SlideShare a Scribd company logo
Development of SBAS-enabled
Shipborne Receivers
Fundamental Elements Webinar, 29th March 2017
Manuel Lopez, Technology officer – Maritime and SAR applications
Vincenza de Tommaso, Financial Officer
Alina Hriscu, Market Development Officer
1This presentation can be interpreted only together with the oral comments accompanying it
2
• Participants’ microphones are muted.
To avoid any echo, please switch off
your microphone.
• Make sure your speakers or
headphones are switched on, and turn
up the volume.
• To interact you can use the common
chat room. Questions to individual
participants will not be answered.
• Your questions will appear anonymously
to the other participants
Before we start – way of working (1/2)
• Questions are collected and addressed at the end of the session, if
time allows it.
• All questions and answers will be published on the GSA website in
order to guarantee the equal treatment of tenderers/applicants.
• Slides and clarifications will be available in due course online after
this webinar.
• After the information session, you will receive a short satisfaction
questionnaire, please fill it in.
3
Before we start – way of working (2/2)
 CALL BACKGROUND
 TECHNICAL SCOPE
 ELIGIBLE PARTICIPANTS
 HOW TO PREPARE YOUR PROPOSAL
 GRANT AGREEMENT
 Q&A TIME
Agenda
4
Context
5
• Satellite-based Augmentation Systems are included in the IMO Res. MSC.401 (95) on Performance
Standards for Multi-System Shipborne Radionavigation Receivers
• SBAS is already adopted in shipborne receivers providing increased accuracy.
• However, today there is no maritime Standard or Guidelines for the implementation of SBAS in
shipborne receivers and the majority of these implementations do not take into account the
information related to the system integrity messages that is already broadcasted by SBAS.
• To complement IMO Res. MSC.401(95),
‒ RCTM SC-104 on DGNSS created a SBAS subgroup in 2016 to prepare Guidelines for the
implementation of SBAS in shipborne receivers and draft test specifications for a safety service
compliant with IMO Res. A.1046.
‒ RTCM SC-131 is already drafting the performance requirements and test specifications for
multisystem shipborne radionavigation receiver. Liaison between SC-104 and SC-131 is already
established with respect to SBAS Guidelines.
‒ IEC TC 80 is expected to finalise test specifications for the type approval of multisystem shipborne
radionavigation receivers with the support of RTCM SC-131 by mid-2019.
OBJECTIVES OF THE CALL
6
Objectives of the call
7
(1) Secure the availability of commercial products from European manufacturers of SBAS-
enabled Shipborne Receivers..
(2) Develop and test SBAS-enabled Shipborne Receivers according to the draft Guidelines, for the
implementation of SBAS, submitted to RTCM. This includes:
a. Receiver firmware update (required), taking into account:
i. The minimum set of SBAS Messages to be processed by a maritime receiver in compliance to IMO
Resolution A.1046 operational requirements using SBAS SIS corrections and integrity data
(required).
ii. The recommended processing of messages as well as the system alerts in compliance to the
requirements of IMO Res. A. 1046 (required).
b. Static and Dynamic Test Campaign in the laboratory (required).
c. Dynamic Test Campaign on a vessel (required)
Objectives of the call
8
Prototype (TRL-7) of an SBAS-enabled Shipborne Receiver
(3) Support the finalisation of the draft Guidelines based on the results of the implementation and the
results of the tests (required).
(4) Support the SBAS standardisation process at RTCM and IEC including the definition of tests
specifications for the type approval (optional). The support may include attendance to meetings
and preparation of test specifications.
Proposals can address development of one or more (receiver type):
(1) EGNOS-enabled Shipborne Receivers for navigation in SOLAS vessels (required)
(2) EGNOS-enabled Shipborne Receivers for navigation in non-SOLAS vessels (optional)
(3) EGNOS-enabled Shipborne Receiver for AIS class A transponder (optional)
(4) EGNOS-enabled Shipborne Receiver for AIS class B transponder (optional)
Type of Receivers
9
Requirements to all proposals
(=all receiver types)
MANDATORY
MUST BE IN
ANY PROPOSAL
1.- Process the SBAS messages according to the Draft Guidelines on SBAS submitted to RTCM
2.- Test the SBAS-enabled receiver and provide recommendation for the tests specifications
3.- Provide feedback to support the finalisation of the Draft Guidelines.
(1) Work plan (including project workflow).
(2) Preliminary analysis of the latest Draft Guidelines available (before mid-term review).
(3) Description of the logic for the use of SBAS corrections and integrity alarms when IALA DGNSS is
available or not.
(4) Describe measures taken to adopt the Marine Equipment Directive approval (Wheel Mark) on the final
product.
(5) Description of Test Campaigns, including the definition of the proposed tests and planning.
(6) Test reports.
(7) Recommendations and proposed modifications for the latest Draft Guidelines available based on the
test reports.
(8) New Receiver User Manual: Preliminary new version of the chapter related to SBAS.
(9) Dissemination and business plan.
(10) Dissemination documents and multi-media.
Minimum set of deliverables
to be included in the proposal
11
Award criteria
12
DESCRIPTION WEIGHT
LEVEL OF RELEVANCE AND CREDIBILITY OF THE PROPOSAL
(e.g. Use of EGNOS message types related to integrity, activities related to
implementation, integration and testing of receiver)
35
IMPACT IN TERMS OF ECONOMIC AND PUBLIC BENEFITS DERIVED FROM THE PROPOSAL
(e.g. Contribution to safety of life at sea, business plan, standardisation activities)
35
COHERENCE AND EFFECTIVENESS OF THE WORK PLAN
(e.g. Schedule, effort, tasks distribution, etc.)
30
If a total score lower than 55 points or a score lower than 50% for any of the above three criteria is obtained, the
proposal will not be evaluated further and will be rejected
Call timeline (indicative)
13
Stage Deadline
Publication of the call 28 February 2017
Deadline for request for clarifications 5 May 2017
Publication of the clarifications 16 May 2017
Deadline for submission of applications 31 May 2017
Evaluation period June 2017
Information to applicants on the outcome of the
evaluation
July 2017
Signature of the Grant Agreement September 2017
• Maximum total budget allocated to the call: EUR 1.000.000
• Indicative number of projects: 2
• Indicative maximum EU financing per project: EUR 500.000
• Maximum EU financing rate of eligible costs: 70%
• Maximum duration of the action: 2 years
Budget allocation and duration
14
• Applications by legal persons (consortia or mono-beneficiary)
established1 in and/or natural person(s) being nationals of any of the
EU Member States, Switzerland or Norway.
1 Legal persons are considered to be established in the EU when they are formed in
accordance with the law of an EU Member State, Norway or Switzerland, and have
their central administration, registered office or principal place of business in an EU
Member State, Norway or Switzerland.
• Applicants: active in the development, integration and/or manufacturing
of GNSS components, receivers, antennas and/or expert in the field of
GNSS Research and development.
Eligible applicants
15
16
Participation conditions
‒ Single or multiple applicants (consortia)
‒ If consortium:
‒ Minimum 2 applicants, out of which the coordinator shall be a legal person
‒ Composition of the consortium: applicants can be from any eligible
countries
HOW TO PREPARE YOUR PROPOSAL
17
 The Administrative package
 The Technical package
 The Financial package
Summary of the proposals
18
Summary of the proposals
19
FORM CONTENT CO-ORDINATOR CO-APPLICANT(S)
A1 PROPOSAL OVERVIEW X
A2 PROPOSAL SUMMARY X
A3 COORDINATOR PROFILE X
A4 CO-APPLICANT PROFILE X
A5 DECLARATION OF HONOUR X X
A6 FINANCIAL CAPACITY X X
B1 TECHNICAL PROPOSAL X
B2 OPERATIONAL CAPACITY X X
C1 PRELIMINARY BUDGET X X
ADMIN
PACKAGE
TECHNICAL
PACKAGE
FINANCIAL
PACKAGE
 Admin package:
WHO does WHAT?
20
FORM CONTENT
Single applicant
/ Co-ordinator
Co-applicant(s)
Affiliated
entity
A1
PROPOSAL
OVERVIEW
X
A2
PROPOSAL
SUMMARY
X
A3
COORDINATOR
PROFILE
X
A4
CO-APPLICANT
PROFILE
X
A5
DECLARATION OF
HONOUR
X X X
A6 FINANCIAL CAPACITY X X X
21
Admin package – overview of forms
Cover page
It serves 2 purposes:
COVER PAGE (TO BE FILLED BY THE COORDINATOR + GSA)
 Checklist for the applicants: list of the submission set +
number of docs to be submitted
 Basic information on the Proposal for GSA: project
acronym and consortium composition + receipt of the
documents.
22
Admin package – overview of forms
Form A1 & Form A2
 Contact details: Name/Surname, Organisation, ..
 Proposal Abstract: high level description of the proposed technical solution
 About the participants: name, role in the project and represented country
FORM A1. PROPOSAL OVERVIEW (TO BE FILLED BY THE COORDINATOR)
FORM A2. PROPOSAL SUMMARY (TO BE FILLED BY THE COORDINATOR)
 Objectives of the proposal: target of the proposal, including value proposition and
benefit for the users
 Description of the work: high level project’s workflow
 Milestone and Expected results
23
Admin package – overview of forms
Form A3 & Form A4
FORM A3. COORDINATOR / SINGLE APPLICANT PROFILE
(TO BE SUBMITTED BY THE COORDINATOR WITH: LEGAL ENTITY AND FINANCIAL IDENTIFICATION FORMS)
 Legal Information: LEF (Legal Entity Form: private or public company, registration info)
 Financial Identification: (FIF) banking details and account holder’s info
