneficial to a developer: - Subsidies & incentives - Strength of intent 0 1000 2000 3000 4000 5000 Lakshadweep Arunachal Pradesh Meghalaya Nagaland Tripura Puducherry Goa Assam Uttarakhand Chhattisgarh Kerala Odisha Haryana Punjab West Bengal Karnataka Gujarat Uttar Pradesh Year Wise NSM Rooftop Target for all States 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
  • 4.
    Rooftop Attractiveness Evaluation-Methodology Gensol Group Gensol has carried out assessment from solar investor's and customer’s point of view to portray attractiveness of rooftop segment for both industrial and commercial segments and to understand project economics. 1) State Prioritization 2) Estimation of Solar PV Plant Capacity 3) Energy Prediction For 1 MW Rooftop (RT) Solar PV System 4) Identification Of Grid Tariff for Industrial & Commercial Consumers 5) Financial Analysis - LCOE, EIRR, PIRR And Payback Periods. Results And Sensitivity Scenarios The following methodology has been adopted for evaluation: Financial Pillars Of Solar Project
  • 5.
    Methodology & Assumptions GensolGroup All States in India - 29 Well Defined Solar Policy - 21 Net Metering Policy - 20 Solar Radiation>5 kWh/m2) -15 State Prioritization Criteria1 Priority 1 Commercial - MH, TN, RJ, KA & DL Industrial - MH, TN, RJ & DL; KA and RJ Priority 2 Commercial - UP, PB, TS & OR Industrial - KA, UP, PB, & TS PV Capacity Estimation2 Solar PV Capacity has been estimated to be 1 MW to understand the project economics on common base.
  • 6.
    Methodology & Assumptions GensolGroup Solar Energy Estimation3 Grid Tariff Comparison4 Financial Assumptions5 Energy generation from 1 MW RT solar PV plant estimated for following project configuration: • Module - 325 kW Polycrystalline (Tier 1) • Inverter- 50 kW String Inverters (Tier 1) • Concrete Roofs (RCC ) with Pitch - 7 meters • Tilt angle – 17 to 26 degrees on based on optimisation • Azimuth- 0 deg. (True South ) Grid tariff selection methodology • HT Tariff slab • HT consumers (industrial & commercial) -11/33kV • Weighted average calculated for State wise latest tariff orders • Electricity duty included in grid tariffs • Fuel charges not considered. Investor profile Commercial /Industrial Expected commissioning date 1-Jan-2019 DC Capacity of system (kWp) 1200 AC Capacity of system(kW) 1000 Exceedance probability P75 O&M expense for project during 1st year (Rs/Wp) 0.40 Annual increase in O&M Cost 4.0% Project Price per Watt peak (Wp) 40.0 Debt 70% Equity 30% Subsidy benefit excluded Rate of interest of domestic bank loan 13% Repayment period of domestic loan 10 years Annual escalation in grid tariff 0.0% Life of plant 25 years Book depreciation rate (SLM) 5.28% Normal depreciation rate for tax calculations 15% Corporate Tax 25-30% Minimum Alternate Tax 20% Analysis & Results6 LCOE (Rs/kWh) Equity IRR (%) Project IRR (%) Payback period (Years)
  • 7.
    Industrial Sector –Attractiveness GensolGroup Industrial Buildings Scenario Top Cities (Rank Wise- Payback period) Specific Yield (kWh/kWp/year) Grid Tariff (Rs./kWh) LCOE (Rs./kWh) PIRR (%) EIRR (%) Payback period (yrs) New Delhi 1750 7.61 3.59 29.81% 50.27% 2.87 Pune 1720 7.63 3.99 28.32% 46.44% 3.06 Jaipur 1713 7.40 3.67 28.36% 46.38% 3.07 Bangalore 1685 7.32 3.73 27.61% 44.40% 3.18 Lucknow 1561 6.83 4.06 23.69% 34.53% 4.00 Hyderabad 1603 6.52 3.92 23.43% 33.89% 4.07 Chennai 1534 6.67 4.10 22.93% 32.72% 4.22 Bhopal 1606 6.33 3.92 22.75% 32.31% 4.27 Chandigarh 1654 5.75 3.80 21.31% 29.01% 4.78 Ahmedabad 1653 4.97 3.80 18.37% 22.82% 6.30 Bhubaneshwar 1488 4.70 4.23 15.49% 17.40% 8.75 Financial highlights for industrial rooftop solar projects:
  • 8.
