Development of a Galileo-based timing
receiver for critical infrastructures
Fundamental Elements Webinar, 11th of January 2018
1This presentation can be interpreted only together with the oral comments accompanying it
Valeria Catalano, Technology Officer
Justine Vacher, Legal Officer
Vincenza de Tommaso, Financial Officer
Alina Hriscu, Market Development Officer
 CALL BACKGROUND
 TECHNICAL SCOPE
 ELIGIBLE PARTICIPANTS
 HOW TO PREPARE YOUR PROPOSAL
 GRANT AGREEMENT
 Q&A TIME
Agenda
2
15 MIN
15 MIN
30 MIN
This call is launched within the EU R&D funding programme ‘Fundamental
Elements’ which supports the development of EGNSS-enabled chipsets,
receivers and antennas.
The objectives of the Fundamental Elements can be summarised as following:
 Facilitate the adoption of the European GNSS Systems, building on their
innovative services and differentiators
 Improve the competitiveness of EU industry
 Address user needs in priority market segments
 Maximise benefits to European citizens
Call background
3
GNSS systems are delivering today a free and highly accurate timing capability
available worldwide, providing a way to obtain the Coordinate Universal Time
(UTC).
Call background
4
Precise Timing & Synchronisation (T&S) is
crucial to a range of strategic applications as
telecommunications and computer networks,
energy generation and distribution, finance or
other governmental functionalities.
All these applications use Critical
Infrastructures (CI) with different accuracy
requirements that are essential for maintaining
such vital societal functions as health, safety,
economic and social well‐being of people.
The call for proposal aims at developing, testing and assessing a
Galileo-based time receiver prototype for the Critical
Infrastructures and providing accurate and highly robust timing.
Activities shall be divided in six tasks:
Task 1: User’s requirements
Task 2: Timing Receiver’s Requirements
Task 3: Detailed design of the Receiver prototype
Task 4: Prototype development
Task 5: Testing and validation of the receiver prototype
Task 6: Dissemination of the results
Objectives of the call
5
 As described in Section 2.1
 The receiver shall be configurable for providing time in Galileo
System Time and UTC based on Galileo signals only, in single
and in multiple frequency
 The receiver shall improve the timing robustness
Essential objectives to be reached
9
MANDATORY
MUST BE IN
ANY PROPOSAL
 All the activities described in Sec 2.2 of the CfP
 A preliminary strategy for the validation of the receiver’s
performances
 A methodology for requirements identification, design,
development and testing of the receiver
 A methodology of dissemination plan including extent of
demonstration activities
General requirements
10
REQUIRED
MUST BE IN
ANY PROPOSAL
8
Innovation Elements
 The receiver should be capable of using OS authentication for
the provisioning of authenticated time stamping
 The suitability of using the Commercial Service (CS)
Authentication shall be analysed
Other requirements
1. Project Management Plan
2. Risk Management Document
3. User requirements Report and Justification
4. Timing Requirements specification
5. Design Definition File
6. Design Justification File
7. Design, Development and Validation Plan
8. Test Plan
9. Test procedures
10. Tests results report
11. Receiver’s documentation
12. IPR-related documentation
13. Dissemination Plan
14. Dissemination Report
Minimum set of deliverables to be
included in the proposal
9
Evaluation: Award criteria
10
DESCRIPTION WEIGHT
Relevance of the proposal to the objectives of the call, credibility of the proposed
approach, and innovation of the solutions proposed: 40
Impact in terms of economic and public benefits derived from the proposal
15
Credibility and coherency of the dissemination plan for the dissemination of the results of
the grant 15
Coherence and effectiveness of the work plan, including appropriateness of the allocation
of tasks and resources 30
If a total score lower than 60 points or a score lower than 60% for any of the above three criteria is obtained, the
proposal will not be evaluated further and will be rejected
Call timeline (indicative)
11
Stage Deadline
Publication of the call 12/12/2017
Deadline for request for clarifications 25/01/2018
Publication of the clarifications 14/02/2018
Deadline for submission of applications 28/03/2018
Evaluation period April-June 2018
Information to applicants on the outcome of the
evaluation
July 2018
Signature of the Grant Agreement August 2018
• Maximum total budget allocated to the call: EUR 3.500.000
• Maximum number of projects: 2
• Indicative EU financing per project up to: EUR 1.750.000
• Maximum EU financing rate of eligible costs: 70%
• Maximum duration of the action: 2 years
Budget allocation and duration
12
ELIGIBLE PARTICIPANTS
13
• Applications by legal persons (consortia or mono-beneficiary) established1 in and/or natural
person(s) being nationals of any of the EU Member States, Switzerland or Norway.
1 Legal persons are considered to be established in the EU when they are formed in accordance with the law of an EU
Member State, Norway or Switzerland, and have their central administration, registered office or principal place of
business in an EU Member State, Norway or Switzerland.
For British applicants: Please be aware that eligibility criteria must be complied with for the entire duration of the grant.
If the United Kingdom withdraws from the EU during the grant period without concluding an agreement with the EU
ensuring in particular that British applicants continue to be eligible, you will cease to receive EU funding (while
continuing, where possible, to participate) or be required to leave the project on the basis of Article II.17.3.1(a) of the
multibeneficiary grant agreement or Article II.17.2.1(a) of the monobeneficiary grant agreement.
• Applicants: active in the development and/or integration and/or manufacturing of GNSS
components, receivers, antennas and/or expert in the field of GNSS Research and development
and/or experts in the field of timing and critical infrastructures.
Eligible applicants
14
15
Participation conditions
‒ Single or multiple applicants (consortia)
‒ If consortium:
