SANS 10400 PART XA - ENERGY EFFIECIENCY AND ENERGY USA IN THE BUILT ENVIRONMENT

THE SABS TECHNICAL COMMITTEE (SC 59G) THAT HAS BEEN DELIBERATING ON ENERGY
    EFFICIENT BUILDINGS HAS FINALLY RELEASED THEIR PROPOSED AMENDMENT TO SANS
    10400. THE DOCUMENT IS CALLED ‘SANS 10400 PART XA: ENERGY USAGE.

THIS AMENDMENT HAS TO DO WITH THE ENERGY THAT A BUILDING LOSES AND HOW MUCH
     ENERGY IT CAN GENERATE AT THE SAME TIME. THE BUILDINGS ARE THEN RATED
     ACCORDING TO HOW FAST AND HOW MUCH ENERGY IT LOSES
     THE AMOUNT OF ENERGY LOSS NEEDS TO BE MAINTAINED AS TO NOT ALLOW FOR THE
     BUILDING TO LOSE MORE ENERGY THAN IT IS PRODUCING

THIS AMENDMENT REQUIRES THAT ALL NEW BUILDINGS IN SOUTH AFRICA ARE TO MAKE USE OF
     SOLAR WATER HEATING, HEAT PUMPS OR HEAT RECOVERY SYSTEMS TO HEAT AT LEAST 50%
     OF THE BUILDINGS HOT WATER SUPPLY
ARCHITECTS ARE TRAINED INDIVIDUALS WHO DEVELOP CONCEPTUAL IDEAS FOR BUILDINGS AND STRUCTURESM
THEN TURN THOSE CONCEPTS INTO THE DESIGNS AND PLANS THAT ARE USED TO GUIDE THE BUILDING PROCESS.
THROUGHOUT THIS PROCESS, ARCHITECTS TAKE ON A NUMBER OF DUTIES AND RESPONSIBILITIES:

ARCHITECTS ARE EXPECTED TO HAVE A REASONABLE WORKING KNOWLEGDE OF THE LAWS AND LEGISLATIONS
GOVERNING DESIGN AND BUILDING WORKS. THE ARCHITECT HAS TO ENSURE THAT HIS PLANS COMPLY WITH THE
ACTS AND REGULATIONS

SOMETIMES DUE TO THE COMPLEXITIES OF SOME PROJECTS, THE ARCHITECT WILL USUALLY DELEGATE A LARGE
AMOUNT OF THE TECHNICAL ASPECTS OF A DESIGN TO OTHER SKILLED PROFESSIONALS SUCH AS MECHANICAL
AND ELECTRICAL ENGINEERS, CIVIL AND STRUCTURAL ENGINEERS, QUANTITY SURVEYORS, ETC, AND SHOULD
THEN INFORM THE CLIENT OF THIS.

DESIGN RESPONSIBILITIES OF AN ARCHITECT CAN RANGE FROM THE AESTHETIC DESIGNS OF A BUILDING TO
SPECIFICATIONS, SELECTION OF FINISHES, AND THE CHOICE OF CONSTRUCTION TECHNIQUES. THE ARCHITECT
MUST EXERCISE SKILL AND CARE IN THE EXECUTION OF HIS DESIGNS AND IN THE CHOICE AND SPECIFICATION
OF MATERIALS
THE ARCHITECT HAS TO HAVE A HIGH DUTY OF CARE TO HIS EMPLOYER TO ENSURE THAT HIS DESIGN IS
     SUITABLE FOR THE PURPOSE MADE KNOWN TO HIM

THE ARCHITECT IS TO OBSERVE AND INVESTIGATE THE SITE TO DETERMINE WHETHER THERE ARE ANY PHYSICAL
     CONSTRAINTS WHICH MAY AFFECT THE SITE OR BUILDING. HE SHOULD ALSO OBTAIN PLANS FROM THE
     LOCAL AUTHORITIES SHOWING ANY PLANNING CONSTRAINTS. IF THE ARCHITECT DOES NOT HAVE THE
     SUITABLE EQUIPMENT TO CONDUCT A PROPER SITE INVESTIGATION, HE MUST ADVISE THE CLIENT TO MAKE
     USE OF A SUAITABLE PROFESSIONAL SUCH AS A LAND SURVEYOR, ETC TO CONDUCT THE INVESTIGATION

