RINA, the former Italian Register of Shipping, is a multi-national group
dedicated to support its clients in the development and management of the
various phases of their activities, offering through dedicated companies
consulting engineering, certification services, testing and inspections
 Over 150 years of experience
 Tailored high innovative solutions
 Specialized skills coverage throughout project life cycle
 Prompt responses
 Global network
 IACS Founding Member
 1st Italian certification body
 Global Network
 + 30 years of experience in
offshore platform
certification
Classification
Native Marine Business
Certification
System, Product, Personnel and
Project Certification
Testing & Inspection
Inspection, Site Supervision and
Testing for O&G and T&I Clients
Certification of Fixed
Offshore Platforms
Since 70s RINA offers certification services for design, construction and
installation of offshore platforms aimed to oil and gas production from the
offshore reservoir
150+ offshore platforms certified
(Mediterranean, West Africa,
Caspian Sea, …)
Certification is aimed to ensure
the compliance of the structure
and equipment with internationally
recognized industrial standards
(such as API or ISO)
or Applicable National Regulations
(ref. to Territorial waters)
Certification of Fixed
Offshore Platforms
 In today's increasingly more attentive and demanding market, the
certification procedure, in which a third party gives written assurance that
a product complies with specified requirements, is a tool of great economic
and social utility
 Certification of an offshore platform has the main purpose to ensure, by
performing a third party independent review of the project, that the
industrial plant going to be installed in a socially sensitive scenario, will
respect objective parameters of safety in order to reduce as low as
reasonably possible the risk to human life and environment, eventually
allowing the owner to be facilitated in the permission and insurance
processes
Why Certification?
 Offshore platforms are to be designed and
constructed so as:
 To ensure an acceptable standard with regard to
the safety of life at sea and to the prevention of
environmental pollution
 To prevent possible major economic losses during
all phases of the design life
 The certification covers all phases of an offshore
project after its preparation and throughout all
stages of construction and operation (up to removal
or reuse):
 Design (3rd Party Independent Verification)
 Fabrication at onshore yard (Survey)
 Offshore installation operations (Survey)
 Service Life (Periodical follow-up surveys)
Certification
Requirements
 Initial design and construction appraisal
SAFETY and OPTIMIZATION OF CAPEX
 Modern design codes (ISO 19900 series)
 Risk Exposue Categories
 LRFD Format
 Platform Dynamics (Seismic/Fatigue)
 Foundation model
 Modern technologies for fabrication /NDT
 Service life (20-25 years design target)
MAINTENANCE COST REDUCTION (OPEX)
 Reliability based inspection and maintenance plan
NEW RULES
FOR
CERTIFICATION
Certification
Drivers / Benefits
The number of existing fixed
offshore platforms nearing the end of
their design life is increasing
The regulatory framework
for offshore platforms is changing
(new European Directive
2013/30/EU)
Pressure on platforms operators and designer of new units
Business Challenge
The existing structure is fit-for-
purpose when the risk of structural
failure leading to unacceptable
consequences is adequately low
Due to a change in economic conditions - and an increase in oil & gas recovery
possibilities - operators often want to continue exploiting platforms beyond
their 20-25-year designed lifecycle instead of investing in a new platform
 The challenge is to continue to use, in safety conditions, offshore
platforms that have reached the end of their designed lifetime and have
this extended use approved by statutory authorities
Safety and environment are still
essential but focus shall be also on
cost reduction and production
optimization
NEW RINA RULES
Platforms life extension
When the platform is ageing, and is planned to remain in service longer than its
original design lifetime, a comprehensive reassessment of the platform
conditions is to be carried out before any life extension
The reassessment takes into account:
 Actual conditions of the structure
 Recent metocean data and updated calculation methods for the re-analysis
 Platform history data
Key benefits
 A new or continued License to Operate
 Reduction in amount of repairs and reinforcements required
 Confidence for the operator, regulatory agencies and surrounding
community that the platform is safe and reliable
Life extension target
The required safety target shall be demonstrated for the specific site
conditions and given operational requirements
The original design target was ensured (typically with respect to the extreme
environmental event, related in turn to a prescribed design life) introducing
some conservativisms
 Uncertianties in platform actual response (still to be realized)
Reassessment is possible by taking into account the new information and
measurements due to the actual behaviour of the platform and its history
 Platform as its own Full Scale Model
 Reduced Uncertianties
 Margin for Design Life Extension
Design life extension
principle
 More than 80 platforms verified (mainly in last 15 years) for various
operators:
 ENI/Petrobel/Eni Congo/Edison/DOTL/ONGC
 Adriatic Sea (28)
 Sicily Channel (3)
 Mediterranean (Egypt) (2)
 Red Sea (11)
 Offshore Congo (13)
 Offshore Nigeria (2)
 Caspian Sea (9)
 Indian Ocean (22)
 Jacket engineering reassessment (main issue):
 Fatigue & Corrosion
 Life extension based on inspections/maintenance records
 Future IMR Planning
RINA experience in certification
of existing platforms
 A cradle-to-grave framework for the structural and process safety of the
platform
 Design, fabrication, installation, life extension assessment and de-
commissioning are all covered
 Platform designers and operators can choose from and mix three
approaches:
 Classification
 allows the platform to be built and maintained against a set of rules
covering the whole service life
 Certification
