Introduction
ERP manufacturing management services
• There are many specialist steps required to
take a product from prototype to mass production;
• ERP has experience of these processes and has successfully
taken a number of products into full production;

• It makes sense to outsource this work as
it is intermittent and specialist.
Manufacturer Communication
It is Vital to communicate with manufacturers credibly
• ERP has working relationships with many
UK and Far Eastern product manufacturers
• ERP has templates for
– RFQs (Request for Quotation)

– Manufacturing agreements
– Licensing agreements
– AQL agreements
Quotations and pricing negotiation
Know the pitfalls
• Use open book pricing agreement
• Understand likely margins, wastage figures etc
• Critical path to product delivery analysis and reduction
• Ensure component multi-sourcing and/or
• Carefully manage single source components
Use Open Book Pricing
Create a win-win situation with the manufacturer
• Create of Approved Vendor Lists
• Create Bills of Materials including :– Source long lead time items quickly
– MOQ's / batch size implications
– Tooling / change costs

• Establish the real capital outlay
for initial and repeat orders
Manufacturing Execution
Ensure execution is trouble free
• Implement a Change Note system
– ensure all changes are approved

• Procedures for accepting alternative components
• Manage alternative component sources
• Ensure EN or UL approved components
are used if and where necessary
Product delivery & Stock management
Manage your cash and costs
• Work with Sales teams to establish expected volumes
• Use of waterfall or equivalent method to qualify these
• Derive manufacturing finance requirements
• Factoring to improve cash flow
• Project repeat orders and advise
manufacturer(s)
• Manage long lead/critical components
Quality Assurance
Work with manufacturer to ensure quality
• Golden sample Acceptance
• Implementation of AQL (Acceptable Quality Level) system
• Ensure access to and knowledge of standard AQL tables
• Test and acceptance of product batches
• Critical, Major, Minor categorisation
• Agreeing course of action on rejection
Test for Manufacture
Maximise yield
• Test software planning and delivery (before product release)
• Manufacturing pack release requirements
• Drafting of Functional Specifications,
User Guides, etc
• NB: PCB Pads for signal access
CE marks and European Approvals
Meet regulatory requirements
• ERP has access to British Standards Online
• Can assist in choosing the correct standards
• Safety Approval execution
• EMC testing and approvals
• CE Certificate generation
• Relationships with specialist
consultants in the UK / Far east
Parts List database creation
The key to delivery
• Knowledge of data field capture requirements
• Part numbering systems to managing
– Electrical / Electronic Components
– Mechanical / non electrical Components
– Assemblies and Components
Design for manufacture
Make sure your product can be made in volume
• Test for manufacture requirements
• Bed of Nails Testing
• Design and assembly of test rigs
• Test-time adds to product cost,
so design in fast test ability
• IP protection, typically retain
a key piece of technology **
** Software only released in protected IC rather than in soft binary form
ERP Design
Make sure it works and can be produced
• ERP design consumer electronics products, providing
– Consumer electronics software and hardware design
– Schematic capture
– PCB Layout (approvals may have impact)
– Analogue and Digital hardware debug
– Component tolerance analysis for acceptance
Relationships
The ERP knowledge
• Far Eastern manufacturers

• UK manufacturers
• UK Industrial Designers
• UK low volume prototype assembly

• Safety Approval consultants
• EMC consultants
• Component Distributors

• Prototype plastics/product models
END
Contact us
Telephone: 01223 969934

Email: Giles.Hutchison@erp-uk.com

More Related Content

What's hot

CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATION
CBN2014
 
Presentation Nitronics Ltd
Presentation Nitronics LtdPresentation Nitronics Ltd
Presentation Nitronics Ltd
nitronics
 
Voyantic Tagsurance Reducing the Cost of Quality
Voyantic Tagsurance Reducing the Cost of QualityVoyantic Tagsurance Reducing the Cost of Quality
Voyantic Tagsurance Reducing the Cost of Quality
Voyantic
 
Heat Networks Code of Practice
Heat Networks Code of PracticeHeat Networks Code of Practice
Heat Networks Code of Practice
Simon Owen FIRP
 
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
SPRA: The Single Ply Roofing Association
 
NSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems Scheme
NSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems SchemeNSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems Scheme
NSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems Scheme
National Security Inspectorate
 
Allware - Software development
Allware - Software developmentAllware - Software development
Allware - Software development
Santiago Rudnick
 
Tata project scm logistics offereing scc part 2
Tata project scm logistics offereing scc part 2Tata project scm logistics offereing scc part 2
Tata project scm logistics offereing scc part 2
Zubin Poonawalla
 
Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?
Nicholas Chazapis
 
Company overview
Company overviewCompany overview
Company overview
TJ Curtis Technologies Inc.
 
