EPC CONTRACTS:A REVIEW
DR K M SONI
ADG(RETD.), CPWD, NEW DELHI
EPC
• E - ENGINEERING MEANS PLANNING
ACTIVITIES
• P - PROCUREMENT MEANS OBTAINING
SOMETHING
• C - CONSTRUCTION MEANS EXECUTION
• THUS EPC MEANS ENGINEERING,
PROCUREMENT AND CONSTRUCTION
EPC CONTRACTOF A WORK
• A WORK MAY INVOLVE MANY ACTIVITIES OR
SUB HEADS
• EPC MEANS ALL ACTIVITIES OF ENGINEERING,
PROCUREMENT AND CONSTRUCTION OR
MAY BE PART ALSO?
• LET US DISCUSS
SCOPE OF A WORK
• WORK MEANS THE SCOPE OF WORK DEFINED IN A
SANCTION
• THIS MAY INCLUDE
– CIVIL WORKS
– E&M WORKS
– FIRE PROTECTION & FIRE FIGHTING WORKS
– SECURITY RELATED WORKS
– HORTICULTURE WORKS
– FURNITURE
– INTERIOR & FURNISHING
– EQUIPMENT
– OPERATION AND MAINTENANCE
TYPE OF CONTRACTS
• ITEM RATE CONTRACT
• PERCENTAGE RATE CONTRACT
• EPC CONTRACT
• TURN KEY CONTRACT
ITEM RATE CONTRACT
• CONTRACT IN WHICH RATES ARE QUAOTED
BY THE TENDERER FOR EACH ITEM AND
ACCEPTED BY OTHER PARTY ACCORDINGLY
• THUS ITEMS ARE TO BE SPECIFIED BY THE BID
INVITING AUTHORITY
• THE BID INVITING AUTHORITY SHALL NOT
MENTION HIS RATES OF THE ITEMS
PERCENTAGE RATECONTRACT
• CONTRACT IN WHICH RATES ARE QUOATED
BY THE TENDERER ON PERCENTAGE BASIS,
ABOVE OR BELOW OR AT PAR ON ESTIMATED
RATES OF THE ITEMS MENTIONED BY OTHER
PARTY
• THUS ITEMS ARE TO BE SPECIFIED BY THE BID
INVITING AUTHORITY IN THIS TYPE OF
CONTRACT AND ADDITIONALLY ESTIMATED
RATES OF ITEMS ALSO
TURNKEY CONTRACT
• MEANS CLIENT OR EMPLOYER WANTS
EVERYTHING TO BE INCLUDED IN A CONTRACT
AND HE TAKES OVER THE KEY AND ENTERS INTO
THE BUILDING OR PREMISES
• THUS CLIENT HAS TO SPECIFY BROAD
REQUIREMENTS ONLY AND ENGINEERING,
PROCUREMENT AND CONSTRUCTION OF ONE
OR MORE PACKAGES TO BE DECIDED BY THE
CONTRACTOR
• IT MEANS THERE IS ONLY ONE CONTRACT
BETWEEN CLIENT AND CONTRACTOR
TURNKEY AND EPC CONTRACT
• IS THERE ANY DIFFERENCE BETWEEN
TURNKEY AND EPC CONTRACTS ?
• YES PROBABLY
WHAT SUBHEADS SHOULD BE INCLUDED IN
EPC CONTRACT?
– CIVIL WORKS
– E&M WORKS
– FIRE PROTECTION & FIRE FIGHTING WORKS
– LANDSCAPING AND HORTICULTURE WORKS
– SECURITY RELATED WORKS
– FURNITURE
– INTERIOR & FURNISHING
– EQUIPMENT
– OPERATION AND MAINTENANCE
CASE -I
• CIVIL OR E&M WORKS ALONE WHICH INCLUDES
• ARCHITECTURAL SERVICES
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
AND CALL TENDER FOR ALL ABOVE HAVING
ARCHITECTURAL, ENGINEERING, PROCUREMENT AND
CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE
EPC CONTRACT?
CASE -II
• CIVIL AND E&M WORKS WHICH INCLUDE
• ARCHITECTURAL SERVICES
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
AND CALL TENDER FOR ALL ABOVE HAVING
ARCHITECTURAL, ENGINEERING, PROCUREMENT
AND CONSTRUCTION ACTIVITIES OF ABOVE HEADS.
WILL IT BE EPC CONTRACT?
CASE -III
• CIVIL, E&M WORKS AND
LANDSCAPING/HORTICUTURE WHICH INCLUDE
• ARCHITECTURAL SERVICES
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
AND CALL TENDER FOR ALL ABOVE HAVING
ARCHITECTURAL, ENGINEERING, PROCUREMENT AND
CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE
EPC CONTRACT?
CASE -IV
• CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE
AND FURNITURE/FURNISHING WHICH INCLUDE
• ARCHITECTURAL SERVICES
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
AND CALL TENDER FOR ALL ABOVE HAVING
ARCHITECTURAL, ENGINEERING, PROCUREMENT AND
CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE
EPC CONTRACT?
CASE -V
• CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE,
FURNITURE/FURNISHING AND SECURITY MEASURES
WHICH INCLUDE
• ARCHITECTURAL SERVICES
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
AND CALL TENDER FOR ALL ABOVE HAVING
ARCHITECTURAL, ENGINEERING, PROCUREMENT AND
CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE
EPC CONTRACT?
CASE -VI
• CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE,
FURNITURE/FURNISHING, SECURITY MEASURES,
EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S
REQUIREMENT WHICH INCLUDE
• ARCHITECTURAL SERVICES
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
AND CALL TENDER FOR ALL ABOVE HAVING
ARCHITECTURAL, ENGINEERING, PROCUREMENT AND
CONSTRUCTION ACTIVITIES . WILL IT BE EPC CONTRACT?
CASE -VII
• CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE,