‒ Minimum 2 applicants, out of which the coordinator shall be a legal person
and co-applicant(s) can be either legal and/or natural person(s)
‒ Composition of the consortium: applicants can be from any eligible
countries
HOW TO PREPARE YOUR PROPOSAL
16
 The Administrative package
 The Technical package
 The Financial package
Summary of the proposals
17
Summary of the proposals
18
FORM CONTENT
SINGLE APPLICANT/
CO-ORDINATOR
CO-APPLICANT(S)
A1 PROPOSAL OVERVIEW X
A2 PROPOSAL SUMMARY X
A3 COORDINATOR PROFILE X
A4 CO-APPLICANT PROFILE X
A5 DECLARATION OF HONOUR X X
A6 FINANCIAL CAPACITY X X
B1 TECHNICAL PROPOSAL X
B2 OPERATIONAL CAPACITY X X
C1 PRELIMINARY BUDGET X X
ADMIN
PACKAGE
TECHNICAL
PACKAGE
FINANCIAL
PACKAGE
 Admin package:
WHO does WHAT?
19
FORM CONTENT
Single applicant
/ Co-ordinator
Co-applicant(s)
Affiliated
entity
A1
PROPOSAL
OVERVIEW
X
A2
PROPOSAL
SUMMARY
X
A3
COORDINATOR
PROFILE
X
A4
CO-APPLICANT
PROFILE
X
A5
DECLARATION OF
HONOUR
X X X
A6 FINANCIAL CAPACITY X X X
20
Admin package – overview of forms
Cover page
It serves 2 purposes:
COVER PAGE (TO BE FILLED BY THE COORDINATOR + GSA)
 Checklist for the applicants: list of the submission set +
number of docs to be submitted
 Basic information on the Proposal for GSA: project
acronym and consortium composition (if relevant) + receipt of
the documents.
21
Admin package – overview of forms
Form A1 & Form A2
 Contact details: Name/Surname, Organisation, ..
 Proposal Abstract: high level description of the proposed technical solution
 About the participants: name, role in the project and represented country
FORM A1. PROPOSAL OVERVIEW (TO BE FILLED BY THE COORDINATOR)
FORM A2. PROPOSAL SUMMARY (TO BE FILLED BY THE COORDINATOR)
 Objectives of the proposal: target of the proposal, including value proposition and
benefit for the users
 Description of the work: high level project’s workflow
 Milestone and Expected results
22
Admin package – overview of forms
Form A3 & Form A4
FORM A3. COORDINATOR / SINGLE APPLICANT PROFILE
(TO BE SUBMITTED BY THE COORDINATOR WITH: LEGAL ENTITY AND FINANCIAL IDENTIFICATION FORMS)
 Legal Information: LEF (Legal Entity Form: private or public company, registration info)
 Financial Identification: (FIF) banking details and account holder’s info
 Power of attorney: to commit the company/organisation
 Information on co-financing: how the applicant would do it? under which form?
 Previous EU contracts/grants: to check the no-double payment principle.
 Stamp: in some countries, it’s not common; however it is necessary for administrative purposes
FORM A4. CO-APPLICANT PROFILE
(TO BE FILLED BY THE CO-APPLICANTS WITH: LEGAL ENTITY FORM)
 Same as for Coordinator: to be filled by the co-applicant.
23
Admin package – overview of forms
Form A5 & A6
FORM A5. DECLARATION OF HONOUR
(TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)
 It serves to check the exclusion and selection criteria
 To be filled and submitted by ALL applicants
 Generic text used by EU.
 (The template was made after the amendment of the EU Financial Regulations as of 1 Jan 2016.)
 Consider starting early enough collecting all the evidences; since might be time consuming
FORM A6. FINANCIAL CAPACITY
(TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)
 Technical package:
WHO does WHAT?
24
FORM CONTENT
Single applicant /
Co-ordinator
Co-applicant(s)
Affiliated
entity
B1
TECHNICAL
PROPOSAL
X
B2
OPERATIONAL
CAPACITY
X X X
25
Technical package
• Every proposal will be assessed against the criteria set
out in the relevant Call for Proposal.
• In particular, for the technical package:
The Technical proposal (B1 Form) shall be assessed against
the AWARD criteria (CfP sect. 10)
The Operational capacity (B2 Form) shall be assessed against
the SELECTION criteria (CfP sect. 9.2)
26
Technical package – overview of forms
Form B1
The co-ordinator, on behalf of the consortium, shall
submit the TECHNICAL PROPOSAL.
1. CONCEPT and APPROACH (max. 30 pages)
2. EXPECTED IMPACT (max. 10 pages)
3. IMPLEMENTATION (max. 20 pages)
4. TECHNICAL ANNEXES
1.I This section shall contain, as minimum:
Description of the proposed technical solution and how
the project is relevant for the main objectives, in
particular the description of:
• The process to identify the requirements, design and develop the
receiver’s prototype
• The validation plan to assess the receiver’s performance against the
operational requirements, both in simulated and in real environment
• The dissemination activities towards the relevant stakeholders
27
Technical package – overview of forms
Form B1: Concept
1.II. This section shall contain, as minimum, a detailed
description of the proposed implementation of the project
including:
• A methodology for requirements identification, design, development and testing
of the receiver
• A preliminary strategy for the validation of the receiver’s performances
• How the applicants propose to leverage the partners in the consortium and the
key external stakeholders (e.g. GNSS receiver/chipset manufacturers, finance,
telecommunication and energy industry, as well as other relevant stakeholders)
• The list of deliverables and related deliverables plan
• The roadmap for operational implementation
28
Technical package – overview of forms
Form B1: Approach
29
Technical package – overview of forms
Form B1: Expected impact
2. This section shall at least address the following topics:
• Describe how your project will contribute to the maximisation of the
benefits to citizens by the adoption of the proposed solution in the
market
• Elaborate a preliminary roadmap for operational implementation of the
results of the grant
30
Technical package – overview of forms
Form B1: Implementation (1/2)
3. Structured section guiding the applicant through the following
points:
• Work Plan definition
 Work Packages: description, effort, resp., objectives, etc.
 WP schedule: Gantt chart, or similar
 WP inter-dependencies: Pert chart, or similar
 List of Deliverables (e.g. specification, report, demo kit, etc.)
• Project management
 Milestones, and relevant decision making
 Preliminary Risk register
31
Technical package – overview of forms
Form B1: Implementation (2/2)
3. Structured section guiding the applicant through the following
