Sr.
No.
Equipment Description of Equipment Unit
Total
Qty
A Main Equipment
1
132/33 kV Power Transformer + RTCC
Panel
132/33 KV, 15 MVA, ONAN, YNYn0, OLTC, +/-10% in steps of
1.25%, CU wound Power transformer including all standards
fittings, LV-NCT, HV-NCT & accessories as per IS2026, Max.
Total Power loss - 0.5%
Nos. 1
2
Fire Fighting System for Power
Transformer
NIFPS based Nos. 1
3 Surge Arrestor 120KV, 10KA Gapless, ZnO, station class 3 Nos. 6
4 132kV CT , 5 Core (Protection - Trafo)
275 / 1-1-1-1-1 Amp, 132 KV, 31.5 KA for 1 sec
Core 1 - 0.2S, 10 VA
Core 2 - 5P20, 10VA
Core 3- PS, Vk>800 Volt, Rct < 5 ohm, Imag <30A
Core 4 -PS, Vk>800 Volt, Rct < 5 ohm, Imag <30A
Core 5 -PS, Vk>800 Volt, Rct < 5 ohm, Imag <30A
Nos. 3
5 132kV SF6 Circuit Breaker 132 KV, 1250 Amps, 31.5 KA / 3sec, 3 Phase circuit breaker Nos. 1
6 132kV PT , 2 Core
132kV/sqrt(3) / 110 V/sqrt(3)/ 110 V/sqrt(3)
Core 1 - 3P, 10VA
Core 1- 0.2, 10VA
Nos. 3
7 132 KV Motorized Isolator with two ES
Double Break, Gang operated, 132 KV, 800 Amps, 31.5 KA /
3sec
Nos. 1
8 132kV CT_Tarrif metering
275 / 1-1 Amp, 132 KV, 31.5 KA for 1 sec
Core 1- 0.2S, 5VA
Core 2 - 0.2S, 5VA
Nos. 3
9 132kV PT_Tarrif metering
132kV/sqrt(3) / 110 V/sqrt(3)
Core 1- 0.2, 10VA
Core 2- 0.2, 10VA
Nos. 3
Tarriff Energy Meter ABT compitable (Main + Check) Nos. 2
Software + CMRI Set 1
Metering Cubical Nos. 1
11 Control, Relay & Protection Panels
Power Transformer cum Line CRP with BCU (87T, 87L 50LBB,
51NLV, 51NHV, 64RHV, 64RLV, 67, 67N, 50, 50N, 51, 51N, 60,
30, 26, 49, 63, 71, 95, 80, 86,TVM, Ameter, Voltmeter)
Nos. 1
12 SAS Substation Automation System L/S 1
13 Fote Panel Fibre Optic Telecome Equipment panel Nos. 1
14 Bay Marshalling Kiosk Nos. 1
15 CT & PT Junction Box Nos. 4
Tentative BOM of 132/33kV Pooling Substation
10 Tarriff Meters
16 132 KV BPI Nos. 3
17 3 mtr long spike for lightning protection Nos. 3
B Other material
1 ACSR Panther Conductor
ACSR Panther Conductor for connecting all electrical
equipments inside 132 KV switchyard
Meter 150
2 Clamps and terminal connectors
For ACSR Panther conductor (CTs, PTs, Isolator, SF6 CB, LA,
Transformer, disc insulators, etc.)
LS 1
3 Shield Wire 7/3.15 mm shield wire Meter 100
4 Silicon Composite Disc Insulator string
66 KV sillicon Composite string insulator with all fittings &
accessories
Lot 1
75X 8 mm MS Flat Mtr 1,350
50 X 8 mm GI flat Mtr 500
Cu Earth Plate earthing having 600x600x3mm CU plate, 40 MM
DIA,3 MTR LONG G.I. PIPE including salt, charcoal, coke,
bentonite powder (if requred), earth pit chamber with cover for
Power Trafo neutral earthing.
Nos. 2
50 X 6 mm CU flat for Power Trafo neutral earthing Mtr 50
125 MM DIA, 13MM THICK 3 MTR LONG C.I PIPE TYP EARTH PIT
including Earth pit material, bentonite powder (if requred),
earth pit chamber with cover.
Nos. 25
Flexible wire Copper strips of 2 mtr Length (25x6 mm for LA to
Lightning Counter connection)
Mtr 12
PVC pipe (100 mm) Mtr 50
6 1.1 KV control & Auxiliary power cables
2.5 Sqmm, 4 Sqmm & 6 sqmm or as required with 2 core, 3
core, 4 core, 7 core, 12 core cables, 16 core, for control wiring
(metering TCs, PTs, Protection CTs, PTs, CB, C&R panel,
Isolator, Yard lighting, ABT meter etc)
2C X 2.5 Sqmm CU cable Mtr 500
4C X 4 Sqmm CU cable Mtr 750
5C X 2.5 Sqmm CU cable Mtr 750
7C X 2.5 Sqmm CU cable Mtr 500
12C X 2.5 Sqmm CU cable Mtr 500
16C X 2.5 Sqmm CU cable Mtr 500
3.5C X 35 Sqmm AL cable Mtr 300
2C X 6 sqmm AL cable Mtr 750