 Power of attorney: to commit the company/organisation
 Information on co-financing: how the applicant would do it? under which form?
 Previous EU contracts/grants: to check the no-double payment principle.
 Stamp: in UK it’s not common however for admin purposes EC needs it!
FORM A4. CO-APPLICANT PROFILE
(TO BE FILLED BY THE CO-APPLICANTS WITH: LEGAL ENTITY FORM)
 Same as for Coordinator: to be filled by the co-applicant.
24
Admin package – overview of forms
Form A5 & A6
FORM A5. DECLARATION OF HONOUR
(TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)
 It serves to check the exclusion and selection criteria
 Generic text used by EU.
 (The template was made after the amendment of the EU Financial Regulations as of 1 Jan
2016.)
 If requested consider to start early enough collecting all the evidences; since might be
time consuming
FORM A6. FINANCIAL CAPACITY
(TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)
 Technical package:
WHO does WHAT?
25
FORM CONTENT
Single applicant /
Co-ordinator
Co-applicant(s)
Affiliated
entity
B1
TECHNICAL
PROPOSAL
X
B2
OPERATIONAL
CAPACITY
X X X
26
Technical package
• Every proposal shall be assessed against the criteria
set out in the relevant Call for Proposal.
• In particular, for the technical package:
The Technical proposal (B1 Form) shall be assessed against
the AWARD criteria (CfP sect. 9)
The Operational capacity (B2 Form) shall be assessed against
the SELECTION criteria (CfP sect. 8.2)
27
Technical package – overview of forms
Form B1
The co-ordinator, on behalf of the consortium, shall
submit the TECHNICAL PROPOSAL.
1. CONCEPT and APPROACH (max. 30 pages)
2. EXPECTED IMPACT (max. 10 pages)
3. IMPLEMENTATION (max. 20 pages)
4. TECHNICAL ANNEXES
1. This section shall contain, as minimum:
 Description of the proposed technical solution and its compliance with the
CfP’s objectives
 Technology involved (focusing on innovation elements), E-GNSS
differentiators, etc.
 Description of the applied methodologies which shall be used in the
implementation of the action
 The feasibility of the proposal targeting market implementation
 Considerations about the engagement of the key stakeholders (e.g. chipset
manufacturer, system integrator, service provider, etc.)
28
Technical package – overview of forms
Form B1: Concept and approach
29
Technical package – overview of forms
Form B1: Expected impact
2. This section shall at least address the following topics:
 Which benefits to the user will derive from the implementation of the
project? Which additional applications shall be enabled?
 Elaboration of a Preliminary Business Plan, describing the strategy to
exploit the results.
 Elaboration of a Preliminary Dissemination Plan, establishing the
measures to disseminate the achievements of the project among
relevant stakeholders in the appropriate phases of the project
30
Technical package – overview of forms
Form B1: Implementation (1/2)
3. Structured section guiding the applicant through the following
points:
 Work Plan definition
 Work Packages: description, effort, resp., objectives, etc.
 WP schedule: Gantt chart, or similar
 WP inter-dependencies: Pert chart, or similar
 List of Deliverables (e.g. specification, report, demo kit, etc.)
 Project management
 Milestones, and relevant decision making
 Preliminary Risk register
31
Technical package – overview of forms
Form B1: Implementation (2/2)
3. Structured section guiding the applicant through the following
points:
 Consortium as a whole:
 Partners complementarity
 Tasks allocation
 Effectiveness in the project execution and to target
commercialisation
 Project’s Resources:
 Planned staff effort
 Other Direct Costs
 Subcontracting
 Budget overview
32
Technical package – overview of forms
Form B1: Technical annexes
4. Table to be filled out with the following information:
 Partners name (Organisation/Company)
 Company category (e.g. Research institute, chipset manufacturer, other)
 Country
Legal person: origin meaning “established”: having a registered office OR
central administration OR principal place of business in one of those
countries.
Natural Person: citizenship
33
Technical package – overview of forms
Form B1: Operational capacity
Every applicant (coordinator and co-applicants), shall
submit the OPERATIONAL CAPACITY Form.
Objective: to demonstrate compliance with SELECTION criteria set out in the
CfP
Ref. CfP section 8.2 – “Applicants must show they have the operational
(technical and management) capacity to complete the activities to be
supported by this Call for Proposal and must demonstrate their capacity to
manage the activities corresponding to the size of the project for which the
grant is requested.”
34
FORM CONTENT CO-ORDINATOR CO-APPLICANT(S)
A1 PROPOSAL OVERVIEW X
A2 PROPOSAL SUMMARY X
A3 COORDINATOR PROFILE X
A4 CO-APPLICANT PROFILE X
A5 DECLARATION OF HONOUR X X
A6 FINANCIAL CAPACITY X X
B1 TECHNICAL PROPOSAL X
B2 OPERATIONAL CAPACITY X X
C1 PRELIMINARY BUDGET X X
ADMIN
PACKAGE
TECHNICAL
PACKAGE
FINANCIAL
PACKAGE
 Financial package:
WHO does WHAT?
• Filled in with figures from your annual (audited)
accounts
• GSA calculates ratios (e.g. profitability, indebtedness,
financial independence)
• Used to assess your financial viability
Not applicable to public bodies and international
organisations
Financial package – overview of forms
Form A6: Financial capacity (1/2)
35
If outcome of the check is not satisfactory and in any other case GSA can:
• request further information
• propose a grant agreement without pre-financing
• propose a grant agreement with a pre-financing paid in instalments;
• propose a grant agreement with a lower percentage of a pre-financing;
• propose a grant agreement with a pre-financing covered by a bank
guarantee
• reject the application
36
Financial package – overview of forms
Form A6: Financial capacity (2/2)
Financial package – overview of forms
Form C1: Estimated budget
37
Project Name Participant Name
Project Acronym
Estimated eligible direct costs
Estimated eligible indirect
costs Total estimated eligible costs
Total requested GSAgrant
(EUR) (EUR) (EUR) (EUR)
A B C = A+B D = 70% x C
Direct eligible costs
(Numbering of categories as in "Eligible Costs for
the grants" section 12.2 of the Call for Proposals -
apply the rules detailed thereunder)
declared on the basis of flat rate of 7%
of 1. + 2. without costs of
subcontractors, costs of third parties
not working on beneficiary premises,
and cost of financial support to 3rd
parties
Total requested GSA grant at the
maximum reimbursment rate of 70%of
total costs
1.1 Personnel under direct empl. contract 0.00 € 0.00 € 0.00 € 0.00 €
1.2 Personnel under other than under empl.
contract (in-house consultants)
0.00 € 0.00 € 0.00 € 0.00 €
Sub-total for cost category 1 0.00 € 0.00 € 0.00 € 0.00 €
2.1 Travel costs 0.00 € 0.00 € 0.00 € 0.00 €
2.2 Costs for equipment and other assets
procured for the action
2.2 a) Costs for equipment and other assets
procured for the action: Full purchase costs
2.2 b) Costs for equipment and other assets
procured for the action: Depreciation costs
0.00 € 0.00 € 0.00 € 0.00 €
2.3 Costs for equipment or other assets not
procured but used for the action (depreciation
costs)
0.00 € 0.00 € 0.00 € 0.00 €
2.4 Costs for rental or lease of equipment or
other assets only to the portion of use and
limited to the duration of the action
0.00 € 0.00 € 0.00 € 0.00 €
2.5 Costs for use of technical facilities or
laboratories
0.00 € 0.00 € 0.00 € 0.00 €
2.6 Costs for consumables and supplies 0.00 € 0.00 € 0.00 € 0.00 €
2.7 Costs arising directly from requirements
imposed by the grant agreement
0.00 € 0.00 € 0.00 € 0.00 €
2.8 Costs entailed by subcontracts as
described in the proposal
0.00 € Not applicable 0.00 € 0.00 €
2.9 costs of financial support to third parties
2.10 Duties, taxes and charges paid by the
beneficiary
0.00 € 0.00 € 0.00 € 0.00 €
Sub-total for cost category 2 0.00 0.00 € 0.00 € 0.00 €
Total direct eligible costs 0.00 €
Total indirect eligible costs 0.00 €
Total eligible costs 0.00 €
5. Total EU contribution 0.00 €
Not applicable in this call for proposals
ESTIMATED BUDGET
Not applicable in this call for proposals
Estimated eligible costs of the action and GSA contribution (Table 1)
1. PERSONNEL COSTS
2. OTHER DIRECT COSTS
• During evaluation it will be checked:
‒ Staff effort – in relation to estimated budget for
personnel
‒ Description of other direct costs
‒ List of subcontracts
‒ Cumulative budget overview
Financial package – overview of forms
Form B1: Technical proposal
38
The amounts
should fit with
amounts in C1
Form
• 3 payments in total:
‒ Pre-financing 30%
‒ Interim payment up to 40%
‒ Final payment (30-70%)
Payment scheme
39
• When the tasks in B1 cannot be done by the consortium
• Principles:
‒ Best value for money or the lowest price
‒ No Conflict of Interest
‒ May only cover a limited part of the action and can not cover the core activities
‒ Necessary for implementation
‒ Stated in the proposal and in estimated budget
Subcontracting among beneficiaries is not possible!
Subcontracting
40
GRANT AGREEMENT
41
Draft Grant Agreement
42
• NOT part of the submitted proposal
• Please read it before submitting a proposal!
• It contains important elements on payments,
reporting, IPR etc.
• GSA: Legal and Procurement Department
• E-mail address: gnss.grants@gsa.europa.eu
• Office address: GSA, Janovského 438/2, 170 00, Prague 7, Czech
Republic
Contact coordinates for the call
43
Please refer in the subject to the relevant reference number of the Call
GSA/GRANT/03/2017
Submit requests for clarifications by: 5 May 2017
Submit proposals by: 31 May 2017

