CONTRACT
• PARTIES HAVE RELATION OF PROMISOR AND
PROMISEE AND NOT OF EMPLOYER AND
EMPLOYEE
• PROMISE (OBLIGATIONS) IS BINDING TO THE
PARTIES & HAS TO BE FULFILLED FOR
CONTRACT MANAGEMENT
IF ABOVE IS IMPLEMENTED BY BOTH THE
PARTIES, CONTRACT MANAGEMENT
BECOMES SUCCESSFUL
CONTRACTS
• ITEM RATE CONTRACTS
• PERCENTAGE RATE CONTRACTS
• LUMP SUM CONTRACTS
• EPC CONTRACTS
• TURNKEY CONTRACTS
IN A CONTRACT, PROMISE IS
DEFINED THROUGH CONTRACT
PROVISIONS
TENDER AND CONTRACT
• TENDER WHEN ACCEPTED (AND
COMMUNICATED) IS CONTRACT
• CONTRACT INCLUDES ACCEPTED TENDER
DOCUMENT, CONDITIONS AND
NEGOTIATIONS IF ANY
TENDER DOCUMENT
• PRESS NOTICE/EXPRESSION OF INTEREST
• NOTICE INVITING TENDER
• INSTRUCTIONS TO BIDDERS
• CONDITIONS OF CONTRACT
• BILL OF QUANTITIES
• GENERAL/SPECIAL CONDITIONS
• TECHNICAL SPECIFICATIONS/CONDITIONS IF ANY
• DRAWINGS
 PLEASE CALL A MEETING OF YOUR TEAM BEFORE
PREPARATION OF TENDER DOCUMENT
 PLEASE GO THROUGH THE ARCHITECTURAL DRAWINGS,
SERVICE DRAWINGS AND STRUCTURAL DRAWINGS IF
AVAILABLE
 PLEASE GO THROUGH THE E & M SERVICE DRAWINGS
 IF LANDSCAPE AND HORTICULTURE PROVISIONS ARE IN THE
CONTRACT, PLEASE GO THORUGH THEM
 ALL ABOVE DRAWINGS ARE TO BE GONE THROUGH BY THE
PROJECT TEAM
TENDER DOCUMENT
• BRAINSTORM THE TENDER CONDITIONS TO BE
INCORPORATED FOR SUCCESS OF CONTRACT
• NOTE DOWN ALL MAJOR POINTS OF THE
DISCUSSION
• DO NOT FINALISE THEM IN ONE GO BUT SPELL
OUT THEM TO ALL TEAM MEMBERS
• ASK EVERYONE TO THINK ABOUT THE POINTS
DISCUSSED
• TAKE A BREAK OF ONE OR TWO DAYS
• MEET AFTER BREAK WITH SAME GROUP
 DISCUSS SALIENT FEATURES OF EARLIER CONVERGING
POINTS
 SOME NEW IDEAS MIGHT HAVE CROPPED UP
 SOME DESCREPANCIES MIGHT HAVE COME TO NOTICE
 SOME ADDITIONAL CONDITIONS, ITEMS OR
SPECIFICATIONS MIGHT BE REQUIRED TO BE INCLUDED
 DISCUSS THEM AGAIN AND FINALISE THEM
 PLEASE CALL A MEETING WITH THE
ARCHITECT/CONSULTANT(S)
 THERE MAY BE SOME POINTS WHICH NEED
CLARIFICATIONS OR REVISIONS
 IN THE MEETING SERVICE CONSULTANTS, E&M
CONSULTANTS, LANDSCAPE
CONSULTANTS/HORTICULTURE OFFICERS SHOULD ALSO
BE PRESENT
 IN THIS MEETING, IT IS UNLIKELY THAT FINAL DECISION
IS TAKEN AS FEW ISSUES MIGHT CROP UP
 KEEP NEXT MEETING AS SOON AS POSSIBLE. DELAYED
MEETINGS MAY LOSE THE TRACK
 IN THE NEXT MEETING, MOST OF THE ISSUES MIGHT GET
RESOLVED BUT NOT ALL
 BROADLY FINALISE THE DECISIONS IN THIS MEETING
AND ASK INDIVIDUAL CONSULTANTS/ ARCHITECTS/
ENGINEERS TO WORK AS PER THE FINAL DECISIONS
 REVISED DOCUMENT WILL LEAD TO CURTAILMENT OF
TIME AND COST OVERRUN AND DISPUTES WITH THE
CONTRACTOR.
 TIME OF COMPLETION SHOULD BE REASONABLE AND
SHOULD NOT BE REDUCED
 GO THROUGH THE GENERAL CONDITIONS, SPECIAL
CONDITIONS, TECHNICAL SPECIFICATIONS AND BOQ.
 IF SUCH CONDITIONS ARE GIVEN TO DIFFERENT TEAM
MEMBERS FOR PREPARATION, EACH ONE SHOULD GO
THROUGH COMPLETE DOCUMENT
 PROJECT MANAGER SHOULD GO THROUGH THE TENDER
DOCUMENT HIMSELF TO AVOID REPETITIVE
CONDITIONS WITH DIFFERENT MEANING.
 PLEASE CHECK ABOUT THE DUPLICITY OF CONDITIONS,
VAGUE CONDITIONS, DUAL MEANING CONDITIONS AND
IRRELEVANT CONDITIONS
 THERE MAY BE SOME OMMISSIONS WHICH ARE
NECESSARY TO BE INCORPORATED
 FINALISE THE DOCUMENT AND SEND TO ALL THE TEAM
MEMBERS FOR COMMENTS
 CONVENE THE MEETING OF YOUR TEAM MEMBERS AND
FINALISE THE TENDER DOCUMENT
 ORDER OF PRFERENCE MUST BE MENTIONED IN TENDER
DOCUMENTS FOR DISCREPANCIES
 PLEASE CHECK ABOUT THE MANDATORY APPROVALS LIKE
LOCAL BODY APPROVAL, TREE PERMISSION,
ENVIRONMENTAL CLEARANCE ETC
 PLEASE CHECK ABOUT ADMN APPROVAL AND EXP
SANCTION AND BUDGET AVAILABILITY
 PLEASE CHECK AVAILABILITY OF SITE FREE FROM
ENCUMBRANCES
 PLEASE CHECK THE AVAILABILITY OF ARCHITECTURAL,
STRUCTURAL AND PLUMBING DRAWINGS

