Commissioning & FM Consultant
Commissioning for new construction
• Owner project requirements
• Basis of Design
• Commissioning Plan
• Commissioned systems
• Pre-commissioning work sheets
• Functional performance tests
• Acceptance & Commissioning Report
• Systems Manual & Training
Re-commissioning after 3-5 years
• Overview Owner project requirements
• Overview Basis of Design
• Overview Commissioning Report
• Audit and Survey
– Operations
– Energy consumption
– Operators training
– Maintenance & replacement costs
Re-commissioning after 3-5 years
• …. Continued
• Fault detection and diagnostics
• Re-commissioning plan
• Functional performance tests
• Acceptance
• Update Systems Manual
• Training
Retro-commissioning for EB
• A systematic process for improving and
optimization building performance in an
existing building that has never gone through
any type of commissioning or quality
assurance process.
Standard Facilities Management
• Facility planning and operations.
• Equipment Maintenance.
• Security.
• Catering.
• Janitorial.
• Office services.
• Minor retrofit projects.
Facilities management Design
• Reduction in energy costs …
• Reduction in water costs …
• Reduction in Maintenance cost …
• Reduction in HVAC replacement costs …
• Increase in productivity!
• Increase indoor air quality!
• Increase staff comfort!
END OF PRESENTATION
Facility Management Design:
a core process for experts

More Related Content

What's hot

Resume
ResumeResume
92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)
Pegah Hamidkhani
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
Varun Singh
 
Capp
CappCapp
Ramanathan_Mechanical_Resume_2016
Ramanathan_Mechanical_Resume_2016Ramanathan_Mechanical_Resume_2016
Ramanathan_Mechanical_Resume_2016
Ramanathan Arumugasamy
 
CAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCTCAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCT
Khalid Tariq
 
Michael Smith Resume v5 with dates
Michael Smith Resume v5 with datesMichael Smith Resume v5 with dates
Michael Smith Resume v5 with dates
Michael Smith
 
Episode 32 : Project Execution Part (3)
Episode 32 :  Project Execution Part (3)Episode 32 :  Project Execution Part (3)
Episode 32 : Project Execution Part (3)
SAJJAD KHUDHUR ABBAS
 
Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1
Sami Ahmed
 
Seven quality tools
Seven quality toolsSeven quality tools
Seven quality tools
Abhishek Thakur
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
Dave Thompson
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
chethan kumar
 
Episode 31 : Project Execution Part (2)
Episode 31 :  Project Execution Part (2)Episode 31 :  Project Execution Part (2)
Episode 31 : Project Execution Part (2)
SAJJAD KHUDHUR ABBAS
 
Anitha Vanga
Anitha VangaAnitha Vanga
Anitha Vanga
Anitha vanga
 
Resume
ResumeResume
Resume
Ramesh Kumar
 
Automation Upgrade
Automation UpgradeAutomation Upgrade
Automation Upgrade
Ryan Gunhold
 
MohamedSaleh_McMasterUniversity_Resume
MohamedSaleh_McMasterUniversity_ResumeMohamedSaleh_McMasterUniversity_Resume
MohamedSaleh_McMasterUniversity_Resume
Mohamed (Moe) Saleh, EIT
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
chethan kumar
 
Computer Aided Process Planning Poster
Computer Aided Process Planning PosterComputer Aided Process Planning Poster
Computer Aided Process Planning Poster
Jyotiraman De
 
Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?
Nicholas Chazapis
 

What's hot (20)

Resume
ResumeResume
Resume
 
92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
 
Capp
CappCapp
Capp
 
Ramanathan_Mechanical_Resume_2016
Ramanathan_Mechanical_Resume_2016Ramanathan_Mechanical_Resume_2016
Ramanathan_Mechanical_Resume_2016
 
CAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCTCAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCT
 
Michael Smith Resume v5 with dates
Michael Smith Resume v5 with datesMichael Smith Resume v5 with dates
Michael Smith Resume v5 with dates
 
Episode 32 : Project Execution Part (3)
Episode 32 :  Project Execution Part (3)Episode 32 :  Project Execution Part (3)
Episode 32 : Project Execution Part (3)
 
Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1
 
Seven quality tools
Seven quality toolsSeven quality tools
Seven quality tools
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Episode 31 : Project Execution Part (2)
Episode 31 :  Project Execution Part (2)Episode 31 :  Project Execution Part (2)
Episode 31 : Project Execution Part (2)
 
Anitha Vanga
Anitha VangaAnitha Vanga
Anitha Vanga
 
Resume
ResumeResume
Resume
 
Automation Upgrade
Automation UpgradeAutomation Upgrade
Automation Upgrade
 
MohamedSaleh_McMasterUniversity_Resume
MohamedSaleh_McMasterUniversity_ResumeMohamedSaleh_McMasterUniversity_Resume
MohamedSaleh_McMasterUniversity_Resume
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Computer Aided Process Planning Poster
Computer Aided Process Planning PosterComputer Aided Process Planning Poster
Computer Aided Process Planning Poster
 
Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?
 