More Related Content

What's hot

Companies which attended Fundamental Elements Info Day
Companies which attended Fundamental Elements Info DayCompanies which attended Fundamental Elements Info Day
Companies which attended Fundamental Elements Info Day
The European GNSS Agency (GSA)
 
H2020-Galileo-2015-1 Call
H2020-Galileo-2015-1 CallH2020-Galileo-2015-1 Call
H2020-Galileo-2015-1 Call
The European GNSS Agency (GSA)
 
Second EGNOS Adoption Aviation Call_GSA instruction
Second EGNOS Adoption Aviation Call_GSA instructionSecond EGNOS Adoption Aviation Call_GSA instruction
Second EGNOS Adoption Aviation Call_GSA instruction
The European GNSS Agency (GSA)
 
Aviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingAviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management Training
The European GNSS Agency (GSA)
 
Low End Receiver - Sbardellati
Low End Receiver - Sbardellati Low End Receiver - Sbardellati
Low End Receiver - Sbardellati
The European GNSS Agency (GSA)
 
Enhanced Receiver for autonomous driving/navigation - Webinar presentation
Enhanced Receiver for autonomous driving/navigation - Webinar presentationEnhanced Receiver for autonomous driving/navigation - Webinar presentation
Enhanced Receiver for autonomous driving/navigation - Webinar presentation
The European GNSS Agency (GSA)
 
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationMulti-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
The European GNSS Agency (GSA)
 
05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures
The European GNSS Agency (GSA)
 
GSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for AviationGSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for Aviation
The European GNSS Agency (GSA)
 
Guidelines how to prepare a proposal - Jutasi, Lenova, Hriscu
Guidelines how to prepare a proposal - Jutasi, Lenova, HriscuGuidelines how to prepare a proposal - Jutasi, Lenova, Hriscu
Guidelines how to prepare a proposal - Jutasi, Lenova, Hriscu
The European GNSS Agency (GSA)
 
Intro Fundamental Elements - Calini - GSA
Intro Fundamental Elements - Calini - GSAIntro Fundamental Elements - Calini - GSA
Intro Fundamental Elements - Calini - GSA
The European GNSS Agency (GSA)
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
The European GNSS Agency (GSA)
 
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
The European GNSS Agency (GSA)
 
16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal
The European GNSS Agency (GSA)
 
H2020 2014 1st call GNSS Projects Portfolio
H2020 2014 1st call GNSS Projects PortfolioH2020 2014 1st call GNSS Projects Portfolio
H2020 2014 1st call GNSS Projects Portfolio
The European GNSS Agency (GSA)
 
Intro Fundamental Elements - Boyero - EC
Intro Fundamental Elements - Boyero - ECIntro Fundamental Elements - Boyero - EC
Intro Fundamental Elements - Boyero - EC
The European GNSS Agency (GSA)
 