FURNITURE/FURNISHING, SECURITY MEASURES,
EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S
REQUIREMENT WHICH INCLUDE
• ARCHITECTURAL SERVICES BUT WITHOUT CONCEPTUAL
PLANS
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
WILL IT BE CALLED EPC CONTRACT?
CASE -VIII
• CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE,
FURNITURE/FURNISHING, SECURITY MEASURES,
EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S
REQUIREMENT WHICH INCLUDE
• ENGINEERING SERVICES
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
BUT EXCLUDING ARCHITECTURAL DRAWINGS. WILL IT BE
CALLED EPC CONTRACT?
CASE -IX
• CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE,
FURNITURE/FURNISHING, SECURITY MEASURES,
EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S
REQUIREMENT WHICH INCLUDE
• ENGINEERING SERVICES EXCLUDING STRUCTURAL DESIGN
• EXECUTION
• QUALITY ASSURANCE
• PROJECT MANAGEMENT
• OPERATION & MAINTENANCE
BUT EXCLUDING ARCHITECTURAL DRAWINGS , E&M AND
STRUCTURAL DRAWINGS. WILL IT BE CALLED EPC
CONTRACT?
EPC
• THUS EPC CONTRACTS IS A CONTRACT FOR PART
OF A WORK OR COMPLETE WORK IN WHICH
ENGINEERING, PROCUREMENT AND
CONSTRUCTION ARE INCLUDED
• IF EPC IS FOR COMPLETE WORK AND INCLUDES
ALL ITEMS OF E, P AND C, IT BECOMES TURNKEY
CONTRACT
• HOWEVER EPC MAY BE FOR PART OF WORK
• AND EPC MAY BE FOR E, P AND C WITHOUT
ARCHITECTURAL AND PART OF ENGINEERING
SERVICES ALSO.
AND CONTRACT
• A CONTRACT IS BASICALLY AN AGREEMENT BETWEEN
TWO PARTIES CREATING A LEGAL OBLIGATION FOR
BOTH OF THEM TO PERFORM SPECIFIC ACTS. EACH
PARTY IS LEGALLY BOUND TO PERFORM THE
SPECIFIED DUTIES SUCH AS RENDERING A PAYMENT
OR DELIVERING GOODS.
• IN ORDER FOR THE CONTRACT TO BE ENFORCEABLE,
EACH PARTY MUST EXCHANGE SOMETHING OF VALUE
(CALLED “CONSIDERATION”).
• THEY MAY BE EITHER ORAL OR WRITTEN, THOUGH
COURTS PREFER THAT AGREEMENTS BE PUT IN
WRITING.
REQUIREMENTS OFA VALID CONTRACT
• MUTUAL ASSENT: EACH PARTY MUST HAVE A SHARED
UNDERSTANDING REGARDING WHAT THE SUBJECT
MATTER OF THE CONTRACT IS. FOR EXAMPLE, WORK
MEANS PROJECT AND NOT A SERVICE OF BRINGING
SOMETHING FROM SOME WHERE.
• OFFER AND ACCEPTANCE: ONE PARTY MUST MAKE AN
OFFER BY CLEARLY COMMUNICATING THEIR INTENT TO BE
BOUND IN A CONTRACT. LIKEWISE, THE OTHER PARTY
MUST RENDER THEIR ACCEPTANCE IN UNAMBIGUOUS
TERMS.
• CONSIDERATION: THIS WHERE BOTH PARTIES MUTUALLY
EXCHANGE SOMETHING OF VALUE IN ORDER TO MAKE
THE AGREEMENT BINDING.
• AN EPC CONTRACT SHOULD ALSO CONFORM TO
REQUIREMENTS OF A CONTRACT AS PER THE CONTRACT
ACT
UNDERSTANDING
• UNDERSTANDING MEANS THE TERMS AND
CONDITIONS ARE TO BE CEARLY SPELLED OUT
• THESE ARE INCLUDED IN GENERAL CONDITIONS
OF CONTRACT, SPECIAL CONDITIONS OR ANY
OTHER CONDITIONS MADE PART OF TENDER
DOCUMENT HENCE THERE MUST BE CLEAR
UNDERSTANDING OF SCOPE OF WORK IN EPC
CONTRACT ALSO
• LET US DISCUSS SOME OF THE CONTRACT
CONDITIONS
SECURITIES
• PERFORMANCE SECURITY/GUARANTEE FOR
PERFORMANCE OF CONTRACT
• SECURITY DEPOSIT FOR ADJUSTMENT ON
ACCOUNT OF SUMS PAYABLE BY THE
CONTRACTOR
• THIS IS SIMILAR TO OTHER CONTRACTS
TIME AND DELAY
• COMPENSATION FOR DELAY
– WITH MAXIMUM RATE @ 1% (ONE PERCENT) PER MONTH OF
DELAY TO BE COMPUTED ON PER DAY BASIS BASED ON
QUANTUM OF DAMAGE SUFFERED DUE TO STATED DELAY ON
THE PART OF CONTRACTOR
• INCENTIVES FOR EARLY COMPLETION
– IN CASE, THE CONTRACTOR COMPLETES THE WORK AHEAD OF
STIPULATED DATE OF COMPLETION OR JUSTIFIED EXTENDED
DATE OF COMPLETION, A BONUS @ 0.5 % (ZERO POINT FIVE
PER CENT) OF THE TENDERED VALUE PER MONTH COMPUTED
ON PER DAY BASIS, SHALL BE PAYABLE TO THE CONTRACTOR,
SUBJECT TO A MAXIMUM LIMIT OF 2 % (TWO PERCENT) OF
THE TENDERED VALUE.
THIS IS SIMILAR TO OTHER CONTRACTS. ABOVE CRITERION MAY
CHANGE FROM ORGANISATION TO ORGANISATION. ABOVE
CRITERION IS OF CPWD
DETERMINATION OF CONTRACT
• DEFECTIVE WORK
• SUSPENSION OF WORK
• DELAY
• NEGLIGENCE OF OBLIGATIONS
• INVOLVED IN CORRUPTION
• PAYING COMMISSION
• OBTAINED CONTRACT WITH MALPRACTICES
• BECOMES INSOLVENT
• SUBLETS THE WORK
ABOVE CRITERION IS FROM CPWD, APPLICABLE TO ALL
TYPES OF CONTRACTS
CLAUSE 3 A
• IN CASE, THE WORK CANNOT BE STARTED DUE