points:
• Consortium as a whole:
 Partners complementarity
 Tasks allocation
 Effectiveness in the project execution and to ensure exploitation of
the results
• Project’s Resources:
 Planned staff effort
 Other Direct Costs
 Subcontracting
 Budget overview
32
Technical package – overview of forms
Form B1: Technical annexes
4. Table to be filled out with the following information:
• Partners name (Organisation/Company)
• Company category (e.g. Research institute, chipset manufacturer, other)
• Country
Legal person: origin meaning “established”: having a registered office OR
central administration OR principal place of business in one of those
countries.
Natural Person: citizenship
33
Technical package – overview of forms
Form B1: Operational capacity
Every applicant (coordinator and co-applicants), shall
submit the OPERATIONAL CAPACITY Form.
Objective: to demonstrate compliance with SELECTION criteria set out in the
CfP
Ref. CfP section 9.2 – “Applicants must show they have the operational
(technical and management) capacity to complete the activities to be
supported by this Call for Proposal and must demonstrate their capacity to
manage the activities corresponding to the size of the project for which the
grant is requested.”
34
FORM CONTENT CO-ORDINATOR CO-APPLICANT(S)
A1 PROPOSAL OVERVIEW X
A2 PROPOSAL SUMMARY X
A3 COORDINATOR PROFILE X
A4 CO-APPLICANT PROFILE X
A5 DECLARATION OF HONOUR X X
A6 FINANCIAL CAPACITY X X
B1 TECHNICAL PROPOSAL X
B2 OPERATIONAL CAPACITY X X
C1 PRELIMINARY BUDGET X X
ADMIN
PACKAGE
TECHNICAL
PACKAGE
FINANCIAL
PACKAGE
 Financial package:
WHO does WHAT?
• Filled in with figures from your annual (audited)
accounts
• GSA calculates ratios (e.g. profitability, indebtedness,
financial independence)
• Used to assess your financial viability
Not applicable to public bodies and international
organisations
Financial package – overview of forms
Form A6: Financial capacity (1/2)
35
If outcome of the check is not satisfactory and in any other case GSA can:
• request further information
• propose a grant agreement without pre-financing
• propose a grant agreement with a pre-financing paid in instalments;
• propose a grant agreement with a lower percentage of a pre-financing;
• propose a grant agreement with a pre-financing covered by a bank
guarantee
• reject the application
36
Financial package – overview of forms
Form A6: Financial capacity (2/2)
Financial package – overview of forms
Form C1: Estimated budget
37
Project Name Participant Name
Project Acronym
Estimated eligible direct costs
Estimated eligible indirect
costs Total estimated eligible costs
Total requested GSAgrant
(EUR) (EUR) (EUR) (EUR)
A B C = A+B D = 70% x C
Direct eligible costs
(Numbering of categories as in "Eligible Costs for
the grants" section 12.2 of the Call for Proposals -
apply the rules detailed thereunder)
declared on the basis of flat rate of 7%
of 1. + 2. without costs of
subcontractors, costs of third parties
not working on beneficiary premises,
and cost of financial support to 3rd
parties
Total requested GSA grant at the
maximum reimbursment rate of 70%of
total costs
1.1 Personnel under direct empl. contract 0.00 € 0.00 € 0.00 € 0.00 €
1.2 Personnel under other than under empl.
contract (in-house consultants)
0.00 € 0.00 € 0.00 € 0.00 €
Sub-total for cost category 1 0.00 € 0.00 € 0.00 € 0.00 €
2.1 Travel costs 0.00 € 0.00 € 0.00 € 0.00 €
2.2 Costs for equipment and other assets
procured for the action
2.2 a) Costs for equipment and other assets
procured for the action: Full purchase costs
2.2 b) Costs for equipment and other assets
procured for the action: Depreciation costs
0.00 € 0.00 € 0.00 € 0.00 €
2.3 Costs for equipment or other assets not
procured but used for the action (depreciation
costs)
0.00 € 0.00 € 0.00 € 0.00 €
2.4 Costs for rental or lease of equipment or
other assets only to the portion of use and
limited to the duration of the action
0.00 € 0.00 € 0.00 € 0.00 €
2.5 Costs for use of technical facilities or
laboratories
0.00 € 0.00 € 0.00 € 0.00 €
2.6 Costs for consumables and supplies 0.00 € 0.00 € 0.00 € 0.00 €
2.7 Costs arising directly from requirements
imposed by the grant agreement
0.00 € 0.00 € 0.00 € 0.00 €
2.8 Costs entailed by subcontracts as
described in the proposal
0.00 € Not applicable 0.00 € 0.00 €
2.9 costs of financial support to third parties
2.10 Duties, taxes and charges paid by the
beneficiary
0.00 € 0.00 € 0.00 € 0.00 €
Sub-total for cost category 2 0.00 0.00 € 0.00 € 0.00 €
Total direct eligible costs 0.00 €
Total indirect eligible costs 0.00 €
Total eligible costs 0.00 €
5. Total EU contribution 0.00 €
Not applicable in this call for proposals
ESTIMATED BUDGET
Not applicable in this call for proposals
Estimated eligible costs of the action and GSA contribution (Table 1)
1. PERSONNEL COSTS
2. OTHER DIRECT COSTS
• During evaluation it will be checked:
‒ Staff effort – in relation to estimated budget for
personnel
‒ Description of other direct costs
‒ List of subcontracts
‒ Cumulative budget overview
Financial package – overview of forms
Form B1: Technical proposal
38
The amounts
should fit with
amounts in C1
Form
• 3 payments in total:
‒ Pre-financing 30%
‒ Interim payment up to 40%
‒ Final payment (30-70%)
Payment scheme
39
• When the tasks in B1 cannot be done by the consortium
• Principles:
‒ Best value for money or the lowest price
‒ No Conflict of Interest
‒ May only cover a limited part of the action and can not cover the core activities
‒ Necessary for implementation
‒ Stated in the proposal and in estimated budget
Subcontracting among beneficiaries is not possible!
Subcontracting
40
GRANT AGREEMENT
41
Draft Grant Agreement
42
• NOT part of the submitted proposal
• Please read it before submitting a proposal!
• It contains important elements on payments,
reporting, IPR etc.
• GSA: Legal and Procurement Department
• E-mail address: gnss.grants@gsa.europa.eu
• Office address: GSA, Janovského 438/2, 170 00, Prague 7, Czech
Republic
Contact coordinates for the call
43
Please refer in the subject to the relevant reference number of the Call
GSA/GRANT/05/2017
Submit requests for clarifications by: 25 January 2017
Submit proposals by: 28 March 2018