AN ARCHITECT IS OFTEN ASKED TO PRODUCE A DESIGN WITHIN A GIVEN BUDGET, AND IN THIS CASE, THE
    ARCHITECT MAY BE UNDER A DUTY TO DESIGN WORKS CAPABLE OF BEING CARRIED OUT AT A
    REASONABLE COST, WHILST CONSIDERING ITS SCOPE AND FUNCTION

THE ARCHITECT HAS THE DUTY OF RECOMMENDING THE FORM OF CONTRACT TO BE USED TO HIS EMPLOYER,
     ENSURING THAT HE IS FAMILIAR WITH THAT FORM OF CONTRACT AND IS ABLE TO ADMINISTER THAT
     CONTRACT

THE ARCHITECT IS TO ENSURE THAT THE PLANS, DRAWINGS AND DETAILS ARE ISSUED TO HIS EMPLOYER AND
     THE CONTRACTOR WITHIN A REASONABLE TIME

IT IS ALSO THE DUTY OF THE ARCHITECT TO SUPERVISE THE BUILDING WORKS FOR WHICH HE/SHE HAS
       DESIGNED, ENSURING THAT THE BUILDING WORKS ARE CARRIED OUT ACCORDING TO THE PLANS,
       SPECIFICATIONS AND THE FORMS OF THE BUILDING CONTRACT, AS WELL AS IN ACCORDANCE WITH THE
       ACTS AND REGULATIONS. THIS INCLUDES THE PREVENTION, DETECTION, AND CORRECTION OF DEFECTIVE
       WORK WHILST ENSURING THAT THE MATERIALS AND WORKMANSHIP CONFORM TO THE CONTRACTURAL
       REQUIREMENTS

WHERE THE TERMS OF THE CONTRACT REQUIRE THE ARCHITECT TO CERTIFY PAYMENTS TO THE CONTRACTOR,
    THE ARCHITECT IS TO ENSURE THAT THE WORKS ARE CARRIED OUT TO HIS SATISFACTION BEFORE HE CAN
    CERTIFY THE PAYMENT
THE LIST OF TENDER DOCUMENTS
                                              GENERALLY INCLUDES:
A TENDER DOCUMENT IS A WRITTEN INVITATION
    WHICH IS SENT TO POTENTIAL SUPPLIERS OF
                                              o INSTRUCTIONS TO TENDERERS
    A GOOD OR SERVICE INFORMING THEM
                                              o FORM OF TENDER
    ABOUT THE INFORMATION REQUIRED FOR
                                              o GENERAL CONDITION OF
    THE BUYER TO CHOOSE AMONG THEM.
                                              CONTRACT
                                              o SPECIAL CONDITION OF
ISSUING A TENDER DOCUMENT TYPICALLY           CONTRACT
     BEGINS THE TENDER PROCESS BY WHICH A     o GENERAL SPECIFICATION
     BUSINESS SELECTS QUALIFIED AND           o PARTICULAR SPECIFICATION
     INTERESTED SUPPLIERS BASED ON THINGS     o BILL OF QUANTITIES
     SUCH AS THEIR PRICE, AVAILABILITY, AND   o METHODS OF MEASUREMENT
     PROPOSED DELIVERY TERMS. A LACK OF       o TENDER DRAWINGS
     ADEQUATE INFORMATION IN THE TENDER       o ADDITIONAL APPENDICES
     DOCUMENTS WILL, AS A RESULT, LEAD TO     o FORM OF AGREEMENT
     DISPUTES AND CLAIMS DURING AND AT
     THE END OF THE CONTRACT
THINGS TO REMEMBER WHEN SETTING
   UP TENDER DOCUMENTS:

o    FOCUS ON THE CLIENT – TALK ABOUT THEIR
    NEEDS AND HOW YOU CAN SOLVE THEIR
    PROBLEMS

o    HELP THE CLIENT COME UP WITH IDEAS

o    MAKE SURE YOU COVER EVERYTHING IN THE
    QUALIFICATIONS DOCUMENT

o    VALUE FOR MONEY, AND NOT JUST THE PRICE,
    DECIDES MOST BIDS – EMPHASISE RISK
    REDUCTION, LOW MAINTENANCE, QUALITY,
    RELAIBILITY, ETC