    Commercial Sector –Attractiveness GensolGroup Commercial Buildings Scenario Top Cities (Ranking Wise- Payback period) Specific Yield (kWh/kWp/year ) Grid Tariff (Rs./kWh) LCOE (Rs./kWh) PIRR (%) EIRR (%) Payback period (yrs) Pune 1720 13.85 3.99 52.01% 118.13% 1.66 Jaipur 1713 9.20 3.67 35.17% 65.44% 2.36 Bangalore 1685 9.12 3.73 34.31% 62.95% 2.43 New Delhi 1750 8.40 3.59 32.85% 58.77% 2.55 Lucknow 1561 8.65 4.06 29.96% 50.69% 2.85 Chennai 1534 8.40 4.10 28.85% 47.69% 3.00 Hyderabad 1603 7.42 3.92 26.65% 41.89% 3.34 Bhopal 1606 6.65 3.92 23.92% 35.07% 3.94 Chandigarh 1654 6.44 3.80 23.87% 34.95% 3.95 Ahmedabad 1653 5.40 3.80 20.00% 26.18% 5.36 Bhubaneshwar 1488 4.70 4.23 15.49% 17.40% 8.75 Financial highlights for commercial rooftop solar projects:
  • 9.
    LCOE IRR Trends- Industrial Vs Commercial Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Grid Tariff Vs Solar LCOE for Rooftop SPV Grid Tariff (Rs./kWh) LCOE (Rs./kWh) Payback period (yrs) PIRR (%) 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Grid Tariff Vs Solar LCOE for Rooftop SPV Grid Tariff (Rs./kWh) LCOE (Rs./kWh) Payback period (yrs) PIRR (%)
  • 10.
    Sensitivity Analysis –State-Wise Gensol Group Sensitivity analysis has been carried out for all the 11 states to understand the impact on a particular dependent variable like project cost, tariff, O&M cost and interest rate under a given set of assumptions. Sensitivity Analysis Project Cost ±10% Tariff ±5% O&M Cost ±20% Interest Rate ±2% 4 3 2 1 New Delhi, Delhi Pune, Maharashtra Jaipur, Rajasthan Bangalore, Karnataka 9 7 8 Hyderabad, Telangana Chandigarh, Punjab Lucknow, Uttar Pradesh 5 Ahmedabad, Gujarat 10 Chennai, Tamil Nadu 11 Bhubaneshwar, Orissa 6 Bhopal, MP 12 Results & Ranking Click on cities to check the sensitivities
  • 11.
    New Delhi -Sensitivity Analysis Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Delhi Industrial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Delhi Commercial - Sensitivity PIRR (%) Payback period (yrs)
  • 12.
    Pune, Maharashtra -Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Maharashtra Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Maharashtra Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 13.
    Jaipur, Rajasthan -Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Rajasthan Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Rajasthan Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 14.
    Bangalore, Karnataka -Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Karnataka Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Karnataka Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 15.
    Ahmedabad, Gujarat -Sensitivity on Tariff (1) Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Gujarat Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Gujarat Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 16.
    Hyderabad, Telangana- Sensitivityon Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Telangana Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Telangana Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 17.
    Chandigarh, Punjab -Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Punjab Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Punjab Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 18.
    Bhopal, Madhya Pradesh-Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Madhya Pradesh Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Madhya Pradesh Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 19.
    Lucknow, Uttar Pradesh- Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Uttar Pradesh Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Uttar Pradesh Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 20.