Similar to 17.11.2016 fm design chazapis presentation

Energy efficiency services by Greenleaf
Energy efficiency services by GreenleafEnergy efficiency services by Greenleaf
Energy efficiency services by Greenleaf
Mathews Vincent
 
Chazapis cx for better buildings
Chazapis cx for better buildingsChazapis cx for better buildings
Chazapis cx for better buildings
Nicholas Chazapis
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
Roger Boyette
 
Software Architecture – Centric Methods and Agile Development
Software Architecture –   Centric Methods and   Agile DevelopmentSoftware Architecture –   Centric Methods and   Agile Development
Software Architecture – Centric Methods and Agile Development
sathish sak
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
Novacom Turn Key
Novacom Turn KeyNovacom Turn Key
Novacom Turn Key
theiguy
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Lakshminarasimman S
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
Michelle Kleiber-Viglione
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
Alliance To Save Energy
 
OnePM - Project Management System
OnePM - Project Management SystemOnePM - Project Management System
OnePM - Project Management System
Sunil Rane, MS Project Server
 
Chazapis cx for better buildings rev
Chazapis cx for better buildings   revChazapis cx for better buildings   rev
Chazapis cx for better buildings rev
Nicholas Chazapis
 
Concurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silosConcurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silos
NNE
 
The five core processes: Service transition
The five core processes: Service transitionThe five core processes: Service transition
The five core processes: Service transition
Rhy Carloy Basalo
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
commissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdfcommissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdf
Vincent Bui
 
Perdue Farms Experience
Perdue Farms ExperiencePerdue Farms Experience
Perdue Farms Experience
Clarence Bell
 
APQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering productsAPQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering products
INSTITUTE OF ENGINEERING /BKC
 
vijay resume final
vijay resume finalvijay resume final
vijay resume final
Vijay thakur
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
Nur Azwin
 
Presentation1
Presentation1Presentation1
Presentation1
Arun Kumar
 

Similar to 17.11.2016 fm design chazapis presentation (20)

Energy efficiency services by Greenleaf
Energy efficiency services by GreenleafEnergy efficiency services by Greenleaf
Energy efficiency services by Greenleaf
 
Chazapis cx for better buildings
Chazapis cx for better buildingsChazapis cx for better buildings
Chazapis cx for better buildings
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
Software Architecture – Centric Methods and Agile Development
Software Architecture –   Centric Methods and   Agile DevelopmentSoftware Architecture –   Centric Methods and   Agile Development
Software Architecture – Centric Methods and Agile Development
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Novacom Turn Key
Novacom Turn KeyNovacom Turn Key
Novacom Turn Key
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor Management
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
 
OnePM - Project Management System
OnePM - Project Management SystemOnePM - Project Management System
OnePM - Project Management System
 
Chazapis cx for better buildings rev
Chazapis cx for better buildings   revChazapis cx for better buildings   rev
Chazapis cx for better buildings rev
 
Concurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silosConcurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silos
 
The five core processes: Service transition
The five core processes: Service transitionThe five core processes: Service transition
The five core processes: Service transition
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
commissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdfcommissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdf
 
Perdue Farms Experience
Perdue Farms ExperiencePerdue Farms Experience
Perdue Farms Experience
 
APQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering productsAPQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering products
 
vijay resume final
vijay resume finalvijay resume final
vijay resume final
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
Presentation1
Presentation1Presentation1
Presentation1
 

More from Nicholas Chazapis

Chazapis the automated bldg
Chazapis the automated bldgChazapis the automated bldg
Chazapis the automated bldg
Nicholas Chazapis
 
Systems trg syllabus
Systems trg syllabusSystems trg syllabus
Systems trg syllabus
Nicholas Chazapis
 
Predictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCUPredictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCU
Nicholas Chazapis
 
Chazapis cx management
Chazapis cx managementChazapis cx management
Chazapis cx management
Nicholas Chazapis
 
HVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiencyHVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiency
Nicholas Chazapis
 
Chazapis cx for better buildings rev2
Chazapis cx for better buildings   rev2Chazapis cx for better buildings   rev2
Chazapis cx for better buildings rev2
Nicholas Chazapis
 
2016 chazapis energy - efficiency - comfort - iso 50001
2016 chazapis   energy - efficiency - comfort - iso 500012016 chazapis   energy - efficiency - comfort - iso 50001
2016 chazapis energy - efficiency - comfort - iso 50001
Nicholas Chazapis
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
Nicholas Chazapis
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
Nicholas Chazapis
 