 measures the platform structure and topside process against set
international or local standards
 Verification
 is the new risk-based Safety Case, regulatory system to the entire EU
from 2015, in increasing use globally, with the aim of significantly
reducing the risk of accidents and environmental damage
New RINA Rules
RINA Rules for Classification and Certification of Fixed Offshore Platforms – 2015 Ed.
 PART A
– APPLICATION AND GENERAL
– CLASSIFICATION CERTIFICATION AND INDIPENDENT VERIFICATION
– MAINTENANCE OF CLASS OR EXTENSION OF THE CERTIFICATION
 PART B
– GENERAL PRINCIPLES
– ENVIRONMENTAL CONDITIONS
– DESIGN LOADS
– STRUCTURAL ANALYSIS
– FOUNDATIONS
– ASSESSMENT OF EXISTING STRUCTURES
 PART C
– GENERAL REQUIREMENTS
– PRODUCTION, PROCESS AND ANCILLARY PIPING SYSTEMS
 PART D
– MATERIALS FOR STRUCTURES
– MATERIALS FOR PROCESS PIPING SYSTEMS
– STRUCTURE FABRICATION
– PIPING FABRICATION
– QUALITY ASSURANCE / QUALITY CONTROL
– PROTECTION AGAINST CORROSION
 PART E
– MARINE OPERATIONS
RINA Rules - 2015 Ed.
PART B CHAPTER 6 – ASSESSMENT OF EXISTING STRUCTURES
1 General
2 Assessment Process
2.1 Assessment data gathering
2.2 Inspection on the current platform status
2.2.1 General requirements
2.2.2 Requirements for submarine survey
2.2.3 Level I
2.2.4 Level II
2.2.5 Level III
2.2.6 Level IV
2.2.7 Survey Specification
2.2.8 Survey Procedure
2.3 Definition of the up-to-date platform model
2.4 Definition of the loads
2.5 Verification of the platform structure
2.5.1 Resistance assessment
2.5.2 Fatigue assessment
2.5.3 System assessment
2.5.4 Reference values for the Reserve Strength Ratio
RINA Rules for the Classification
or Certification
of Steel Fixed Offshore Platforms – 2015 Ed.
Limited failures of individual components are accepted if the reserve against
overall system failure remains acceptable.
The platform has shown appropriate performance via full-scale model, i.e. the
platform itself
Yielding or failure of individual components is acceptable, if the remaining
parts of the structural system have sufficient reserve strength to redistribute
the action
A pushover analysis is used to demonstrate that the safety factor against
failure of the whole structural system meets acceptable levels (RSR target)
Strength Assessment
The system approach
Ultimate strength analysis by elasto-plastic analysis.
Environmental loads increase up to the whole system collapse. The verification is considered satisfied
when the collapse load will result “appropriately” greater than the design load
Non-linear push-over
 Loads are applied in sequence:
 Dead and live loads are applied
to their nominal value
 100-year environmental load
vector (wave, current and wind)
is applied and increased until
the structural collapse of the
whole platform
 RSR: ratio between base shear
resistance and design load
(Rd/F100)
The system approach
 When it is not possible to show that the structure is acceptable even by RSR
 decreased reliability of the overall system could be acceptable, provided
that the consequences of failure are acceptable for both the life and the
environment
 e.g. de-manning the platform and provide for safety system to close the
wells in case of foreseen extreme environmental event
 Notional yearly probability of failure evaluation by SRA to determine
maximum extreme wave (return period) and relevant residual life
The system approach
Existing platform installed in the Caspian Sea, offshore Turkmenistan, in
about 27m w.d.
 several jacket modules with vertical legs
 topside lattice frames
 drilled and grouted piles
Reassessment analysis carried out in n 2011-2014 (9 platforms)
Target: life extension
Possible strengthening, also to support foreseen work-over rig
Push-over analysis considering the most critical environmental loading
Example of residual life
evaluation
Minimum RSR = 1.02
probability of collapse Pc = 2.75x10-2,
safety index b = F-1 (- Pc) = 1.919
Reference ‘target’ RSR = 1.2
‘target’ value of b = 2.253
design life of 20 years
Actual life 10 years
Allowable wave return period 85 years
maximum allowable wave height 10.2 m
Life extension
assessment results
 The platforms are characterized by an overall level of safety that can be
considered acceptable for a design life of about 10 years
 The platforms would be globally able to withstand a maximum wave height
characterized by 50 yrs return period, i.e. a maximum wave height of 10.2m
(wrt NW incoming direction)
 Conditional Certificates issued
– Required repairs and strengthening measures as identified by relevant
analysis and drawings are to be carried out
– The platforms are to be evacuated and consequently subject to a special
survey in the event where a sea state characterized by maximum wave
height of 10.2m occurs during the recognized 10 years of lifetime
Conclusions: conditional
certificates
By adopting a reliability based fatigue approach it is possible to account for a
new possibility, which is of paramount importance to the management of
structural safety:
 The results of the in situ inspections can be utilized to update, in
quantitative terms, the structural reliability evaluation
 The reliability index is evaluated as a function of the time passed since
installation, the expected endurance of the node at the design stage and
the results of the node inspection
Maintenace optimization example
Reliability based fatigue approach
b
T
bo
bup
Inspection outcomes combined with
fatigue predictions:
 Reliability approach to update fatigue
safety margin and to plan future
inspections
 Fatigue safey margin as b(t)
 Updating of b at a given time of
inspection
 Reducing uncertainty -> increasing
safety margin, particularly in case
that no cracks are detected
Optimal inspections
planning
 Optimal Inspection Planning
 When required
 Increase in safety
 Less frequent inspections when the
structure is new or well-manufactured,
increase in frequency when older
 Optimal Maintenance
 Cost Saving
 Less number of offshore campaign
wrt regular scheduling
RELIABILITY BASED
24
Optimal inspections
planning
RINA SERVICES S.p.A.
Via Corsica, 12
16128 Genoa - Italy
Ph. +39 010 53851
Fax +39 010 5351000
info@rina.org
www.rina.org
Stefano Copello
Ph. +39 010 5385872
Mob +39 335 8749142
stefano.copello@rina.org