 PRE BID MEETING IS ARRANGED BEFORE DUE DATE OF
RECEIPT OF TENDERS
 PLEASE ASK YOUR TEAM MEMBERS TO BE PRESENT IN
THE MEETING
 MOST OFTEN, FEW PROSPECTIVE BIDDERS WILL ASK FOR
POSTPONEMENT OF THE DATE OF RECEIPT OF TENDERS
 SINCE TENDER DOCUMENT HAS BEEN DRAFTED
CAREFULLY, IF THERE ARE NO MAJOR CORRECTIONS,
YOU MAY NOT NEED TO EXTEND THE DATE
 FEW PROSPECTIVE BIDDERS MAY COME UNPREPARED
HENCE, IT IS ADVISABLE TO MAKE A BRIEF PRESENTATION
BEFORE THE MEETING
 THE PROSPECTIVE BIDDERS MAY ALSO ASK FOR SOME
DETAILS LIKE DRAWINGS, SITE DATA AND PAYMENT MODES.
PLEASE INCLUDE THEM IN THE PRESENTATION BRIEFLY
 IT IS ADVISABLE THAT MEETING IS CHAIRED BY THE CHIEF
PROJECT MANAGER/PROJECT MANAGER WELL CONVERSANT
WITH THE TENDER DOCUMENT. IF REQUIRED, THEN ONLY HIS
TEAM MEMBERS MAY MAKE SUPPLEMENTARY REMARKS.
 PROSPECTIVE BIDDERS MAY BE ENCOURAGED TO ASK
THE CLARIFICATIONS BUT IN ORDERLY MANNER
 REPLIES SHOULD BE SPECIFIC AS THE REPLIES FORM
PART OF THE TENDER DOCUMENTS/ CONTRACT
 IN CASE, IT IS ESSENTIAL TO ISSUE CORRIGENDUM AND
IS TIME CONSUMING, DATE OF RECEIPT OF TENDERS
SHOULD BE EXTENDED
TECHNICAL BIDS
• TECHNICAL BIDS ARE THE BASIS OF PRE
QUALIFICATION OF THE BIDDERS
• THE BIDDERS WHOSE TECHNICAL BIDS ARE
REJECTED ARE LIKELY TO RAISE THE OBJECTIONS
• PRE QUALIFICATION CRITERIA SHOULD BE VERY
WELL DEFINED IN THE TENDER DOCUMENTS
AND SHOULD BE TRANSPARENT.
• DISCRETIONARY PROVISIONS SHOULD NOT BE
INCLUDED IN THE PRE QUALIFICATION CRITERIA.
 PRE QUALIFICATION CRITERIA MAY INCLUDE;
 SATISFACTORY COMPLETION OF SIMILAR WORK(S) OF REQUIRED AMOUNT
 QUALITY/PERFORMANCE EVALUATION OF COMPLETED AND ONGOING
WORKS
 FINANCIAL CRITERION OF ANNUAL TURN OVER OF WORKS
 CASH FLOW/SOLVENCY CERTIFICATE
 LOSS CRITERION
 REQUIREMENT OF TECHNICAL PERSONNEL
 REQUIREMENT OF T&P
 INSPECTION OF COMPLETED/ONGOING WORK FOR QUALITY EVALUATION
 SCORE ON VARIOUS ATTRIBUTES AND OVERALL SCORE
 GST REGISTRATION
 ASSESSED AVAILABLE BID CAPACITY
 UPLOADING OF DOCUMENTS
 EARNEST MONEY OF REQUIRED AMOUNT AND FORM
 THERE MAY BE OBJECTIONS IN THE DEFINITION OF SIMILAR
WORKS HENCE SIMILAR WORK SHOULD BE DEFINED WITH CLARITY
 THERE MAY BE OBJECTIONS REGARDING QUALITY ASSESSMENT BY
THE TEAM HENCE CRITERION SHOULD BE WELL DOCUMENTED
BEFORE INVITATION OF TENDERS AND INCLUDED IN THE TENDER
DOCUMENT. IT IS ADVISABLE TO KEEP PHOTOGRAPHS OF THE
INSPECTED WORKS/DEFECTS IN RECORD
 IT SHOULD BE CLEARLY DEFINED WHETHER AVERAGE FINANCIAL
TURN OVER IS TO BE TAKEN AND OF HOW MANY YEARS?
 AVAILABLE ASSESSED BID CAPACITY INCLUDES COMPONENT OF
ONGOING COMMITMENT. SOMETIMES ALL THE COMMITMENTS
ARE NOT PROJECTED BY THE BIDDER WHICH MAY RESULT INTO
INTERPRETATION AS MISREPRESENTATION OF FACTS
 SOMETIMES EARNEST MONEY IS NOT SUBMITTED IN PRESCRIBED
FORM AND ALL DOCUMENTS NOT UPLOADED
 CALCULATION OF SCORE MAY BE OBJECTED BY SOME BIDDERS
HENCE TO BE SPELT OUT IN TENDER DOCUMENTS
FINANCIAL BIDS
• SINCE NOW e –TENDERING IS BEING ADOPTED,
OPENING OF FINANCIAL BIDS HAS BECOME EASY
AND A MECHANICAL PROCESS.
• AS PER CVC GUIDELINES, WORK CAN BE
AWARDED ONLY TO THE LOWEST BIDDER
• ALSO AS PER CVC GUIDELINES, NEGOTIATIONS
IN RATES IS NOT PERMITTED
• CONDITIONAL TENDERS ARE ALSO NOT
ACCEPTED AND THERE IS NO SCOPE OF WRITING
CONDITIONS IN ONLINE FINANCIAL BIDS
AWARD OF WORK