TO REASONS NOT WITHIN THE CONTROL OF THE
CONTRACTOR WITHIN 1/8TH OF THE
STIPULATED TIME FOR COMPLETION OF WORK
OR ONE MONTH WHICHEVER IS HIGHER, EITHER
PARTY MAY CLOSE THE CONTRACT BY GIVING
NOTICE TO THE OTHER PARTY STATING THE
REASONS.
• ABOVE CRITERION IS FROM CPWD, APPLICABLE
TO ALL TYPES OF CONTRACTS
OTHERMAIN CLAUSES
• SECURED ADVANCE
• MOBILIZATION ADVANCE
• T & P ADVANCE
• WAGE INCREASES DUE TO STATUTORY
ORDERS
• PRICE INCREASE ON MATERIALS SPECIFIED
• ESCALATION CLAUSE
• DEVIATIONS
SECURED ADVANCE
• SECURED ADVANCE MAY BE INCLUDED IN EPC
CONTRCATS OR MAY NOT BE
• IN CPWD EPC CONTRACTS, IT IS INCLUDED
• IT HELPS IN MOBILISING RESOURCES AND DOES
NOT BLOCK MONEY FOR LONG TIME HENCE IS IN
FAVOUR OF WORK
• SINCE RATES OF ITEMS ARE NOT AVAILABLE IN
CONTRACT, ENGINEER IN CHARGE HAS TO
ASSESS THE MARKET RATES AND REQUIEMENTS
OF MATERIALS ON WHICH SECURED ADVANCE IS
GIVEN CAREFULLY
MOBILISATIONANDT&P ADVANCE
• MOBILIZATION AND T&P ADVANCE ALSO
HELP THE AGENCY TO ACCELERATE THE
PROGRESS HENCE IN FAVOUR OF WORK
WAGE INCREASE DUE TOSTATUTORY
ORDERS
• THIS IS REQUIRED TO BE PAID AS PER
APPLICABLAWS HENCE NEEDS TO BE
INCORPORATED IN EPC CONTRACTS ELSE
PROVISION HAS TO BE MADE AND CONTRACTOR
HAS TO PABSORB THE RISK AND PAY IF THERE IS
AN INCREASE
• THIS CLAUSE CAN ALSO BE AS REIMBURSEMENT
ON ACTUAL BASIS
• CPWD CONTRACT CLAUSE IS KNOWN AS CLAUSE
10C
ESCALATIONCLAUSES
• CPWD CONTRACT DOCUMENT HAS THREE SUB CLAUSES
IN ESCALATION CLAUSE (CLAUSE 10)
• CLUSE 10C: WAGE INCREASE DUE TO STATUTORY
INCREASE
• CLAUSE 10CA: FOR CERTAIN COSTLY ITEMS LIKE CEMENT,
STEEL
• CLAUSE 10CC: ESCALATION ON LABOUR AND OTHER
MATERIALS EXCEPT COVERED UNDER CLAUSE 10CA
IT IS UPTO NIT APPROVING AUTHORITY TO INCLUDE CLAUSE
10CA AND 10CC
IN CASE, ESCALATION CLAUSE IS INCLUDED, THEORETICAL
CHECK (QUANTITY) OF MATERIALS IS REQUIRED TO BE
PREPARED/CHECKED
DEVIATION
• EXTRA/SUBSTITUTED ITEMS
• IN CASE THERE IS CHANGE/ MODIFICATION IN DRAWINGS GIVEN
BY THE CONTRACTOR AFTER THE APPROVAL BY THE ENGINEER -
IN- CHARGE DUE TO FUNCTIONAL OR SITE REQUIREMENTS THE
CONTRACTOR SHALL CARRY OUT THE CHANGES INCLUDING EXTRA
ITEMS, SUBSTITUTE ITEMS, DEVIATIONS AS PER DIRECTION OF
ENGINEER IN CHARGE FOR WHICH NOTHING EXTRA SHALL BE
PAYABLE TO THE CONTRACTOR ON ACCOUNT OF SAME, PROVIDED
THE ADDITIONAL COST OF SUCH WORK IS UP TO 1 % (ONE
PERCENT) OF THE ACCEPTED TENDERED AMOUNT AND WORKED
OUT ON MARKET RATE BASIS FOR THE VARIATION COSTING
ABOVE 1 % (ONE PERCENT).
ABOVE CLAUSE IS AS PER CPWD CONTRACT WITH THE IDEA THAT
SOME DEVIATIONS MAY BE REQUIRED DUE TO LOCAL BODY
REQUIREMENTS LATER PROJECTED OR CLIENT’S REQUIREMENTS
OR STRUCTURAL REQUIREMENTS AND THUS SOME PROVISION IS
INCLUDED
DEVIATION
• THERE MAY BE CHANCES THAT
• DRAWINGS ARE SUPPLIED BY THE ENGINEER TO THE
CONTRACTOR
• DRAWINGS ARE PREPARED AND APPROVED BY THE
ENGINEER
• DEVIATIONS WILL BE WITH RESPECT TO APPROVAL OF
DRAWINGS ACCORDED BY THE ENGINEER HENCE
DEVIATIONS WILL ALSO BE WITH RESPECT TO
DRAWINGS APPROVED EITHER SUPPLIED BY THE
ENGINEER OR THE CONTRACTOR HENCE ENGINEER
SHOULD TAKE DUE CARE BEFORE CONVEYING
APPROVAL OF THE DRAWINGS TO AVOID DEVIATIONS
DEVIATION
• NIT APPROVING AUTHORITY MAY ALSO
CHOOSE THE OPTION OF “NO DEVIATION
ALLOWED” IN THE CONTRACT
FORECLOSURE OF CONTRACT
• DUE TO ABANDONMENT OR REDUCTION IN
SCOPE OF WORK
LIFE CYCLECOST
• CLAUSE 24
• THE CONTRACTOR SHALL HAVE OBLIGATION TO
RECTIFY CONSTRUCTION DEFECTS MINIMUM UP
TO 5 (FIVE) YEARS FROM THE DATE OF
COMPLETION OF WORK. THE DEFECTS HAVE TO
BE RECTIFIED WITHIN A REASONABLE TIME NOT
EXCEEDING THREE MONTHS AFTER ISSUE OF
NOTICE BY ENGINEER- IN- CHARGE
THE CLAUSE IS MORE ABOUT THE CONSTRUCTION
DEFECT REMOVAL PERIOD RATHER THAN LIFE
CYCLE COST
ARBITRATION
• CLAUSE 25 AS PER CPWD CONTRACT
• PROVISION OF DRC WITHOUT REFERENCE TO SE/CE
• DRC WILL GIVE DECISION WITHIN 60 DAYS
EXTENDABLE BY 30 DAYS WITH CONSENT OF BOTH
THE PARTIES
• NO PARTY WILL BE REPRESENTED BY LEGAL COUNSEL
DURING DRC
• PROVISION OF ARBITRATOR FROM GOVERNMENT
ORGANISATIONS OR RETIRED.
• SOLE ARBITRATOR FOR WORKS (TENDERED COST)
COSTING UPTO 500 CR AND TRIBUNAL OF THREE
ARBITRATORS FOR WORKS ABOVE 500 CRORES.
THANK YOU