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Dan Aldridge, ERP Software Evangelist, LION
 
Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Jason Hudspeth
 
CenturyLink's Game-Changing Strategies for Increasing Project Quality
CenturyLink's Game-Changing Strategies for Increasing Project QualityCenturyLink's Game-Changing Strategies for Increasing Project Quality
CenturyLink's Game-Changing Strategies for Increasing Project Quality
Worksoft
 
Techlink_Velocity_Commercialization_v3
Techlink_Velocity_Commercialization_v3Techlink_Velocity_Commercialization_v3
Techlink_Velocity_Commercialization_v3Larry Zheng
 
2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation
msnelling
 
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of TestingCuriosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software Ireland
 

What's hot (20)

CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATION
 
Presentation Nitronics Ltd
Presentation Nitronics LtdPresentation Nitronics Ltd
Presentation Nitronics Ltd
 
Voyantic Tagsurance Reducing the Cost of Quality
Voyantic Tagsurance Reducing the Cost of QualityVoyantic Tagsurance Reducing the Cost of Quality
Voyantic Tagsurance Reducing the Cost of Quality
 
Heat Networks Code of Practice
Heat Networks Code of PracticeHeat Networks Code of Practice
Heat Networks Code of Practice
 
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
 
NSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems Scheme
NSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems SchemeNSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems Scheme
NSI and BAFE's SP206 scheme - Kitchen Fire Protection Systems Scheme
 
Allware - Software development
Allware - Software developmentAllware - Software development
Allware - Software development
 
Tata project scm logistics offereing scc part 2
Tata project scm logistics offereing scc part 2Tata project scm logistics offereing scc part 2
Tata project scm logistics offereing scc part 2
 
Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?
 
Kamban Cv 14 Year Gulf
Kamban Cv 14 Year GulfKamban Cv 14 Year Gulf
Kamban Cv 14 Year Gulf
 
MTC16 Presentation - eHT
MTC16 Presentation - eHTMTC16 Presentation - eHT
MTC16 Presentation - eHT
 
Company overview
Company overviewCompany overview
Company overview
 
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
Inforln.com ERP LN 10.3 & 10.4 Manufacturing Non-conformance Handling Differe...
 
ci newsletter
ci newsletterci newsletter
ci newsletter
 
Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531Retail Fixture Delivery Solution For REL Website 160531
Retail Fixture Delivery Solution For REL Website 160531
 
Presentation1 FCC
Presentation1 FCCPresentation1 FCC
Presentation1 FCC
 
CenturyLink's Game-Changing Strategies for Increasing Project Quality
CenturyLink's Game-Changing Strategies for Increasing Project QualityCenturyLink's Game-Changing Strategies for Increasing Project Quality
CenturyLink's Game-Changing Strategies for Increasing Project Quality
 
Techlink_Velocity_Commercialization_v3
Techlink_Velocity_Commercialization_v3Techlink_Velocity_Commercialization_v3
Techlink_Velocity_Commercialization_v3
 
2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation
 
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of TestingCuriosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
 

Viewers also liked

Босова
БосоваБосова
БосоваSergey2
 
Social Media for Social Change
Social Media for Social ChangeSocial Media for Social Change
Social Media for Social Change
sashagaya
 
Energy saver with Eliminata
Energy saver with Eliminata Energy saver with Eliminata
Energy saver with Eliminata
Energy reducing Products Limited
 
Introduction to Eliminata Laser-Copier Saver
Introduction to Eliminata  Laser-Copier SaverIntroduction to Eliminata  Laser-Copier Saver
Introduction to Eliminata Laser-Copier Saver
Energy reducing Products Limited
 
Unlocking Sumatra by Ian Wollff
Unlocking Sumatra by Ian WollffUnlocking Sumatra by Ian Wollff
Unlocking Sumatra by Ian Wollffsashagaya
 
Eliminata Water Dispenser Saver
Eliminata Water Dispenser SaverEliminata Water Dispenser Saver
Eliminata Water Dispenser Saver
Energy reducing Products Limited
 

Viewers also liked (6)

Босова
БосоваБосова
Босова
 
Social Media for Social Change
Social Media for Social ChangeSocial Media for Social Change
Social Media for Social Change
 
Energy saver with Eliminata
Energy saver with Eliminata Energy saver with Eliminata
Energy saver with Eliminata
 
Introduction to Eliminata Laser-Copier Saver
Introduction to Eliminata  Laser-Copier SaverIntroduction to Eliminata  Laser-Copier Saver
Introduction to Eliminata Laser-Copier Saver
 