More Related Content

What's hot

DNV GL Asset Life Extension (ALE) Projects Showcase
DNV GL Asset Life Extension (ALE) Projects ShowcaseDNV GL Asset Life Extension (ALE) Projects Showcase
DNV GL Asset Life Extension (ALE) Projects Showcase
Ian Ng
 
XOM Work for LinkedIn
XOM Work for LinkedInXOM Work for LinkedIn
XOM Work for LinkedInBryce Renick
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
20150426-LinkedIn_CV - R Sargeant
20150426-LinkedIn_CV - R Sargeant20150426-LinkedIn_CV - R Sargeant
20150426-LinkedIn_CV - R SargeantRoy Sargeant
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineerankur sood
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015Gideon Manthorp
 
Field Services Brochure_WEB
Field Services Brochure_WEBField Services Brochure_WEB
Field Services Brochure_WEBJohn Greig
 
ASME PVP 2016 PCC-1 Appendix A session summary
ASME PVP 2016   PCC-1 Appendix A session summaryASME PVP 2016   PCC-1 Appendix A session summary
ASME PVP 2016 PCC-1 Appendix A session summary
Clay D. Rodery
 
CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)Gideon Manthorp
 

What's hot (18)

TJL%20Resume%202
TJL%20Resume%202TJL%20Resume%202
TJL%20Resume%202
 
DNV GL Asset Life Extension (ALE) Projects Showcase
DNV GL Asset Life Extension (ALE) Projects ShowcaseDNV GL Asset Life Extension (ALE) Projects Showcase
DNV GL Asset Life Extension (ALE) Projects Showcase
 
Sr.Inst Tech
Sr.Inst TechSr.Inst Tech
Sr.Inst Tech
 
CV PL Mukhtar )
CV  PL  Mukhtar )CV  PL  Mukhtar )
CV PL Mukhtar )
 
XOM Work for LinkedIn
XOM Work for LinkedInXOM Work for LinkedIn
XOM Work for LinkedIn
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
20150426-LinkedIn_CV - R Sargeant
20150426-LinkedIn_CV - R Sargeant20150426-LinkedIn_CV - R Sargeant
20150426-LinkedIn_CV - R Sargeant
 
