SlideShare a Scribd company logo
Dear building Owner, or Operator,
Are you interested in …
Benefits of Systems Commissioning
Are you interested in Energy savings?
• You may operate a big or medium building and
try to save energy, knowing the most energy
inefficient equipment and think to start
retrofit.
• You may plan to start with an Energy Audit.
• You may never heard about Commissioning at
all.
• Ask Commissioning procedures from your
Consultant.
Are you interested in Indoor air
quality?
• You, may have problems in your Office or
Facility or Laboratory.
• You, may try to measure parameters and
discover why the quality of indoor air is not
acceptable.
• You, may plan your next project with strict IAQ
requirements.
• Ask Commissioning procedures from your
Consultant.
Are you interested in LEED
certification?
• You know, may be, already about
Fundamental and Enhanced Commissioning.
• You have, may be, the experience of a recent
project or a scheduled one.
• You, may be, interested in a prestigious
certification (Gold or Platinum) for your next
project.
• You may plan to upgrade your certificate.
Are you interested in Post Occupancy
Evaluation?
• You may operate a brand new building but you
face your first problems from occupants.
• You may have not finished yet the HVAC
seasonal tests.
• You may search for a protocol on P.O.E
• You may face deterioration of systems
performance during the first 3-years.
Are you interested in Facilities
Management?
• You may think to lower OPEX with a facilities
management contract (parts and labor).
• You may desire to outsource non critical
operations.
• You may desire to consolidate different
suppliers to a single FM provider in order to fix
the budget for years.
Are you interested in Internet of
Things?
• You may wish to gain from Innovation and
new technology inside your corporation.
• You want to re-engineer the whole
communication process of people, equipment
and systems.
• You may want instant automation and wide
use of open protocols available in the market.
Are you interested in High performing
buildings?
• You may have targeted on a high performance
score for your facilities.
• You may keep a benchmarking classification
for all your processes (staff) and systems
(equipment).
• You may score all sustainable issues: Energy –
Water – Internal Environment – Occupant
satisfation.
Are you interested in Energy savings
Performance Contracting?
• Your organization, may keep a portfolio with
many existing building stock.
• You may have restrictions in you CAPEX
budget and have a limited cash flow.
• You may think to initiate on a ESPC contract.
• You may plan to monitor the performance of
the ESPC contract.
Are you interested in Operating
Expenses (OPEX) savings?
• You may consider that it is possible to lower
the operating expenses as a whole: staff –
energy – water – maintenance – repair – spare
parts and space.
• You consider the impact of lower OPEX on
higher profit margin.
• You may want to evaluate different Operation
& Maintenance scenarios.
Are you interested in ISO 50001 for
your organization?
• You may follow the new trend of leading
Corporations.
• You may want to satisfy your environmentally
conscious customers, shareholders and
stakeholders.
• You may want to standardize and certify your
Energy Management System inside your
organization.

More Related Content

What's hot

2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation
msnelling
 
Energy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysEnergy Innovators Powerpoint Tmays
Energy Innovators Powerpoint Tmays
Tmays
 
Energy Efficiency Consulting
Energy Efficiency ConsultingEnergy Efficiency Consulting
Energy Efficiency Consulting
Mexico Energy Partners
 
Estimation in the Tendering Process - Frank Vogelezang
Estimation in the Tendering Process - Frank VogelezangEstimation in the Tendering Process - Frank Vogelezang
Estimation in the Tendering Process - Frank Vogelezang
Nesma
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
Tom Mikols
 
DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015
Dustin Nordell
 
Plant Design Engineering Services
Plant Design Engineering ServicesPlant Design Engineering Services
Plant Design Engineering Services
Enventure
 
Getting things made
Getting things madeGetting things made
resume open 2015
resume open 2015resume open 2015
resume open 2015
Robert Wolfe
 
The Golden Circle (Why, How, What P.P.R.).
The Golden Circle (Why, How, What P.P.R.).The Golden Circle (Why, How, What P.P.R.).
The Golden Circle (Why, How, What P.P.R.).
Matthew Macdonald
 
arghadip
arghadiparghadip
arghadip
ARGHADIP PODDAR
 
Resume
ResumeResume
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
David Lawrence
 
Badrinath_Dash
Badrinath_DashBadrinath_Dash
Badrinath_Dash
Badrinath Dash
 
Matthew Egan End of Assignment Presentation 2nd Rotation
Matthew Egan End of Assignment Presentation 2nd RotationMatthew Egan End of Assignment Presentation 2nd Rotation
Matthew Egan End of Assignment Presentation 2nd Rotation
Matthew Egan
 
Same Jetc May 6 2010
Same Jetc May 6 2010Same Jetc May 6 2010
Same Jetc May 6 2010
GPlattenburg
 
Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...
Genpact Ltd
 
Brenda_Johnson 2-2015
Brenda_Johnson 2-2015Brenda_Johnson 2-2015
Brenda_Johnson 2-2015
Brenda Johnson
 
Aia presentation getting the most out of your roof asset 099 pm
Aia presentation getting the most out of your roof asset 099 pmAia presentation getting the most out of your roof asset 099 pm
Aia presentation getting the most out of your roof asset 099 pm
Florida Public Works Expo - 2016 - Tampa, Florida
 
CDEC Mining
CDEC MiningCDEC Mining
CDEC Mining
Julia Fawkes
 

What's hot (20)

2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation
 
Energy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysEnergy Innovators Powerpoint Tmays
Energy Innovators Powerpoint Tmays
 
Energy Efficiency Consulting
Energy Efficiency ConsultingEnergy Efficiency Consulting
Energy Efficiency Consulting
 
Estimation in the Tendering Process - Frank Vogelezang
Estimation in the Tendering Process - Frank VogelezangEstimation in the Tendering Process - Frank Vogelezang
Estimation in the Tendering Process - Frank Vogelezang
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015
 
Plant Design Engineering Services
Plant Design Engineering ServicesPlant Design Engineering Services
Plant Design Engineering Services
 
Getting things made
Getting things madeGetting things made
Getting things made
 
resume open 2015
resume open 2015resume open 2015
resume open 2015
 
The Golden Circle (Why, How, What P.P.R.).
The Golden Circle (Why, How, What P.P.R.).The Golden Circle (Why, How, What P.P.R.).
The Golden Circle (Why, How, What P.P.R.).
 
arghadip
arghadiparghadip
arghadip
 
Resume
ResumeResume
Resume
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Badrinath_Dash
Badrinath_DashBadrinath_Dash
Badrinath_Dash
 
Matthew Egan End of Assignment Presentation 2nd Rotation
Matthew Egan End of Assignment Presentation 2nd RotationMatthew Egan End of Assignment Presentation 2nd Rotation
Matthew Egan End of Assignment Presentation 2nd Rotation
 
Same Jetc May 6 2010
Same Jetc May 6 2010Same Jetc May 6 2010
Same Jetc May 6 2010
 
Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...
 
Brenda_Johnson 2-2015
Brenda_Johnson 2-2015Brenda_Johnson 2-2015
Brenda_Johnson 2-2015
 
Aia presentation getting the most out of your roof asset 099 pm
Aia presentation getting the most out of your roof asset 099 pmAia presentation getting the most out of your roof asset 099 pm
Aia presentation getting the most out of your roof asset 099 pm
 
CDEC Mining
CDEC MiningCDEC Mining
CDEC Mining
 

Similar to Chazapis Commissioning: are you interested in?

2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)
MICHAEL MORGAN
 
WillCV2016
WillCV2016WillCV2016
WillCV2016
William Hunt
 
Cli Grp
Cli GrpCli Grp
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
SustainableEnergyAut
 
Existing Buildings: Energy Efficiency
Existing Buildings: Energy EfficiencyExisting Buildings: Energy Efficiency
Existing Buildings: Energy Efficiency
jwalleisa
 
D4EnergySolutions Presentation
D4EnergySolutions PresentationD4EnergySolutions Presentation
D4EnergySolutions Presentation
Eric Doak PE
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
Jermaine Brown
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
Evan Lewis
 
Marwan Presentation 1
Marwan Presentation 1Marwan Presentation 1
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
AVEVA Group plc
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
Pramod Patil
 
LinkedIn
LinkedInLinkedIn
LinkedIn
Bret Stauffer
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Engineering Technician Job Specification
Engineering Technician Job SpecificationEngineering Technician Job Specification
Engineering Technician Job Specification
Richard Gregory
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
Keya Bhattacharyya
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
Schneider Electric
 
Essentialsof Project Management
Essentialsof Project ManagementEssentialsof Project Management
Essentialsof Project Management
masilamani ramasamy
 
Ajay Kumar Resume
Ajay Kumar ResumeAjay Kumar Resume
D4 energysolutions presentation
D4 energysolutions presentationD4 energysolutions presentation
D4 energysolutions presentation
Eric Doak PE
 
Finding the ROI in Your Quality System
Finding the ROI in Your Quality SystemFinding the ROI in Your Quality System
Finding the ROI in Your Quality System
Northwest Analytics
 

Similar to Chazapis Commissioning: are you interested in? (20)

2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)
 
