SlideShare a Scribd company logo
Tamil Nadu Solar Policy 2019
Sl.No Clause/Head Interpretation
1 Policy Tamil Nadu Solar Policy 2019
2 Policy Effective Date 04-02-2019
3 Operative Period
 Policy will be applicable and valid till further Amendments and modification proposed.
However, government will review the implementation of policy on an annual basis to evaluate
actual result.
4 Vision and Target
 Solar Energy target of 9000 MW from both ground mounted and rooftop project by 2023.
Out of which 40% from rooftop projects.
The energy targets are 4000 MW higher, compared to draft policy
5 Category System
 Utility Category System- Objective is to sale of power to distribution licensee/third
party/Self consumption at a remote location i.e. captive consumption
 Consumer Category System- Objective is self-consumption of solar energy and excess
feed to grid.
6 Gross Feed & Net Feed
 For Utility category gross feed in will be permitted at all voltage level subject to applicable
wheeling and other applicable charges.
 For consumer category net feed in will be available for all LT electricity consumer
categories
Gensol Engineering Pvt. Ltd
Solar Policy Review 2019: Tamil Nadu
7 Settlement Period
 For consumer category: the net credited/surplus unit settlement will be done once in 12
month/ financial year.
8 Wheeling of Power
 Wheeling facility is not permitted at LT voltage level.
 For HT consumer open access regulation of TNERC will be applicable.
 Wheeling of Power is allowed only above 1 MW capacity and the wheeling facility is only
allowed during generation hours
9 Energy Accounting
 Energy accounting will be done on slot or block basis. Excess unconsumed generation
considered as infirm power under sale of Discom category only. The excess energy will be
paid at a tariff determined by TNERC.
However, the block/ slot time intervals are not defined. Generally, the accounting is done in
15 minute time block
10
Business Model for Solar
Project
 Upfront Ownership: which is basically a Capex model in which, the developer puts
upfront capital cost and takes ownership.
 Deferred Ownership: it is basically a RESCO business model in which the owner makes
system performance based payment to the developer.
11 Incentives
 Consumer Category solar energy will be exempted from electricity tax for two year from
the date of policy.
 Single window process for all department approval, with time limits.
Incentives are limited to major extent as exemption of major charges like electricity tax, grid
connectivity, open access, wheeling, and banking and cross-subsidy charges are proposed in
the draft policy.
12 Grid Connectivity
 Evacuation of power shall be allowed at all voltage level.
 For consumer category system capacity is restricted to 100% of sanctioned load.

More Related Content

What's hot

Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
Vijay Menghani
 
Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020
Power System Operation
 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid Technology
Aditya Jalan
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
Malik Sameeullah
 
Renewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaRenewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaSurabhi Pal
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendments
Amitava Nag
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
Puneet Jaggi
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
Gensol Engineering Limited
 
Solar power integration with grid
Solar power integration with gridSolar power integration with grid
Solar power integration with grid
ashishant
 
Solar pv connected to grid
Solar pv connected to gridSolar pv connected to grid
Solar pv connected to grid
Darshan Prajapati
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizingfirstgreen
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Gensol Engineering Limited
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
Dr Naim R Kidwai
 
Rural Electrification in India
Rural Electrification in IndiaRural Electrification in India
Rural Electrification in India
Piyushkhinvasara
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
Gensol Engineering Limited
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
Ritesh Kumawat
 
Scenario of renewable energy sources
Scenario of renewable energy sourcesScenario of renewable energy sources
Scenario of renewable energy sources
Himanshi Gupta
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary ServicesIPPAI
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
Saravanan Sivamani
 

What's hot (20)

Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020
 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid Technology
 
OPEN ACCESS REGULATION
OPEN ACCESS REGULATIONOPEN ACCESS REGULATION
OPEN ACCESS REGULATION
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
Renewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaRenewable energy & its furure prospects in india
Renewable energy & its furure prospects in india
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendments
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Solar power integration with grid
Solar power integration with gridSolar power integration with grid
Solar power integration with grid
 
Solar pv connected to grid
Solar pv connected to gridSolar pv connected to grid
Solar pv connected to grid
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizing
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Rural Electrification in India
Rural Electrification in IndiaRural Electrification in India
Rural Electrification in India
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
 
Scenario of renewable energy sources
Scenario of renewable energy sourcesScenario of renewable energy sources
Scenario of renewable energy sources
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary Services
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 

Similar to Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019

Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
Headway Solar
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
Headway Solar
 
Re connect newsletter xxvi
Re connect newsletter xxviRe connect newsletter xxvi
Re connect newsletter xxviVibhav Nuwal
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
AbhishekMallick29
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
ZAINI ABDUL WAHAB
 
PNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxPNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptx
ParamJothi
 