    Chennai, Tamil Nadu- Sensitivity on Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Tamil Nadu Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Tamil Nadu Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 21.
    Bhubaneshwar, Odisha- Sensitivityon Tariff Gensol Group Industrial Buildings ScenarioCommercial Buildings Scenario Back 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Odisha Commercial - Sensitivity PIRR (%) Payback period (yrs) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% Tariff-5% Tariff-2.5% Tariff0% Tariff+2.5% Tariff+5% Projectcost-10% Projectcost-5% Projectcost-0% Projectcost+5% Projectcost+10% O&M-20% O&M-10% O&M0% O&M+10% O&M+20% Interest-2% Interest-1% Interest0% Interest+1% Interest+2% Odisha Industrial - Sensitivity PIRR (%) Payback period (yrs)
  • 22.
    Results and Recommendations GensolGroup Industrial Ranking New Delhi Jaipur Pune Bangalore Lucknow Hyderabad Chennai Bhopal Chandigarh Ahmedabad Bhuvnesh war Commercia l Ranking Pune Jaipur Bangalore New Delhi Lucknow Chennai Hyderabad Bhopal Chandigarh Ahmedabad Bhuvnesh war 1 2 3 4 5 6 7 8 9 1110 •Higher solar radiation in the location results in the lower solar Levelized Cost of Energy (LCOE) which makes the project technically feasible; •Higher the delta between grid tariff and solar LCOE or cost of generation in Rs/kWh, better the savings. Thus, higher the project IRR, equity IRR and lower will be the payback periods; •Highly sensitive parameters are project cost & tariffs followed by interest rates; •Least sensitive parameter is O&M cost; approx.. 0.10% of impact observed on the IRR on ±20% variation; •In almost all the states, higher PIRR is obtained as compared to domestic interest rate which makes rooftop project financially viable; •The impact of fiscal and financial incentives i.e., tax benefits, capital subsidy, depreciation benefits is not substantial. It has been analysed from the financial assessment and sensitivity that: Gofor Rooftop Solar GoGreen Rankingonthebasisofhighest PIRR,EIRRandpaybackperiod.
  • 23.
    About Gensol Solar AdvisoryServices Solar EPC Services Solar O&M Services 20,332 MW 95 MW 2200 MW Gensol Group Gensol provides concept to commissioning solar advisory, execution and operations services for Solar Projects in India and abroad. 150+ Advisors Anmol Singh Evangelist +91 7698833311 anmoljaggi@gensol.in Imran Naqvi Head of Strategic Advisory & Business Development +91 9327016962 imrannaqvi@gensol.in Gurpreet Singh Head of Engineering & Operations +91 9725544301 gurpreetsingh@gensol.in Puneet Singh Jaggi Director +91 9998025820 puneetjaggi@gensol.in Pranay Mundra President +91 9850673664 pranaymundra@gensol.in Shivya Singhal Head of Supply Chain & Group CFO +91 9376703846 shivyasinghal@gensol.in 230+ Projects 70+ Engineers 170+ Projects 210+ Engineers 45+ Projects
  • 24.
    Gensol is oneof the leading consultants and system integrators for Solar Power Plants. We boast of a portfolio of over 6000 MW of Solar Photovoltaic Plants. Gensol is also a channel partner to Ministry of New & Renewable Energy and installs kW scale Solar Rooftop systems on a turnkey basis with more than 42 MW of cumulative installations across the country. The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavor to provide accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act on such information without appropriate professional advice after a thorough examination of the particular situation. Email: solar@gensol.in | Web: www.gensol.in | Phone: +91 79 40068235 | Twitter: gensol_tweets Gensol Engineering Pvt Ltd | Gensol Consultants Pvt Ltd | Solarig Gensol Utilities Pvt Ltd Corporate Office A2, 12th Floor Palladium, Opp. to Vodafone House , Corporate Road, Prahladnagar, Ahmedabad, Gujarat. India - 380015