A detailed project execution schedule including major and minor milestones for a 10 MW Plant. The EPC has been spread over 4 months. In case of larger or smaller power plants, the activities would remain same while the timeline would change
A Delay of a single day for a 10 MW plant can lead to a loss of Rs. 6.5 Lacs ($110,000) in addition to Statutory Losses. Here, we explore typical project execution timelines and possible reasons for delay. The presentation talks about Lead Times of Equipment, Key vendors, Permits Required, Construction & Engineering related delays and finally, gives recommendations on how to keep project on track.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
A detailed project execution schedule including major and minor milestones for a 10 MW Plant. The EPC has been spread over 4 months. In case of larger or smaller power plants, the activities would remain same while the timeline would change
A Delay of a single day for a 10 MW plant can lead to a loss of Rs. 6.5 Lacs ($110,000) in addition to Statutory Losses. Here, we explore typical project execution timelines and possible reasons for delay. The presentation talks about Lead Times of Equipment, Key vendors, Permits Required, Construction & Engineering related delays and finally, gives recommendations on how to keep project on track.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Engineering Limited
Gensol is the largest Solar Advisory Firm with 7900 MW of solar projects under advisory (including design, lenders engineer, owner engineer) , 49 MW of solar projects under Engineering Procurement and Construction (EPC) & 2200 MW of solar projects under Operation and Maintenance.
This document contains a SWOT analysis of 10 MW solar power plant designing project and basic procedures to take before implementing a such power plant design project. Application structures are also included in the document.
What services should a solar project developer expect from solar park & how much each service can be valued.
The ppt clears concept on value add by solar park.
The technical risks in solar PV projects are arising mainly in modules, inverters, other equipment. These risks are unpredictable and can be occurred in any phases of life cycle of PV project like development, installation, commissioning and operation leading to plant outage or reduction in energy output. The presentation covers the various risks and associated mitigation measures.
FirstGreen Consulting is a company working in the area of renewable energy, energy efficiency and climate change
The team has extensive experience in handling the Renewable, and energy efficiency projects
FirstGreen is providing energy sector consultancy in the sustainable energy, with expertise ranging from carbon advisory to technical consulting, to project implementation and project management.
Gensol strives to add value from Project Conceptualisation to Commissioning to ensure timely, quality and cost effective completion. From drafting exhaustive EPC contracts to approving engineering drawings and quality control during construction, Gensol's experience of 1500 MW works to ensure Peace of Mind for the Project Developer.
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
By installing and successfully operating 10 MW photovoltaic (PV) power plants will deliver electricity for consumption by the owners, the relevant peoples in the project assessment place will be made aware of the technical and economic potential of solar power generation. Furthermore, the power required from the public grid will be reduced, and overall expenditure on electric power will be lowered & our project aims to create the necessary awareness among the population, and especially among policy-makers and large investors, Youngsters.....
Balance of System (BOS) of a Solar Project has undergone a significant price reduction but continuous optimisation is making the trend continuing to go further down.
The presentation discusses on aspects around over-loading, cable optimisation, introduction of 1500 V systems and many other interesting optimisations.