More Related Content

What's hot

Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
nipuna_bopage
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
Nam N.N Tran M.Eng, PMP
 
Why EPC
Why EPCWhy EPC
Why EPC
vivektmax
 
Gcc vs scc
Gcc vs sccGcc vs scc
Gcc vs scc
Arpita Gupta
 
claims management framework
 claims management framework claims management framework
claims management framework
Mohammad Salama,PMP,PgMP,PMI-SP,PMI-RMP, PMOC
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
Yash Patel
 
fidic , jct and nec contracts
fidic , jct and nec contractsfidic , jct and nec contracts
fidic , jct and nec contracts
EVERSENDAI ENGINEERING (L.L.C.)
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
Dr K M SONI
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
Tulsi Pokhrel
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
Jeff B
 
Contracts
ContractsContracts
Contracts
krrish706
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)
Satish Kambaliya
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering Works
Dr K M SONI
 
Liquidated damages contracts
Liquidated damages   contractsLiquidated damages   contracts
Liquidated damages contracts
Bhushan Goyal
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
Shahin MB
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
Archistudent Portal
 
Epc contractor
Epc contractorEpc contractor
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparison
helensuni
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
SOURAV4798
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
Shantanu Kumar Behera
 

What's hot (20)

Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Gcc vs scc
Gcc vs sccGcc vs scc
Gcc vs scc
 
claims management framework
 claims management framework claims management framework
claims management framework
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 
fidic , jct and nec contracts
fidic , jct and nec contractsfidic , jct and nec contracts
fidic , jct and nec contracts
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Contracts
ContractsContracts
Contracts
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering Works
 
Liquidated damages contracts
Liquidated damages   contractsLiquidated damages   contracts
Liquidated damages contracts
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Epc contractor
Epc contractorEpc contractor
Epc contractor
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparison
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 

Similar to EPC Contracts

Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and Liabilities
Primila Edward
 
Contract Management
Contract Management Contract Management
Contract Management
Dr K M SONI
 
Construction phases
Construction phasesConstruction phases
Construction phases
Meesum Zaidi
 
Contract closing ppt
Contract closing pptContract closing ppt
Management of Commer Risks in construction.pptx
Management of Commer Risks in construction.pptxManagement of Commer Risks in construction.pptx
Management of Commer Risks in construction.pptx
Vinod Nakra, FRICS
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
AkankshaPendharkar1
 
Presentation1 COMERC.pptx
Presentation1 COMERC.pptxPresentation1 COMERC.pptx
Presentation1 COMERC.pptx
tommybrook
 
Lecture series on Civil Engineering - Understanding Crucial aspects of constr...
Lecture series on Civil Engineering - Understanding Crucial aspects of constr...Lecture series on Civil Engineering - Understanding Crucial aspects of constr...
Lecture series on Civil Engineering - Understanding Crucial aspects of constr...
John Sushil Packiaraj
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
Brandon Hummel
 
Infrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppInfrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in ppp
ChhabiYadav2
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
HASMANIRA
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
HASMANIRA
 
Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
CrediconConsulting
 
FIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptFIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.ppt
DonaAlisyahSiregar
 