7 Cable accessories heat shrinks, terminations, lugs, glands, ferrules, tag etc. LS 1
8 9 mtr Lighting Pole Nos. 4
9 250 Watt HPSV Flood Lights Nos. 8
Earthing material5
10 Lighting Junction Box Nos. 4
11 AC Distribution Box
415V, 3 Phase, 4 Wire, ACDB (Outdoor), for switchyard lighting
& Outdoor equipment supply distribution
Nos. 1
12 Fire Fighting / safety Material DCP (6 Kg) Nos. 2
CO2 Type (4.5 Kg) Nos. 2
Fire Bucket stand with canopy having 4 buckets (10 kg
capacity)
Nos. 2
First Aid Box Nos. 2
First Aid Chart Nos. 2
Rubber Hand gloves pair 2
Rubber Mat, Class C, thickness 3 mm, 1 mtr X 2 mtr Nos. 12
13 Discharge Rod
Highly insulated FRP telescopic earthing rod with 10 ft length ,
Locking system should be with threded coupler with grounding
clamp as per IS
Nos. 1
14 Danger Board Reflective Type Nos. 5
15
OPGW cable and accessories as per
specification and relevant IS / IEC
between Solar Plant end PSS and Grid
substation
OPGW cable (24F), Tension fittings, Suspension fittings,
vibration damper, down lead clamps etc.
KM 1
C Civil Works
1 Land Development Only bush cleaning and normal levelling considered Acre 0.25
2
Metal Spreading 100 mm thick using
40mm/20mm metal in switch yard
areas
Metal Spreading 100 mm thick using 40mm/20mm metal in
switch yard areas
Sqmtr 1,000
3 RCC cable trenches with slab RCC cable trenches for control & auxiliary power cable laying mtrs 50
600 mm wide ladded cable tray mtrs 60
300 mm wide ladded cable tray mtrs 60
100 mm wide ladded cable tray mtrs 60
4 Support Angles for cable trays L 50 X 50 X 5 MT 0.50
5
HDPE pipe for control & auxilliary cable
laying
HDPE pipes mtrs 250
6 Boundary wall
Precast boundary wall with 2.5 mtr high barbed wire and
concentrina coil (one layer)
mtrs 150
7 Main gate
Fabrication and supply of 6m Wide double leaf MS frame main
gate with sliding arrangement and RCC columns to support the
frame including foundation work.
Nos 1
8 wicket gate
Fabrication and supply of 1.5m Wide MS frame wicket gate with
sliding arrangement and RCC columns to support the frame
including foundation work.
Nos 1
9 Drainage system
A network of open drains shall be designed &
provided to carry surface run off of water during rainy season,
with excavation and side stone pitching of size bottom width
0.6m and top vidth 1.2m by providing H:V = 1:1 with 75mm
bottom PCC.
Mtrs 150
10 Water Piping system for earth pits Arrangment for 50 earth pits approx. Job 1
11 Borewell Borewell with pump set & starter LS 0
12 Main oil drain tank capacity 6000 ltrs (RCC) LS 1
13 Suppy & laying of hume pipe 300mm dia RCC pipe mtrs 20
14 Asphalt road 6 mtrs wide mtrs 20
15 Security Cabin 2.5x2.5mtr PEB No 0
16 Switchyard sign board (outdoor & Indoor) Lot 0
E
Lattice Type equipment supporting
structure
1 Tower Lattice steel structure (1200kG) Kg 3,600
2 Boom Lattice steel structure (853kG) Kg 853
3 Isolator Lattice steel structure (750kG) Kg 750
4 CT Lattice steel structure (220kG) Kg 1,320
5 PT Lattice steel structure (200kG) Kg 1,320
6 CVT Lattice steel structure (220kG) Kg -
7 LA Lattice steel structure (220kG) Kg 1,320
8 BPI Lattice steel structure (282kG) Kg 846
F Foundation
1 Tower RCC foundation No.s 3
2 Boom RCC foundation No.s 1
3 Circuit Breaker RCC foundation No.s 1
4 Isolator RCC foundation Nos. 1
5 CT RCC foundation Nos. 6
6 PT RCC foundation Nos. 6
7 LA RCC foundation Nos. 6
8 BPI RCC foundation Nos. 3
9 Power Transformer RCC foundation Nos. 1
10 NIFPS RCC foundation Nos. 1
11 CT PT Jb & bay marshalling box RCC foundation Nos. 5