Unlocking Sumatra by Ian Wollff
Unlocking Sumatra by Ian WollffUnlocking Sumatra by Ian Wollff
Unlocking Sumatra by Ian Wollff
 
Eliminata Water Dispenser Saver
Eliminata Water Dispenser SaverEliminata Water Dispenser Saver
Eliminata Water Dispenser Saver
 

Similar to Getting things made

Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
AJAYKUMAR836335
 
Valve CPQ challenges & solutions
Valve CPQ challenges & solutionsValve CPQ challenges & solutions
Valve CPQ challenges & solutions
Sanjeev Nadkarni
 
Why Generic Configurators dont work in the valve Industry
Why Generic Configurators dont work in the valve IndustryWhy Generic Configurators dont work in the valve Industry
Why Generic Configurators dont work in the valve Industry
Sanjeev Nadkarni
 
Presentation on 3 Pillars of DevOps - Kovair DevOps
Presentation on 3 Pillars of DevOps - Kovair DevOpsPresentation on 3 Pillars of DevOps - Kovair DevOps
Presentation on 3 Pillars of DevOps - Kovair DevOps
Kovair
 
Sonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percentSonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percent
IntelligentManufacturingInstitute
 
Software development life cycle
Software development life cycleSoftware development life cycle
Software development life cycleManindra Simhadri
 
On-off valves – selection & quotation software
On-off valves – selection & quotation softwareOn-off valves – selection & quotation software
On-off valves – selection & quotation software
Sanjeev Nadkarni
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunch
Stephen Williams
 
Innovative Inventory and Production Management Techniques
Innovative Inventory and  Production Management TechniquesInnovative Inventory and  Production Management Techniques
Innovative Inventory and Production Management Techniques
narman1402
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
Gary Giblock
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
Sunrator Technologies LLP
 
3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt
KrishnaGupta191
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
AVEVA Group plc
 
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesOm lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesvideoaakash15
 
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
BSAMARKETING
 
Sbs overview r4
Sbs overview r4Sbs overview r4
Sbs overview r4
Rubin Dhillon
 

Similar to Getting things made (20)

Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
 
Valve CPQ challenges & solutions
Valve CPQ challenges & solutionsValve CPQ challenges & solutions
Valve CPQ challenges & solutions
 
Why Generic Configurators dont work in the valve Industry
Why Generic Configurators dont work in the valve IndustryWhy Generic Configurators dont work in the valve Industry
Why Generic Configurators dont work in the valve Industry
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Presentation on 3 Pillars of DevOps - Kovair DevOps
Presentation on 3 Pillars of DevOps - Kovair DevOpsPresentation on 3 Pillars of DevOps - Kovair DevOps
Presentation on 3 Pillars of DevOps - Kovair DevOps
 
Sonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percentSonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percent
 
Software development life cycle
Software development life cycleSoftware development life cycle
Software development life cycle
 
On-off valves – selection & quotation software
On-off valves – selection & quotation softwareOn-off valves – selection & quotation software
On-off valves – selection & quotation software
 
AIA Solutions Brochure
AIA Solutions BrochureAIA Solutions Brochure
AIA Solutions Brochure
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunch
 
Innovative Inventory and Production Management Techniques
Innovative Inventory and  Production Management TechniquesInnovative Inventory and  Production Management Techniques
Innovative Inventory and Production Management Techniques
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
 
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesOm lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
 
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
 
PJTabac_CV
PJTabac_CVPJTabac_CV
PJTabac_CV
 
Sbs overview r4
Sbs overview r4Sbs overview r4
Sbs overview r4
 

Recently uploaded

一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
kywwoyk
 
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
PinkySharma900491
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
eemet
 
Cyber Sequrity.pptx is life of cyber security
Cyber Sequrity.pptx is life of cyber securityCyber Sequrity.pptx is life of cyber security
Cyber Sequrity.pptx is life of cyber security
perweeng31
 
web-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jerweb-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jer
freshgammer09
 
一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理
一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理
一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理
kywwoyk
 
NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...
NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...
NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...
Amil baba
 
Drugs used in parkinsonism and other movement disorders.pptx
Drugs used in parkinsonism and other movement disorders.pptxDrugs used in parkinsonism and other movement disorders.pptx
Drugs used in parkinsonism and other movement disorders.pptx
ThalapathyVijay15
 
F5 LTM TROUBLESHOOTING Guide latest.pptx
F5 LTM TROUBLESHOOTING Guide latest.pptxF5 LTM TROUBLESHOOTING Guide latest.pptx
F5 LTM TROUBLESHOOTING Guide latest.pptx
ArjunJain44
 

Recently uploaded (9)

一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 
Cyber Sequrity.pptx is life of cyber security
Cyber Sequrity.pptx is life of cyber securityCyber Sequrity.pptx is life of cyber security
Cyber Sequrity.pptx is life of cyber security
 
web-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jerweb-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jer
 
一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理
一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理
一比一原版UVM毕业证佛蒙特大学毕业证成绩单如何办理
 
NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...
NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...
NO1 Uk Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Amil In La...
 