Playing nice with the neighbors dealing with adjoining properties during cons...
Playing nice with the neighbors dealing with adjoining properties during cons...Playing nice with the neighbors dealing with adjoining properties during cons...
Playing nice with the neighbors dealing with adjoining properties during cons...
francistoriaga
 
Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...
Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...
Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...
Ryan Slack
 
contract procedure
contract procedurecontract procedure
contract procedure
hasyimah ismail
 
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr  ias 11 construction contract presentation by MOHSIN MUMTAZCfr  ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
mianmohsinmumtazshb
 

Similar to EPC Contracts (20)

Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and Liabilities
 
Contract Management
Contract Management Contract Management
Contract Management
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Contract closing ppt
Contract closing pptContract closing ppt
Contract closing ppt
 
Management of Commer Risks in construction.pptx
Management of Commer Risks in construction.pptxManagement of Commer Risks in construction.pptx
Management of Commer Risks in construction.pptx
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
 
Presentation1 COMERC.pptx
Presentation1 COMERC.pptxPresentation1 COMERC.pptx
Presentation1 COMERC.pptx
 
Lecture series on Civil Engineering - Understanding Crucial aspects of constr...
Lecture series on Civil Engineering - Understanding Crucial aspects of constr...Lecture series on Civil Engineering - Understanding Crucial aspects of constr...
Lecture series on Civil Engineering - Understanding Crucial aspects of constr...
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
 
Infrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppInfrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in ppp
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
 
FIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptFIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.ppt
 
Playing nice with the neighbors dealing with adjoining properties during cons...
Playing nice with the neighbors dealing with adjoining properties during cons...Playing nice with the neighbors dealing with adjoining properties during cons...
Playing nice with the neighbors dealing with adjoining properties during cons...
 
Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...
Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...
Playing Nice with the Neighbors Dealing with Adjoining Properties During Cons...
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr  ias 11 construction contract presentation by MOHSIN MUMTAZCfr  ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
 

More from Dr K M SONI

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage Conservation
Dr K M SONI
 
Project Management
Project ManagementProject Management
Project Management
Dr K M SONI
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leader
Dr K M SONI
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreements
Dr K M SONI
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
Dr K M SONI
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
Dr K M SONI
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering works
Dr K M SONI
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
Dr K M SONI
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
Dr K M SONI
 
Deconstruction
DeconstructionDeconstruction
Deconstruction
Dr K M SONI
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
Dr K M SONI
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
Dr K M SONI
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
Dr K M SONI
 
Contract Management
Contract Management Contract Management
Contract Management
Dr K M SONI
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam Blocks
Dr K M SONI
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through Glass
Dr K M SONI
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
Dr K M SONI
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
Dr K M SONI
 
About me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniAbout me i.e. Dr. K M Soni
About me i.e. Dr. K M Soni
Dr K M SONI
 
Repair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage StructuresRepair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage Structures
Dr K M SONI
 

More from Dr K M SONI (20)

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage Conservation
 
Project Management
Project ManagementProject Management
Project Management
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leader
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreements
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering works
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
Deconstruction
DeconstructionDeconstruction
Deconstruction
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
 
Contract Management
Contract Management Contract Management
Contract Management
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam Blocks
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through Glass
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
 
About me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniAbout me i.e. Dr. K M Soni
About me i.e. Dr. K M Soni
 
Repair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage StructuresRepair and Maintenance of Heritage Structures
Repair and Maintenance of Heritage Structures
 

Recently uploaded

CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 

Recently uploaded (20)

CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 

EPC Contracts

  • 1. EPC CONTRACTS:A REVIEW DR K M SONI ADG(RETD.), CPWD, NEW DELHI
  • 2. EPC • E - ENGINEERING MEANS PLANNING ACTIVITIES • P - PROCUREMENT MEANS OBTAINING SOMETHING • C - CONSTRUCTION MEANS EXECUTION • THUS EPC MEANS ENGINEERING, PROCUREMENT AND CONSTRUCTION
  • 3. EPC CONTRACTOF A WORK • A WORK MAY INVOLVE MANY ACTIVITIES OR SUB HEADS • EPC MEANS ALL ACTIVITIES OF ENGINEERING, PROCUREMENT AND CONSTRUCTION OR MAY BE PART ALSO? • LET US DISCUSS
  • 4. SCOPE OF A WORK • WORK MEANS THE SCOPE OF WORK DEFINED IN A SANCTION • THIS MAY INCLUDE – CIVIL WORKS – E&M WORKS – FIRE PROTECTION & FIRE FIGHTING WORKS – SECURITY RELATED WORKS – HORTICULTURE WORKS – FURNITURE – INTERIOR & FURNISHING – EQUIPMENT – OPERATION AND MAINTENANCE
  • 5. TYPE OF CONTRACTS • ITEM RATE CONTRACT • PERCENTAGE RATE CONTRACT • EPC CONTRACT • TURN KEY CONTRACT
  • 6. ITEM RATE CONTRACT • CONTRACT IN WHICH RATES ARE QUAOTED BY THE TENDERER FOR EACH ITEM AND ACCEPTED BY OTHER PARTY ACCORDINGLY • THUS ITEMS ARE TO BE SPECIFIED BY THE BID INVITING AUTHORITY • THE BID INVITING AUTHORITY SHALL NOT MENTION HIS RATES OF THE ITEMS
  • 7. PERCENTAGE RATECONTRACT • CONTRACT IN WHICH RATES ARE QUOATED BY THE TENDERER ON PERCENTAGE BASIS, ABOVE OR BELOW OR AT PAR ON ESTIMATED RATES OF THE ITEMS MENTIONED BY OTHER PARTY • THUS ITEMS ARE TO BE SPECIFIED BY THE BID INVITING AUTHORITY IN THIS TYPE OF CONTRACT AND ADDITIONALLY ESTIMATED RATES OF ITEMS ALSO
  • 8. TURNKEY CONTRACT • MEANS CLIENT OR EMPLOYER WANTS EVERYTHING TO BE INCLUDED IN A CONTRACT AND HE TAKES OVER THE KEY AND ENTERS INTO THE BUILDING OR PREMISES • THUS CLIENT HAS TO SPECIFY BROAD REQUIREMENTS ONLY AND ENGINEERING, PROCUREMENT AND CONSTRUCTION OF ONE OR MORE PACKAGES TO BE DECIDED BY THE CONTRACTOR • IT MEANS THERE IS ONLY ONE CONTRACT BETWEEN CLIENT AND CONTRACTOR
  • 9. TURNKEY AND EPC CONTRACT • IS THERE ANY DIFFERENCE BETWEEN TURNKEY AND EPC CONTRACTS ? • YES PROBABLY
  • 10. WHAT SUBHEADS SHOULD BE INCLUDED IN EPC CONTRACT? – CIVIL WORKS – E&M WORKS – FIRE PROTECTION & FIRE FIGHTING WORKS – LANDSCAPING AND HORTICULTURE WORKS – SECURITY RELATED WORKS – FURNITURE – INTERIOR & FURNISHING – EQUIPMENT – OPERATION AND MAINTENANCE
  • 11. CASE -I • CIVIL OR E&M WORKS ALONE WHICH INCLUDES • ARCHITECTURAL SERVICES • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE AND CALL TENDER FOR ALL ABOVE HAVING ARCHITECTURAL, ENGINEERING, PROCUREMENT AND CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE EPC CONTRACT?
  • 12. CASE -II • CIVIL AND E&M WORKS WHICH INCLUDE • ARCHITECTURAL SERVICES • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE AND CALL TENDER FOR ALL ABOVE HAVING ARCHITECTURAL, ENGINEERING, PROCUREMENT AND CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE EPC CONTRACT?
  • 13. CASE -III • CIVIL, E&M WORKS AND LANDSCAPING/HORTICUTURE WHICH INCLUDE • ARCHITECTURAL SERVICES • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE AND CALL TENDER FOR ALL ABOVE HAVING ARCHITECTURAL, ENGINEERING, PROCUREMENT AND CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE EPC CONTRACT?
  • 14. CASE -IV • CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE AND FURNITURE/FURNISHING WHICH INCLUDE • ARCHITECTURAL SERVICES • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE AND CALL TENDER FOR ALL ABOVE HAVING ARCHITECTURAL, ENGINEERING, PROCUREMENT AND CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE EPC CONTRACT?
  • 15. CASE -V • CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE, FURNITURE/FURNISHING AND SECURITY MEASURES WHICH INCLUDE • ARCHITECTURAL SERVICES • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE AND CALL TENDER FOR ALL ABOVE HAVING ARCHITECTURAL, ENGINEERING, PROCUREMENT AND CONSTRUCTION ACTIVITIES OF ABOVE HEADS. WILL IT BE EPC CONTRACT?
  • 16. CASE -VI • CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE, FURNITURE/FURNISHING, SECURITY MEASURES, EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S REQUIREMENT WHICH INCLUDE • ARCHITECTURAL SERVICES • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE AND CALL TENDER FOR ALL ABOVE HAVING ARCHITECTURAL, ENGINEERING, PROCUREMENT AND CONSTRUCTION ACTIVITIES . WILL IT BE EPC CONTRACT?