More Related Content

What's hot

transmission line
transmission line transmission line
transmission line
singh1515
 
Electric substation
Electric substation Electric substation
Electric substation
ANNU KUMAR
 
Basic power distribution system007
Basic power distribution system007Basic power distribution system007
Basic power distribution system007
Vaishnavee Patel
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
SARAVANAN A
 
INSULATORS AND ITS TYPES
INSULATORS AND ITS TYPESINSULATORS AND ITS TYPES
INSULATORS AND ITS TYPES
Raviteja Damerla
 
Switchyard
SwitchyardSwitchyard
Switchyard
I.E.T. lucknow
 
Principles of Cable Selection
Principles of Cable SelectionPrinciples of Cable Selection
Principles of Cable Selection
Leonardo ENERGY
 
Power cables
Power cablesPower cables
Power cablescollege
 
Underground cables
Underground cablesUnderground cables
Underground cables
Poonam Sarawgi
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
Engr Numan Sarwar
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars
PremanandDesai
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
Sourabh sharma
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
SURESH GOPAL
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
Dhananjay Jha
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
Substations
SubstationsSubstations
Substations
itfakash
 
Protection Relays Numbering (ANSI)
Protection Relays Numbering (ANSI)Protection Relays Numbering (ANSI)
Protection Relays Numbering (ANSI)
AHMED MOHAMED HEGAB
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
Demsew Mitiku
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
Md Irshad Ahmad
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methods
Leonardo ENERGY
 

What's hot (20)

transmission line
transmission line transmission line
transmission line
 
Electric substation
Electric substation Electric substation
Electric substation
 
Basic power distribution system007
Basic power distribution system007Basic power distribution system007
Basic power distribution system007
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
 
INSULATORS AND ITS TYPES
INSULATORS AND ITS TYPESINSULATORS AND ITS TYPES
INSULATORS AND ITS TYPES
 
Switchyard
SwitchyardSwitchyard
Switchyard
 
Principles of Cable Selection
Principles of Cable SelectionPrinciples of Cable Selection
Principles of Cable Selection
 
Power cables
Power cablesPower cables
Power cables
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Substations
SubstationsSubstations
Substations
 
Protection Relays Numbering (ANSI)
Protection Relays Numbering (ANSI)Protection Relays Numbering (ANSI)
Protection Relays Numbering (ANSI)
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methods
 

Similar to Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)

M. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemM. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-system
Ramesh Meti
 
Catalog CB tép MCB 2P 3P 4P BKN BKH LS
Catalog CB tép MCB 2P 3P 4P BKN BKH LSCatalog CB tép MCB 2P 3P 4P BKN BKH LS
Catalog CB tép MCB 2P 3P 4P BKN BKH LS
Beeteco
 
