SlideShare a Scribd company logo
1 of 1
Download to read offline
Why? – Purpose
We believe that every building owner should benefit from reliable, efficient equipment that
produces an environment suitable for generating peak productivity from their staff while protecting
their investment in the facility.
As a long standing service provider we know we can help companies make more informed decisions
bringing them peace of mind and reduced costs by moving away from unpredictable expenses and
towards accurate, forecasted budgets.
Our asset integrity program is designed to fulfil both regulatory requirements while also ensuring
equipment reliability, low maintenance costs, reduced owning and operating expenses and lifecycle
planning.
How? – Process
We analyze facilities equipment and the cost centers associated with heating, ventilating and air
conditioning based on the assets remaining life, condition and runtime. This process helps assist owners
and operators in aligning their budgets with national averages.
This is done though a consultative process in which building owners and CAON Services
representatives work together in determining the best service level agreement for their building.
Determining the equipment’s remaining useful life, annualized replacement asset value (R.A.V.), and
cost center expenditures help owners to set proactive budgets. This allows for more strategic and
effective cost controls.
What? – Result
Our mission is to help owners and managers make more informed decisions when it comes to
protecting their mechanical assets as a way to reduce the buildings owning and operating expenses.
This consultative process will result in:
 Reduced current and future risk (Controlled capital costs and decreasing financial cost centers)
 Extended asset lifecycle (Equipment’s remaining useful life can be extended by 50%)
 Less emergency calls (A 50-65% reduction in the rate of emergency work)
 Less unexpected breakdowns (Up to a 16% reduction in corrective work over a 5 year period)
 Less major repairs (Reactive, unexpected repairs cost 3-4 times more than planned maintenance)
 A way for your assets to communicate their current health to you (Tracking, reporting, and
tasking)
 Reduced owning & operating costs associated with the facility such as energy consumption (A 5-
30% reduction in energy wastage can be realized)

More Related Content

What's hot

PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)
Akshay Tilak
 
Maintenance Costs Reduction Strategy Presentation
Maintenance Costs  Reduction Strategy PresentationMaintenance Costs  Reduction Strategy Presentation
Maintenance Costs Reduction Strategy Presentation
weshumba
 
AQC Business Overview 2015
AQC Business Overview 2015AQC Business Overview 2015
AQC Business Overview 2015
Bill Griffin
 

What's hot (20)

Solar power plant management by OutSmart
Solar power plant management by OutSmartSolar power plant management by OutSmart
Solar power plant management by OutSmart
 
PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)
 
Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?
 
On the job with an instrumentation technician
On the job with an instrumentation technicianOn the job with an instrumentation technician
On the job with an instrumentation technician
 
Refrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ CroydonRefrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ Croydon
 
Stephen Gill Iosh
Stephen Gill IoshStephen Gill Iosh
Stephen Gill Iosh
 
Air Conditioning Inspections For Buildings Talk
Air Conditioning Inspections For Buildings  TalkAir Conditioning Inspections For Buildings  Talk
Air Conditioning Inspections For Buildings Talk
 
Maintenance Costs Reduction Strategy Presentation
Maintenance Costs  Reduction Strategy PresentationMaintenance Costs  Reduction Strategy Presentation
Maintenance Costs Reduction Strategy Presentation
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
 
Air Conditioning Inspections For Buildings Cibse Belfast
Air Conditioning Inspections For Buildings  Cibse BelfastAir Conditioning Inspections For Buildings  Cibse Belfast
Air Conditioning Inspections For Buildings Cibse Belfast
 
MSD Swords Role
MSD Swords RoleMSD Swords Role
MSD Swords Role
 
Asset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines rAsset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines r
 
MxMax Productivity Intro
MxMax Productivity IntroMxMax Productivity Intro
MxMax Productivity Intro
 
Order of Magnitude Estimator for Public Hospitals
Order of Magnitude Estimator for Public HospitalsOrder of Magnitude Estimator for Public Hospitals
Order of Magnitude Estimator for Public Hospitals
 
Solufy MaxTalk FMMUG 2018
Solufy MaxTalk FMMUG 2018Solufy MaxTalk FMMUG 2018
Solufy MaxTalk FMMUG 2018
 
Actionable information 2
Actionable information 2Actionable information 2
Actionable information 2
 
Job titl1
Job titl1Job titl1
Job titl1
 
Actionable information 1
Actionable information 1Actionable information 1
Actionable information 1
 
CXG Commercial
CXG CommercialCXG Commercial
CXG Commercial
 
AQC Business Overview 2015
AQC Business Overview 2015AQC Business Overview 2015
AQC Business Overview 2015
 

Similar to The Golden Circle (Why, How, What P.P.R.).