• PLEASE CHECK ABOUT THE BUDGET
AVAILABILITY
• PLEASE ENSURE THAT THE BIDS ARE STILL
VALID
• DO NOT PUT ANY ADDITIONAL CONDITIONS
BEYOND MENTIONED IN THE BID
DOCUMENTS
• FOLLOW THE CONDITIONS OF PERFORMANCE
GUARANTEE AND OTHER PROVISIONS
COMMENCEMENT OF WORK
• GOOD CONTRACTORS NORMALLY COMMENCE THE
WORK IN TIME
• FEW CONTRACTORS WHO MAY SUBLET THE WORK,
WAIT FOR OTHER AGENCY TO TAKE OVER THE WORK
HENCE DECISION OF DETERMINATION SHOULD BE
TAKEN AS EARLY AS POSSIBLE
• MONITORING OF THE QUALITY AND PROGRESS
SHOULD BE DONE FROM THE BEGINNING AS IT SETS
YOUR IMAGE
• WHATEVER DECISION IS TO BE TAKEN SHOULD BE
TAKEN WITH WELL THOUGHT PROCESS BUT SHOULD
NOT BE DELAYED
 THERE ARE TOOLS AVAILABLE WHICH CAN BE USED FOR
MONITORING. REMEMBER TOOLS ARE ONLY THE AID
FOR THE PROJECT TEAM AND THE CONTRACTOR
 DEPARTMENT/EMPLOYER SHOULD ENSURE PROGRESS,
SAFETY AND QUALITY AND SHOULD NOT RELAX ANY
CRITERION
 FOR THE CONTRACTOR, PAYMENTS AND DECISIONS ARE
IMPORTANT. DEPARTMENT/EMPLOYER SHOULD NOT
DELAY PAYMENT AND DECISIONS
 PROGRESS AND QUALITY CAN BE ACHIEVED ONLY IF
DEPARTMENT/EMPLOYER BOTH ARE SERIOUS ABOUT IT
CO-ORDINATION
• CO-ORDINATION IS ESSENTIAL FOR ANY SUCCESS
BUT LACKS MORE OFTEN AT THE SITE
• CO-ORDINATION IS REQUIRED AT VARIOUS
LEVELS AS
– CIVIL, ELECTRICAL, HORTICULTURE AND ARCHITECT
OFFICERS
– CONTRACTORS/AGENCIES THOUGH MAY WORK
UNDER PROJECT MANAGER/CHIEF PROJECT
MANAGER BUT AT GROUND THEY MAY WORK
UNDER DIFFERENT TEAMS AND MAY HAVE CO-
ORDINATION PROBLEMS
 CO-ORDINATION BETWEEN HIERARCHY OF SAME WING
LIKE CIVIL, ELECTRICAL
 CO-ORDINATION BETWEEN VARIOUS LEVEL OFFICERS
 CO-ORDINATION BETWEEN LOCAL BODIES AND PROJECT
TEAM
 CO-ORDINATION WITH PAYMENT AUTHORITIES
 CO-ORDINATION BETWEEN SUPERVISORS OF VARIOUS
AGENCIES/CONTRACTORS
 SIMILARLY, AIR CONDITIONING, FIRE FIGHTING, FIRE
DETECTION EQUIPMENT AGENCIES MAY COME ONLY AFTER
FALSE CEILING IS LAID DAMAGING IT
 SERVICE PROVIDING TEAM LIKE PLUMBING, TILE FIXING,
WATER PROOFING, INTERNAL ELECTRICAL INSTALLATION
ETC MAY NOT HAVE ANY CO-ORDINATION
 THEREFORE, CO-ORDINATION IS MAIN KEY OF SUCCESS
IN PROGRESS
 TAKE DECISION AS EARLY AS POSSIBLE IF CONTRACT IS
TO BE RESCINDED
 CO-ORDINATION MAY ALSO BE LACKING BETWEEN
VARIOUS SUB CONTRACTORS AND SUPPLIERS
DETERMINATION/RESCISSION OF
CONTRACT
• TO BE DECIDED DURING CURRENCY OF CONTRACT
• IF WORK IS NOT SATISFACTORY IN TERMS OF PROGRESS
OR QUALITY, WHATEVER DECISION IS TO BE TAKEN, TAKE
RIGHT AT FIRST TIME. IN ALL PROBABILITIES, ONCE WORK
IS DELAYED, IT IS UNLIKELY THAT PROGRESS OR QUALITY
WILL BE RESTORED.
• CONTRACTOR GETS GOOD AMOUNT OF
MONEY/PAYMENT TILL THE COMPLETION OF STRUCTURE
HENCE IS QUITE ENTHUSIASTIC
• FINISHING ITEMS REQUIRE CONSIDERABLE FUNDS, ARE
TIME TAKING AND AVAILABLE ON CASH HENCE AGENCIES
MAY NOT GET ENTHUSIASM AND SOMETIMES EVEN
LEAVE ON JUNIORS TO MONITOR. BLAME GAME STARTS
DURING FINISHING STAGE AND CO-ORDINATION
BECOMES A MAJOR PROBLEM
 WORKS CONTRACT IS BETWEEN TWO PARTIES AND THEY
HAVE RELATION OF PROMISOR AND PROMISEE AND
NOT OF EMPLOYER AND EMPLOYEE
 SO, EACH PARTY HAS TO FULFIL ITS OBLIGATIONS FOR
SUCCESSFUL CONTRACT MANAGEMENT
Thanks for attending
Dr K M Soni, ADG (Retd.), CPWD, New Delhi
Also available on Youtube: KRISHNA MURARI Soni at
https://www.youtube.com/channel/UC_pPYxk0jI1ayqA5rO6fBOw