Stephen Murphy Resume
Stephen Murphy ResumeStephen Murphy Resume
Stephen Murphy Resume
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015
 
Field Services Brochure_WEB
Field Services Brochure_WEBField Services Brochure_WEB
Field Services Brochure_WEB
 
Kruse.Chris_resume
Kruse.Chris_resumeKruse.Chris_resume
Kruse.Chris_resume
 
Asme codes
Asme codesAsme codes
Asme codes
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
ASME PVP 2016 PCC-1 Appendix A session summary
ASME PVP 2016   PCC-1 Appendix A session summaryASME PVP 2016   PCC-1 Appendix A session summary
ASME PVP 2016 PCC-1 Appendix A session summary
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
 
CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)
 

Viewers also liked

WaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016newWaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016newGary Willmore
 
Présentation1
Présentation1Présentation1
Présentation1Paul Daou
 
API : l'architecture REST
API : l'architecture RESTAPI : l'architecture REST
API : l'architecture REST
Fadel Chafai
 
Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practice
Web2Present
 
SOUTENANCE : Dimensionnement Tripode KB-NORTH
SOUTENANCE : Dimensionnement Tripode KB-NORTHSOUTENANCE : Dimensionnement Tripode KB-NORTH
SOUTENANCE : Dimensionnement Tripode KB-NORTH
Njeugna
 
Fondation..
Fondation..Fondation..
Fondation..
OUSSAMA EL-hdiri
 
Les fondations
Les fondationsLes fondations
Les fondations
Said Baazi
 

Viewers also liked (8)

WaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016newWaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016new
 
Présentation1
Présentation1Présentation1
Présentation1
 
API : l'architecture REST
API : l'architecture RESTAPI : l'architecture REST
API : l'architecture REST
 
Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practice
 
SOUTENANCE : Dimensionnement Tripode KB-NORTH
SOUTENANCE : Dimensionnement Tripode KB-NORTHSOUTENANCE : Dimensionnement Tripode KB-NORTH
SOUTENANCE : Dimensionnement Tripode KB-NORTH
 
Fondations 03
Fondations 03Fondations 03
Fondations 03
 
Fondation..
Fondation..Fondation..
Fondation..
 
Les fondations
Les fondationsLes fondations
Les fondations
 

Similar to RINA approach to the offshore

E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
Vincent Bui
 
Mes presentation subsea reliability
Mes presentation  subsea reliability  Mes presentation  subsea reliability
Mes presentation subsea reliability
Changiz Rezvani
 
Mes presentation subsea reliability
Mes presentation subsea reliability  Mes presentation subsea reliability
Mes presentation subsea reliability
Changiz Rezvani
 
Mes presentation subsea reliability changiz
Mes presentation  subsea reliability changizMes presentation  subsea reliability changiz
Mes presentation subsea reliability changiz
Changiz Rezvani
 
Bureau Veritas Marine Offshore presentation 2014 - english
Bureau Veritas Marine Offshore presentation   2014 - englishBureau Veritas Marine Offshore presentation   2014 - english
Bureau Veritas Marine Offshore presentation 2014 - english
Kiet Nguyen
 
abridged CV 2015 Feb
abridged CV 2015 Febabridged CV 2015 Feb
abridged CV 2015 FebMark Howell
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ Reliability Division
 
Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016
Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016
Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016David Byrne
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
Forum for the Future
 
Process & Commissioning Resume
Process & Commissioning ResumeProcess & Commissioning Resume
Process & Commissioning ResumePrabu Kathiresan
 
Air Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas CopcoAir Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas Copco
AtlasCopcoCompressors
 

Similar to RINA approach to the offshore (20)

E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Ted Bouchier - CV
Ted Bouchier - CVTed Bouchier - CV
Ted Bouchier - CV
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 
Mes presentation subsea reliability
Mes presentation  subsea reliability  Mes presentation  subsea reliability
Mes presentation subsea reliability
 
Mes presentation subsea reliability
Mes presentation subsea reliability  Mes presentation subsea reliability
Mes presentation subsea reliability
 
Mes presentation subsea reliability changiz
Mes presentation  subsea reliability changizMes presentation  subsea reliability changiz
Mes presentation subsea reliability changiz
 