Value oriented Maintenance - Improvement of O.E.E. and cost efficiency
Value oriented Maintenance - Improvement of O.E.E. and cost efficiency Value oriented Maintenance - Improvement of O.E.E. and cost efficiency
Value oriented Maintenance - Improvement of O.E.E. and cost efficiency
ConMoto Consulting Group
 
pub057-031-00_0715
pub057-031-00_0715pub057-031-00_0715
pub057-031-00_0715
Regan Bull
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
sheryl90
 

Similar to The Golden Circle (Why, How, What P.P.R.). (20)

Concierge_Brochure_r9_LoREZ
Concierge_Brochure_r9_LoREZConcierge_Brochure_r9_LoREZ
Concierge_Brochure_r9_LoREZ
 
Operation & Maintenance
Operation & MaintenanceOperation & Maintenance
Operation & Maintenance
 
7 KIPs to Measure in Facility Management
7 KIPs to Measure in Facility Management7 KIPs to Measure in Facility Management
7 KIPs to Measure in Facility Management
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
Switch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergySwitch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergy
 
Value oriented Maintenance - Improvement of O.E.E. and cost efficiency
Value oriented Maintenance - Improvement of O.E.E. and cost efficiency Value oriented Maintenance - Improvement of O.E.E. and cost efficiency
Value oriented Maintenance - Improvement of O.E.E. and cost efficiency
 
PAM Case Study 2 Revenue Protection V1
PAM Case Study 2 Revenue Protection V1PAM Case Study 2 Revenue Protection V1
PAM Case Study 2 Revenue Protection V1
 
pub057-031-00_0715
pub057-031-00_0715pub057-031-00_0715
pub057-031-00_0715
 
The renewed Importance of an Infrastructure Strategy
The renewed Importance of an Infrastructure StrategyThe renewed Importance of an Infrastructure Strategy
The renewed Importance of an Infrastructure Strategy
 
post
postpost
post
 
The renewed Importance of an Infrastructure Strategy
The renewed Importance of an Infrastructure StrategyThe renewed Importance of an Infrastructure Strategy
The renewed Importance of an Infrastructure Strategy
 
Life Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation ReportLife Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation Report
 
Mexico Energy Partners, Kijana Mack, Director
Mexico Energy Partners, Kijana Mack, DirectorMexico Energy Partners, Kijana Mack, Director
Mexico Energy Partners, Kijana Mack, Director
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance
 
The renewed Importance of an Infrastructure Strategy
The renewed Importance of an Infrastructure StrategyThe renewed Importance of an Infrastructure Strategy
The renewed Importance of an Infrastructure Strategy
 
PAM Case Study 1 - Predictive Maintenance V1
PAM Case Study 1 - Predictive Maintenance V1PAM Case Study 1 - Predictive Maintenance V1
PAM Case Study 1 - Predictive Maintenance V1
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
Operating a next generation utility driving performance through enterprise as...
Operating a next generation utility driving performance through enterprise as...Operating a next generation utility driving performance through enterprise as...
Operating a next generation utility driving performance through enterprise as...
 
Unveiling Efficiency Benefits of Facility Management Services.pdf
Unveiling Efficiency Benefits of Facility Management Services.pdfUnveiling Efficiency Benefits of Facility Management Services.pdf
Unveiling Efficiency Benefits of Facility Management Services.pdf
 

The Golden Circle (Why, How, What P.P.R.).

  • 1. Why? – Purpose We believe that every building owner should benefit from reliable, efficient equipment that produces an environment suitable for generating peak productivity from their staff while protecting their investment in the facility. As a long standing service provider we know we can help companies make more informed decisions bringing them peace of mind and reduced costs by moving away from unpredictable expenses and towards accurate, forecasted budgets. Our asset integrity program is designed to fulfil both regulatory requirements while also ensuring equipment reliability, low maintenance costs, reduced owning and operating expenses and lifecycle planning. How? – Process We analyze facilities equipment and the cost centers associated with heating, ventilating and air conditioning based on the assets remaining life, condition and runtime. This process helps assist owners and operators in aligning their budgets with national averages. This is done though a consultative process in which building owners and CAON Services representatives work together in determining the best service level agreement for their building. Determining the equipment’s remaining useful life, annualized replacement asset value (R.A.V.), and cost center expenditures help owners to set proactive budgets. This allows for more strategic and effective cost controls. What? – Result Our mission is to help owners and managers make more informed decisions when it comes to protecting their mechanical assets as a way to reduce the buildings owning and operating expenses. This consultative process will result in:  Reduced current and future risk (Controlled capital costs and decreasing financial cost centers)  Extended asset lifecycle (Equipment’s remaining useful life can be extended by 50%)  Less emergency calls (A 50-65% reduction in the rate of emergency work)  Less unexpected breakdowns (Up to a 16% reduction in corrective work over a 5 year period)  Less major repairs (Reactive, unexpected repairs cost 3-4 times more than planned maintenance)  A way for your assets to communicate their current health to you (Tracking, reporting, and tasking)  Reduced owning & operating costs associated with the facility such as energy consumption (A 5- 30% reduction in energy wastage can be realized)