More Related Content

What's hot

Fidic contract
Fidic contract Fidic contract
Fidic contract
Yash Patel
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
Shahin MB
 
Construction contract
Construction contract Construction contract
Construction contract
Rakshith Reddy
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
Hafizul Mukhlis
 
Types of contract
Types of contractTypes of contract
Types of contract
HarshalNarkhede7
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
jagadish108
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
Dr K M SONI
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
irkportal
 
Construction tender process
Construction tender processConstruction tender process
Tender
TenderTender
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
TEJAS2011
 
Architects professional liability
Architects professional liabilityArchitects professional liability
Architects professional liability
Aditi Garg
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
Dr K M SONI
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
JIT KUMAR GUPTA
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
somitra bhardwaj
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
Raj Shah
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
Vj NiroSh
 
fidic , jct and nec contracts
fidic , jct and nec contractsfidic , jct and nec contracts
fidic , jct and nec contracts
EVERSENDAI ENGINEERING (L.L.C.)
 
Tender
TenderTender

What's hot (20)

Fidic contract
Fidic contract Fidic contract
Fidic contract
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Construction contract
Construction contract Construction contract
Construction contract
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Tender
TenderTender
Tender
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
 
Architects professional liability
Architects professional liabilityArchitects professional liability
Architects professional liability
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
fidic , jct and nec contracts
fidic , jct and nec contractsfidic , jct and nec contracts
fidic , jct and nec contracts
 
Tender
TenderTender
Tender
 

Similar to Contract Management

EPC and other types of contracts
EPC and other types of contractsEPC and other types of contracts
EPC and other types of contracts
Dr K M SONI
 
Progress mark 2
Progress mark 2Progress mark 2
Progress mark 2
bradalexander5
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and Liabilities
Primila Edward
 
Ease of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission DaignosisEase of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission Daignosis
Kartikey Joshi
 
Project Management
Project ManagementProject Management
Project Management
Dr K M SONI
 
Pre qualification
Pre qualificationPre qualification
Pre qualification
kavishkakrisho
 
Change management and dispute resolution
Change management and dispute resolutionChange management and dispute resolution
Change management and dispute resolution
Alex Iskandar
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the Contract
SHKLaw
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
Dr K M SONI
 
Merit General Contractors, Inc.
Merit General Contractors, Inc.Merit General Contractors, Inc.
Merit General Contractors, Inc.
Suzanne Monahan
 
2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.
Suzanne Monahan
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
Brandon Hummel
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
coryn
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
coryn
 
Contracts
ContractsContracts
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
Cordell Parvin
 
EPC CONTRACTS-CPWD.pdf
EPC CONTRACTS-CPWD.pdfEPC CONTRACTS-CPWD.pdf
EPC CONTRACTS-CPWD.pdf
RiteshRajput22
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
Dr K M SONI
 

Similar to Contract Management (20)

EPC and other types of contracts
EPC and other types of contractsEPC and other types of contracts
EPC and other types of contracts
 
Progress mark 2
Progress mark 2Progress mark 2
Progress mark 2
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and Liabilities
 
Ease of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission DaignosisEase of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission Daignosis
 
Project Management
Project ManagementProject Management
Project Management
 
Pre qualification
Pre qualificationPre qualification
Pre qualification
 
Change management and dispute resolution
Change management and dispute resolutionChange management and dispute resolution
Change management and dispute resolution
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the Contract
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
Merit General Contractors, Inc.
Merit General Contractors, Inc.Merit General Contractors, Inc.
Merit General Contractors, Inc.
 