Drugs used in parkinsonism and other movement disorders.pptx
Drugs used in parkinsonism and other movement disorders.pptxDrugs used in parkinsonism and other movement disorders.pptx
Drugs used in parkinsonism and other movement disorders.pptx
 
F5 LTM TROUBLESHOOTING Guide latest.pptx
F5 LTM TROUBLESHOOTING Guide latest.pptxF5 LTM TROUBLESHOOTING Guide latest.pptx
F5 LTM TROUBLESHOOTING Guide latest.pptx
 

Getting things made

  • 1. Energy Reducing Products Ltd Manufacturing Consulting Services September 2013
  • 2. Introduction ERP manufacturing management services • There are many specialist steps required to take a product from prototype to mass production; • ERP has experience of these processes and has successfully taken a number of products into full production; • It makes sense to outsource this work as it is intermittent and specialist.
  • 3. Manufacturer Communication It is Vital to communicate with manufacturers credibly • ERP has working relationships with many UK and Far Eastern product manufacturers • ERP has templates for – RFQs (Request for Quotation) – Manufacturing agreements – Licensing agreements – AQL agreements
  • 4. Quotations and pricing negotiation Know the pitfalls • Use open book pricing agreement • Understand likely margins, wastage figures etc • Critical path to product delivery analysis and reduction • Ensure component multi-sourcing and/or • Carefully manage single source components
  • 5. Use Open Book Pricing Create a win-win situation with the manufacturer • Create of Approved Vendor Lists • Create Bills of Materials including :– Source long lead time items quickly – MOQ's / batch size implications – Tooling / change costs • Establish the real capital outlay for initial and repeat orders
  • 6. Manufacturing Execution Ensure execution is trouble free • Implement a Change Note system – ensure all changes are approved • Procedures for accepting alternative components • Manage alternative component sources • Ensure EN or UL approved components are used if and where necessary
  • 7. Product delivery & Stock management Manage your cash and costs • Work with Sales teams to establish expected volumes • Use of waterfall or equivalent method to qualify these • Derive manufacturing finance requirements • Factoring to improve cash flow • Project repeat orders and advise manufacturer(s) • Manage long lead/critical components
  • 8. Quality Assurance Work with manufacturer to ensure quality • Golden sample Acceptance • Implementation of AQL (Acceptable Quality Level) system • Ensure access to and knowledge of standard AQL tables • Test and acceptance of product batches • Critical, Major, Minor categorisation • Agreeing course of action on rejection
  • 9. Test for Manufacture Maximise yield • Test software planning and delivery (before product release) • Manufacturing pack release requirements • Drafting of Functional Specifications, User Guides, etc • NB: PCB Pads for signal access
  • 10. CE marks and European Approvals Meet regulatory requirements • ERP has access to British Standards Online • Can assist in choosing the correct standards • Safety Approval execution • EMC testing and approvals • CE Certificate generation • Relationships with specialist consultants in the UK / Far east
  • 11. Parts List database creation The key to delivery • Knowledge of data field capture requirements • Part numbering systems to managing – Electrical / Electronic Components – Mechanical / non electrical Components – Assemblies and Components
  • 12. Design for manufacture Make sure your product can be made in volume • Test for manufacture requirements • Bed of Nails Testing • Design and assembly of test rigs • Test-time adds to product cost, so design in fast test ability • IP protection, typically retain a key piece of technology ** ** Software only released in protected IC rather than in soft binary form
  • 13. ERP Design Make sure it works and can be produced • ERP design consumer electronics products, providing – Consumer electronics software and hardware design – Schematic capture – PCB Layout (approvals may have impact) – Analogue and Digital hardware debug – Component tolerance analysis for acceptance
  • 14. Relationships The ERP knowledge • Far Eastern manufacturers • UK manufacturers • UK Industrial Designers • UK low volume prototype assembly • Safety Approval consultants • EMC consultants • Component Distributors • Prototype plastics/product models
  • 15. END Contact us Telephone: 01223 969934 Email: Giles.Hutchison@erp-uk.com

Editor's Notes

  1. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  2. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  3. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  4. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  5. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  6. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  7. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  8. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  9. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  10. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  11. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  12. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year
  13. Electrical appliances in stand-by cost £740 million and generate 4 million tonnes of CO2 in the UK alone every year