Community Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketCommunity Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth Market
ScottMadden, Inc.
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeSanman Rajput
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeSanman Rajput
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
Chirag Jain
 
Wind Force Newsletter September, Edition, 2012
Wind Force Newsletter   September, Edition, 2012Wind Force Newsletter   September, Edition, 2012
Wind Force Newsletter September, Edition, 2012rupeshsingh_1
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
Saurabh Mehta
 
Solar Basics for Non Profits in Massachusetts
Solar Basics for Non Profits in MassachusettsSolar Basics for Non Profits in Massachusetts
Solar Basics for Non Profits in Massachusetts
Bethany Bartlett
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
Manish Ranjan
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
SyamsirAbduh2
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemes
Private Consultants
 
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
Dr. Oliver Massmann
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
Naresh Goud
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
Viraj Bhosale M.S. (Renewables) B.E.(Elect)
 

Similar to Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019 (20)

Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Re connect newsletter xxvi
Re connect newsletter xxviRe connect newsletter xxvi
Re connect newsletter xxvi
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
 
PNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxPNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptx
 
Community Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketCommunity Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth Market
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
SHAMS Dubai
SHAMS DubaiSHAMS Dubai
SHAMS Dubai
 
Wind Force Newsletter September, Edition, 2012
Wind Force Newsletter   September, Edition, 2012Wind Force Newsletter   September, Edition, 2012
Wind Force Newsletter September, Edition, 2012
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
Solar Basics for Non Profits in Massachusetts
Solar Basics for Non Profits in MassachusettsSolar Basics for Non Profits in Massachusetts
Solar Basics for Non Profits in Massachusetts
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemes
 
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 

More from Gensol Engineering Limited

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Gensol Engineering Limited
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Gensol Engineering Limited
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Gensol Engineering Limited
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
Gensol Engineering Limited
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Gensol Engineering Limited
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Gensol Engineering Limited
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
Gensol Engineering Limited
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
Gensol Engineering Limited
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
Gensol Engineering Limited
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Gensol Engineering Limited
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Gensol Engineering Limited
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Gensol Engineering Limited
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Gensol Engineering Limited
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
Gensol Engineering Limited
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
Gensol Engineering Limited
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
Gensol Engineering Limited
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy
Gensol Engineering Limited
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Engineering Limited
 

More from Gensol Engineering Limited (20)

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
 

Recently uploaded

The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 

Recently uploaded (20)

The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 

Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019

  • 1. Tamil Nadu Solar Policy 2019 Sl.No Clause/Head Interpretation 1 Policy Tamil Nadu Solar Policy 2019 2 Policy Effective Date 04-02-2019 3 Operative Period  Policy will be applicable and valid till further Amendments and modification proposed. However, government will review the implementation of policy on an annual basis to evaluate actual result. 4 Vision and Target  Solar Energy target of 9000 MW from both ground mounted and rooftop project by 2023. Out of which 40% from rooftop projects. The energy targets are 4000 MW higher, compared to draft policy 5 Category System  Utility Category System- Objective is to sale of power to distribution licensee/third party/Self consumption at a remote location i.e. captive consumption  Consumer Category System- Objective is self-consumption of solar energy and excess feed to grid. 6 Gross Feed & Net Feed  For Utility category gross feed in will be permitted at all voltage level subject to applicable wheeling and other applicable charges.  For consumer category net feed in will be available for all LT electricity consumer categories Gensol Engineering Pvt. Ltd Solar Policy Review 2019: Tamil Nadu
  • 2. 7 Settlement Period  For consumer category: the net credited/surplus unit settlement will be done once in 12 month/ financial year. 8 Wheeling of Power  Wheeling facility is not permitted at LT voltage level.  For HT consumer open access regulation of TNERC will be applicable.  Wheeling of Power is allowed only above 1 MW capacity and the wheeling facility is only allowed during generation hours 9 Energy Accounting  Energy accounting will be done on slot or block basis. Excess unconsumed generation considered as infirm power under sale of Discom category only. The excess energy will be paid at a tariff determined by TNERC. However, the block/ slot time intervals are not defined. Generally, the accounting is done in 15 minute time block 10 Business Model for Solar Project  Upfront Ownership: which is basically a Capex model in which, the developer puts upfront capital cost and takes ownership.  Deferred Ownership: it is basically a RESCO business model in which the owner makes system performance based payment to the developer. 11 Incentives  Consumer Category solar energy will be exempted from electricity tax for two year from the date of policy.  Single window process for all department approval, with time limits. Incentives are limited to major extent as exemption of major charges like electricity tax, grid connectivity, open access, wheeling, and banking and cross-subsidy charges are proposed in the draft policy. 12 Grid Connectivity  Evacuation of power shall be allowed at all voltage level.  For consumer category system capacity is restricted to 100% of sanctioned load.