Sub station design
Sub station designSub station design
Sub station design
JunaedulIslam
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
PremanandDesai
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
PremanandDesai
 
G. csr-16-17-cds-61-69-gst-1
G. csr-16-17-cds-61-69-gst-1G. csr-16-17-cds-61-69-gst-1
G. csr-16-17-cds-61-69-gst-1
Ramesh Meti
 
Ls catalog thiet bi dien electric products e 1104
Ls catalog thiet bi dien electric products e 1104Ls catalog thiet bi dien electric products e 1104
Ls catalog thiet bi dien electric products e 1104
Dien Ha The
 
Ls catalog thiet bi dien electric products e 1104_dienhathe.vn
Ls catalog thiet bi dien electric products e 1104_dienhathe.vnLs catalog thiet bi dien electric products e 1104_dienhathe.vn
Ls catalog thiet bi dien electric products e 1104_dienhathe.vn
Dien Ha The
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
FunExplode
 
UNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAINUNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAIN
PremanandDesai
 
Catalog ls lvcb dienhathe.vn
Catalog ls lvcb dienhathe.vnCatalog ls lvcb dienhathe.vn
Catalog ls lvcb dienhathe.vn
Dien Ha The
 
Catalog ls lvcb
Catalog ls lvcbCatalog ls lvcb
Catalog ls lvcb
Dien Ha The
 
Low voltage circuit breakers & contactors general leaflet ls
Low voltage circuit breakers & contactors general leaflet   lsLow voltage circuit breakers & contactors general leaflet   ls
Low voltage circuit breakers & contactors general leaflet lsmaianhbao_6519
 
Ls catalog thiet bi dien electric products e 1108
Ls catalog thiet bi dien electric products e 1108Ls catalog thiet bi dien electric products e 1108
Ls catalog thiet bi dien electric products e 1108
Dien Ha The
 
Ls catalog thiet bi dien electric products e 1108_dienhathe.vn
Ls catalog thiet bi dien electric products e 1108_dienhathe.vnLs catalog thiet bi dien electric products e 1108_dienhathe.vn
Ls catalog thiet bi dien electric products e 1108_dienhathe.vn
Dien Ha The
 
F. csr-16-17-cds-1-23-gst-1
F. csr-16-17-cds-1-23-gst-1F. csr-16-17-cds-1-23-gst-1
F. csr-16-17-cds-1-23-gst-1
Ramesh Meti
 
Catalogue mccb doi moi cua hang h yundai
Catalogue mccb doi moi cua hang h yundaiCatalogue mccb doi moi cua hang h yundai
Catalogue mccb doi moi cua hang h yundai
Dien Ha The
 
KB Electric may bien ap kho Ls nhap khau Korea
KB Electric may bien ap kho Ls nhap khau KoreaKB Electric may bien ap kho Ls nhap khau Korea
KB Electric may bien ap kho Ls nhap khau Korea
KB ELECTRIC
 

Similar to Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019) (20)

Thông số MCB LS
Thông số MCB LSThông số MCB LS
Thông số MCB LS
 
M. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemM. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-system
 
Catalog CB tép MCB 2P 3P 4P BKN BKH LS
Catalog CB tép MCB 2P 3P 4P BKN BKH LSCatalog CB tép MCB 2P 3P 4P BKN BKH LS
Catalog CB tép MCB 2P 3P 4P BKN BKH LS
 
Sub station design
Sub station designSub station design
Sub station design
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
 
G. csr-16-17-cds-61-69-gst-1
G. csr-16-17-cds-61-69-gst-1G. csr-16-17-cds-61-69-gst-1
G. csr-16-17-cds-61-69-gst-1
 
Ls catalog thiet bi dien electric products e 1104
Ls catalog thiet bi dien electric products e 1104Ls catalog thiet bi dien electric products e 1104
Ls catalog thiet bi dien electric products e 1104
 