Solar Panel Installation And Maintenance PowerPoint Presentation SlidesSlideTeam
World is moving towards a sustainable future and renewable energy is playing a vital role in achieving that goal. There are various sources of renewable energy but solar energy is dominant when it comes to meet both industrial and residential energy demand at low cost. This presentation will benefit the manufacturing organization that wants to optimize their energy consumption and electricity bill cost by shifting to solar energy. The presentation includes sections namely energy consumption analysis that will help the firm in defining its current electricity composition by resource, its daily, monthly and annual energy utilization rate, share of electricity demand in current year, energy star rating of current appliances and machineries and monthly electricity bill of the plant. Issues we are currently facing section will highlight the current challenges faced by the manufacturer in terms of machine downtime, energy consumption and Co2 emission. Firm can illustrate various solution along with their cost overview to counter their current challenges with help of Available solutions to counter energy issues section. Solar system overview section will help the firm in providing overview about solar system types and its applications along with system workflow. Permission and regulatory key considerations section will help the manufacturer to describe the essential permission and regulatory key consideration required for solar system installation. Manufacturer can provide detailed specification about the project, it objective and expected outcomes with the help of Project description and specifications section. Manufacturer can ensure the best quality of solar panels, mounting structure and inverter with decision making checklist for solar project section. Estimated cost of solar project section will shed a light on total cost required to install solar system. Implementation schedule will help the firm in illustrating the different stages to install solar system. Maintenance plan and schedule section will help the organization in maintaining the solar panel and inverter health. Manufacturer can portrays the stats of plant capacity per annum and electricity bill saving with impact on performance section. Risk and mitigation strategies section will help the manufacturer in illustrating possible risk that may occur during solar system installation and right measures to overcome them. Company can portray possible challenges that may arise while opting for solar energy and solution to overcome them with the help of barriers and solutions for solar energy application section. Finally, performance tracking dashboard will help the manufacturer in tracking plant electricity consumption, solar production and export to grid. https://bit.ly/2MP2gfF
Here are the details on 300MW Wind Power Project located in the Western Region of India presented by Gensol on the various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,
3)Statuary & legal approvals required,
4)Civil & electrical works,
5)Quality & material inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Ajjay Kumar Gupta
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis
Solar PV module panels comprise the solar list of a PV system which generates as well as supplies solar energy in residential and commercial applications. Modules are rated by DC output energy under standard examine conditions as well as usually ranges from 110 - 365 watts.
India’s sustained growth has placed enormous demand on the country’s natural resources. Today, India imports substantial quantities of gas, oil and coal in order to meet its growing energy demand. The increasing dependence on imported fuels creates a serious threat to the energy security of the country. In addition, the country’s 254 GW of power generation capacity based on conventional sources has further strained the natural resources and degrading the environment. India solar capacity forecast for 2020 raised by 240%.
Tags
Solar PV Module Manufacturing Plant, Solar Photovoltaic module Industry, Business consultancy, Detailed Project Report on solar pv module, Download Detailed Project Report on Solar PV Module, Download free project profiles on solar pv module, dpr for solar pv power plant, Feasibility report on solar pv module, Free Project Profiles on solar pv module, how do solar panels work, How to manufacture a photovoltaic module, How to Set Up a Small Solar (Photovoltaic) Power Generator, How to setup Solar PV Module Manufacturing Unit, How to Start a solar pv module Production Business, How to Start solar pv module Manufacturing Industry in India, India Solar PV Module Manufacturing Report, Industrial Project Report on solar pv module, Most Profitable solar pv module Manufacturing Business Ideas, NPCS, Photovoltaic solar module manufacturing, Pre-Investment Feasibility Study on solar pv module, Preparation of Project Profiles, Process technology books, Project consultancy, Project identification and selection, Project on Solar Energy, project profile on solar items, project profile on solar pv module, project report on solar energy system, Project Report on solar pv module, project report on solar pv module assembling industries, Project Report on solar pv module manufacturing unit, pv module manufacturing process pdf, pv module types, PV module, solar panel production & manufacturing line equipment, Small Scale solar pv module Manufacturing Projects, Solar (PV) Cell Module, Solar Based Profitable Projects, solar module manufacturing process pdf, Solar Module/Cell Manufacturing Process,
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Engineering Limited
Gensol is the largest Solar Advisory Firm with 7900 MW of solar projects under advisory (including design, lenders engineer, owner engineer) , 49 MW of solar projects under Engineering Procurement and Construction (EPC) & 2200 MW of solar projects under Operation and Maintenance.
This document contains a SWOT analysis of 10 MW solar power plant designing project and basic procedures to take before implementing a such power plant design project. Application structures are also included in the document.
What services should a solar project developer expect from solar park & how much each service can be valued.
The ppt clears concept on value add by solar park.
The technical risks in solar PV projects are arising mainly in modules, inverters, other equipment. These risks are unpredictable and can be occurred in any phases of life cycle of PV project like development, installation, commissioning and operation leading to plant outage or reduction in energy output. The presentation covers the various risks and associated mitigation measures.
FirstGreen Consulting is a company working in the area of renewable energy, energy efficiency and climate change
The team has extensive experience in handling the Renewable, and energy efficiency projects
FirstGreen is providing energy sector consultancy in the sustainable energy, with expertise ranging from carbon advisory to technical consulting, to project implementation and project management.