2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
 
Contracts
ContractsContracts
Contracts
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
 
EPC CONTRACTS-CPWD.pdf
EPC CONTRACTS-CPWD.pdfEPC CONTRACTS-CPWD.pdf
EPC CONTRACTS-CPWD.pdf
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
 

More from Dr K M SONI

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage Conservation
Dr K M SONI
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leader
Dr K M SONI
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreements
Dr K M SONI
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
Dr K M SONI
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering works
Dr K M SONI
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
Dr K M SONI
 
Deconstruction
DeconstructionDeconstruction
Deconstruction
Dr K M SONI
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
Dr K M SONI
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
Dr K M SONI
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
Dr K M SONI
 
Contract Management
Contract Management Contract Management
Contract Management
Dr K M SONI
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam Blocks
Dr K M SONI
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through Glass
Dr K M SONI
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
Dr K M SONI
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
Dr K M SONI
 
About me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniAbout me i.e. Dr. K M Soni
About me i.e. Dr. K M Soni
Dr K M SONI
 
Repair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage StructuresRepair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage Structures
Dr K M SONI
 
Bamboo Dome
Bamboo DomeBamboo Dome
Bamboo Dome
Dr K M SONI
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
Dr K M SONI
 
Pre engineered and other buildings
Pre engineered and other buildingsPre engineered and other buildings
Pre engineered and other buildings
Dr K M SONI
 

More from Dr K M SONI (20)

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage Conservation
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leader
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreements
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering works
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Deconstruction
DeconstructionDeconstruction
Deconstruction
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
 
Contract Management
Contract Management Contract Management
Contract Management
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam Blocks
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through Glass
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
 
About me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniAbout me i.e. Dr. K M Soni
About me i.e. Dr. K M Soni
 
Repair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage StructuresRepair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage Structures
 
Bamboo Dome
Bamboo DomeBamboo Dome
Bamboo Dome
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
Pre engineered and other buildings
Pre engineered and other buildingsPre engineered and other buildings
Pre engineered and other buildings
 

Recently uploaded

Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 

Recently uploaded (20)

Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 

Contract Management

  • 1. CONTRACT AND CONTRACT MANAGEMENT FOR WORKS: PART - II Dr K M SONI Retd. ADG, CPWD, New Delhi
  • 2. CONTRACT • PARTIES HAVE RELATION OF PROMISOR AND PROMISEE AND NOT OF EMPLOYER AND EMPLOYEE • PROMISE (OBLIGATIONS) IS BINDING TO THE PARTIES & HAS TO BE FULFILLED FOR CONTRACT MANAGEMENT IF ABOVE IS IMPLEMENTED BY BOTH THE PARTIES, CONTRACT MANAGEMENT BECOMES SUCCESSFUL
  • 3. CONTRACTS • ITEM RATE CONTRACTS • PERCENTAGE RATE CONTRACTS • LUMP SUM CONTRACTS • EPC CONTRACTS • TURNKEY CONTRACTS
  • 4. IN A CONTRACT, PROMISE IS DEFINED THROUGH CONTRACT PROVISIONS
  • 5. TENDER AND CONTRACT • TENDER WHEN ACCEPTED (AND COMMUNICATED) IS CONTRACT • CONTRACT INCLUDES ACCEPTED TENDER DOCUMENT, CONDITIONS AND NEGOTIATIONS IF ANY
  • 6. TENDER DOCUMENT • PRESS NOTICE/EXPRESSION OF INTEREST • NOTICE INVITING TENDER • INSTRUCTIONS TO BIDDERS • CONDITIONS OF CONTRACT • BILL OF QUANTITIES • GENERAL/SPECIAL CONDITIONS • TECHNICAL SPECIFICATIONS/CONDITIONS IF ANY • DRAWINGS
  • 7.  PLEASE CALL A MEETING OF YOUR TEAM BEFORE PREPARATION OF TENDER DOCUMENT  PLEASE GO THROUGH THE ARCHITECTURAL DRAWINGS, SERVICE DRAWINGS AND STRUCTURAL DRAWINGS IF AVAILABLE  PLEASE GO THROUGH THE E & M SERVICE DRAWINGS  IF LANDSCAPE AND HORTICULTURE PROVISIONS ARE IN THE CONTRACT, PLEASE GO THORUGH THEM  ALL ABOVE DRAWINGS ARE TO BE GONE THROUGH BY THE PROJECT TEAM
  • 8. TENDER DOCUMENT • BRAINSTORM THE TENDER CONDITIONS TO BE INCORPORATED FOR SUCCESS OF CONTRACT • NOTE DOWN ALL MAJOR POINTS OF THE DISCUSSION • DO NOT FINALISE THEM IN ONE GO BUT SPELL OUT THEM TO ALL TEAM MEMBERS • ASK EVERYONE TO THINK ABOUT THE POINTS DISCUSSED • TAKE A BREAK OF ONE OR TWO DAYS • MEET AFTER BREAK WITH SAME GROUP
  • 9.  DISCUSS SALIENT FEATURES OF EARLIER CONVERGING POINTS  SOME NEW IDEAS MIGHT HAVE CROPPED UP  SOME DESCREPANCIES MIGHT HAVE COME TO NOTICE  SOME ADDITIONAL CONDITIONS, ITEMS OR SPECIFICATIONS MIGHT BE REQUIRED TO BE INCLUDED  DISCUSS THEM AGAIN AND FINALISE THEM
  • 10.  PLEASE CALL A MEETING WITH THE ARCHITECT/CONSULTANT(S)  THERE MAY BE SOME POINTS WHICH NEED CLARIFICATIONS OR REVISIONS  IN THE MEETING SERVICE CONSULTANTS, E&M CONSULTANTS, LANDSCAPE CONSULTANTS/HORTICULTURE OFFICERS SHOULD ALSO BE PRESENT  IN THIS MEETING, IT IS UNLIKELY THAT FINAL DECISION IS TAKEN AS FEW ISSUES MIGHT CROP UP
  • 11.  KEEP NEXT MEETING AS SOON AS POSSIBLE. DELAYED MEETINGS MAY LOSE THE TRACK  IN THE NEXT MEETING, MOST OF THE ISSUES MIGHT GET RESOLVED BUT NOT ALL  BROADLY FINALISE THE DECISIONS IN THIS MEETING AND ASK INDIVIDUAL CONSULTANTS/ ARCHITECTS/ ENGINEERS TO WORK AS PER THE FINAL DECISIONS  REVISED DOCUMENT WILL LEAD TO CURTAILMENT OF TIME AND COST OVERRUN AND DISPUTES WITH THE CONTRACTOR.  TIME OF COMPLETION SHOULD BE REASONABLE AND SHOULD NOT BE REDUCED
  • 12.  GO THROUGH THE GENERAL CONDITIONS, SPECIAL CONDITIONS, TECHNICAL SPECIFICATIONS AND BOQ.  IF SUCH CONDITIONS ARE GIVEN TO DIFFERENT TEAM MEMBERS FOR PREPARATION, EACH ONE SHOULD GO THROUGH COMPLETE DOCUMENT  PROJECT MANAGER SHOULD GO THROUGH THE TENDER DOCUMENT HIMSELF TO AVOID REPETITIVE CONDITIONS WITH DIFFERENT MEANING.
  • 13.  PLEASE CHECK ABOUT THE DUPLICITY OF CONDITIONS, VAGUE CONDITIONS, DUAL MEANING CONDITIONS AND IRRELEVANT CONDITIONS  THERE MAY BE SOME OMMISSIONS WHICH ARE NECESSARY TO BE INCORPORATED  FINALISE THE DOCUMENT AND SEND TO ALL THE TEAM MEMBERS FOR COMMENTS  CONVENE THE MEETING OF YOUR TEAM MEMBERS AND FINALISE THE TENDER DOCUMENT  ORDER OF PRFERENCE MUST BE MENTIONED IN TENDER DOCUMENTS FOR DISCREPANCIES
