HISTORY 
AFTER INDEPENDENCE PUNJAB SPLITED INTO TWO PARTS 
AND IT NEEDED A NEW CAPITAL. 
THEN THE PROJECT WAS ASSIGNED TO AMERICAN 
PLANNER AND ENGINEER ALBERT MAYER WITH MATHEW 
NOWICKI AS HIS ASSISTANT. 
AFTER NOWICKI’S DEATH IN A PLANE CRASH MAYER 
RESIGNED IN 1950. 
IN 1951 INDIAN GOVERNMENT APPROACHED LE 
CORBUSIER FOR THE PROJECT. 
MAXWELL FRY, JANE DREW AND PIERRE JEANNERET WERE 
ALSO INVOLVED IN THE TEAM OF ARCHITECTS.
LOCATION 
• THE CITY IS LOCATED AT THE JUNCTION OF FOOTHILLS OF 
THE HIMALAYAS MOUNTAIN RANGE AND THE GANGES 
PLAINS. 
• IT WAS BOUND BY TWO SEASONAL RIVULETS, THE PATIALI 
RAO AND THE SUKHNA IN THE NORTHWEST AND THE 
SOUTH EAST RESPECTIVELY. IT EXTENDS IN THE NORTHEAST 
RIGHT UP TO THE FOOTHILLS OF THE SHIVALIKS. 
• THE REGION EXPERIENCES EXTREMES IN THE CLIMATE. THE 
TEMPERATURE COULD RISE TO 45 DEGREES IN SUMMER 
AND DROP TO FREEZING POINT IN WINTER. 
• THE DIRECTION OF THE PREVALENT WINDS IS SOUTHEAST 
TO THE NORTHWEST IN SUMMER AND NORTHWEST TO 
THE SOUTHEAST IN WINTER.
ALBERT MAYER’S PLAN 
• ALBERT MAYER’S PLAN WAS FAN SHAPED AND SPREAD 
GENTLY BETWEEN THE TWO RIVERS SUKHNA AND PATIALI 
RAO. 
• IT CONSISTED OF SUPERBLOCKS WHICH WERE MARKED BY 
THE CURVED ROADS. 
• TWO LINEAR PARK LANDS CAN ALSO BE SEEN RUNNING FROM 
ONE END TO OTHER IN THE PLAN. 
• AT THE HEAD OF THE PLAN WAS THE CAPITOL (SEAT OF STATE 
GOVERNMENT ) AND THE CITY CENTRE WAS AT THE MIDDLE.
ALBERT MAYER’S PLAN 
CAPITOL 
CITY CENTRE 
SUPERBLOCK 
PARKLANDS
LE CORBUSIER 
• THERE WERE FOUR PEOPLE INCLUDING CORBUSIER 
WORKING IN THE PROJECT: PIERRE JEANNERET, 
MAXWELL FRY AND JANE DREW. ALONG WITH 20 
YOUNG ARCHITECTS FROM INDIA. 
• THE INDIAN ARCHITECTS WERE ASSIGNED TO DETAILED 
PLAN WHILE CORBUSIER HAD TO CONCENTRATE ON 
MAJOR BUILDINGS AND PIERRE JEANNERET,MAXWELL 
FRY AND JANE DREW WERE CHARGED WITH THE TASK 
OF DEVELOPING THE NEIGHBOURHOOD SECTORS 
WITH THEIR SCHOOLS,SHOPPING BAZAARS,AND THE 
TRACTS OF GOVERNMENT HOUSING.
THREE DISCIPLINES 
• CORBUSIER NOTICED THREE QUALITIES IN INDIA 
• THE DISCIPLINE OF MONEY- AS IT WAS THE PERIOD OF POST 
INDEPENDENCE THE PROJECT COUDNT BE MADE TO A GRAND 
LEVEL AND HAD TO BE MADE IN A IDEAL BUDGET. 
• THE DISCIPLINE OF TECHNOLOGY-EVEN WITH VAST AMOUNTS 
OF CLAY STONE , SAND CORBUSIER WENT FOR USAGE OF 
ROUGH CONCRETE IN CAPITOL AND CENTRAL BUSINESS 
DISTRICT. 