Bureau Veritas Marine Offshore presentation 2014 - english
Bureau Veritas Marine Offshore presentation   2014 - englishBureau Veritas Marine Offshore presentation   2014 - english
Bureau Veritas Marine Offshore presentation 2014 - english
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
 
abridged CV 2015 Feb
abridged CV 2015 Febabridged CV 2015 Feb
abridged CV 2015 Feb
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016
Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016
Wellhead 6pp Brochure WEB VERSION_FINAL_Feb2016
 
Ahmed Reedy CVf
Ahmed Reedy CVfAhmed Reedy CVf
Ahmed Reedy CVf
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
Reneesh@brahamOffshore
Reneesh@brahamOffshoreReneesh@brahamOffshore
Reneesh@brahamOffshore
 
Process & Commissioning Resume
Process & Commissioning ResumeProcess & Commissioning Resume
Process & Commissioning Resume
 
Symvionics general overview
Symvionics general overview Symvionics general overview
Symvionics general overview
 
Air Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas CopcoAir Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas Copco
 

Recently uploaded

Bulk SMS Service Provider In Mumbai | sms2orbit
Bulk SMS Service Provider In Mumbai | sms2orbitBulk SMS Service Provider In Mumbai | sms2orbit
Bulk SMS Service Provider In Mumbai | sms2orbit
Orbit Messaging Hub
 
What Are the Latest Trends in Endpoint Security for 2024?
What Are the Latest Trends in Endpoint Security for 2024?What Are the Latest Trends in Endpoint Security for 2024?
What Are the Latest Trends in Endpoint Security for 2024?
VRS Technologies
 
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...
Softradix Technologies
 
Best steel industrial company LLC in UAE
Best steel industrial company LLC in UAEBest steel industrial company LLC in UAE
Best steel industrial company LLC in UAE
alafnanmetals
 
x ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in Indiax ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in India
Gujar Industries India Pvt. Ltd
 
Get your dream bridal look with top North Indian makeup artist - Pallavi Kadale
Get your dream bridal look with top North Indian makeup artist - Pallavi KadaleGet your dream bridal look with top North Indian makeup artist - Pallavi Kadale
Get your dream bridal look with top North Indian makeup artist - Pallavi Kadale
Pallavi Makeup Artist
 
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROL
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROLSECUREX UK FOR SECURITY SERVICES AND MOBILE PATROL
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROL
securexukweb
 
Inspect Edge & NSPIRE Inspection Application - Streamline Housing Inspections
Inspect Edge & NSPIRE Inspection Application - Streamline Housing InspectionsInspect Edge & NSPIRE Inspection Application - Streamline Housing Inspections
Inspect Edge & NSPIRE Inspection Application - Streamline Housing Inspections
inspectedge1
 
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...
RNayak3
 
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
Landscape Express
 
Maximizing Efficiency with Integrated Water Management Systems
Maximizing Efficiency with Integrated Water Management SystemsMaximizing Efficiency with Integrated Water Management Systems
Maximizing Efficiency with Integrated Water Management Systems
Irri Design Studio
 
Hospitality Training for Hotel Industries
Hospitality Training for Hotel IndustriesHospitality Training for Hotel Industries
Hospitality Training for Hotel Industries
VanieTAnggita
 
Colors of Wall Paint and Their Mentally Properties.pptx
Colors of Wall Paint and Their Mentally Properties.pptxColors of Wall Paint and Their Mentally Properties.pptx
Colors of Wall Paint and Their Mentally Properties.pptx
Brendon Jonathan
 
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...
gitapress3
 
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...
gitapress3
 
SIMBA SQUAD : Best seo company in perth
SIMBA SQUAD :  Best seo company in perthSIMBA SQUAD :  Best seo company in perth
SIMBA SQUAD : Best seo company in perth
ridebiler
 
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques SupplierAll Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier
Trophy-World Malaysia Your #1 Rated Trophy Supplier
 
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...
gitapress3
 
Emmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A PhilanthropistEmmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A Philanthropist
Marina Costa
 
DOJO Training Center - Empowering Workforce Excellence
DOJO Training Center - Empowering Workforce ExcellenceDOJO Training Center - Empowering Workforce Excellence
DOJO Training Center - Empowering Workforce Excellence
Himanshu
 

Recently uploaded (20)

Bulk SMS Service Provider In Mumbai | sms2orbit
Bulk SMS Service Provider In Mumbai | sms2orbitBulk SMS Service Provider In Mumbai | sms2orbit
Bulk SMS Service Provider In Mumbai | sms2orbit
 
What Are the Latest Trends in Endpoint Security for 2024?
What Are the Latest Trends in Endpoint Security for 2024?What Are the Latest Trends in Endpoint Security for 2024?
What Are the Latest Trends in Endpoint Security for 2024?
 