o    ANALYSE ALL THE COST AND PRICING FACTORS
    OF THE CONTRACT

o    SHOW YOU HAVE THE RESOURCES TO DO THE
    WORK IN A COST – EFFECTIVE WAY TO MEET THE
    NEEDS OF THE CLIENT, HIT DEADLINES, AND
    RESPOND WELL TO CHANGING SITUATIONS
THE BILLS OF QUANITITES IS THE MOST COMMON FORM OF PRICING STRATEGY USED WHERE
    THE CONTRACTOR UNDERTAKES CONSTRUCTION ON THE BASIS OF FULL DESIGNS ISSUED
    BY THE EMPLOYER

THE BILLS OF QUANTITIES IS SOMETIMES ALSO REFERRED TO AS A ‘SCHEDULE OF QUANTITIES’
    AND IS A LIST OF ITEMS AND ITS MEASURED OR ESTIMATED QUANTITIES AS WELL AS A
    BRIEF DESCRIPTION OF THE WORK TO BE PERFORMEDUNDER THE CONTRACT. THE
    QUANTITIES AND DESCRIPTIONS ARE DETERMINED AND MEASURED FROM DRAWINGS
    AND SPECIFICATIONS
THE BoQ HAS TWO PURPOSES:                 THE USE OF A BoQ ON
                                          CONSTRUCTION CONTRACTS
o    PRESENTING INFORMATION TO THE        PERMITS 4 IMPORTANT
    TENDERES ENABLING THEM TO PRICE       OBJECTIVES TO BE ACHIEVED:
    EACH INDIVIDUAL ITEMS AS IT RELATES
    TO THE DATA STIPULATED IN THE
    CONTRACT, THE SCOPE OF THE            o THE TENDERERS ARE PROVIDED WITH
    WORK, AND THE SITE                    ENOUGH INFORMATION REGARDING THE
    INFORMATION, ALLOWING THE             EXTENT OF THE WORK REQUIRED TO
    TENDERERS TO ARRIVE AT A TOTAL OF     ENABLE THEM TO ACCURATLEY AND
    PRICES                                CONFIDENTLY PREPARE RESPONSIVE
                                          TENDERS
o    ALLOWS THOSE RESPONSIBLE FOR         o TENDER PRICES CAN BE OBJECTIVELY
    EVALUATING TENDERS TO UNDERSTAND      COMPARED AS THEY HAVE BEEN
    HOW THE WORKS HAVE BEEN PRICED        SUBMITTED USING THE SAME
                                          INFORMATION

                                          o IF ALL THE WORK HAS BEEN
                                          MEASURED, EMPLOYERS CAN
                                          DETERMINE, BEFORE-HAND, THE COST OF
                                          CONTRACTS WITH A HIGH DEGREE OF
                                          ACCURACY

                                          o THE VALUE OF WORK CARRIED OUT AT
                                          ANY STAGE OF A CONTRACT CAN BE
                                          OBJECTIVLEY DETERMINED
Before any form of building work can
begin, contracts need to be signed and
the building licence approval is
obtained. The builder can then begin
construction on site. After signing the
contract with the builder the architect
then has to administer the contract and
assure that the building is constructed
according to the documents. The
architects also signs and certifies any
changes, claims for payment, and
alterations during that period. Once the
building is completed, the architect is to
issues a final certificate which ends the
contracts between the builder and
architect.

More Related Content

Similar to Progress mark 2

Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesPrimila Edward
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Melvin Lim
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.pptssuser32da691
 
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdfUAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdfjosephiigo
 
Form of Master Agreement For Verification and Validation Services (Purchase t...
Form of Master Agreement For Verification and Validation Services (Purchase t...Form of Master Agreement For Verification and Validation Services (Purchase t...
Form of Master Agreement For Verification and Validation Services (Purchase t...GLC
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...
Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...
Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...GLC
 
Construction Supervisor represents their Employer and their team while managi...
Construction Supervisor represents their Employer and their team while managi...Construction Supervisor represents their Employer and their team while managi...
Construction Supervisor represents their Employer and their team while managi...Mark Burness
 
Sample Construction Contract.PDF
Sample Construction Contract.PDFSample Construction Contract.PDF
Sample Construction Contract.PDFssuser6a7545
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaNIZAM ISMAIL
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Cicerone
 