WillCV2016
WillCV2016WillCV2016
WillCV2016
 
Cli Grp
Cli GrpCli Grp
Cli Grp
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 
Existing Buildings: Energy Efficiency
Existing Buildings: Energy EfficiencyExisting Buildings: Energy Efficiency
Existing Buildings: Energy Efficiency
 
D4EnergySolutions Presentation
D4EnergySolutions PresentationD4EnergySolutions Presentation
D4EnergySolutions Presentation
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
Marwan Presentation 1
Marwan Presentation 1Marwan Presentation 1
Marwan Presentation 1
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Engineering Technician Job Specification
Engineering Technician Job SpecificationEngineering Technician Job Specification
Engineering Technician Job Specification
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Essentialsof Project Management
Essentialsof Project ManagementEssentialsof Project Management
Essentialsof Project Management
 
Ajay Kumar Resume
Ajay Kumar ResumeAjay Kumar Resume
Ajay Kumar Resume
 
D4 energysolutions presentation
D4 energysolutions presentationD4 energysolutions presentation
D4 energysolutions presentation
 
Finding the ROI in Your Quality System
Finding the ROI in Your Quality SystemFinding the ROI in Your Quality System
Finding the ROI in Your Quality System
 

More from Nicholas Chazapis

Chazapis the automated bldg
Chazapis the automated bldgChazapis the automated bldg
Chazapis the automated bldg
Nicholas Chazapis
 
Systems trg syllabus
Systems trg syllabusSystems trg syllabus
Systems trg syllabus
Nicholas Chazapis
 
Predictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCUPredictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCU
Nicholas Chazapis
 
Chazapis cx management
Chazapis cx managementChazapis cx management
Chazapis cx management
Nicholas Chazapis
 
HVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiencyHVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiency
Nicholas Chazapis
 
17.11.2016 fm design chazapis presentation
17.11.2016 fm design chazapis presentation17.11.2016 fm design chazapis presentation
17.11.2016 fm design chazapis presentation
Nicholas Chazapis
 
Chazapis cx for better buildings rev2
Chazapis cx for better buildings   rev2Chazapis cx for better buildings   rev2
Chazapis cx for better buildings rev2
Nicholas Chazapis
 
2016 chazapis energy - efficiency - comfort - iso 50001
2016 chazapis   energy - efficiency - comfort - iso 500012016 chazapis   energy - efficiency - comfort - iso 50001
2016 chazapis energy - efficiency - comfort - iso 50001
Nicholas Chazapis
 
Chazapis cx for better buildings rev
Chazapis cx for better buildings   revChazapis cx for better buildings   rev
Chazapis cx for better buildings rev
Nicholas Chazapis
 
Chazapis cx for better buildings
Chazapis cx for better buildingsChazapis cx for better buildings
Chazapis cx for better buildings
Nicholas Chazapis
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
Nicholas Chazapis
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
Nicholas Chazapis
 
Chazapis pm basics
Chazapis pm basicsChazapis pm basics
Chazapis pm basics
Nicholas Chazapis
 
Cx a activities flow diagram en
Cx a activities flow diagram enCx a activities flow diagram en
Cx a activities flow diagram en
Nicholas Chazapis
 
BMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSEBMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSE
Nicholas Chazapis
 
EMPATHY IN PROJECT MANAGEMENT EL V20100915
EMPATHY IN PROJECT MANAGEMENT EL   V20100915EMPATHY IN PROJECT MANAGEMENT EL   V20100915
EMPATHY IN PROJECT MANAGEMENT EL V20100915
Nicholas Chazapis
 
Chazapis elot en 15232 the impact of bacs - preso
Chazapis   elot en 15232 the impact of bacs - presoChazapis   elot en 15232 the impact of bacs - preso
Chazapis elot en 15232 the impact of bacs - preso
Nicholas Chazapis
 
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOLChazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Nicholas Chazapis
 
Commissioning for energy saving nha
Commissioning for energy saving nhaCommissioning for energy saving nha
Commissioning for energy saving nha
Nicholas Chazapis
 

More from Nicholas Chazapis (19)

Chazapis the automated bldg
Chazapis the automated bldgChazapis the automated bldg
Chazapis the automated bldg
 
Systems trg syllabus
Systems trg syllabusSystems trg syllabus
Systems trg syllabus
 
Predictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCUPredictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCU
 
Chazapis cx management
Chazapis cx managementChazapis cx management
Chazapis cx management
 
HVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiencyHVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiency
 
17.11.2016 fm design chazapis presentation
17.11.2016 fm design chazapis presentation17.11.2016 fm design chazapis presentation
17.11.2016 fm design chazapis presentation
 
Chazapis cx for better buildings rev2
Chazapis cx for better buildings   rev2Chazapis cx for better buildings   rev2
Chazapis cx for better buildings rev2
 