Gensol strives to add value from Project Conceptualisation to Commissioning to ensure timely, quality and cost effective completion. From drafting exhaustive EPC contracts to approving engineering drawings and quality control during construction, Gensol's experience of 1500 MW works to ensure Peace of Mind for the Project Developer.
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
By installing and successfully operating 10 MW photovoltaic (PV) power plants will deliver electricity for consumption by the owners, the relevant peoples in the project assessment place will be made aware of the technical and economic potential of solar power generation. Furthermore, the power required from the public grid will be reduced, and overall expenditure on electric power will be lowered & our project aims to create the necessary awareness among the population, and especially among policy-makers and large investors, Youngsters.....
Balance of System (BOS) of a Solar Project has undergone a significant price reduction but continuous optimisation is making the trend continuing to go further down.
The presentation discusses on aspects around over-loading, cable optimisation, introduction of 1500 V systems and many other interesting optimisations.
Solar Panel Installation And Maintenance PowerPoint Presentation SlidesSlideTeam
World is moving towards a sustainable future and renewable energy is playing a vital role in achieving that goal. There are various sources of renewable energy but solar energy is dominant when it comes to meet both industrial and residential energy demand at low cost. This presentation will benefit the manufacturing organization that wants to optimize their energy consumption and electricity bill cost by shifting to solar energy. The presentation includes sections namely energy consumption analysis that will help the firm in defining its current electricity composition by resource, its daily, monthly and annual energy utilization rate, share of electricity demand in current year, energy star rating of current appliances and machineries and monthly electricity bill of the plant. Issues we are currently facing section will highlight the current challenges faced by the manufacturer in terms of machine downtime, energy consumption and Co2 emission. Firm can illustrate various solution along with their cost overview to counter their current challenges with help of Available solutions to counter energy issues section. Solar system overview section will help the firm in providing overview about solar system types and its applications along with system workflow. Permission and regulatory key considerations section will help the manufacturer to describe the essential permission and regulatory key consideration required for solar system installation. Manufacturer can provide detailed specification about the project, it objective and expected outcomes with the help of Project description and specifications section. Manufacturer can ensure the best quality of solar panels, mounting structure and inverter with decision making checklist for solar project section. Estimated cost of solar project section will shed a light on total cost required to install solar system. Implementation schedule will help the firm in illustrating the different stages to install solar system. Maintenance plan and schedule section will help the organization in maintaining the solar panel and inverter health. Manufacturer can portrays the stats of plant capacity per annum and electricity bill saving with impact on performance section. Risk and mitigation strategies section will help the manufacturer in illustrating possible risk that may occur during solar system installation and right measures to overcome them. Company can portray possible challenges that may arise while opting for solar energy and solution to overcome them with the help of barriers and solutions for solar energy application section. Finally, performance tracking dashboard will help the manufacturer in tracking plant electricity consumption, solar production and export to grid. https://bit.ly/2MP2gfF
Here are the details on 300MW Wind Power Project located in the Western Region of India presented by Gensol on the various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,
3)Statuary & legal approvals required,
4)Civil & electrical works,
5)Quality & material inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Ajjay Kumar Gupta
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis
Solar PV module panels comprise the solar list of a PV system which generates as well as supplies solar energy in residential and commercial applications. Modules are rated by DC output energy under standard examine conditions as well as usually ranges from 110 - 365 watts.
India’s sustained growth has placed enormous demand on the country’s natural resources. Today, India imports substantial quantities of gas, oil and coal in order to meet its growing energy demand. The increasing dependence on imported fuels creates a serious threat to the energy security of the country. In addition, the country’s 254 GW of power generation capacity based on conventional sources has further strained the natural resources and degrading the environment. India solar capacity forecast for 2020 raised by 240%.