Similar to Progress mark 2 (20)

Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and Liabilities
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
CEO-REPORTING.pptx
CEO-REPORTING.pptxCEO-REPORTING.pptx
CEO-REPORTING.pptx
 
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdfUAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
 
Form of Master Agreement For Verification and Validation Services (Purchase t...
Form of Master Agreement For Verification and Validation Services (Purchase t...Form of Master Agreement For Verification and Validation Services (Purchase t...
Form of Master Agreement For Verification and Validation Services (Purchase t...
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
TENDERS.pdf
TENDERS.pdfTENDERS.pdf
TENDERS.pdf
 
Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...
Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...
Verification and validation services agreement (Beli/ Buy Agreement, Hub: 081...
 
Construction Supervisor represents their Employer and their team while managi...
Construction Supervisor represents their Employer and their team while managi...Construction Supervisor represents their Employer and their team while managi...
Construction Supervisor represents their Employer and their team while managi...
 
12 pv o&m cost-resource optimization
12   pv o&m cost-resource optimization 12   pv o&m cost-resource optimization
12 pv o&m cost-resource optimization
 
Sample Construction Contract.PDF
Sample Construction Contract.PDFSample Construction Contract.PDF
Sample Construction Contract.PDF
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur India
 
Sample construction contract
Sample construction contractSample construction contract
Sample construction contract
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of Residences
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Progress mark 2