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...
 
Best steel industrial company LLC in UAE
Best steel industrial company LLC in UAEBest steel industrial company LLC in UAE
Best steel industrial company LLC in UAE
 
x ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in Indiax ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in India
 
Get your dream bridal look with top North Indian makeup artist - Pallavi Kadale
Get your dream bridal look with top North Indian makeup artist - Pallavi KadaleGet your dream bridal look with top North Indian makeup artist - Pallavi Kadale
Get your dream bridal look with top North Indian makeup artist - Pallavi Kadale
 
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROL
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROLSECUREX UK FOR SECURITY SERVICES AND MOBILE PATROL
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROL
 
Inspect Edge & NSPIRE Inspection Application - Streamline Housing Inspections
Inspect Edge & NSPIRE Inspection Application - Streamline Housing InspectionsInspect Edge & NSPIRE Inspection Application - Streamline Housing Inspections
Inspect Edge & NSPIRE Inspection Application - Streamline Housing Inspections
 
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...
 
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
 
Maximizing Efficiency with Integrated Water Management Systems
Maximizing Efficiency with Integrated Water Management SystemsMaximizing Efficiency with Integrated Water Management Systems
Maximizing Efficiency with Integrated Water Management Systems
 
Hospitality Training for Hotel Industries
Hospitality Training for Hotel IndustriesHospitality Training for Hotel Industries
Hospitality Training for Hotel Industries
 
Colors of Wall Paint and Their Mentally Properties.pptx
Colors of Wall Paint and Their Mentally Properties.pptxColors of Wall Paint and Their Mentally Properties.pptx
Colors of Wall Paint and Their Mentally Properties.pptx
 
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...
 
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...
 
SIMBA SQUAD : Best seo company in perth
SIMBA SQUAD :  Best seo company in perthSIMBA SQUAD :  Best seo company in perth
SIMBA SQUAD : Best seo company in perth
 
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques SupplierAll Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier
 
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...
 
Emmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A PhilanthropistEmmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A Philanthropist
 
DOJO Training Center - Empowering Workforce Excellence
DOJO Training Center - Empowering Workforce ExcellenceDOJO Training Center - Empowering Workforce Excellence
DOJO Training Center - Empowering Workforce Excellence
 