More Related Content

Similar to Gsa timing-rx-webinar Presentation

Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...The European GNSS Agency (GSA)
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)The European GNSS Agency (GSA)
 
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018The European GNSS Agency (GSA)
 
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationMulti-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationThe European GNSS Agency (GSA)
 
FRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: IntroductionFRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: IntroductionGrigoris Chatzikostas
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana
 
2nd call grants' presentation
2nd call grants' presentation2nd call grants' presentation
2nd call grants' presentationSRTD _ II
 
EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey Thierry Debels
 
CallforEurope weekly report_extract
CallforEurope weekly report_extractCallforEurope weekly report_extract
CallforEurope weekly report_extractCall4Europe
 
Navigation - introduction to galileo call
Navigation - introduction to galileo callNavigation - introduction to galileo call
Navigation - introduction to galileo callSpace-Applications
 
What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?IIED
 
05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructuresThe European GNSS Agency (GSA)
 
Europeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial ReportingEuropeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial ReportingEuropeana
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingKTN
 

Similar to Gsa timing-rx-webinar Presentation (20)

Development of MEOSAR Beacons
Development of MEOSAR Beacons  Development of MEOSAR Beacons
Development of MEOSAR Beacons
 
16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal
 
Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...Development of GNSS receiver technologies for premium and general mass market...
Development of GNSS receiver technologies for premium and general mass market...
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
 
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018The 3rd EGNOS adoption aviation Call webinar 15 march 2018
The 3rd EGNOS adoption aviation Call webinar 15 march 2018
 
Development of SBAS-Enabled Shipborne Receivers
Development of SBAS-Enabled Shipborne Receivers Development of SBAS-Enabled Shipborne Receivers
Development of SBAS-Enabled Shipborne Receivers
 
33138 gf a ip v1-en
33138 gf a ip v1-en33138 gf a ip v1-en
33138 gf a ip v1-en
 
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationMulti-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
 
FRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: IntroductionFRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: Introduction
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
 
2nd call grants' presentation
2nd call grants' presentation2nd call grants' presentation
2nd call grants' presentation
 
EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey
 
CallforEurope weekly report_extract
CallforEurope weekly report_extractCallforEurope weekly report_extract
CallforEurope weekly report_extract
 
Navigation - introduction to galileo call
Navigation - introduction to galileo callNavigation - introduction to galileo call
Navigation - introduction to galileo call
 
What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?What does the Paris Agreement’s transparency framework mean for LDCs?
What does the Paris Agreement’s transparency framework mean for LDCs?
 
Grant Scheme
Grant  SchemeGrant  Scheme
Grant Scheme
 
05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures
 
Europeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial ReportingEuropeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial Reporting
 
Second EGNOS Adoption Aviation Call_GSA instruction
Second EGNOS Adoption Aviation Call_GSA instructionSecond EGNOS Adoption Aviation Call_GSA instruction
Second EGNOS Adoption Aviation Call_GSA instruction
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
 

More from The European GNSS Agency (GSA)

EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications The European GNSS Agency (GSA)
 
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe European GNSS Agency (GSA)
 
DGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - OptimizationDGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - OptimizationThe European GNSS Agency (GSA)
 
ESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMSESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMSThe European GNSS Agency (GSA)
 
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...The European GNSS Agency (GSA)
 
STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...The European GNSS Agency (GSA)
 
Integrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport modeIntegrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport modeThe European GNSS Agency (GSA)
 
Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)The European GNSS Agency (GSA)
 
Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...The European GNSS Agency (GSA)
 
Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...The European GNSS Agency (GSA)
 

More from The European GNSS Agency (GSA) (20)

EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications
 
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
 
Smart cargo
Smart cargoSmart cargo
Smart cargo
 
DGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - OptimizationDGNSS & Autonomous Rail Transport Mobility - Optimization
DGNSS & Autonomous Rail Transport Mobility - Optimization
 
GSA project roadmap summary and next steps
GSA project roadmap summary and next stepsGSA project roadmap summary and next steps
GSA project roadmap summary and next steps
 
X2RAIL2 and other S2R projects
X2RAIL2 and other S2R projectsX2RAIL2 and other S2R projects
X2RAIL2 and other S2R projects
 
ESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMSESA stems system suitability study for train positioning using ERTMS
ESA stems system suitability study for train positioning using ERTMS
 
Sia GNSS contribution to rail asset management
Sia GNSS contribution to rail asset managementSia GNSS contribution to rail asset management
Sia GNSS contribution to rail asset management
 
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
ERSAT Projects – E-GNSS based solution for Low density lines and its certific...
 
STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...STARS Project – GNSS performances, rail environment characterisation and conc...
STARS Project – GNSS performances, rail environment characterisation and conc...
 
Integrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport modeIntegrating GNSS within another safety critical transport mode
Integrating GNSS within another safety critical transport mode
 
Six challenges to ensure digital transformation
Six challenges to ensure digital transformationSix challenges to ensure digital transformation
Six challenges to ensure digital transformation
 
Autonomous emergency manoeuvring
Autonomous emergency manoeuvringAutonomous emergency manoeuvring
Autonomous emergency manoeuvring
 
Sensor observation of urban life
Sensor observation of urban lifeSensor observation of urban life
Sensor observation of urban life
 
Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)Testbed in aarhus for precision positioning and autonomous systems (tapas)
Testbed in aarhus for precision positioning and autonomous systems (tapas)
 
Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...Cooperative its and advanced location and navigation solution for signalling ...
Cooperative its and advanced location and navigation solution for signalling ...
 
Cloudy boss
Cloudy bossCloudy boss
Cloudy boss
 
French SmartPort
French SmartPortFrench SmartPort
French SmartPort
 
Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...Make your logistic assets smarter exploit their full potential with the inter...
Make your logistic assets smarter exploit their full potential with the inter...
 
Farming by Satellite Award Ceremony
Farming by Satellite Award CeremonyFarming by Satellite Award Ceremony
Farming by Satellite Award Ceremony
 

Recently uploaded

Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 

Recently uploaded (20)

Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 

Gsa timing-rx-webinar Presentation

  • 1. Development of a Galileo-based timing receiver for critical infrastructures Fundamental Elements Webinar, 11th of January 2018 1This presentation can be interpreted only together with the oral comments accompanying it Valeria Catalano, Technology Officer Justine Vacher, Legal Officer Vincenza de Tommaso, Financial Officer Alina Hriscu, Market Development Officer
  • 2.  CALL BACKGROUND  TECHNICAL SCOPE  ELIGIBLE PARTICIPANTS  HOW TO PREPARE YOUR PROPOSAL  GRANT AGREEMENT  Q&A TIME Agenda 2 15 MIN 15 MIN 30 MIN
  • 3. This call is launched within the EU R&D funding programme ‘Fundamental Elements’ which supports the development of EGNSS-enabled chipsets, receivers and antennas. The objectives of the Fundamental Elements can be summarised as following:  Facilitate the adoption of the European GNSS Systems, building on their innovative services and differentiators  Improve the competitiveness of EU industry  Address user needs in priority market segments  Maximise benefits to European citizens Call background 3
  • 4. GNSS systems are delivering today a free and highly accurate timing capability available worldwide, providing a way to obtain the Coordinate Universal Time (UTC). Call background 4 Precise Timing & Synchronisation (T&S) is crucial to a range of strategic applications as telecommunications and computer networks, energy generation and distribution, finance or other governmental functionalities. All these applications use Critical Infrastructures (CI) with different accuracy requirements that are essential for maintaining such vital societal functions as health, safety, economic and social well‐being of people.
  • 5. The call for proposal aims at developing, testing and assessing a Galileo-based time receiver prototype for the Critical Infrastructures and providing accurate and highly robust timing. Activities shall be divided in six tasks: Task 1: User’s requirements Task 2: Timing Receiver’s Requirements Task 3: Detailed design of the Receiver prototype Task 4: Prototype development Task 5: Testing and validation of the receiver prototype Task 6: Dissemination of the results Objectives of the call 5
  • 6.  As described in Section 2.1  The receiver shall be configurable for providing time in Galileo System Time and UTC based on Galileo signals only, in single and in multiple frequency  The receiver shall improve the timing robustness Essential objectives to be reached 9 MANDATORY MUST BE IN ANY PROPOSAL
  • 7.  All the activities described in Sec 2.2 of the CfP  A preliminary strategy for the validation of the receiver’s performances  A methodology for requirements identification, design, development and testing of the receiver  A methodology of dissemination plan including extent of demonstration activities General requirements 10 REQUIRED MUST BE IN ANY PROPOSAL
  • 8. 8 Innovation Elements  The receiver should be capable of using OS authentication for the provisioning of authenticated time stamping  The suitability of using the Commercial Service (CS) Authentication shall be analysed Other requirements
  • 9. 1. Project Management Plan 2. Risk Management Document 3. User requirements Report and Justification 4. Timing Requirements specification 5. Design Definition File 6. Design Justification File 7. Design, Development and Validation Plan 8. Test Plan 9. Test procedures 10. Tests results report 11. Receiver’s documentation 12. IPR-related documentation 13. Dissemination Plan 14. Dissemination Report Minimum set of deliverables to be included in the proposal 9
  • 10. Evaluation: Award criteria 10 DESCRIPTION WEIGHT Relevance of the proposal to the objectives of the call, credibility of the proposed approach, and innovation of the solutions proposed: 40 Impact in terms of economic and public benefits derived from the proposal 15 Credibility and coherency of the dissemination plan for the dissemination of the results of the grant 15 Coherence and effectiveness of the work plan, including appropriateness of the allocation of tasks and resources 30 If a total score lower than 60 points or a score lower than 60% for any of the above three criteria is obtained, the proposal will not be evaluated further and will be rejected
  • 11. Call timeline (indicative) 11 Stage Deadline Publication of the call 12/12/2017 Deadline for request for clarifications 25/01/2018 Publication of the clarifications 14/02/2018 Deadline for submission of applications 28/03/2018 Evaluation period April-June 2018 Information to applicants on the outcome of the evaluation July 2018 Signature of the Grant Agreement August 2018
  • 12. • Maximum total budget allocated to the call: EUR 3.500.000 • Maximum number of projects: 2 • Indicative EU financing per project up to: EUR 1.750.000 • Maximum EU financing rate of eligible costs: 70% • Maximum duration of the action: 2 years Budget allocation and duration 12
  • 14. • Applications by legal persons (consortia or mono-beneficiary) established1 in and/or natural person(s) being nationals of any of the EU Member States, Switzerland or Norway. 1 Legal persons are considered to be established in the EU when they are formed in accordance with the law of an EU Member State, Norway or Switzerland, and have their central administration, registered office or principal place of business in an EU Member State, Norway or Switzerland. For British applicants: Please be aware that eligibility criteria must be complied with for the entire duration of the grant. If the United Kingdom withdraws from the EU during the grant period without concluding an agreement with the EU ensuring in particular that British applicants continue to be eligible, you will cease to receive EU funding (while continuing, where possible, to participate) or be required to leave the project on the basis of Article II.17.3.1(a) of the multibeneficiary grant agreement or Article II.17.2.1(a) of the monobeneficiary grant agreement. • Applicants: active in the development and/or integration and/or manufacturing of GNSS components, receivers, antennas and/or expert in the field of GNSS Research and development and/or experts in the field of timing and critical infrastructures. Eligible applicants 14
  • 15. 15 Participation conditions ‒ Single or multiple applicants (consortia) ‒ If consortium: ‒ Minimum 2 applicants, out of which the coordinator shall be a legal person and co-applicant(s) can be either legal and/or natural person(s) ‒ Composition of the consortium: applicants can be from any eligible countries
  • 16. HOW TO PREPARE YOUR PROPOSAL 16
  • 17.  The Administrative package  The Technical package  The Financial package Summary of the proposals 17
  • 18. Summary of the proposals 18 FORM CONTENT SINGLE APPLICANT/ CO-ORDINATOR CO-APPLICANT(S) A1 PROPOSAL OVERVIEW X A2 PROPOSAL SUMMARY X A3 COORDINATOR PROFILE X A4 CO-APPLICANT PROFILE X A5 DECLARATION OF HONOUR X X A6 FINANCIAL CAPACITY X X B1 TECHNICAL PROPOSAL X B2 OPERATIONAL CAPACITY X X C1 PRELIMINARY BUDGET X X ADMIN PACKAGE TECHNICAL PACKAGE FINANCIAL PACKAGE
  • 19.  Admin package: WHO does WHAT? 19 FORM CONTENT Single applicant / Co-ordinator Co-applicant(s) Affiliated entity A1 PROPOSAL OVERVIEW X A2 PROPOSAL SUMMARY X A3 COORDINATOR PROFILE X A4 CO-APPLICANT PROFILE X A5 DECLARATION OF HONOUR X X X A6 FINANCIAL CAPACITY X X X
  • 20. 20 Admin package – overview of forms Cover page It serves 2 purposes: COVER PAGE (TO BE FILLED BY THE COORDINATOR + GSA)  Checklist for the applicants: list of the submission set + number of docs to be submitted  Basic information on the Proposal for GSA: project acronym and consortium composition (if relevant) + receipt of the documents.
  • 21. 21 Admin package – overview of forms Form A1 & Form A2  Contact details: Name/Surname, Organisation, ..  Proposal Abstract: high level description of the proposed technical solution  About the participants: name, role in the project and represented country FORM A1. PROPOSAL OVERVIEW (TO BE FILLED BY THE COORDINATOR) FORM A2. PROPOSAL SUMMARY (TO BE FILLED BY THE COORDINATOR)  Objectives of the proposal: target of the proposal, including value proposition and benefit for the users  Description of the work: high level project’s workflow  Milestone and Expected results
  • 22. 22 Admin package – overview of forms Form A3 & Form A4 FORM A3. COORDINATOR / SINGLE APPLICANT PROFILE (TO BE SUBMITTED BY THE COORDINATOR WITH: LEGAL ENTITY AND FINANCIAL IDENTIFICATION FORMS)  Legal Information: LEF (Legal Entity Form: private or public company, registration info)  Financial Identification: (FIF) banking details and account holder’s info  Power of attorney: to commit the company/organisation  Information on co-financing: how the applicant would do it? under which form?  Previous EU contracts/grants: to check the no-double payment principle.  Stamp: in some countries, it’s not common; however it is necessary for administrative purposes FORM A4. CO-APPLICANT PROFILE (TO BE FILLED BY THE CO-APPLICANTS WITH: LEGAL ENTITY FORM)  Same as for Coordinator: to be filled by the co-applicant.
  • 23. 23 Admin package – overview of forms Form A5 & A6 FORM A5. DECLARATION OF HONOUR (TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)  It serves to check the exclusion and selection criteria  To be filled and submitted by ALL applicants  Generic text used by EU.  (The template was made after the amendment of the EU Financial Regulations as of 1 Jan 2016.)  Consider starting early enough collecting all the evidences; since might be time consuming FORM A6. FINANCIAL CAPACITY (TO BE SUBMITTED BY ALL APPLICANTS – INCLUDING AFFILIATED ENTITIES)