2016 chazapis energy - efficiency - comfort - iso 50001
2016 chazapis   energy - efficiency - comfort - iso 500012016 chazapis   energy - efficiency - comfort - iso 50001
2016 chazapis energy - efficiency - comfort - iso 50001
 
Chazapis cx for better buildings rev
Chazapis cx for better buildings   revChazapis cx for better buildings   rev
Chazapis cx for better buildings rev
 
Chazapis cx for better buildings
Chazapis cx for better buildingsChazapis cx for better buildings
Chazapis cx for better buildings
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
 
Chazapis pm basics
Chazapis pm basicsChazapis pm basics
Chazapis pm basics
 
Cx a activities flow diagram en
Cx a activities flow diagram enCx a activities flow diagram en
Cx a activities flow diagram en
 
BMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSEBMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSE
 
EMPATHY IN PROJECT MANAGEMENT EL V20100915
EMPATHY IN PROJECT MANAGEMENT EL   V20100915EMPATHY IN PROJECT MANAGEMENT EL   V20100915
EMPATHY IN PROJECT MANAGEMENT EL V20100915
 
Chazapis elot en 15232 the impact of bacs - preso
Chazapis   elot en 15232 the impact of bacs - presoChazapis   elot en 15232 the impact of bacs - preso
Chazapis elot en 15232 the impact of bacs - preso
 
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOLChazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
 
Commissioning for energy saving nha
Commissioning for energy saving nhaCommissioning for energy saving nha
Commissioning for energy saving nha
 

Recently uploaded

Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
Global Landscapes Forum (GLF)
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
ballkicker20
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
Open Access Research Paper
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
sairaanwer024
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
tiwarimanvi3129
 
DENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EISDENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EIS
MarlonJayBayag
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
Global Landscapes Forum (GLF)
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 

Recently uploaded (20)

Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
 
DENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EISDENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EIS
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 

Chazapis Commissioning: are you interested in?

  • 1. Dear building Owner, or Operator, Are you interested in … Benefits of Systems Commissioning
  • 2. Are you interested in Energy savings? • You may operate a big or medium building and try to save energy, knowing the most energy inefficient equipment and think to start retrofit. • You may plan to start with an Energy Audit. • You may never heard about Commissioning at all. • Ask Commissioning procedures from your Consultant.
  • 3. Are you interested in Indoor air quality? • You, may have problems in your Office or Facility or Laboratory. • You, may try to measure parameters and discover why the quality of indoor air is not acceptable. • You, may plan your next project with strict IAQ requirements. • Ask Commissioning procedures from your Consultant.
  • 4. Are you interested in LEED certification? • You know, may be, already about Fundamental and Enhanced Commissioning. • You have, may be, the experience of a recent project or a scheduled one. • You, may be, interested in a prestigious certification (Gold or Platinum) for your next project. • You may plan to upgrade your certificate.
  • 5. Are you interested in Post Occupancy Evaluation? • You may operate a brand new building but you face your first problems from occupants. • You may have not finished yet the HVAC seasonal tests. • You may search for a protocol on P.O.E • You may face deterioration of systems performance during the first 3-years.
  • 6. Are you interested in Facilities Management? • You may think to lower OPEX with a facilities management contract (parts and labor). • You may desire to outsource non critical operations. • You may desire to consolidate different suppliers to a single FM provider in order to fix the budget for years.
  • 7. Are you interested in Internet of Things? • You may wish to gain from Innovation and new technology inside your corporation. • You want to re-engineer the whole communication process of people, equipment and systems. • You may want instant automation and wide use of open protocols available in the market.
  • 8. Are you interested in High performing buildings? • You may have targeted on a high performance score for your facilities. • You may keep a benchmarking classification for all your processes (staff) and systems (equipment). • You may score all sustainable issues: Energy – Water – Internal Environment – Occupant satisfation.
  • 9. Are you interested in Energy savings Performance Contracting? • Your organization, may keep a portfolio with many existing building stock. • You may have restrictions in you CAPEX budget and have a limited cash flow. • You may think to initiate on a ESPC contract. • You may plan to monitor the performance of the ESPC contract.
  • 10. Are you interested in Operating Expenses (OPEX) savings? • You may consider that it is possible to lower the operating expenses as a whole: staff – energy – water – maintenance – repair – spare parts and space. • You consider the impact of lower OPEX on higher profit margin. • You may want to evaluate different Operation & Maintenance scenarios.
  • 11. Are you interested in ISO 50001 for your organization? • You may follow the new trend of leading Corporations. • You may want to satisfy your environmentally conscious customers, shareholders and stakeholders. • You may want to standardize and certify your Energy Management System inside your organization.