RINA approach to the offshore

  • 1. RINA Approach To The Offshore Enhancing Safety and Profitability Stefano COPELLO RINA SERVICES S.p.A.
  • 2. RINA, the former Italian Register of Shipping, is a multi-national group dedicated to support its clients in the development and management of the various phases of their activities, offering through dedicated companies consulting engineering, certification services, testing and inspections  Over 150 years of experience  Tailored high innovative solutions  Specialized skills coverage throughout project life cycle  Prompt responses  Global network
  • 3.  IACS Founding Member  1st Italian certification body  Global Network  + 30 years of experience in offshore platform certification Classification Native Marine Business Certification System, Product, Personnel and Project Certification Testing & Inspection Inspection, Site Supervision and Testing for O&G and T&I Clients Certification of Fixed Offshore Platforms
  • 4. Since 70s RINA offers certification services for design, construction and installation of offshore platforms aimed to oil and gas production from the offshore reservoir 150+ offshore platforms certified (Mediterranean, West Africa, Caspian Sea, …) Certification is aimed to ensure the compliance of the structure and equipment with internationally recognized industrial standards (such as API or ISO) or Applicable National Regulations (ref. to Territorial waters) Certification of Fixed Offshore Platforms
  • 5.  In today's increasingly more attentive and demanding market, the certification procedure, in which a third party gives written assurance that a product complies with specified requirements, is a tool of great economic and social utility  Certification of an offshore platform has the main purpose to ensure, by performing a third party independent review of the project, that the industrial plant going to be installed in a socially sensitive scenario, will respect objective parameters of safety in order to reduce as low as reasonably possible the risk to human life and environment, eventually allowing the owner to be facilitated in the permission and insurance processes Why Certification?
  • 6.  Offshore platforms are to be designed and constructed so as:  To ensure an acceptable standard with regard to the safety of life at sea and to the prevention of environmental pollution  To prevent possible major economic losses during all phases of the design life  The certification covers all phases of an offshore project after its preparation and throughout all stages of construction and operation (up to removal or reuse):  Design (3rd Party Independent Verification)  Fabrication at onshore yard (Survey)  Offshore installation operations (Survey)  Service Life (Periodical follow-up surveys) Certification Requirements
  • 7.  Initial design and construction appraisal SAFETY and OPTIMIZATION OF CAPEX  Modern design codes (ISO 19900 series)  Risk Exposue Categories  LRFD Format  Platform Dynamics (Seismic/Fatigue)  Foundation model  Modern technologies for fabrication /NDT  Service life (20-25 years design target) MAINTENANCE COST REDUCTION (OPEX)  Reliability based inspection and maintenance plan NEW RULES FOR CERTIFICATION Certification Drivers / Benefits
  • 8. The number of existing fixed offshore platforms nearing the end of their design life is increasing The regulatory framework for offshore platforms is changing (new European Directive 2013/30/EU) Pressure on platforms operators and designer of new units Business Challenge
  • 9. The existing structure is fit-for- purpose when the risk of structural failure leading to unacceptable consequences is adequately low Due to a change in economic conditions - and an increase in oil & gas recovery possibilities - operators often want to continue exploiting platforms beyond their 20-25-year designed lifecycle instead of investing in a new platform  The challenge is to continue to use, in safety conditions, offshore platforms that have reached the end of their designed lifetime and have this extended use approved by statutory authorities Safety and environment are still essential but focus shall be also on cost reduction and production optimization NEW RINA RULES Platforms life extension
  • 10. When the platform is ageing, and is planned to remain in service longer than its original design lifetime, a comprehensive reassessment of the platform conditions is to be carried out before any life extension The reassessment takes into account:  Actual conditions of the structure  Recent metocean data and updated calculation methods for the re-analysis  Platform history data Key benefits  A new or continued License to Operate  Reduction in amount of repairs and reinforcements required  Confidence for the operator, regulatory agencies and surrounding community that the platform is safe and reliable Life extension target
  • 11. The required safety target shall be demonstrated for the specific site conditions and given operational requirements The original design target was ensured (typically with respect to the extreme environmental event, related in turn to a prescribed design life) introducing some conservativisms  Uncertianties in platform actual response (still to be realized) Reassessment is possible by taking into account the new information and measurements due to the actual behaviour of the platform and its history  Platform as its own Full Scale Model  Reduced Uncertianties  Margin for Design Life Extension Design life extension principle
  • 12.  More than 80 platforms verified (mainly in last 15 years) for various operators:  ENI/Petrobel/Eni Congo/Edison/DOTL/ONGC  Adriatic Sea (28)  Sicily Channel (3)  Mediterranean (Egypt) (2)  Red Sea (11)  Offshore Congo (13)  Offshore Nigeria (2)  Caspian Sea (9)  Indian Ocean (22)  Jacket engineering reassessment (main issue):  Fatigue & Corrosion  Life extension based on inspections/maintenance records  Future IMR Planning RINA experience in certification of existing platforms