  • 1.
  • 2. SANS 10400 PART XA - ENERGY EFFIECIENCY AND ENERGY USA IN THE BUILT ENVIRONMENT THE SABS TECHNICAL COMMITTEE (SC 59G) THAT HAS BEEN DELIBERATING ON ENERGY EFFICIENT BUILDINGS HAS FINALLY RELEASED THEIR PROPOSED AMENDMENT TO SANS 10400. THE DOCUMENT IS CALLED ‘SANS 10400 PART XA: ENERGY USAGE. THIS AMENDMENT HAS TO DO WITH THE ENERGY THAT A BUILDING LOSES AND HOW MUCH ENERGY IT CAN GENERATE AT THE SAME TIME. THE BUILDINGS ARE THEN RATED ACCORDING TO HOW FAST AND HOW MUCH ENERGY IT LOSES THE AMOUNT OF ENERGY LOSS NEEDS TO BE MAINTAINED AS TO NOT ALLOW FOR THE BUILDING TO LOSE MORE ENERGY THAN IT IS PRODUCING THIS AMENDMENT REQUIRES THAT ALL NEW BUILDINGS IN SOUTH AFRICA ARE TO MAKE USE OF SOLAR WATER HEATING, HEAT PUMPS OR HEAT RECOVERY SYSTEMS TO HEAT AT LEAST 50% OF THE BUILDINGS HOT WATER SUPPLY
  • 3. ARCHITECTS ARE TRAINED INDIVIDUALS WHO DEVELOP CONCEPTUAL IDEAS FOR BUILDINGS AND STRUCTURESM THEN TURN THOSE CONCEPTS INTO THE DESIGNS AND PLANS THAT ARE USED TO GUIDE THE BUILDING PROCESS. THROUGHOUT THIS PROCESS, ARCHITECTS TAKE ON A NUMBER OF DUTIES AND RESPONSIBILITIES: ARCHITECTS ARE EXPECTED TO HAVE A REASONABLE WORKING KNOWLEGDE OF THE LAWS AND LEGISLATIONS GOVERNING DESIGN AND BUILDING WORKS. THE ARCHITECT HAS TO ENSURE THAT HIS PLANS COMPLY WITH THE ACTS AND REGULATIONS SOMETIMES DUE TO THE COMPLEXITIES OF SOME PROJECTS, THE ARCHITECT WILL USUALLY DELEGATE A LARGE AMOUNT OF THE TECHNICAL ASPECTS OF A DESIGN TO OTHER SKILLED PROFESSIONALS SUCH AS MECHANICAL AND ELECTRICAL ENGINEERS, CIVIL AND STRUCTURAL ENGINEERS, QUANTITY SURVEYORS, ETC, AND SHOULD THEN INFORM THE CLIENT OF THIS. DESIGN RESPONSIBILITIES OF AN ARCHITECT CAN RANGE FROM THE AESTHETIC DESIGNS OF A BUILDING TO SPECIFICATIONS, SELECTION OF FINISHES, AND THE CHOICE OF CONSTRUCTION TECHNIQUES. THE ARCHITECT MUST EXERCISE SKILL AND CARE IN THE EXECUTION OF HIS DESIGNS AND IN THE CHOICE AND SPECIFICATION OF MATERIALS
  • 4. THE ARCHITECT HAS TO HAVE A HIGH DUTY OF CARE TO HIS EMPLOYER TO ENSURE THAT HIS DESIGN IS SUITABLE FOR THE PURPOSE MADE KNOWN TO HIM THE ARCHITECT IS TO OBSERVE AND INVESTIGATE THE SITE TO DETERMINE WHETHER THERE ARE ANY PHYSICAL CONSTRAINTS WHICH MAY AFFECT THE SITE OR BUILDING. HE SHOULD ALSO OBTAIN PLANS FROM THE LOCAL AUTHORITIES SHOWING ANY PLANNING CONSTRAINTS. IF THE ARCHITECT DOES NOT HAVE THE SUITABLE EQUIPMENT TO CONDUCT A PROPER SITE INVESTIGATION, HE MUST ADVISE THE CLIENT TO MAKE USE OF A SUAITABLE PROFESSIONAL SUCH AS A LAND SURVEYOR, ETC TO CONDUCT THE INVESTIGATION AN ARCHITECT IS OFTEN ASKED TO PRODUCE A DESIGN WITHIN A GIVEN BUDGET, AND IN THIS CASE, THE ARCHITECT MAY BE UNDER A DUTY TO DESIGN WORKS CAPABLE OF BEING CARRIED OUT AT A REASONABLE COST, WHILST CONSIDERING ITS SCOPE AND FUNCTION THE ARCHITECT HAS THE DUTY OF RECOMMENDING THE FORM OF CONTRACT TO BE USED TO HIS EMPLOYER, ENSURING THAT HE IS FAMILIAR WITH THAT FORM OF CONTRACT AND IS ABLE TO ADMINISTER THAT CONTRACT THE ARCHITECT IS TO ENSURE THAT THE PLANS, DRAWINGS AND DETAILS ARE ISSUED TO HIS EMPLOYER AND THE CONTRACTOR WITHIN A REASONABLE TIME IT IS ALSO THE DUTY OF THE ARCHITECT TO SUPERVISE THE BUILDING WORKS FOR WHICH HE/SHE HAS DESIGNED, ENSURING THAT THE BUILDING WORKS ARE CARRIED OUT ACCORDING TO THE PLANS, SPECIFICATIONS AND THE FORMS OF THE BUILDING CONTRACT, AS WELL AS IN ACCORDANCE WITH THE ACTS AND REGULATIONS. THIS INCLUDES THE PREVENTION, DETECTION, AND CORRECTION OF DEFECTIVE WORK WHILST ENSURING THAT THE MATERIALS AND WORKMANSHIP CONFORM TO THE CONTRACTURAL REQUIREMENTS WHERE THE TERMS OF THE CONTRACT REQUIRE THE ARCHITECT TO CERTIFY PAYMENTS TO THE CONTRACTOR, THE ARCHITECT IS TO ENSURE THAT THE WORKS ARE CARRIED OUT TO HIS SATISFACTION BEFORE HE CAN CERTIFY THE PAYMENT