Ls catalog thiet bi dien electric products e 1104_dienhathe.vn
Ls catalog thiet bi dien electric products e 1104_dienhathe.vnLs catalog thiet bi dien electric products e 1104_dienhathe.vn
Ls catalog thiet bi dien electric products e 1104_dienhathe.vn
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 
UNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAINUNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAIN
 
Catalog ls lvcb dienhathe.vn
Catalog ls lvcb dienhathe.vnCatalog ls lvcb dienhathe.vn
Catalog ls lvcb dienhathe.vn
 
Catalog ls lvcb
Catalog ls lvcbCatalog ls lvcb
Catalog ls lvcb
 
Low voltage circuit breakers & contactors general leaflet ls
Low voltage circuit breakers & contactors general leaflet   lsLow voltage circuit breakers & contactors general leaflet   ls
Low voltage circuit breakers & contactors general leaflet ls
 
Ls catalog thiet bi dien electric products e 1108
Ls catalog thiet bi dien electric products e 1108Ls catalog thiet bi dien electric products e 1108
Ls catalog thiet bi dien electric products e 1108
 
Ls catalog thiet bi dien electric products e 1108_dienhathe.vn
Ls catalog thiet bi dien electric products e 1108_dienhathe.vnLs catalog thiet bi dien electric products e 1108_dienhathe.vn
Ls catalog thiet bi dien electric products e 1108_dienhathe.vn
 
F. csr-16-17-cds-1-23-gst-1
F. csr-16-17-cds-1-23-gst-1F. csr-16-17-cds-1-23-gst-1
F. csr-16-17-cds-1-23-gst-1
 
Catalogue mccb doi moi cua hang h yundai
Catalogue mccb doi moi cua hang h yundaiCatalogue mccb doi moi cua hang h yundai
Catalogue mccb doi moi cua hang h yundai
 
Specifications
SpecificationsSpecifications
Specifications
 
KB Electric may bien ap kho Ls nhap khau Korea
KB Electric may bien ap kho Ls nhap khau KoreaKB Electric may bien ap kho Ls nhap khau Korea
KB Electric may bien ap kho Ls nhap khau Korea
 

More from Gensol Engineering Limited

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Gensol Engineering Limited
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Gensol Engineering Limited
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Gensol Engineering Limited
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
Gensol Engineering Limited
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Gensol Engineering Limited
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
Gensol Engineering Limited
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
Gensol Engineering Limited
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Gensol Engineering Limited
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
Gensol Engineering Limited
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Gensol Engineering Limited
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Gensol Engineering Limited
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Gensol Engineering Limited
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Gensol Engineering Limited
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
Gensol Engineering Limited
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Gensol Engineering Limited
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Gensol Engineering Limited
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
Gensol Engineering Limited
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
Gensol Engineering Limited
 

More from Gensol Engineering Limited (20)

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
 

Recently uploaded

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 

Recently uploaded (20)

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 

Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)