• THE DISCIPLINE OF CLIMATE- BESIDES THE ADMINISTRATIVE 
AND FINANCIAL REGULATONS THERE WAS A LAW OF THE SUN 
IN INDIA. THE ARCHITECTURAL PROBLEM CONSISTS;FIRST TO 
MAKE SHADE,SECOND TO MAKE A CURRENT OF AIR[TO 
VENTILATE], THIRD TO CONTROL HYDRAULICS.
CORBUSIER’S PLAN OF CHANDIGARH
CORBUSIER’S PLAN 
• HIS PLAN WAS IN GRID-IRON PATTERN SURROUNDED 
BY THE TWO RIVERS IN BOTH THE SIDES. 
• THE UNIT WAS A SECTOR INSTEAD OF A 
SUPERBLOCK.(NEARLY 3 SECTORS MADE A 
SUPERBLOCK) 
• THE BASIC FRAMEWORK OF ALBERT MAYER’S PLAN 
WERE RETAINED- CAPITOL, CITY CENTRE,INDUSTRIAL 
AREA, PARKLAND 
• THE CITY CENTRE AND RAILWAY STATIONS REMAINED 
IN THE SAME LOCATIONS THE CAPITOL WAS SHIFTED 
FROM THE NORTH-EASTERN TIP THE TO NORTH-WESTERN 
TIP
HUMAN ANALOGY 
• LE CORBUSIER CONCEIVED THE MASTER PLAN OF 
CHANDIGARH AS ANALOGOUS TO HUMAN BODY, WITH A 
CLEARLY DEFINED 
• HEAD (THE CAPITOL COMPLEX, SECTOR 1), 
• HEART (THE CITY CENTRE SECTOR-17), 
• LUNGS (THE LEISURE VALLEY, INNUMERABLE OPEN SPACES 
AND SECTOR GREENS), 
• INTELLECT (THE CULTURAL AND EDUCATIONAL 
INSTITUTIONS), 
• CIRCULATORY SYSTEM (THE NETWORK OF ROADS, THE 
7VS) 
• VISCERA (THE INDUSTRIAL AREA).
CAPITOL (HEAD) 
• THE AREA OF THE GREATEST SYMBOLIC 
SIGNIFICANCE IN CHANDIGARH WAS THE 
CAPITOL COMPLEX. 
• THE MOST IMPORTANT GROUP OF THE 
BUILDINGS CONSTITUTING THE CAPITOL- THE 
PARLIAMENT, THE SECRETARIAT THE POOL OF 
THE PALACE OF JUSTICE. 
• THE ARTIFICIAL HILLS IN THE FRONT OF THE 
SECRETARIAT HAVE NOT BEEN CREATED AND LAID 
OUT IN ACCORDANCE WITH CORBUSIERS 
CONCEPTIONS
CAPITOL COMPLEX PLAN 
Open hand 
Governor's place 
Assembly 
secretariat 
High court
THE CITY CENTRE(HEART) 
• The Central Sector of 
the city, Sector 17, is 
the main Public 
Congregation area of 
the city. It houses all 
major Shopping 
Complexes, Sports 
Facilities and 
Congregation Spaces.
LANDSCAPES(LUNGS) 
• A HIERARCHY OF GREEN SPACES CAN BE 
OBSERVED RANGING FROM PUBLIC GREENS AT 
CITY LEVEL TO SEMI-PRIVATE TO PRIVATE GREEN 
AREAS. 
• CITY LEVEL PUBLIC GREEN SPACE WITH 
ARTIFICIAL WATER BODY 
• FREE- FLOWING GREEN SPACE, CONNECTING THE 
ENTIRE SITE 
• SEMI-PRIVATE GREEN AREAS FOR 
NEIGHBORHOOD POCKETS 
• PRIVATE GREEN AREAS FOR RESIDENTIAL UNITS
OPEN SPACES 
• SOME 800 HECTARES OF GREEN OPEN SPACE 
ARE SPREAD OVER THE APPROXIMATELY 114 
SQUARE KILOMETERS OF THE CAPITAL 
PROJECT AREA. MAJOR OPEN AREAS INCLUDE 
THE LEISURE VALLEY, SUKHNA LAKE, ROCK 
GARDEN AND MANY OTHER SPECIAL 
GARDENS.