  • 5. THE LIST OF TENDER DOCUMENTS GENERALLY INCLUDES: A TENDER DOCUMENT IS A WRITTEN INVITATION WHICH IS SENT TO POTENTIAL SUPPLIERS OF o INSTRUCTIONS TO TENDERERS A GOOD OR SERVICE INFORMING THEM o FORM OF TENDER ABOUT THE INFORMATION REQUIRED FOR o GENERAL CONDITION OF THE BUYER TO CHOOSE AMONG THEM. CONTRACT o SPECIAL CONDITION OF ISSUING A TENDER DOCUMENT TYPICALLY CONTRACT BEGINS THE TENDER PROCESS BY WHICH A o GENERAL SPECIFICATION BUSINESS SELECTS QUALIFIED AND o PARTICULAR SPECIFICATION INTERESTED SUPPLIERS BASED ON THINGS o BILL OF QUANTITIES SUCH AS THEIR PRICE, AVAILABILITY, AND o METHODS OF MEASUREMENT PROPOSED DELIVERY TERMS. A LACK OF o TENDER DRAWINGS ADEQUATE INFORMATION IN THE TENDER o ADDITIONAL APPENDICES DOCUMENTS WILL, AS A RESULT, LEAD TO o FORM OF AGREEMENT DISPUTES AND CLAIMS DURING AND AT THE END OF THE CONTRACT
  • 6. THINGS TO REMEMBER WHEN SETTING UP TENDER DOCUMENTS: o FOCUS ON THE CLIENT – TALK ABOUT THEIR NEEDS AND HOW YOU CAN SOLVE THEIR PROBLEMS o HELP THE CLIENT COME UP WITH IDEAS o MAKE SURE YOU COVER EVERYTHING IN THE QUALIFICATIONS DOCUMENT o VALUE FOR MONEY, AND NOT JUST THE PRICE, DECIDES MOST BIDS – EMPHASISE RISK REDUCTION, LOW MAINTENANCE, QUALITY, RELAIBILITY, ETC o ANALYSE ALL THE COST AND PRICING FACTORS OF THE CONTRACT o SHOW YOU HAVE THE RESOURCES TO DO THE WORK IN A COST – EFFECTIVE WAY TO MEET THE NEEDS OF THE CLIENT, HIT DEADLINES, AND RESPOND WELL TO CHANGING SITUATIONS
  • 7. THE BILLS OF QUANITITES IS THE MOST COMMON FORM OF PRICING STRATEGY USED WHERE THE CONTRACTOR UNDERTAKES CONSTRUCTION ON THE BASIS OF FULL DESIGNS ISSUED BY THE EMPLOYER THE BILLS OF QUANTITIES IS SOMETIMES ALSO REFERRED TO AS A ‘SCHEDULE OF QUANTITIES’ AND IS A LIST OF ITEMS AND ITS MEASURED OR ESTIMATED QUANTITIES AS WELL AS A BRIEF DESCRIPTION OF THE WORK TO BE PERFORMEDUNDER THE CONTRACT. THE QUANTITIES AND DESCRIPTIONS ARE DETERMINED AND MEASURED FROM DRAWINGS AND SPECIFICATIONS
  • 8. THE BoQ HAS TWO PURPOSES: THE USE OF A BoQ ON CONSTRUCTION CONTRACTS o PRESENTING INFORMATION TO THE PERMITS 4 IMPORTANT TENDERES ENABLING THEM TO PRICE OBJECTIVES TO BE ACHIEVED: EACH INDIVIDUAL ITEMS AS IT RELATES TO THE DATA STIPULATED IN THE CONTRACT, THE SCOPE OF THE o THE TENDERERS ARE PROVIDED WITH WORK, AND THE SITE ENOUGH INFORMATION REGARDING THE INFORMATION, ALLOWING THE EXTENT OF THE WORK REQUIRED TO TENDERERS TO ARRIVE AT A TOTAL OF ENABLE THEM TO ACCURATLEY AND PRICES CONFIDENTLY PREPARE RESPONSIVE TENDERS o ALLOWS THOSE RESPONSIBLE FOR o TENDER PRICES CAN BE OBJECTIVELY EVALUATING TENDERS TO UNDERSTAND COMPARED AS THEY HAVE BEEN HOW THE WORKS HAVE BEEN PRICED SUBMITTED USING THE SAME INFORMATION o IF ALL THE WORK HAS BEEN MEASURED, EMPLOYERS CAN DETERMINE, BEFORE-HAND, THE COST OF CONTRACTS WITH A HIGH DEGREE OF ACCURACY o THE VALUE OF WORK CARRIED OUT AT ANY STAGE OF A CONTRACT CAN BE OBJECTIVLEY DETERMINED
  • 9. Before any form of building work can begin, contracts need to be signed and the building licence approval is obtained. The builder can then begin construction on site. After signing the contract with the builder the architect then has to administer the contract and assure that the building is constructed according to the documents. The architects also signs and certifies any changes, claims for payment, and alterations during that period. Once the building is completed, the architect is to issues a final certificate which ends the contracts between the builder and architect.