Overview of JRC Capabilities - Sbardellati
Overview of JRC Capabilities - SbardellatiOverview of JRC Capabilities - Sbardellati
Overview of JRC Capabilities - Sbardellati
The European GNSS Agency (GSA)
 
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The European GNSS Agency (GSA)
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications
The European GNSS Agency (GSA)
 
15. Sbas-enabled maritime receiver
15. Sbas-enabled maritime receiver15. Sbas-enabled maritime receiver
15. Sbas-enabled maritime receiver
The European GNSS Agency (GSA)
 

What's hot (20)

Companies which attended Fundamental Elements Info Day
Companies which attended Fundamental Elements Info DayCompanies which attended Fundamental Elements Info Day
Companies which attended Fundamental Elements Info Day
 
H2020-Galileo-2015-1 Call
H2020-Galileo-2015-1 CallH2020-Galileo-2015-1 Call
H2020-Galileo-2015-1 Call
 
Second EGNOS Adoption Aviation Call_GSA instruction
Second EGNOS Adoption Aviation Call_GSA instructionSecond EGNOS Adoption Aviation Call_GSA instruction
Second EGNOS Adoption Aviation Call_GSA instruction
 
Aviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingAviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management Training
 
Low End Receiver - Sbardellati
Low End Receiver - Sbardellati Low End Receiver - Sbardellati
Low End Receiver - Sbardellati
 
Enhanced Receiver for autonomous driving/navigation - Webinar presentation
Enhanced Receiver for autonomous driving/navigation - Webinar presentationEnhanced Receiver for autonomous driving/navigation - Webinar presentation
Enhanced Receiver for autonomous driving/navigation - Webinar presentation
 
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationMulti-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
 
05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures
 
GSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for AviationGSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for Aviation
 
Guidelines how to prepare a proposal - Jutasi, Lenova, Hriscu
Guidelines how to prepare a proposal - Jutasi, Lenova, HriscuGuidelines how to prepare a proposal - Jutasi, Lenova, Hriscu
Guidelines how to prepare a proposal - Jutasi, Lenova, Hriscu
 
Intro Fundamental Elements - Calini - GSA
Intro Fundamental Elements - Calini - GSAIntro Fundamental Elements - Calini - GSA
Intro Fundamental Elements - Calini - GSA
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
 
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
 
16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal
 
H2020 2014 1st call GNSS Projects Portfolio
H2020 2014 1st call GNSS Projects PortfolioH2020 2014 1st call GNSS Projects Portfolio
H2020 2014 1st call GNSS Projects Portfolio
 
Intro Fundamental Elements - Boyero - EC
Intro Fundamental Elements - Boyero - ECIntro Fundamental Elements - Boyero - EC
Intro Fundamental Elements - Boyero - EC
 
Overview of JRC Capabilities - Sbardellati
Overview of JRC Capabilities - SbardellatiOverview of JRC Capabilities - Sbardellati
Overview of JRC Capabilities - Sbardellati
 
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications
 
15. Sbas-enabled maritime receiver
15. Sbas-enabled maritime receiver15. Sbas-enabled maritime receiver
15. Sbas-enabled maritime receiver
 

Viewers also liked

Wherecamp Berlin Introduction to RAW GNSS Measurements
Wherecamp Berlin Introduction to RAW GNSS MeasurementsWherecamp Berlin Introduction to RAW GNSS Measurements
Wherecamp Berlin Introduction to RAW GNSS Measurements
The European GNSS Agency (GSA)
 
Life watch App Presentation
Life watch App PresentationLife watch App Presentation
Life watch App Presentation
The European GNSS Agency (GSA)
 
Cecile Deprez - Relative positioning with Galileo E5 AltBOC code measurements
Cecile Deprez - Relative positioning with Galileo E5 AltBOC code measurementsCecile Deprez - Relative positioning with Galileo E5 AltBOC code measurements
Cecile Deprez - Relative positioning with Galileo E5 AltBOC code measurements
The European GNSS Agency (GSA)
 
Galileo, the point of view of a chip manufacturer: BROADCOM
Galileo, the point of view of a chip manufacturer: BROADCOMGalileo, the point of view of a chip manufacturer: BROADCOM
Galileo, the point of view of a chip manufacturer: BROADCOM
The European GNSS Agency (GSA)
 
Meyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesa
Meyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesaMeyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesa
Meyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesaJesús Aguado
 
Gnss.asia Position
Gnss.asia  PositionGnss.asia  Position
Gnss.asia Position
The European GNSS Agency (GSA)
 
Otoko App Presentation
Otoko App PresentationOtoko App Presentation
Otoko App Presentation
The European GNSS Agency (GSA)
 
Wherewild App Presentation
Wherewild App PresentationWherewild App Presentation
Wherewild App Presentation
The European GNSS Agency (GSA)
 
Disco draw App Presentation
Disco draw App PresentationDisco draw App Presentation
Disco draw App Presentation
The European GNSS Agency (GSA)
 
EASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants Maintenance
EASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants MaintenanceEASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants Maintenance
EASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants Maintenance
The European GNSS Agency (GSA)
 
Pseudoranges from your Android smartphone
Pseudoranges from your Android smartphonePseudoranges from your Android smartphone
Pseudoranges from your Android smartphone
Lukasz Kosma Bonenberg
 
Designing Teams for Emerging Challenges
Designing Teams for Emerging ChallengesDesigning Teams for Emerging Challenges
Designing Teams for Emerging Challenges
Aaron Irizarry
 

Viewers also liked (13)

Wherecamp Berlin Introduction to RAW GNSS Measurements
Wherecamp Berlin Introduction to RAW GNSS MeasurementsWherecamp Berlin Introduction to RAW GNSS Measurements
Wherecamp Berlin Introduction to RAW GNSS Measurements
 
Life watch App Presentation
Life watch App PresentationLife watch App Presentation
Life watch App Presentation
 
Cecile Deprez - Relative positioning with Galileo E5 AltBOC code measurements
Cecile Deprez - Relative positioning with Galileo E5 AltBOC code measurementsCecile Deprez - Relative positioning with Galileo E5 AltBOC code measurements
Cecile Deprez - Relative positioning with Galileo E5 AltBOC code measurements
 
Galileo, the point of view of a chip manufacturer: BROADCOM
Galileo, the point of view of a chip manufacturer: BROADCOMGalileo, the point of view of a chip manufacturer: BROADCOM
Galileo, the point of view of a chip manufacturer: BROADCOM
 
Meyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesa
Meyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesaMeyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesa
Meyerbeer y Los Hugonotes: poder y religión en la "Grand Opéra" francesa
 
Gnss.asia Position
Gnss.asia  PositionGnss.asia  Position
Gnss.asia Position
 
Otoko App Presentation
Otoko App PresentationOtoko App Presentation
Otoko App Presentation
 
Wherewild App Presentation
Wherewild App PresentationWherewild App Presentation
Wherewild App Presentation
 
Disco draw App Presentation
Disco draw App PresentationDisco draw App Presentation
Disco draw App Presentation
 
EASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants Maintenance
EASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants MaintenanceEASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants Maintenance
EASY-PV EGNSS High Accuracy System improving Photo-voltaic Plants Maintenance
 
Galileo gnss
Galileo gnssGalileo gnss
Galileo gnss
 
Pseudoranges from your Android smartphone
Pseudoranges from your Android smartphonePseudoranges from your Android smartphone
Pseudoranges from your Android smartphone
 
Designing Teams for Emerging Challenges
Designing Teams for Emerging ChallengesDesigning Teams for Emerging Challenges
Designing Teams for Emerging Challenges
 