Tags
Solar PV Module Manufacturing Plant, Solar Photovoltaic module Industry, Business consultancy, Detailed Project Report on solar pv module, Download Detailed Project Report on Solar PV Module, Download free project profiles on solar pv module, dpr for solar pv power plant, Feasibility report on solar pv module, Free Project Profiles on solar pv module, how do solar panels work, How to manufacture a photovoltaic module, How to Set Up a Small Solar (Photovoltaic) Power Generator, How to setup Solar PV Module Manufacturing Unit, How to Start a solar pv module Production Business, How to Start solar pv module Manufacturing Industry in India, India Solar PV Module Manufacturing Report, Industrial Project Report on solar pv module, Most Profitable solar pv module Manufacturing Business Ideas, NPCS, Photovoltaic solar module manufacturing, Pre-Investment Feasibility Study on solar pv module, Preparation of Project Profiles, Process technology books, Project consultancy, Project identification and selection, Project on Solar Energy, project profile on solar items, project profile on solar pv module, project report on solar energy system, Project Report on solar pv module, project report on solar pv module assembling industries, Project Report on solar pv module manufacturing unit, pv module manufacturing process pdf, pv module types, PV module, solar panel production & manufacturing line equipment, Small Scale solar pv module Manufacturing Projects, Solar (PV) Cell Module, Solar Based Profitable Projects, solar module manufacturing process pdf, Solar Module/Cell Manufacturing Process,
To get exposure of the process Mivan technology and the Raft Foundation
To learn about basic technical skills required during construction
To improve soft skills like communication and teamwork at the workplace.
Summary of internship
Dear Friends
I am MEP Draftsman/ Junior Design Engineer and i am also available for part time/freelancer work. For any kind of above said work you can contact me.
Thanks & Best Regards
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
3. 1 MW SOLAR
POWER PLANT
INSTALLATION
PROJECT
MANG.
PRE-
CONSTRUCTION
CONSTRUCTION INSPECTIONS
POST
CONSTRUCTION
INITIATION
PLANNING
SITE SURVEY
CONTRACT
PERMITS
DESIGN
PACKAGE
PRODUCTS DATA
SHEETS
PROCUREMENT
ASSEMBLING
ELECTRICAL
SYSTEM
INSTALLATION
PANEL TESTING
FINAL WORK
INSPECTION
HAND OVER
CLOSEOUT
DOCUMENTATION
WBS
4. ACTIVITY REPRESENTATION IPA
DURATION
(DAYS)
Site Survey
A - 10
Area Cleaning
B A 15
Procurement
C B 90
Excavation
D B 40
Foundation
E D 40
Erection
F E 60
Assembling
G C 60
Electric System
Installation
H F,G 90
Installation of
Control System
I F,G 45
Inspection & Testing
J I,H 15
Grid Synchronisation
K J 15
8. Crashing
Activity IPA Nd
(DAYS)
Nc
(Rs.)
Cd
(DAYS)
Cc
(Rs)
∆d=
(Nd-Cd)
∆c=
(Cc-Nc) ∆c/∆d
A - 10 40K 9 45K 1 5K 5K
B A 15 125K 13 130K 2 5K 2.5K
C B 90 8000K 88 8100K 2 100K 50K
D B 40 500K 39 510K 1 10K 10K
E D 40 1000K 38 1050K 2 50K 25K
F E 60 500K 59 505K 1 5K 5K
G C 60 500K 58 515K 2 15K 7.5K
H F,G 90 1500K 89 1525K 1 25K 25K
I F,G 45 4000K 44 4050K 1 50K 50K
J I,H 15 200K 13 210K 2 10K 5K
K J 15 1000K 14 1100K 1 100K 100K
9. Total Direct Cost= 1,73,65,000 -
Overheads=25000/day
Total indirect cost= 25000*295= 7375000 -
Total Cost= DC+IDC = 2,47,40,000 -
Step 1: Crash B by 2 days
TC=(17365K+5K)+(293*25K)= 2,46,95,000 -
Step 2: Crash A by 1 day
TC=(17370K+5K)+(292*25K)= 2,46,75,000-
Step 3: Crash J by 2 days
TC=(17375K+10K)+(290*25K)= 2,46,35,000-
10. Step 4: Crash G by 2 days
TC=(17385K+15K)+(288*25K)= 2,46,00,000 -
Step 5: Crash H by 1 day
TC=(17400K+25K)+(287*25K)= 2,46,00,000-
Step 6: Crash C by 1 day
TC=(17425K+50K)+(286*25K)=2,46,25,000 -
Optimum Cost= 2,46,00,000 -
Optimum Duration= 287 days