  • 17. CASE -VII • CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE, FURNITURE/FURNISHING, SECURITY MEASURES, EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S REQUIREMENT WHICH INCLUDE • ARCHITECTURAL SERVICES BUT WITHOUT CONCEPTUAL PLANS • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE WILL IT BE CALLED EPC CONTRACT?
  • 18. CASE -VIII • CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE, FURNITURE/FURNISHING, SECURITY MEASURES, EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S REQUIREMENT WHICH INCLUDE • ENGINEERING SERVICES • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE BUT EXCLUDING ARCHITECTURAL DRAWINGS. WILL IT BE CALLED EPC CONTRACT?
  • 19. CASE -IX • CIVIL, E&M WORKS, LANDSCAPING/HORTICUTURE, FURNITURE/FURNISHING, SECURITY MEASURES, EQUIPMENT AND ANY OTHER ITEM AS PER CLIENT’S REQUIREMENT WHICH INCLUDE • ENGINEERING SERVICES EXCLUDING STRUCTURAL DESIGN • EXECUTION • QUALITY ASSURANCE • PROJECT MANAGEMENT • OPERATION & MAINTENANCE BUT EXCLUDING ARCHITECTURAL DRAWINGS , E&M AND STRUCTURAL DRAWINGS. WILL IT BE CALLED EPC CONTRACT?
  • 20. EPC • THUS EPC CONTRACTS IS A CONTRACT FOR PART OF A WORK OR COMPLETE WORK IN WHICH ENGINEERING, PROCUREMENT AND CONSTRUCTION ARE INCLUDED • IF EPC IS FOR COMPLETE WORK AND INCLUDES ALL ITEMS OF E, P AND C, IT BECOMES TURNKEY CONTRACT • HOWEVER EPC MAY BE FOR PART OF WORK • AND EPC MAY BE FOR E, P AND C WITHOUT ARCHITECTURAL AND PART OF ENGINEERING SERVICES ALSO.
  • 21. AND CONTRACT • A CONTRACT IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES CREATING A LEGAL OBLIGATION FOR BOTH OF THEM TO PERFORM SPECIFIC ACTS. EACH PARTY IS LEGALLY BOUND TO PERFORM THE SPECIFIED DUTIES SUCH AS RENDERING A PAYMENT OR DELIVERING GOODS. • IN ORDER FOR THE CONTRACT TO BE ENFORCEABLE, EACH PARTY MUST EXCHANGE SOMETHING OF VALUE (CALLED “CONSIDERATION”). • THEY MAY BE EITHER ORAL OR WRITTEN, THOUGH COURTS PREFER THAT AGREEMENTS BE PUT IN WRITING.
  • 22. REQUIREMENTS OFA VALID CONTRACT • MUTUAL ASSENT: EACH PARTY MUST HAVE A SHARED UNDERSTANDING REGARDING WHAT THE SUBJECT MATTER OF THE CONTRACT IS. FOR EXAMPLE, WORK MEANS PROJECT AND NOT A SERVICE OF BRINGING SOMETHING FROM SOME WHERE. • OFFER AND ACCEPTANCE: ONE PARTY MUST MAKE AN OFFER BY CLEARLY COMMUNICATING THEIR INTENT TO BE BOUND IN A CONTRACT. LIKEWISE, THE OTHER PARTY MUST RENDER THEIR ACCEPTANCE IN UNAMBIGUOUS TERMS. • CONSIDERATION: THIS WHERE BOTH PARTIES MUTUALLY EXCHANGE SOMETHING OF VALUE IN ORDER TO MAKE THE AGREEMENT BINDING. • AN EPC CONTRACT SHOULD ALSO CONFORM TO REQUIREMENTS OF A CONTRACT AS PER THE CONTRACT ACT
  • 23. UNDERSTANDING • UNDERSTANDING MEANS THE TERMS AND CONDITIONS ARE TO BE CEARLY SPELLED OUT • THESE ARE INCLUDED IN GENERAL CONDITIONS OF CONTRACT, SPECIAL CONDITIONS OR ANY OTHER CONDITIONS MADE PART OF TENDER DOCUMENT HENCE THERE MUST BE CLEAR UNDERSTANDING OF SCOPE OF WORK IN EPC CONTRACT ALSO • LET US DISCUSS SOME OF THE CONTRACT CONDITIONS
  • 24. SECURITIES • PERFORMANCE SECURITY/GUARANTEE FOR PERFORMANCE OF CONTRACT • SECURITY DEPOSIT FOR ADJUSTMENT ON ACCOUNT OF SUMS PAYABLE BY THE CONTRACTOR • THIS IS SIMILAR TO OTHER CONTRACTS
  • 25. TIME AND DELAY • COMPENSATION FOR DELAY – WITH MAXIMUM RATE @ 1% (ONE PERCENT) PER MONTH OF DELAY TO BE COMPUTED ON PER DAY BASIS BASED ON QUANTUM OF DAMAGE SUFFERED DUE TO STATED DELAY ON THE PART OF CONTRACTOR • INCENTIVES FOR EARLY COMPLETION – IN CASE, THE CONTRACTOR COMPLETES THE WORK AHEAD OF STIPULATED DATE OF COMPLETION OR JUSTIFIED EXTENDED DATE OF COMPLETION, A BONUS @ 0.5 % (ZERO POINT FIVE PER CENT) OF THE TENDERED VALUE PER MONTH COMPUTED ON PER DAY BASIS, SHALL BE PAYABLE TO THE CONTRACTOR, SUBJECT TO A MAXIMUM LIMIT OF 2 % (TWO PERCENT) OF THE TENDERED VALUE. THIS IS SIMILAR TO OTHER CONTRACTS. ABOVE CRITERION MAY CHANGE FROM ORGANISATION TO ORGANISATION. ABOVE CRITERION IS OF CPWD
  • 26. DETERMINATION OF CONTRACT • DEFECTIVE WORK • SUSPENSION OF WORK • DELAY • NEGLIGENCE OF OBLIGATIONS • INVOLVED IN CORRUPTION • PAYING COMMISSION • OBTAINED CONTRACT WITH MALPRACTICES • BECOMES INSOLVENT • SUBLETS THE WORK ABOVE CRITERION IS FROM CPWD, APPLICABLE TO ALL TYPES OF CONTRACTS