Similar to Development of SBAS-Enabled Shipborne Receivers

Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation
The European GNSS Agency (GSA)
 
Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...
The European GNSS Agency (GSA)
 
Sesar the european atm programme mai 2013 bonnefous
Sesar   the european atm programme mai 2013 bonnefousSesar   the european atm programme mai 2013 bonnefous
Sesar the european atm programme mai 2013 bonnefousP. K. Mwangi
 
The Ocean of Tomorrow 2013 - modalities
The Ocean of Tomorrow 2013  - modalitiesThe Ocean of Tomorrow 2013  - modalities
The Ocean of Tomorrow 2013 - modalities
jagotcha
 
E Sponder Project
E Sponder ProjectE Sponder Project
E Sponder Project
dvasilia1978
 
Science-based targets in sugarcane (Work Plan)
Science-based targets in sugarcane (Work Plan)Science-based targets in sugarcane (Work Plan)
Science-based targets in sugarcane (Work Plan)
Bonsucro1
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
KTN
 
RINA approach to the offshore
RINA approach to the offshoreRINA approach to the offshore
RINA approach to the offshore
RINA_SERVICES
 
Eia procedural-guideline
Eia procedural-guidelineEia procedural-guideline
Eia procedural-guideline
Hussaini Omale
 
EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016
EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016
EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016
EEP Mekong
 
US-UK Offshore Wind R&D
US-UK Offshore Wind R&DUS-UK Offshore Wind R&D
US-UK Offshore Wind R&D
KTN
 
Asrf poc application form
Asrf poc application formAsrf poc application form
Asrf poc application form
Applied Scientific Research Fund
 
Sesar swim master class best in class 2014 next steps
Sesar swim master class best in class 2014  next stepsSesar swim master class best in class 2014  next steps
Sesar swim master class best in class 2014 next steps
SESAR Joint Undertaking
 
Navigation - introduction to galileo call
Navigation - introduction to galileo callNavigation - introduction to galileo call
Navigation - introduction to galileo callSpace-Applications
 
SLOPE intro we have a new project!
SLOPE intro we have a new project!SLOPE intro we have a new project!
SLOPE intro we have a new project!SLOPE Project
 
DIATOMIC PULL Experiments - Open Call Procedure & F6S Platform
DIATOMIC PULL  Experiments - Open Call Procedure & F6S PlatformDIATOMIC PULL  Experiments - Open Call Procedure & F6S Platform
DIATOMIC PULL Experiments - Open Call Procedure & F6S Platform
DiatomicEU
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
DNVGLEnergy
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
TECNALIA Marine Energy
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Caribbean Development Bank
 

Similar to Development of SBAS-Enabled Shipborne Receivers (20)

Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation
 
Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...
 
Sesar the european atm programme mai 2013 bonnefous
Sesar   the european atm programme mai 2013 bonnefousSesar   the european atm programme mai 2013 bonnefous
Sesar the european atm programme mai 2013 bonnefous
 
The Ocean of Tomorrow 2013 - modalities
The Ocean of Tomorrow 2013  - modalitiesThe Ocean of Tomorrow 2013  - modalities
The Ocean of Tomorrow 2013 - modalities
 
33138 gf a ip v1-en
33138 gf a ip v1-en33138 gf a ip v1-en
33138 gf a ip v1-en
 
E Sponder Project
E Sponder ProjectE Sponder Project
E Sponder Project
 
Science-based targets in sugarcane (Work Plan)
Science-based targets in sugarcane (Work Plan)Science-based targets in sugarcane (Work Plan)
Science-based targets in sugarcane (Work Plan)
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
 
RINA approach to the offshore
RINA approach to the offshoreRINA approach to the offshore
RINA approach to the offshore
 
Eia procedural-guideline
Eia procedural-guidelineEia procedural-guideline
Eia procedural-guideline
 
EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016
EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016
EEP Mekong: 6th Call for Proposals Meeting in Yangon, 1 July 2016
 
US-UK Offshore Wind R&D
US-UK Offshore Wind R&DUS-UK Offshore Wind R&D
US-UK Offshore Wind R&D
 
Asrf poc application form
Asrf poc application formAsrf poc application form
Asrf poc application form
 
Sesar swim master class best in class 2014 next steps
Sesar swim master class best in class 2014  next stepsSesar swim master class best in class 2014  next steps
Sesar swim master class best in class 2014 next steps
 
Navigation - introduction to galileo call
Navigation - introduction to galileo callNavigation - introduction to galileo call
Navigation - introduction to galileo call
 
SLOPE intro we have a new project!
SLOPE intro we have a new project!SLOPE intro we have a new project!
SLOPE intro we have a new project!
 
DIATOMIC PULL Experiments - Open Call Procedure & F6S Platform
DIATOMIC PULL  Experiments - Open Call Procedure & F6S PlatformDIATOMIC PULL  Experiments - Open Call Procedure & F6S Platform
DIATOMIC PULL Experiments - Open Call Procedure & F6S Platform
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
 

More from The European GNSS Agency (GSA)

The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The European GNSS Agency (GSA)
 
Smart cargo
Smart cargoSmart cargo
DGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - OptimizationDGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - Optimization
The European GNSS Agency (GSA)
 
GSA project roadmap summary and next steps
GSA project roadmap summary and next stepsGSA project roadmap summary and next steps
GSA project roadmap summary and next steps
The European GNSS Agency (GSA)
 
X2RAIL2 and other S2R projects
X2RAIL2 and other S2R projectsX2RAIL2 and other S2R projects
X2RAIL2 and other S2R projects
The European GNSS Agency (GSA)
 
ESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMSESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMS
The European GNSS Agency (GSA)
 
Sia GNSS contribution to rail asset management
Sia GNSS contribution to rail asset managementSia GNSS contribution to rail asset management
Sia GNSS contribution to rail asset management
The European GNSS Agency (GSA)
 
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
The European GNSS Agency (GSA)
 
STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...
The European GNSS Agency (GSA)
 
Integrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport modeIntegrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport mode
The European GNSS Agency (GSA)
 
Six challenges to ensure digital transformation
Six challenges to ensure digital transformationSix challenges to ensure digital transformation
Six challenges to ensure digital transformation
The European GNSS Agency (GSA)
 
Autonomous emergency manoeuvring
Autonomous emergency manoeuvringAutonomous emergency manoeuvring
Autonomous emergency manoeuvring
The European GNSS Agency (GSA)
 
Sensor observation of urban life
Sensor observation of urban lifeSensor observation of urban life
Sensor observation of urban life
The European GNSS Agency (GSA)
 
Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)
The European GNSS Agency (GSA)
 
Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...
The European GNSS Agency (GSA)
 
Cloudy boss
Cloudy bossCloudy boss
French SmartPort
French SmartPortFrench SmartPort
Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...
The European GNSS Agency (GSA)
 
Farming by Satellite Award Ceremony
Farming by Satellite Award CeremonyFarming by Satellite Award Ceremony
Farming by Satellite Award Ceremony
The European GNSS Agency (GSA)
 
Enhanced flood mapping service from multi-source data to actionable informat...
 Enhanced flood mapping service from multi-source data to actionable informat... Enhanced flood mapping service from multi-source data to actionable informat...
Enhanced flood mapping service from multi-source data to actionable informat...
The European GNSS Agency (GSA)
 

More from The European GNSS Agency (GSA) (20)

The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
 
Smart cargo
Smart cargoSmart cargo
Smart cargo
 
DGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - OptimizationDGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - Optimization
 
GSA project roadmap summary and next steps
GSA project roadmap summary and next stepsGSA project roadmap summary and next steps
GSA project roadmap summary and next steps
 
X2RAIL2 and other S2R projects
X2RAIL2 and other S2R projectsX2RAIL2 and other S2R projects
X2RAIL2 and other S2R projects
 
ESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMSESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMS
 
Sia GNSS contribution to rail asset management
Sia GNSS contribution to rail asset managementSia GNSS contribution to rail asset management
Sia GNSS contribution to rail asset management
 
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
 
STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...
 
Integrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport modeIntegrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport mode
 
Six challenges to ensure digital transformation
Six challenges to ensure digital transformationSix challenges to ensure digital transformation
Six challenges to ensure digital transformation
 
Autonomous emergency manoeuvring
Autonomous emergency manoeuvringAutonomous emergency manoeuvring
Autonomous emergency manoeuvring
 
Sensor observation of urban life
Sensor observation of urban lifeSensor observation of urban life
Sensor observation of urban life
 
Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)
 
Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...
 
Cloudy boss
Cloudy bossCloudy boss
Cloudy boss
 
French SmartPort
French SmartPortFrench SmartPort
French SmartPort
 
Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...
 
Farming by Satellite Award Ceremony
Farming by Satellite Award CeremonyFarming by Satellite Award Ceremony
Farming by Satellite Award Ceremony
 
Enhanced flood mapping service from multi-source data to actionable informat...
 Enhanced flood mapping service from multi-source data to actionable informat... Enhanced flood mapping service from multi-source data to actionable informat...
Enhanced flood mapping service from multi-source data to actionable informat...
 

Recently uploaded

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 

Recently uploaded (20)

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 

Development of SBAS-Enabled Shipborne Receivers

  • 1. Development of SBAS-enabled Shipborne Receivers Fundamental Elements Webinar, 29th March 2017 Manuel Lopez, Technology officer – Maritime and SAR applications Vincenza de Tommaso, Financial Officer Alina Hriscu, Market Development Officer 1This presentation can be interpreted only together with the oral comments accompanying it
  • 2. 2 • Participants’ microphones are muted. To avoid any echo, please switch off your microphone. • Make sure your speakers or headphones are switched on, and turn up the volume. • To interact you can use the common chat room. Questions to individual participants will not be answered. • Your questions will appear anonymously to the other participants Before we start – way of working (1/2)
  • 3. • Questions are collected and addressed at the end of the session, if time allows it. • All questions and answers will be published on the GSA website in order to guarantee the equal treatment of tenderers/applicants. • Slides and clarifications will be available in due course online after this webinar. • After the information session, you will receive a short satisfaction questionnaire, please fill it in. 3 Before we start – way of working (2/2)
  • 4.  CALL BACKGROUND  TECHNICAL SCOPE  ELIGIBLE PARTICIPANTS  HOW TO PREPARE YOUR PROPOSAL  GRANT AGREEMENT  Q&A TIME Agenda 4
  • 5. Context 5 • Satellite-based Augmentation Systems are included in the IMO Res. MSC.401 (95) on Performance Standards for Multi-System Shipborne Radionavigation Receivers • SBAS is already adopted in shipborne receivers providing increased accuracy. • However, today there is no maritime Standard or Guidelines for the implementation of SBAS in shipborne receivers and the majority of these implementations do not take into account the information related to the system integrity messages that is already broadcasted by SBAS. • To complement IMO Res. MSC.401(95), ‒ RCTM SC-104 on DGNSS created a SBAS subgroup in 2016 to prepare Guidelines for the implementation of SBAS in shipborne receivers and draft test specifications for a safety service compliant with IMO Res. A.1046. ‒ RTCM SC-131 is already drafting the performance requirements and test specifications for multisystem shipborne radionavigation receiver. Liaison between SC-104 and SC-131 is already established with respect to SBAS Guidelines. ‒ IEC TC 80 is expected to finalise test specifications for the type approval of multisystem shipborne radionavigation receivers with the support of RTCM SC-131 by mid-2019.
  • 7. Objectives of the call 7 (1) Secure the availability of commercial products from European manufacturers of SBAS- enabled Shipborne Receivers.. (2) Develop and test SBAS-enabled Shipborne Receivers according to the draft Guidelines, for the implementation of SBAS, submitted to RTCM. This includes: a. Receiver firmware update (required), taking into account: i. The minimum set of SBAS Messages to be processed by a maritime receiver in compliance to IMO Resolution A.1046 operational requirements using SBAS SIS corrections and integrity data (required). ii. The recommended processing of messages as well as the system alerts in compliance to the requirements of IMO Res. A. 1046 (required). b. Static and Dynamic Test Campaign in the laboratory (required). c. Dynamic Test Campaign on a vessel (required)
  • 8. Objectives of the call 8 Prototype (TRL-7) of an SBAS-enabled Shipborne Receiver (3) Support the finalisation of the draft Guidelines based on the results of the implementation and the results of the tests (required). (4) Support the SBAS standardisation process at RTCM and IEC including the definition of tests specifications for the type approval (optional). The support may include attendance to meetings and preparation of test specifications.
  • 9. Proposals can address development of one or more (receiver type): (1) EGNOS-enabled Shipborne Receivers for navigation in SOLAS vessels (required) (2) EGNOS-enabled Shipborne Receivers for navigation in non-SOLAS vessels (optional) (3) EGNOS-enabled Shipborne Receiver for AIS class A transponder (optional) (4) EGNOS-enabled Shipborne Receiver for AIS class B transponder (optional) Type of Receivers 9
  • 10. Requirements to all proposals (=all receiver types) MANDATORY MUST BE IN ANY PROPOSAL 1.- Process the SBAS messages according to the Draft Guidelines on SBAS submitted to RTCM 2.- Test the SBAS-enabled receiver and provide recommendation for the tests specifications 3.- Provide feedback to support the finalisation of the Draft Guidelines.
  • 11. (1) Work plan (including project workflow). (2) Preliminary analysis of the latest Draft Guidelines available (before mid-term review). (3) Description of the logic for the use of SBAS corrections and integrity alarms when IALA DGNSS is available or not. (4) Describe measures taken to adopt the Marine Equipment Directive approval (Wheel Mark) on the final product. (5) Description of Test Campaigns, including the definition of the proposed tests and planning. (6) Test reports. (7) Recommendations and proposed modifications for the latest Draft Guidelines available based on the test reports. (8) New Receiver User Manual: Preliminary new version of the chapter related to SBAS. (9) Dissemination and business plan. (10) Dissemination documents and multi-media. Minimum set of deliverables to be included in the proposal 11
  • 12. Award criteria 12 DESCRIPTION WEIGHT LEVEL OF RELEVANCE AND CREDIBILITY OF THE PROPOSAL (e.g. Use of EGNOS message types related to integrity, activities related to implementation, integration and testing of receiver) 35 IMPACT IN TERMS OF ECONOMIC AND PUBLIC BENEFITS DERIVED FROM THE PROPOSAL (e.g. Contribution to safety of life at sea, business plan, standardisation activities) 35 COHERENCE AND EFFECTIVENESS OF THE WORK PLAN (e.g. Schedule, effort, tasks distribution, etc.) 30 If a total score lower than 55 points or a score lower than 50% for any of the above three criteria is obtained, the proposal will not be evaluated further and will be rejected
  • 13. Call timeline (indicative) 13 Stage Deadline Publication of the call 28 February 2017 Deadline for request for clarifications 5 May 2017 Publication of the clarifications 16 May 2017 Deadline for submission of applications 31 May 2017 Evaluation period June 2017 Information to applicants on the outcome of the evaluation July 2017 Signature of the Grant Agreement September 2017
  • 14. • Maximum total budget allocated to the call: EUR 1.000.000 • Indicative number of projects: 2 • Indicative maximum EU financing per project: EUR 500.000 • Maximum EU financing rate of eligible costs: 70% • Maximum duration of the action: 2 years Budget allocation and duration 14
  • 15. • Applications by legal persons (consortia or mono-beneficiary) established1 in and/or natural person(s) being nationals of any of the EU Member States, Switzerland or Norway. 1 Legal persons are considered to be established in the EU when they are formed in accordance with the law of an EU Member State, Norway or Switzerland, and have their central administration, registered office or principal place of business in an EU Member State, Norway or Switzerland. • Applicants: active in the development, integration and/or manufacturing of GNSS components, receivers, antennas and/or expert in the field of GNSS Research and development. Eligible applicants 15
  • 16. 16 Participation conditions ‒ Single or multiple applicants (consortia) ‒ If consortium: ‒ Minimum 2 applicants, out of which the coordinator shall be a legal person ‒ Composition of the consortium: applicants can be from any eligible countries
  • 17. HOW TO PREPARE YOUR PROPOSAL 17
  • 18.  The Administrative package  The Technical package  The Financial package Summary of the proposals 18
  • 19. Summary of the proposals 19 FORM CONTENT CO-ORDINATOR CO-APPLICANT(S) A1 PROPOSAL OVERVIEW X A2 PROPOSAL SUMMARY X A3 COORDINATOR PROFILE X A4 CO-APPLICANT PROFILE X A5 DECLARATION OF HONOUR X X A6 FINANCIAL CAPACITY X X B1 TECHNICAL PROPOSAL X B2 OPERATIONAL CAPACITY X X C1 PRELIMINARY BUDGET X X ADMIN PACKAGE TECHNICAL PACKAGE FINANCIAL PACKAGE
  • 20.  Admin package: WHO does WHAT? 20 FORM CONTENT Single applicant / Co-ordinator Co-applicant(s) Affiliated entity A1 PROPOSAL OVERVIEW X A2 PROPOSAL SUMMARY X A3 COORDINATOR PROFILE X A4 CO-APPLICANT PROFILE X A5 DECLARATION OF HONOUR X X X A6 FINANCIAL CAPACITY X X X
  • 21. 21 Admin package – overview of forms Cover page It serves 2 purposes: COVER PAGE (TO BE FILLED BY THE COORDINATOR + GSA)  Checklist for the applicants: list of the submission set + number of docs to be submitted  Basic information on the Proposal for GSA: project acronym and consortium composition + receipt of the documents.