  • 14.  PLEASE CHECK ABOUT THE MANDATORY APPROVALS LIKE LOCAL BODY APPROVAL, TREE PERMISSION, ENVIRONMENTAL CLEARANCE ETC  PLEASE CHECK ABOUT ADMN APPROVAL AND EXP SANCTION AND BUDGET AVAILABILITY  PLEASE CHECK AVAILABILITY OF SITE FREE FROM ENCUMBRANCES  PLEASE CHECK THE AVAILABILITY OF ARCHITECTURAL, STRUCTURAL AND PLUMBING DRAWINGS 
  • 15.  PRE BID MEETING IS ARRANGED BEFORE DUE DATE OF RECEIPT OF TENDERS  PLEASE ASK YOUR TEAM MEMBERS TO BE PRESENT IN THE MEETING  MOST OFTEN, FEW PROSPECTIVE BIDDERS WILL ASK FOR POSTPONEMENT OF THE DATE OF RECEIPT OF TENDERS  SINCE TENDER DOCUMENT HAS BEEN DRAFTED CAREFULLY, IF THERE ARE NO MAJOR CORRECTIONS, YOU MAY NOT NEED TO EXTEND THE DATE
  • 16.  FEW PROSPECTIVE BIDDERS MAY COME UNPREPARED HENCE, IT IS ADVISABLE TO MAKE A BRIEF PRESENTATION BEFORE THE MEETING  THE PROSPECTIVE BIDDERS MAY ALSO ASK FOR SOME DETAILS LIKE DRAWINGS, SITE DATA AND PAYMENT MODES. PLEASE INCLUDE THEM IN THE PRESENTATION BRIEFLY  IT IS ADVISABLE THAT MEETING IS CHAIRED BY THE CHIEF PROJECT MANAGER/PROJECT MANAGER WELL CONVERSANT WITH THE TENDER DOCUMENT. IF REQUIRED, THEN ONLY HIS TEAM MEMBERS MAY MAKE SUPPLEMENTARY REMARKS.
  • 17.  PROSPECTIVE BIDDERS MAY BE ENCOURAGED TO ASK THE CLARIFICATIONS BUT IN ORDERLY MANNER  REPLIES SHOULD BE SPECIFIC AS THE REPLIES FORM PART OF THE TENDER DOCUMENTS/ CONTRACT  IN CASE, IT IS ESSENTIAL TO ISSUE CORRIGENDUM AND IS TIME CONSUMING, DATE OF RECEIPT OF TENDERS SHOULD BE EXTENDED
  • 18. TECHNICAL BIDS • TECHNICAL BIDS ARE THE BASIS OF PRE QUALIFICATION OF THE BIDDERS • THE BIDDERS WHOSE TECHNICAL BIDS ARE REJECTED ARE LIKELY TO RAISE THE OBJECTIONS • PRE QUALIFICATION CRITERIA SHOULD BE VERY WELL DEFINED IN THE TENDER DOCUMENTS AND SHOULD BE TRANSPARENT. • DISCRETIONARY PROVISIONS SHOULD NOT BE INCLUDED IN THE PRE QUALIFICATION CRITERIA.
  • 19.  PRE QUALIFICATION CRITERIA MAY INCLUDE;  SATISFACTORY COMPLETION OF SIMILAR WORK(S) OF REQUIRED AMOUNT  QUALITY/PERFORMANCE EVALUATION OF COMPLETED AND ONGOING WORKS  FINANCIAL CRITERION OF ANNUAL TURN OVER OF WORKS  CASH FLOW/SOLVENCY CERTIFICATE  LOSS CRITERION  REQUIREMENT OF TECHNICAL PERSONNEL  REQUIREMENT OF T&P  INSPECTION OF COMPLETED/ONGOING WORK FOR QUALITY EVALUATION  SCORE ON VARIOUS ATTRIBUTES AND OVERALL SCORE  GST REGISTRATION  ASSESSED AVAILABLE BID CAPACITY  UPLOADING OF DOCUMENTS  EARNEST MONEY OF REQUIRED AMOUNT AND FORM
  • 20.  THERE MAY BE OBJECTIONS IN THE DEFINITION OF SIMILAR WORKS HENCE SIMILAR WORK SHOULD BE DEFINED WITH CLARITY  THERE MAY BE OBJECTIONS REGARDING QUALITY ASSESSMENT BY THE TEAM HENCE CRITERION SHOULD BE WELL DOCUMENTED BEFORE INVITATION OF TENDERS AND INCLUDED IN THE TENDER DOCUMENT. IT IS ADVISABLE TO KEEP PHOTOGRAPHS OF THE INSPECTED WORKS/DEFECTS IN RECORD  IT SHOULD BE CLEARLY DEFINED WHETHER AVERAGE FINANCIAL TURN OVER IS TO BE TAKEN AND OF HOW MANY YEARS?  AVAILABLE ASSESSED BID CAPACITY INCLUDES COMPONENT OF ONGOING COMMITMENT. SOMETIMES ALL THE COMMITMENTS ARE NOT PROJECTED BY THE BIDDER WHICH MAY RESULT INTO INTERPRETATION AS MISREPRESENTATION OF FACTS  SOMETIMES EARNEST MONEY IS NOT SUBMITTED IN PRESCRIBED FORM AND ALL DOCUMENTS NOT UPLOADED  CALCULATION OF SCORE MAY BE OBJECTED BY SOME BIDDERS HENCE TO BE SPELT OUT IN TENDER DOCUMENTS
  • 21. FINANCIAL BIDS • SINCE NOW e –TENDERING IS BEING ADOPTED, OPENING OF FINANCIAL BIDS HAS BECOME EASY AND A MECHANICAL PROCESS. • AS PER CVC GUIDELINES, WORK CAN BE AWARDED ONLY TO THE LOWEST BIDDER • ALSO AS PER CVC GUIDELINES, NEGOTIATIONS IN RATES IS NOT PERMITTED • CONDITIONAL TENDERS ARE ALSO NOT ACCEPTED AND THERE IS NO SCOPE OF WRITING CONDITIONS IN ONLINE FINANCIAL BIDS