THE LIESURE VALLEY 
• THE LEISURE VALLEY IS A GREEN SPRAWLING 
SPACE EXTENDING NORTH-EAST TO SOUTH-WEST 
ALONG A SEASONAL RIVERLET 
GRADIENT AND WAS CONCEIVED BY LE 
CORBUSIER AS THE LUNGS OF THE CITY. 
• APART FROM LARGE PUBLIC PARKS AND 
SPECIAL BOTANICAL GARDENS, IT HOUSES 
SERIES OF FITNESS TRAILS, AMPHITHEATRES 
AND SPACES FOR OPEN-AIR EXHIBITIONS.
ROAD NETWORK 
(7V’S-CIRCULATORY SYSTEM) 
• V1 CONNECTS CHANDIGARH TO OTHER CITIES 
• V2 ARE THE MAJOR AVENUES OF THE CITY E.G 
MADHYA MARG ETC 
• V3 ARE THE CORRIDORS STREETS FOR 
VEHICULAR TRAFFIC ONLY 
• V4…..V7 ARE THE ROADS WITHIN THE 
SECTORS
PRINCIPLES OF URBAN PLANNING 
• CONVENIENT WALKING DISTANCE FOR SOCIAL SERVICES LIKE SCHOOLS 
AND SHOPPING CENTRES. 
• STREET SYSTEM MAJOR ROADS SHOULD NOT PASS THROUGH 
RESIDENTIAL NEIGHBOURHOOD. 
• INTERNAL ROAD PATTERN SHOULD ENCOURAGE QUITE , SAFE , LOW 
VOLUME TRAFFIC MOVEMENT. 
• FACILITIES 
• ORDERLY ARRANGEMENT OF FACILITIES WHICH WOULD BE SHARED 
COMMON BY THE RESIDENTS . 
• A UNIT HAVING SHOPS, SCHOOL, HEALTH CENTRES AND PLACES OF 
RECREATIONS AND WORSHIPS. 
• BLOCKS ARE DIVIDED IN SECTORS. 
• EACH SECTOR IS SELF SUFFICIENT UNIT HAVING ALL FACILITIES . 
• THESE SECTORS VARIES DEPENDING UPON THE SIZE AND THE 
TOPOGRAPHY OF THE AREA.
THE SECTOR
THE SECTOR 
• LE CORBUSIER AND HIS TEAM REPLACED SUPERBLOCKS 
WITNEIGHBOURHOOD UNITS, ”SECTORS”. IT IS THE 
PRIMARY MODULE OF CITY’S DESIGN, A 
NEIGHBOURHOOD UNIT OF SIZE 800 METERS X 1200 
METERS. 
• EACH SECTOR IS A SELF-SUFFICIENT UNIT HAVING 
SHOPS, SCHOOL, HEALTH CENTRES AND PLACES OF 
RECREATIONS AND WORSHIP. 
• H A GEOMETRIC MATRIX OF GENERIC THE POPULATION 
OF A SECTOR VARIES BETWEEN 3000 AND 20000 
DEPENDING UPON THE SIZES OF PLOTS AND THE 
TOPOGRAPHY OF THE AREA.
• HOWEVER, THE CITY WAS PLANNED TO HOUSE A NUMBER 
OF 
150 000 INHABITANTS IN ITS FIRST PHASE, REALIZED 
BETWEEN 1951-66, AND 500 000 IN ITS” FINAL STAGE”. 
• THE NEIGHBOURHOOD ITSELF IS SURROUNDED BY THE 
FAST-TRAFFIC ROAD CALLED V3 INTERSECTING AT THE 
JUNCTIONS OF THE NEIGHBOURHOOD UNIT CALLED 
SECTOR WITH A DIMENSION OF 800 METERS BY 1200 
METERS. 