  • 22. 22 Admin package – overview of forms Form A1 & Form A2  Contact details: Name/Surname, Organisation, ..  Proposal Abstract: high level description of the proposed technical solution  About the participants: name, role in the project and represented country FORM A1. PROPOSAL OVERVIEW (TO BE FILLED BY THE COORDINATOR) FORM A2. PROPOSAL SUMMARY (TO BE FILLED BY THE COORDINATOR)  Objectives of the proposal: target of the proposal, including value proposition and benefit for the users  Description of the work: high level project’s workflow  Milestone and Expected results
  • 23. 23 Admin package – overview of forms Form A3 & Form A4 FORM A3. COORDINATOR / SINGLE APPLICANT PROFILE (TO BE SUBMITTED BY THE COORDINATOR WITH: LEGAL ENTITY AND FINANCIAL IDENTIFICATION FORMS)  Legal Information: LEF (Legal Entity Form: private or public company, registration info)  Financial Identification: (FIF) banking details and account holder’s info  Power of attorney: to commit the company/organisation  Information on co-financing: how the applicant would do it? under which form?  Previous EU contracts/grants: to check the no-double payment principle.  Stamp: in UK it’s not common however for admin purposes EC needs it! FORM A4. CO-APPLICANT PROFILE (TO BE FILLED BY THE CO-APPLICANTS WITH: LEGAL ENTITY FORM)  Same as for Coordinator: to be filled by the co-applicant.
  • 24. 24 Admin package – overview of forms Form A5 & A6 FORM A5. DECLARATION OF HONOUR (TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)  It serves to check the exclusion and selection criteria  Generic text used by EU.  (The template was made after the amendment of the EU Financial Regulations as of 1 Jan 2016.)  If requested consider to start early enough collecting all the evidences; since might be time consuming FORM A6. FINANCIAL CAPACITY (TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)
  • 25.  Technical package: WHO does WHAT? 25 FORM CONTENT Single applicant / Co-ordinator Co-applicant(s) Affiliated entity B1 TECHNICAL PROPOSAL X B2 OPERATIONAL CAPACITY X X X
  • 26. 26 Technical package • Every proposal shall be assessed against the criteria set out in the relevant Call for Proposal. • In particular, for the technical package: The Technical proposal (B1 Form) shall be assessed against the AWARD criteria (CfP sect. 9) The Operational capacity (B2 Form) shall be assessed against the SELECTION criteria (CfP sect. 8.2)
  • 27. 27 Technical package – overview of forms Form B1 The co-ordinator, on behalf of the consortium, shall submit the TECHNICAL PROPOSAL. 1. CONCEPT and APPROACH (max. 30 pages) 2. EXPECTED IMPACT (max. 10 pages) 3. IMPLEMENTATION (max. 20 pages) 4. TECHNICAL ANNEXES
  • 28. 1. This section shall contain, as minimum:  Description of the proposed technical solution and its compliance with the CfP’s objectives  Technology involved (focusing on innovation elements), E-GNSS differentiators, etc.  Description of the applied methodologies which shall be used in the implementation of the action  The feasibility of the proposal targeting market implementation  Considerations about the engagement of the key stakeholders (e.g. chipset manufacturer, system integrator, service provider, etc.) 28 Technical package – overview of forms Form B1: Concept and approach
  • 29. 29 Technical package – overview of forms Form B1: Expected impact 2. This section shall at least address the following topics:  Which benefits to the user will derive from the implementation of the project? Which additional applications shall be enabled?  Elaboration of a Preliminary Business Plan, describing the strategy to exploit the results.  Elaboration of a Preliminary Dissemination Plan, establishing the measures to disseminate the achievements of the project among relevant stakeholders in the appropriate phases of the project
  • 30. 30 Technical package – overview of forms Form B1: Implementation (1/2) 3. Structured section guiding the applicant through the following points:  Work Plan definition  Work Packages: description, effort, resp., objectives, etc.  WP schedule: Gantt chart, or similar  WP inter-dependencies: Pert chart, or similar  List of Deliverables (e.g. specification, report, demo kit, etc.)  Project management  Milestones, and relevant decision making  Preliminary Risk register
  • 31. 31 Technical package – overview of forms Form B1: Implementation (2/2) 3. Structured section guiding the applicant through the following points:  Consortium as a whole:  Partners complementarity  Tasks allocation  Effectiveness in the project execution and to target commercialisation  Project’s Resources:  Planned staff effort  Other Direct Costs  Subcontracting  Budget overview
  • 32. 32 Technical package – overview of forms Form B1: Technical annexes 4. Table to be filled out with the following information:  Partners name (Organisation/Company)  Company category (e.g. Research institute, chipset manufacturer, other)  Country Legal person: origin meaning “established”: having a registered office OR central administration OR principal place of business in one of those countries. Natural Person: citizenship
  • 33. 33 Technical package – overview of forms Form B1: Operational capacity Every applicant (coordinator and co-applicants), shall submit the OPERATIONAL CAPACITY Form. Objective: to demonstrate compliance with SELECTION criteria set out in the CfP Ref. CfP section 8.2 – “Applicants must show they have the operational (technical and management) capacity to complete the activities to be supported by this Call for Proposal and must demonstrate their capacity to manage the activities corresponding to the size of the project for which the grant is requested.”
  • 34. 34 FORM CONTENT CO-ORDINATOR CO-APPLICANT(S) A1 PROPOSAL OVERVIEW X A2 PROPOSAL SUMMARY X A3 COORDINATOR PROFILE X A4 CO-APPLICANT PROFILE X A5 DECLARATION OF HONOUR X X A6 FINANCIAL CAPACITY X X B1 TECHNICAL PROPOSAL X B2 OPERATIONAL CAPACITY X X C1 PRELIMINARY BUDGET X X ADMIN PACKAGE TECHNICAL PACKAGE FINANCIAL PACKAGE  Financial package: WHO does WHAT?
  • 35. • Filled in with figures from your annual (audited) accounts • GSA calculates ratios (e.g. profitability, indebtedness, financial independence) • Used to assess your financial viability Not applicable to public bodies and international organisations Financial package – overview of forms Form A6: Financial capacity (1/2) 35
  • 36. If outcome of the check is not satisfactory and in any other case GSA can: • request further information • propose a grant agreement without pre-financing • propose a grant agreement with a pre-financing paid in instalments; • propose a grant agreement with a lower percentage of a pre-financing; • propose a grant agreement with a pre-financing covered by a bank guarantee • reject the application 36 Financial package – overview of forms Form A6: Financial capacity (2/2)
  • 37. Financial package – overview of forms Form C1: Estimated budget 37 Project Name Participant Name Project Acronym Estimated eligible direct costs Estimated eligible indirect costs Total estimated eligible costs Total requested GSAgrant (EUR) (EUR) (EUR) (EUR) A B C = A+B D = 70% x C Direct eligible costs (Numbering of categories as in "Eligible Costs for the grants" section 12.2 of the Call for Proposals - apply the rules detailed thereunder) declared on the basis of flat rate of 7% of 1. + 2. without costs of subcontractors, costs of third parties not working on beneficiary premises, and cost of financial support to 3rd parties Total requested GSA grant at the maximum reimbursment rate of 70%of total costs 1.1 Personnel under direct empl. contract 0.00 € 0.00 € 0.00 € 0.00 € 1.2 Personnel under other than under empl. contract (in-house consultants) 0.00 € 0.00 € 0.00 € 0.00 € Sub-total for cost category 1 0.00 € 0.00 € 0.00 € 0.00 € 2.1 Travel costs 0.00 € 0.00 € 0.00 € 0.00 € 2.2 Costs for equipment and other assets procured for the action 2.2 a) Costs for equipment and other assets procured for the action: Full purchase costs 2.2 b) Costs for equipment and other assets procured for the action: Depreciation costs 0.00 € 0.00 € 0.00 € 0.00 € 2.3 Costs for equipment or other assets not procured but used for the action (depreciation costs) 0.00 € 0.00 € 0.00 € 0.00 € 2.4 Costs for rental or lease of equipment or other assets only to the portion of use and limited to the duration of the action 0.00 € 0.00 € 0.00 € 0.00 € 2.5 Costs for use of technical facilities or laboratories 0.00 € 0.00 € 0.00 € 0.00 € 2.6 Costs for consumables and supplies 0.00 € 0.00 € 0.00 € 0.00 € 2.7 Costs arising directly from requirements imposed by the grant agreement 0.00 € 0.00 € 0.00 € 0.00 € 2.8 Costs entailed by subcontracts as described in the proposal 0.00 € Not applicable 0.00 € 0.00 € 2.9 costs of financial support to third parties 2.10 Duties, taxes and charges paid by the beneficiary 0.00 € 0.00 € 0.00 € 0.00 € Sub-total for cost category 2 0.00 0.00 € 0.00 € 0.00 € Total direct eligible costs 0.00 € Total indirect eligible costs 0.00 € Total eligible costs 0.00 € 5. Total EU contribution 0.00 € Not applicable in this call for proposals ESTIMATED BUDGET Not applicable in this call for proposals Estimated eligible costs of the action and GSA contribution (Table 1) 1. PERSONNEL COSTS 2. OTHER DIRECT COSTS
  • 38. • During evaluation it will be checked: ‒ Staff effort – in relation to estimated budget for personnel ‒ Description of other direct costs ‒ List of subcontracts ‒ Cumulative budget overview Financial package – overview of forms Form B1: Technical proposal 38 The amounts should fit with amounts in C1 Form
  • 39. • 3 payments in total: ‒ Pre-financing 30% ‒ Interim payment up to 40% ‒ Final payment (30-70%) Payment scheme 39
  • 40. • When the tasks in B1 cannot be done by the consortium • Principles: ‒ Best value for money or the lowest price ‒ No Conflict of Interest ‒ May only cover a limited part of the action and can not cover the core activities ‒ Necessary for implementation ‒ Stated in the proposal and in estimated budget Subcontracting among beneficiaries is not possible! Subcontracting 40
  • 42. Draft Grant Agreement 42 • NOT part of the submitted proposal • Please read it before submitting a proposal! • It contains important elements on payments, reporting, IPR etc.
  • 43. • GSA: Legal and Procurement Department • E-mail address: gnss.grants@gsa.europa.eu • Office address: GSA, Janovského 438/2, 170 00, Prague 7, Czech Republic Contact coordinates for the call 43 Please refer in the subject to the relevant reference number of the Call GSA/GRANT/03/2017 Submit requests for clarifications by: 5 May 2017 Submit proposals by: 31 May 2017