  • 1. Sr. No. Equipment Description of Equipment Unit Total Qty A Main Equipment 1 132/33 kV Power Transformer + RTCC Panel 132/33 KV, 15 MVA, ONAN, YNYn0, OLTC, +/-10% in steps of 1.25%, CU wound Power transformer including all standards fittings, LV-NCT, HV-NCT & accessories as per IS2026, Max. Total Power loss - 0.5% Nos. 1 2 Fire Fighting System for Power Transformer NIFPS based Nos. 1 3 Surge Arrestor 120KV, 10KA Gapless, ZnO, station class 3 Nos. 6 4 132kV CT , 5 Core (Protection - Trafo) 275 / 1-1-1-1-1 Amp, 132 KV, 31.5 KA for 1 sec Core 1 - 0.2S, 10 VA Core 2 - 5P20, 10VA Core 3- PS, Vk>800 Volt, Rct < 5 ohm, Imag <30A Core 4 -PS, Vk>800 Volt, Rct < 5 ohm, Imag <30A Core 5 -PS, Vk>800 Volt, Rct < 5 ohm, Imag <30A Nos. 3 5 132kV SF6 Circuit Breaker 132 KV, 1250 Amps, 31.5 KA / 3sec, 3 Phase circuit breaker Nos. 1 6 132kV PT , 2 Core 132kV/sqrt(3) / 110 V/sqrt(3)/ 110 V/sqrt(3) Core 1 - 3P, 10VA Core 1- 0.2, 10VA Nos. 3 7 132 KV Motorized Isolator with two ES Double Break, Gang operated, 132 KV, 800 Amps, 31.5 KA / 3sec Nos. 1 8 132kV CT_Tarrif metering 275 / 1-1 Amp, 132 KV, 31.5 KA for 1 sec Core 1- 0.2S, 5VA Core 2 - 0.2S, 5VA Nos. 3 9 132kV PT_Tarrif metering 132kV/sqrt(3) / 110 V/sqrt(3) Core 1- 0.2, 10VA Core 2- 0.2, 10VA Nos. 3 Tarriff Energy Meter ABT compitable (Main + Check) Nos. 2 Software + CMRI Set 1 Metering Cubical Nos. 1 11 Control, Relay & Protection Panels Power Transformer cum Line CRP with BCU (87T, 87L 50LBB, 51NLV, 51NHV, 64RHV, 64RLV, 67, 67N, 50, 50N, 51, 51N, 60, 30, 26, 49, 63, 71, 95, 80, 86,TVM, Ameter, Voltmeter) Nos. 1 12 SAS Substation Automation System L/S 1 13 Fote Panel Fibre Optic Telecome Equipment panel Nos. 1 14 Bay Marshalling Kiosk Nos. 1 15 CT & PT Junction Box Nos. 4 Tentative BOM of 132/33kV Pooling Substation 10 Tarriff Meters
  • 2. 16 132 KV BPI Nos. 3 17 3 mtr long spike for lightning protection Nos. 3 B Other material 1 ACSR Panther Conductor ACSR Panther Conductor for connecting all electrical equipments inside 132 KV switchyard Meter 150 2 Clamps and terminal connectors For ACSR Panther conductor (CTs, PTs, Isolator, SF6 CB, LA, Transformer, disc insulators, etc.) LS 1 3 Shield Wire 7/3.15 mm shield wire Meter 100 4 Silicon Composite Disc Insulator string 66 KV sillicon Composite string insulator with all fittings & accessories Lot 1 75X 8 mm MS Flat Mtr 1,350 50 X 8 mm GI flat Mtr 500 Cu Earth Plate earthing having 600x600x3mm CU plate, 40 MM DIA,3 MTR LONG G.I. PIPE including salt, charcoal, coke, bentonite powder (if requred), earth pit chamber with cover for Power Trafo neutral earthing. Nos. 2 50 X 6 mm CU flat for Power Trafo neutral earthing Mtr 50 125 MM DIA, 13MM THICK 3 MTR LONG C.I PIPE TYP EARTH PIT including Earth pit material, bentonite powder (if requred), earth pit chamber with cover. Nos. 25 Flexible wire Copper strips of 2 mtr Length (25x6 mm for LA to Lightning Counter connection) Mtr 12 PVC pipe (100 mm) Mtr 50 6 1.1 KV control & Auxiliary power cables 2.5 Sqmm, 4 Sqmm & 6 sqmm or as required with 2 core, 3 core, 4 core, 7 core, 12 core cables, 16 core, for control wiring (metering TCs, PTs, Protection CTs, PTs, CB, C&R panel, Isolator, Yard lighting, ABT meter etc) 2C X 2.5 Sqmm CU cable Mtr 500 4C X 4 Sqmm CU cable Mtr 750 5C X 2.5 Sqmm CU cable Mtr 750 7C X 2.5 Sqmm CU cable Mtr 500 12C X 2.5 Sqmm CU cable Mtr 500 16C X 2.5 Sqmm CU cable Mtr 500 3.5C X 35 Sqmm AL cable Mtr 300 2C X 6 sqmm AL cable Mtr 750 7 Cable accessories heat shrinks, terminations, lugs, glands, ferrules, tag etc. LS 1 8 9 mtr Lighting Pole Nos. 4 9 250 Watt HPSV Flood Lights Nos. 8 Earthing material5