  • 24.  Technical package: WHO does WHAT? 24 FORM CONTENT Single applicant / Co-ordinator Co-applicant(s) Affiliated entity B1 TECHNICAL PROPOSAL X B2 OPERATIONAL CAPACITY X X X
  • 25. 25 Technical package • Every proposal will be assessed against the criteria set out in the relevant Call for Proposal. • In particular, for the technical package: The Technical proposal (B1 Form) shall be assessed against the AWARD criteria (CfP sect. 10) The Operational capacity (B2 Form) shall be assessed against the SELECTION criteria (CfP sect. 9.2)
  • 26. 26 Technical package – overview of forms Form B1 The co-ordinator, on behalf of the consortium, shall submit the TECHNICAL PROPOSAL. 1. CONCEPT and APPROACH (max. 30 pages) 2. EXPECTED IMPACT (max. 10 pages) 3. IMPLEMENTATION (max. 20 pages) 4. TECHNICAL ANNEXES
  • 27. 1.I This section shall contain, as minimum: Description of the proposed technical solution and how the project is relevant for the main objectives, in particular the description of: • The process to identify the requirements, design and develop the receiver’s prototype • The validation plan to assess the receiver’s performance against the operational requirements, both in simulated and in real environment • The dissemination activities towards the relevant stakeholders 27 Technical package – overview of forms Form B1: Concept
  • 28. 1.II. This section shall contain, as minimum, a detailed description of the proposed implementation of the project including: • A methodology for requirements identification, design, development and testing of the receiver • A preliminary strategy for the validation of the receiver’s performances • How the applicants propose to leverage the partners in the consortium and the key external stakeholders (e.g. GNSS receiver/chipset manufacturers, finance, telecommunication and energy industry, as well as other relevant stakeholders) • The list of deliverables and related deliverables plan • The roadmap for operational implementation 28 Technical package – overview of forms Form B1: Approach
  • 29. 29 Technical package – overview of forms Form B1: Expected impact 2. This section shall at least address the following topics: • Describe how your project will contribute to the maximisation of the benefits to citizens by the adoption of the proposed solution in the market • Elaborate a preliminary roadmap for operational implementation of the results of the grant
  • 30. 30 Technical package – overview of forms Form B1: Implementation (1/2) 3. Structured section guiding the applicant through the following points: • Work Plan definition  Work Packages: description, effort, resp., objectives, etc.  WP schedule: Gantt chart, or similar  WP inter-dependencies: Pert chart, or similar  List of Deliverables (e.g. specification, report, demo kit, etc.) • Project management  Milestones, and relevant decision making  Preliminary Risk register
  • 31. 31 Technical package – overview of forms Form B1: Implementation (2/2) 3. Structured section guiding the applicant through the following points: • Consortium as a whole:  Partners complementarity  Tasks allocation  Effectiveness in the project execution and to ensure exploitation of the results • Project’s Resources:  Planned staff effort  Other Direct Costs  Subcontracting  Budget overview
  • 32. 32 Technical package – overview of forms Form B1: Technical annexes 4. Table to be filled out with the following information: • Partners name (Organisation/Company) • Company category (e.g. Research institute, chipset manufacturer, other) • Country Legal person: origin meaning “established”: having a registered office OR central administration OR principal place of business in one of those countries. Natural Person: citizenship
  • 33. 33 Technical package – overview of forms Form B1: Operational capacity Every applicant (coordinator and co-applicants), shall submit the OPERATIONAL CAPACITY Form. Objective: to demonstrate compliance with SELECTION criteria set out in the CfP Ref. CfP section 9.2 – “Applicants must show they have the operational (technical and management) capacity to complete the activities to be supported by this Call for Proposal and must demonstrate their capacity to manage the activities corresponding to the size of the project for which the grant is requested.”
  • 34. 34 FORM CONTENT CO-ORDINATOR CO-APPLICANT(S) A1 PROPOSAL OVERVIEW X A2 PROPOSAL SUMMARY X A3 COORDINATOR PROFILE X A4 CO-APPLICANT PROFILE X A5 DECLARATION OF HONOUR X X A6 FINANCIAL CAPACITY X X B1 TECHNICAL PROPOSAL X B2 OPERATIONAL CAPACITY X X C1 PRELIMINARY BUDGET X X ADMIN PACKAGE TECHNICAL PACKAGE FINANCIAL PACKAGE  Financial package: WHO does WHAT?
  • 35. • Filled in with figures from your annual (audited) accounts • GSA calculates ratios (e.g. profitability, indebtedness, financial independence) • Used to assess your financial viability Not applicable to public bodies and international organisations Financial package – overview of forms Form A6: Financial capacity (1/2) 35
  • 36. If outcome of the check is not satisfactory and in any other case GSA can: • request further information • propose a grant agreement without pre-financing • propose a grant agreement with a pre-financing paid in instalments; • propose a grant agreement with a lower percentage of a pre-financing; • propose a grant agreement with a pre-financing covered by a bank guarantee • reject the application 36 Financial package – overview of forms Form A6: Financial capacity (2/2)
  • 37. Financial package – overview of forms Form C1: Estimated budget 37 Project Name Participant Name Project Acronym Estimated eligible direct costs Estimated eligible indirect costs Total estimated eligible costs Total requested GSAgrant (EUR) (EUR) (EUR) (EUR) A B C = A+B D = 70% x C Direct eligible costs (Numbering of categories as in "Eligible Costs for the grants" section 12.2 of the Call for Proposals - apply the rules detailed thereunder) declared on the basis of flat rate of 7% of 1. + 2. without costs of subcontractors, costs of third parties not working on beneficiary premises, and cost of financial support to 3rd parties Total requested GSA grant at the maximum reimbursment rate of 70%of total costs 1.1 Personnel under direct empl. contract 0.00 € 0.00 € 0.00 € 0.00 € 1.2 Personnel under other than under empl. contract (in-house consultants) 0.00 € 0.00 € 0.00 € 0.00 € Sub-total for cost category 1 0.00 € 0.00 € 0.00 € 0.00 € 2.1 Travel costs 0.00 € 0.00 € 0.00 € 0.00 € 2.2 Costs for equipment and other assets procured for the action 2.2 a) Costs for equipment and other assets procured for the action: Full purchase costs 2.2 b) Costs for equipment and other assets procured for the action: Depreciation costs 0.00 € 0.00 € 0.00 € 0.00 € 2.3 Costs for equipment or other assets not procured but used for the action (depreciation costs) 0.00 € 0.00 € 0.00 € 0.00 € 2.4 Costs for rental or lease of equipment or other assets only to the portion of use and limited to the duration of the action 0.00 € 0.00 € 0.00 € 0.00 € 2.5 Costs for use of technical facilities or laboratories 0.00 € 0.00 € 0.00 € 0.00 € 2.6 Costs for consumables and supplies 0.00 € 0.00 € 0.00 € 0.00 € 2.7 Costs arising directly from requirements imposed by the grant agreement 0.00 € 0.00 € 0.00 € 0.00 € 2.8 Costs entailed by subcontracts as described in the proposal 0.00 € Not applicable 0.00 € 0.00 € 2.9 costs of financial support to third parties 2.10 Duties, taxes and charges paid by the beneficiary 0.00 € 0.00 € 0.00 € 0.00 € Sub-total for cost category 2 0.00 0.00 € 0.00 € 0.00 € Total direct eligible costs 0.00 € Total indirect eligible costs 0.00 € Total eligible costs 0.00 € 5. Total EU contribution 0.00 € Not applicable in this call for proposals ESTIMATED BUDGET Not applicable in this call for proposals Estimated eligible costs of the action and GSA contribution (Table 1) 1. PERSONNEL COSTS 2. OTHER DIRECT COSTS
  • 38. • During evaluation it will be checked: ‒ Staff effort – in relation to estimated budget for personnel ‒ Description of other direct costs ‒ List of subcontracts ‒ Cumulative budget overview Financial package – overview of forms Form B1: Technical proposal 38 The amounts should fit with amounts in C1 Form
  • 39. • 3 payments in total: ‒ Pre-financing 30% ‒ Interim payment up to 40% ‒ Final payment (30-70%) Payment scheme 39
  • 40. • When the tasks in B1 cannot be done by the consortium • Principles: ‒ Best value for money or the lowest price ‒ No Conflict of Interest ‒ May only cover a limited part of the action and can not cover the core activities ‒ Necessary for implementation ‒ Stated in the proposal and in estimated budget Subcontracting among beneficiaries is not possible! Subcontracting 40
  • 42. Draft Grant Agreement 42 • NOT part of the submitted proposal • Please read it before submitting a proposal! • It contains important elements on payments, reporting, IPR etc.
  • 43. • GSA: Legal and Procurement Department • E-mail address: gnss.grants@gsa.europa.eu • Office address: GSA, Janovského 438/2, 170 00, Prague 7, Czech Republic Contact coordinates for the call 43 Please refer in the subject to the relevant reference number of the Call GSA/GRANT/05/2017 Submit requests for clarifications by: 25 January 2017 Submit proposals by: 28 March 2018