Editor's Notes

  1. Purely financial forms: A6 and C1 Some important fin. input needed (staff effort, subcontractors, overview budget, breakdown of other direct costs): B1 Some minor financial input needed: A1 and A5
  2. Purely financial forms: A6 and C1 Some important fin. input needed (staff effort, subcontractors, overview budget, breakdown of other direct costs): B1 Some minor financial input needed: A1 and A5
  3. Pre-financing: paid automatically once the GA is signed Interim payment: - After the end of 1st period Following a request for interim payment from the Consortium – financial reporting Max. 70% cumulatively for pre-financing and interim payment – i.e. if pre-financing was paid at 30% then maximum 40% of grant will be paid in interim payment Final payment: Payment of the balance – the final amount depending on the amount of total actual eligible costs After the end of the project Following a request for final payment from the consortium – financial reporting
  4. Subcontracting: the externalisation of specific tasks or activities which form part of the action as described in the proposal – however, beneficiaries must have operational capacity to perform the tasks in B1 therefore subcontracting has to be justified Stated in the proposal and in estimated budget: if not in the proposal/budget then needs prior approval of GSA. If major change, amendment to the GA will be needed.
  5. Pre-financing: paid automatically once the GA is signed Interim payment: - After the end of 1st period Following a request for interim payment from the Consortium – financial reporting Max. 70% cumulatively for pre-financing and interim payment – i.e. if pre-financing was paid at 30% then maximum 40% of grant will be paid in interim payment Final payment: Payment of the balance – the final amount depending on the amount of total actual eligible costs After the end of the project Following a request for final payment from the consortium – financial reporting