  • 3. 10 Lighting Junction Box Nos. 4 11 AC Distribution Box 415V, 3 Phase, 4 Wire, ACDB (Outdoor), for switchyard lighting & Outdoor equipment supply distribution Nos. 1 12 Fire Fighting / safety Material DCP (6 Kg) Nos. 2 CO2 Type (4.5 Kg) Nos. 2 Fire Bucket stand with canopy having 4 buckets (10 kg capacity) Nos. 2 First Aid Box Nos. 2 First Aid Chart Nos. 2 Rubber Hand gloves pair 2 Rubber Mat, Class C, thickness 3 mm, 1 mtr X 2 mtr Nos. 12 13 Discharge Rod Highly insulated FRP telescopic earthing rod with 10 ft length , Locking system should be with threded coupler with grounding clamp as per IS Nos. 1 14 Danger Board Reflective Type Nos. 5 15 OPGW cable and accessories as per specification and relevant IS / IEC between Solar Plant end PSS and Grid substation OPGW cable (24F), Tension fittings, Suspension fittings, vibration damper, down lead clamps etc. KM 1 C Civil Works 1 Land Development Only bush cleaning and normal levelling considered Acre 0.25 2 Metal Spreading 100 mm thick using 40mm/20mm metal in switch yard areas Metal Spreading 100 mm thick using 40mm/20mm metal in switch yard areas Sqmtr 1,000 3 RCC cable trenches with slab RCC cable trenches for control & auxiliary power cable laying mtrs 50 600 mm wide ladded cable tray mtrs 60 300 mm wide ladded cable tray mtrs 60 100 mm wide ladded cable tray mtrs 60 4 Support Angles for cable trays L 50 X 50 X 5 MT 0.50 5 HDPE pipe for control & auxilliary cable laying HDPE pipes mtrs 250 6 Boundary wall Precast boundary wall with 2.5 mtr high barbed wire and concentrina coil (one layer) mtrs 150 7 Main gate Fabrication and supply of 6m Wide double leaf MS frame main gate with sliding arrangement and RCC columns to support the frame including foundation work. Nos 1
  • 4. 8 wicket gate Fabrication and supply of 1.5m Wide MS frame wicket gate with sliding arrangement and RCC columns to support the frame including foundation work. Nos 1 9 Drainage system A network of open drains shall be designed & provided to carry surface run off of water during rainy season, with excavation and side stone pitching of size bottom width 0.6m and top vidth 1.2m by providing H:V = 1:1 with 75mm bottom PCC. Mtrs 150 10 Water Piping system for earth pits Arrangment for 50 earth pits approx. Job 1 11 Borewell Borewell with pump set & starter LS 0 12 Main oil drain tank capacity 6000 ltrs (RCC) LS 1 13 Suppy & laying of hume pipe 300mm dia RCC pipe mtrs 20 14 Asphalt road 6 mtrs wide mtrs 20 15 Security Cabin 2.5x2.5mtr PEB No 0 16 Switchyard sign board (outdoor & Indoor) Lot 0 E Lattice Type equipment supporting structure 1 Tower Lattice steel structure (1200kG) Kg 3,600 2 Boom Lattice steel structure (853kG) Kg 853 3 Isolator Lattice steel structure (750kG) Kg 750 4 CT Lattice steel structure (220kG) Kg 1,320 5 PT Lattice steel structure (200kG) Kg 1,320 6 CVT Lattice steel structure (220kG) Kg - 7 LA Lattice steel structure (220kG) Kg 1,320 8 BPI Lattice steel structure (282kG) Kg 846 F Foundation 1 Tower RCC foundation No.s 3 2 Boom RCC foundation No.s 1 3 Circuit Breaker RCC foundation No.s 1 4 Isolator RCC foundation Nos. 1 5 CT RCC foundation Nos. 6 6 PT RCC foundation Nos. 6
  • 5. 7 LA RCC foundation Nos. 6 8 BPI RCC foundation Nos. 3 9 Power Transformer RCC foundation Nos. 1 10 NIFPS RCC foundation Nos. 1 11 CT PT Jb & bay marshalling box RCC foundation Nos. 5