  • 13.  A cradle-to-grave framework for the structural and process safety of the platform  Design, fabrication, installation, life extension assessment and de- commissioning are all covered  Platform designers and operators can choose from and mix three approaches:  Classification  allows the platform to be built and maintained against a set of rules covering the whole service life  Certification  measures the platform structure and topside process against set international or local standards  Verification  is the new risk-based Safety Case, regulatory system to the entire EU from 2015, in increasing use globally, with the aim of significantly reducing the risk of accidents and environmental damage New RINA Rules
  • 14. RINA Rules for Classification and Certification of Fixed Offshore Platforms – 2015 Ed.  PART A – APPLICATION AND GENERAL – CLASSIFICATION CERTIFICATION AND INDIPENDENT VERIFICATION – MAINTENANCE OF CLASS OR EXTENSION OF THE CERTIFICATION  PART B – GENERAL PRINCIPLES – ENVIRONMENTAL CONDITIONS – DESIGN LOADS – STRUCTURAL ANALYSIS – FOUNDATIONS – ASSESSMENT OF EXISTING STRUCTURES  PART C – GENERAL REQUIREMENTS – PRODUCTION, PROCESS AND ANCILLARY PIPING SYSTEMS  PART D – MATERIALS FOR STRUCTURES – MATERIALS FOR PROCESS PIPING SYSTEMS – STRUCTURE FABRICATION – PIPING FABRICATION – QUALITY ASSURANCE / QUALITY CONTROL – PROTECTION AGAINST CORROSION  PART E – MARINE OPERATIONS RINA Rules - 2015 Ed.
  • 15. PART B CHAPTER 6 – ASSESSMENT OF EXISTING STRUCTURES 1 General 2 Assessment Process 2.1 Assessment data gathering 2.2 Inspection on the current platform status 2.2.1 General requirements 2.2.2 Requirements for submarine survey 2.2.3 Level I 2.2.4 Level II 2.2.5 Level III 2.2.6 Level IV 2.2.7 Survey Specification 2.2.8 Survey Procedure 2.3 Definition of the up-to-date platform model 2.4 Definition of the loads 2.5 Verification of the platform structure 2.5.1 Resistance assessment 2.5.2 Fatigue assessment 2.5.3 System assessment 2.5.4 Reference values for the Reserve Strength Ratio RINA Rules for the Classification or Certification of Steel Fixed Offshore Platforms – 2015 Ed.
  • 16. Limited failures of individual components are accepted if the reserve against overall system failure remains acceptable. The platform has shown appropriate performance via full-scale model, i.e. the platform itself Yielding or failure of individual components is acceptable, if the remaining parts of the structural system have sufficient reserve strength to redistribute the action A pushover analysis is used to demonstrate that the safety factor against failure of the whole structural system meets acceptable levels (RSR target) Strength Assessment The system approach
  • 17. Ultimate strength analysis by elasto-plastic analysis. Environmental loads increase up to the whole system collapse. The verification is considered satisfied when the collapse load will result “appropriately” greater than the design load Non-linear push-over  Loads are applied in sequence:  Dead and live loads are applied to their nominal value  100-year environmental load vector (wave, current and wind) is applied and increased until the structural collapse of the whole platform  RSR: ratio between base shear resistance and design load (Rd/F100) The system approach
  • 18.  When it is not possible to show that the structure is acceptable even by RSR  decreased reliability of the overall system could be acceptable, provided that the consequences of failure are acceptable for both the life and the environment  e.g. de-manning the platform and provide for safety system to close the wells in case of foreseen extreme environmental event  Notional yearly probability of failure evaluation by SRA to determine maximum extreme wave (return period) and relevant residual life The system approach
  • 19. Existing platform installed in the Caspian Sea, offshore Turkmenistan, in about 27m w.d.  several jacket modules with vertical legs  topside lattice frames  drilled and grouted piles Reassessment analysis carried out in n 2011-2014 (9 platforms) Target: life extension Possible strengthening, also to support foreseen work-over rig Push-over analysis considering the most critical environmental loading Example of residual life evaluation
  • 20. Minimum RSR = 1.02 probability of collapse Pc = 2.75x10-2, safety index b = F-1 (- Pc) = 1.919 Reference ‘target’ RSR = 1.2 ‘target’ value of b = 2.253 design life of 20 years Actual life 10 years Allowable wave return period 85 years maximum allowable wave height 10.2 m Life extension assessment results
  • 21.  The platforms are characterized by an overall level of safety that can be considered acceptable for a design life of about 10 years  The platforms would be globally able to withstand a maximum wave height characterized by 50 yrs return period, i.e. a maximum wave height of 10.2m (wrt NW incoming direction)  Conditional Certificates issued – Required repairs and strengthening measures as identified by relevant analysis and drawings are to be carried out – The platforms are to be evacuated and consequently subject to a special survey in the event where a sea state characterized by maximum wave height of 10.2m occurs during the recognized 10 years of lifetime Conclusions: conditional certificates
  • 22. By adopting a reliability based fatigue approach it is possible to account for a new possibility, which is of paramount importance to the management of structural safety:  The results of the in situ inspections can be utilized to update, in quantitative terms, the structural reliability evaluation  The reliability index is evaluated as a function of the time passed since installation, the expected endurance of the node at the design stage and the results of the node inspection Maintenace optimization example Reliability based fatigue approach
  • 23. b T bo bup Inspection outcomes combined with fatigue predictions:  Reliability approach to update fatigue safety margin and to plan future inspections  Fatigue safey margin as b(t)  Updating of b at a given time of inspection  Reducing uncertainty -> increasing safety margin, particularly in case that no cracks are detected Optimal inspections planning
  • 24.  Optimal Inspection Planning  When required  Increase in safety  Less frequent inspections when the structure is new or well-manufactured, increase in frequency when older  Optimal Maintenance  Cost Saving  Less number of offshore campaign wrt regular scheduling RELIABILITY BASED 24 Optimal inspections planning
  • 25. RINA SERVICES S.p.A. Via Corsica, 12 16128 Genoa - Italy Ph. +39 010 53851 Fax +39 010 5351000 info@rina.org www.rina.org Stefano Copello Ph. +39 010 5385872 Mob +39 335 8749142 stefano.copello@rina.org