Editor's Notes

  1. Purely financial forms: A6 and C1 Some important fin. input needed (staff effort, subcontractors, overview budget, breakdown of other direct costs): B1 Some minor financial input needed: A1 and A5
  2. Purely financial forms: A6 and C1 Some important fin. input needed (staff effort, subcontractors, overview budget, breakdown of other direct costs): B1 Some minor financial input needed: A1 and A5
  3. Pre-financing: paid automatically once the GA is signed Interim payment: - After the end of 1st period Following a request for interim payment from the Consortium – financial reporting Max. 70% cumulatively for pre-financing and interim payment – i.e. if pre-financing was paid at 30% then maximum 40% of grant will be paid in interim payment Final payment: Payment of the balance – the final amount depending on the amount of total actual eligible costs After the end of the project Following a request for final payment from the consortium – financial reporting
  4. Subcontracting: the externalisation of specific tasks or activities which form part of the action as described in the proposal – however, beneficiaries must have operational capacity to perform the tasks in B1 therefore subcontracting has to be justified Stated in the proposal and in estimated budget: if not in the proposal/budget then needs prior approval of GSA. If major change, amendment to the GA will be needed.
  5. Pre-financing: paid automatically once the GA is signed Interim payment: - After the end of 1st period Following a request for interim payment from the Consortium – financial reporting Max. 70% cumulatively for pre-financing and interim payment – i.e. if pre-financing was paid at 30% then maximum 40% of grant will be paid in interim payment Final payment: Payment of the balance – the final amount depending on the amount of total actual eligible costs After the end of the project Following a request for final payment from the consortium – financial reporting