Chazapis pm basics
Chazapis pm basicsChazapis pm basics
Chazapis pm basics
Nicholas Chazapis
 
Cx a activities flow diagram en
Cx a activities flow diagram enCx a activities flow diagram en
Cx a activities flow diagram en
Nicholas Chazapis
 
BMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSEBMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSE
Nicholas Chazapis
 
EMPATHY IN PROJECT MANAGEMENT EL V20100915
EMPATHY IN PROJECT MANAGEMENT EL   V20100915EMPATHY IN PROJECT MANAGEMENT EL   V20100915
EMPATHY IN PROJECT MANAGEMENT EL V20100915
Nicholas Chazapis
 
Chazapis elot en 15232 the impact of bacs - preso
Chazapis   elot en 15232 the impact of bacs - presoChazapis   elot en 15232 the impact of bacs - preso
Chazapis elot en 15232 the impact of bacs - preso
Nicholas Chazapis
 
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOLChazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Nicholas Chazapis
 
Commissioning for energy saving nha
Commissioning for energy saving nhaCommissioning for energy saving nha
Commissioning for energy saving nha
Nicholas Chazapis
 

More from Nicholas Chazapis (16)

Chazapis the automated bldg
Chazapis the automated bldgChazapis the automated bldg
Chazapis the automated bldg
 
Systems trg syllabus
Systems trg syllabusSystems trg syllabus
Systems trg syllabus
 
Predictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCUPredictive maintenance of an intelligent FCU
Predictive maintenance of an intelligent FCU
 
Chazapis cx management
Chazapis cx managementChazapis cx management
Chazapis cx management
 
HVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiencyHVAC equipment and systems optimization for efficiency
HVAC equipment and systems optimization for efficiency
 
Chazapis cx for better buildings rev2
Chazapis cx for better buildings   rev2Chazapis cx for better buildings   rev2
Chazapis cx for better buildings rev2
 
2016 chazapis energy - efficiency - comfort - iso 50001
2016 chazapis   energy - efficiency - comfort - iso 500012016 chazapis   energy - efficiency - comfort - iso 50001
2016 chazapis energy - efficiency - comfort - iso 50001
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
 
Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.Chazapis Systems Commissioning Lessons.
Chazapis Systems Commissioning Lessons.
 
Chazapis pm basics
Chazapis pm basicsChazapis pm basics
Chazapis pm basics
 
Cx a activities flow diagram en
Cx a activities flow diagram enCx a activities flow diagram en
Cx a activities flow diagram en
 
BMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSEBMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSE
 
EMPATHY IN PROJECT MANAGEMENT EL V20100915
EMPATHY IN PROJECT MANAGEMENT EL   V20100915EMPATHY IN PROJECT MANAGEMENT EL   V20100915
EMPATHY IN PROJECT MANAGEMENT EL V20100915
 
Chazapis elot en 15232 the impact of bacs - preso
Chazapis   elot en 15232 the impact of bacs - presoChazapis   elot en 15232 the impact of bacs - preso
Chazapis elot en 15232 the impact of bacs - preso
 
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOLChazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
Chazapis HVAC SYSTEMS COMMISSIONING A PROJECT MANAGEMENT TOOL
 
Commissioning for energy saving nha
Commissioning for energy saving nhaCommissioning for energy saving nha
Commissioning for energy saving nha
 

Recently uploaded

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 

Recently uploaded (20)

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 

17.11.2016 fm design chazapis presentation

  • 1. Facility Management Design: a core process for experts. Nicholas Chazapis Mechanical Engineer Commissioning & FM Consultant
  • 2. Commissioning for new construction • Owner project requirements • Basis of Design • Commissioning Plan • Commissioned systems • Pre-commissioning work sheets • Functional performance tests • Acceptance & Commissioning Report • Systems Manual & Training
  • 3. Re-commissioning after 3-5 years • Overview Owner project requirements • Overview Basis of Design • Overview Commissioning Report • Audit and Survey – Operations – Energy consumption – Operators training – Maintenance & replacement costs
  • 4. Re-commissioning after 3-5 years • …. Continued • Fault detection and diagnostics • Re-commissioning plan • Functional performance tests • Acceptance • Update Systems Manual • Training
  • 5. Retro-commissioning for EB • A systematic process for improving and optimization building performance in an existing building that has never gone through any type of commissioning or quality assurance process.
  • 6. Standard Facilities Management • Facility planning and operations. • Equipment Maintenance. • Security. • Catering. • Janitorial. • Office services. • Minor retrofit projects.
  • 7. Facilities management Design • Reduction in energy costs … • Reduction in water costs … • Reduction in Maintenance cost … • Reduction in HVAC replacement costs … • Increase in productivity! • Increase indoor air quality! • Increase staff comfort!
  • 8. END OF PRESENTATION Facility Management Design: a core process for experts