  • 22. AWARD OF WORK • PLEASE CHECK ABOUT THE BUDGET AVAILABILITY • PLEASE ENSURE THAT THE BIDS ARE STILL VALID • DO NOT PUT ANY ADDITIONAL CONDITIONS BEYOND MENTIONED IN THE BID DOCUMENTS • FOLLOW THE CONDITIONS OF PERFORMANCE GUARANTEE AND OTHER PROVISIONS
  • 23. COMMENCEMENT OF WORK • GOOD CONTRACTORS NORMALLY COMMENCE THE WORK IN TIME • FEW CONTRACTORS WHO MAY SUBLET THE WORK, WAIT FOR OTHER AGENCY TO TAKE OVER THE WORK HENCE DECISION OF DETERMINATION SHOULD BE TAKEN AS EARLY AS POSSIBLE • MONITORING OF THE QUALITY AND PROGRESS SHOULD BE DONE FROM THE BEGINNING AS IT SETS YOUR IMAGE • WHATEVER DECISION IS TO BE TAKEN SHOULD BE TAKEN WITH WELL THOUGHT PROCESS BUT SHOULD NOT BE DELAYED
  • 24.  THERE ARE TOOLS AVAILABLE WHICH CAN BE USED FOR MONITORING. REMEMBER TOOLS ARE ONLY THE AID FOR THE PROJECT TEAM AND THE CONTRACTOR  DEPARTMENT/EMPLOYER SHOULD ENSURE PROGRESS, SAFETY AND QUALITY AND SHOULD NOT RELAX ANY CRITERION  FOR THE CONTRACTOR, PAYMENTS AND DECISIONS ARE IMPORTANT. DEPARTMENT/EMPLOYER SHOULD NOT DELAY PAYMENT AND DECISIONS  PROGRESS AND QUALITY CAN BE ACHIEVED ONLY IF DEPARTMENT/EMPLOYER BOTH ARE SERIOUS ABOUT IT
  • 25. CO-ORDINATION • CO-ORDINATION IS ESSENTIAL FOR ANY SUCCESS BUT LACKS MORE OFTEN AT THE SITE • CO-ORDINATION IS REQUIRED AT VARIOUS LEVELS AS – CIVIL, ELECTRICAL, HORTICULTURE AND ARCHITECT OFFICERS – CONTRACTORS/AGENCIES THOUGH MAY WORK UNDER PROJECT MANAGER/CHIEF PROJECT MANAGER BUT AT GROUND THEY MAY WORK UNDER DIFFERENT TEAMS AND MAY HAVE CO- ORDINATION PROBLEMS
  • 26.  CO-ORDINATION BETWEEN HIERARCHY OF SAME WING LIKE CIVIL, ELECTRICAL  CO-ORDINATION BETWEEN VARIOUS LEVEL OFFICERS  CO-ORDINATION BETWEEN LOCAL BODIES AND PROJECT TEAM  CO-ORDINATION WITH PAYMENT AUTHORITIES  CO-ORDINATION BETWEEN SUPERVISORS OF VARIOUS AGENCIES/CONTRACTORS
  • 27.  SIMILARLY, AIR CONDITIONING, FIRE FIGHTING, FIRE DETECTION EQUIPMENT AGENCIES MAY COME ONLY AFTER FALSE CEILING IS LAID DAMAGING IT
  • 28.  SERVICE PROVIDING TEAM LIKE PLUMBING, TILE FIXING, WATER PROOFING, INTERNAL ELECTRICAL INSTALLATION ETC MAY NOT HAVE ANY CO-ORDINATION  THEREFORE, CO-ORDINATION IS MAIN KEY OF SUCCESS IN PROGRESS  TAKE DECISION AS EARLY AS POSSIBLE IF CONTRACT IS TO BE RESCINDED  CO-ORDINATION MAY ALSO BE LACKING BETWEEN VARIOUS SUB CONTRACTORS AND SUPPLIERS
  • 29. DETERMINATION/RESCISSION OF CONTRACT • TO BE DECIDED DURING CURRENCY OF CONTRACT • IF WORK IS NOT SATISFACTORY IN TERMS OF PROGRESS OR QUALITY, WHATEVER DECISION IS TO BE TAKEN, TAKE RIGHT AT FIRST TIME. IN ALL PROBABILITIES, ONCE WORK IS DELAYED, IT IS UNLIKELY THAT PROGRESS OR QUALITY WILL BE RESTORED. • CONTRACTOR GETS GOOD AMOUNT OF MONEY/PAYMENT TILL THE COMPLETION OF STRUCTURE HENCE IS QUITE ENTHUSIASTIC • FINISHING ITEMS REQUIRE CONSIDERABLE FUNDS, ARE TIME TAKING AND AVAILABLE ON CASH HENCE AGENCIES MAY NOT GET ENTHUSIASM AND SOMETIMES EVEN LEAVE ON JUNIORS TO MONITOR. BLAME GAME STARTS DURING FINISHING STAGE AND CO-ORDINATION BECOMES A MAJOR PROBLEM
  • 30.  WORKS CONTRACT IS BETWEEN TWO PARTIES AND THEY HAVE RELATION OF PROMISOR AND PROMISEE AND NOT OF EMPLOYER AND EMPLOYEE  SO, EACH PARTY HAS TO FULFIL ITS OBLIGATIONS FOR SUCCESSFUL CONTRACT MANAGEMENT
  • 31. Thanks for attending Dr K M Soni, ADG (Retd.), CPWD, New Delhi Also available on Youtube: KRISHNA MURARI Soni at https://www.youtube.com/channel/UC_pPYxk0jI1ayqA5rO6fBOw