  • 27. CLAUSE 3 A • IN CASE, THE WORK CANNOT BE STARTED DUE TO REASONS NOT WITHIN THE CONTROL OF THE CONTRACTOR WITHIN 1/8TH OF THE STIPULATED TIME FOR COMPLETION OF WORK OR ONE MONTH WHICHEVER IS HIGHER, EITHER PARTY MAY CLOSE THE CONTRACT BY GIVING NOTICE TO THE OTHER PARTY STATING THE REASONS. • ABOVE CRITERION IS FROM CPWD, APPLICABLE TO ALL TYPES OF CONTRACTS
  • 28. OTHERMAIN CLAUSES • SECURED ADVANCE • MOBILIZATION ADVANCE • T & P ADVANCE • WAGE INCREASES DUE TO STATUTORY ORDERS • PRICE INCREASE ON MATERIALS SPECIFIED • ESCALATION CLAUSE • DEVIATIONS
  • 29. SECURED ADVANCE • SECURED ADVANCE MAY BE INCLUDED IN EPC CONTRCATS OR MAY NOT BE • IN CPWD EPC CONTRACTS, IT IS INCLUDED • IT HELPS IN MOBILISING RESOURCES AND DOES NOT BLOCK MONEY FOR LONG TIME HENCE IS IN FAVOUR OF WORK • SINCE RATES OF ITEMS ARE NOT AVAILABLE IN CONTRACT, ENGINEER IN CHARGE HAS TO ASSESS THE MARKET RATES AND REQUIEMENTS OF MATERIALS ON WHICH SECURED ADVANCE IS GIVEN CAREFULLY
  • 30. MOBILISATIONANDT&P ADVANCE • MOBILIZATION AND T&P ADVANCE ALSO HELP THE AGENCY TO ACCELERATE THE PROGRESS HENCE IN FAVOUR OF WORK
  • 31. WAGE INCREASE DUE TOSTATUTORY ORDERS • THIS IS REQUIRED TO BE PAID AS PER APPLICABLAWS HENCE NEEDS TO BE INCORPORATED IN EPC CONTRACTS ELSE PROVISION HAS TO BE MADE AND CONTRACTOR HAS TO PABSORB THE RISK AND PAY IF THERE IS AN INCREASE • THIS CLAUSE CAN ALSO BE AS REIMBURSEMENT ON ACTUAL BASIS • CPWD CONTRACT CLAUSE IS KNOWN AS CLAUSE 10C
  • 32. ESCALATIONCLAUSES • CPWD CONTRACT DOCUMENT HAS THREE SUB CLAUSES IN ESCALATION CLAUSE (CLAUSE 10) • CLUSE 10C: WAGE INCREASE DUE TO STATUTORY INCREASE • CLAUSE 10CA: FOR CERTAIN COSTLY ITEMS LIKE CEMENT, STEEL • CLAUSE 10CC: ESCALATION ON LABOUR AND OTHER MATERIALS EXCEPT COVERED UNDER CLAUSE 10CA IT IS UPTO NIT APPROVING AUTHORITY TO INCLUDE CLAUSE 10CA AND 10CC IN CASE, ESCALATION CLAUSE IS INCLUDED, THEORETICAL CHECK (QUANTITY) OF MATERIALS IS REQUIRED TO BE PREPARED/CHECKED
  • 33. DEVIATION • EXTRA/SUBSTITUTED ITEMS • IN CASE THERE IS CHANGE/ MODIFICATION IN DRAWINGS GIVEN BY THE CONTRACTOR AFTER THE APPROVAL BY THE ENGINEER - IN- CHARGE DUE TO FUNCTIONAL OR SITE REQUIREMENTS THE CONTRACTOR SHALL CARRY OUT THE CHANGES INCLUDING EXTRA ITEMS, SUBSTITUTE ITEMS, DEVIATIONS AS PER DIRECTION OF ENGINEER IN CHARGE FOR WHICH NOTHING EXTRA SHALL BE PAYABLE TO THE CONTRACTOR ON ACCOUNT OF SAME, PROVIDED THE ADDITIONAL COST OF SUCH WORK IS UP TO 1 % (ONE PERCENT) OF THE ACCEPTED TENDERED AMOUNT AND WORKED OUT ON MARKET RATE BASIS FOR THE VARIATION COSTING ABOVE 1 % (ONE PERCENT). ABOVE CLAUSE IS AS PER CPWD CONTRACT WITH THE IDEA THAT SOME DEVIATIONS MAY BE REQUIRED DUE TO LOCAL BODY REQUIREMENTS LATER PROJECTED OR CLIENT’S REQUIREMENTS OR STRUCTURAL REQUIREMENTS AND THUS SOME PROVISION IS INCLUDED
  • 34. DEVIATION • THERE MAY BE CHANCES THAT • DRAWINGS ARE SUPPLIED BY THE ENGINEER TO THE CONTRACTOR • DRAWINGS ARE PREPARED AND APPROVED BY THE ENGINEER • DEVIATIONS WILL BE WITH RESPECT TO APPROVAL OF DRAWINGS ACCORDED BY THE ENGINEER HENCE DEVIATIONS WILL ALSO BE WITH RESPECT TO DRAWINGS APPROVED EITHER SUPPLIED BY THE ENGINEER OR THE CONTRACTOR HENCE ENGINEER SHOULD TAKE DUE CARE BEFORE CONVEYING APPROVAL OF THE DRAWINGS TO AVOID DEVIATIONS
  • 35. DEVIATION • NIT APPROVING AUTHORITY MAY ALSO CHOOSE THE OPTION OF “NO DEVIATION ALLOWED” IN THE CONTRACT
  • 36. FORECLOSURE OF CONTRACT • DUE TO ABANDONMENT OR REDUCTION IN SCOPE OF WORK
  • 37. LIFE CYCLECOST • CLAUSE 24 • THE CONTRACTOR SHALL HAVE OBLIGATION TO RECTIFY CONSTRUCTION DEFECTS MINIMUM UP TO 5 (FIVE) YEARS FROM THE DATE OF COMPLETION OF WORK. THE DEFECTS HAVE TO BE RECTIFIED WITHIN A REASONABLE TIME NOT EXCEEDING THREE MONTHS AFTER ISSUE OF NOTICE BY ENGINEER- IN- CHARGE THE CLAUSE IS MORE ABOUT THE CONSTRUCTION DEFECT REMOVAL PERIOD RATHER THAN LIFE CYCLE COST
  • 38. ARBITRATION • CLAUSE 25 AS PER CPWD CONTRACT • PROVISION OF DRC WITHOUT REFERENCE TO SE/CE • DRC WILL GIVE DECISION WITHIN 60 DAYS EXTENDABLE BY 30 DAYS WITH CONSENT OF BOTH THE PARTIES • NO PARTY WILL BE REPRESENTED BY LEGAL COUNSEL DURING DRC • PROVISION OF ARBITRATOR FROM GOVERNMENT ORGANISATIONS OR RETIRED. • SOLE ARBITRATOR FOR WORKS (TENDERED COST) COSTING UPTO 500 CR AND TRIBUNAL OF THREE ARBITRATORS FOR WORKS ABOVE 500 CRORES.