• THE ENTRANCE OF CARS INTO THE SECTORS OF 800 
METERS BY 1200M, WHICH ARE EXCLUSIVELY RESERVED TO 
FAMILY LIFE, CAN TAKE PLACE ON FOUR POINTS ONLY; IN 
THE MIDDLE OF THE 1200 M. IN THE MIDDLE OF THE 800 
METERS. 
• ALL STOPPAGE OF CIRCULATION SHALL BE PROHIBITED AT 
THE FOUR CIRCUSES, AT THE ANGLES OF THE SECTORS.
• THE BUS STOPS ARE PROVIDED EACH TIME AT 
200 METERS FROM THE CORNER SO AS TO SERVE 
THE FOUR PEDESTRIAN ENTRANCES INTO A 
SECTOR. 
• THUS, THE TRANSIT TRAFFIC TAKES PLACE OUT 
OF THE SECTORS: THE SECTORS BEING 
SURROUNDED BY FOUR WALL-BOUND CAR 
ROADS WITHOUT OPENINGS (THE V3S). 
• AND THIS (A NOVELTY IN TOWN-PLANNING AND 
DECISIVE) WAS APPLIED AT CHANDIGARH: NO 
HOUSE (OR BUILDING) DOOR OPENS ON THE 
THOROUGHFARE OF RAPID TRAFFIC. 
• THERE ARE 30 SECTORS IN CHANDIGARH,OF 
WHICH 24 ARE RESIDENTIAL.
HOUSING 
• LOWER CATEGORY RESIDENTIAL BUILDINGS ARE 
GOVERNED BY A MECHANISM KNOWN AS “FRAME 
CONTROL” TO CONTROL THEIR FACADES. 
• THIS FIXES THE BUILDING LINE AND HEIGHT AND THE 
USE OF BUILDING MATERIALS. 
• CERTAIN STANDARD SIZES OF DOORS AND WINDOWS 
ARE SPECIFIED AND ALL THE GATES AND BOUNDARY 
WALLS MUST CONFORM TO STANDARD DESIGN. 
• THIS PARTICULARLY APPLIES TO HOUSES BUILT ON 
SMALL PLOTS OF 250 SQUARE METRES OR LESS.
BUILDING TYPOLOGY 
• The basic typology is extremely rectilinear 
with similar proportions. 
• Residential units are arranged around central 
common green spaces with different shapes.

Chandigarh settlement

  • 2.
    HISTORY AFTER INDEPENDENCEPUNJAB SPLITED INTO TWO PARTS AND IT NEEDED A NEW CAPITAL. THEN THE PROJECT WAS ASSIGNED TO AMERICAN PLANNER AND ENGINEER ALBERT MAYER WITH MATHEW NOWICKI AS HIS ASSISTANT. AFTER NOWICKI’S DEATH IN A PLANE CRASH MAYER RESIGNED IN 1950. IN 1951 INDIAN GOVERNMENT APPROACHED LE CORBUSIER FOR THE PROJECT. MAXWELL FRY, JANE DREW AND PIERRE JEANNERET WERE ALSO INVOLVED IN THE TEAM OF ARCHITECTS.
  • 3.
    LOCATION • THECITY IS LOCATED AT THE JUNCTION OF FOOTHILLS OF THE HIMALAYAS MOUNTAIN RANGE AND THE GANGES PLAINS. • IT WAS BOUND BY TWO SEASONAL RIVULETS, THE PATIALI RAO AND THE SUKHNA IN THE NORTHWEST AND THE SOUTH EAST RESPECTIVELY. IT EXTENDS IN THE NORTHEAST RIGHT UP TO THE FOOTHILLS OF THE SHIVALIKS. • THE REGION EXPERIENCES EXTREMES IN THE CLIMATE. THE TEMPERATURE COULD RISE TO 45 DEGREES IN SUMMER AND DROP TO FREEZING POINT IN WINTER. • THE DIRECTION OF THE PREVALENT WINDS IS SOUTHEAST TO THE NORTHWEST IN SUMMER AND NORTHWEST TO THE SOUTHEAST IN WINTER.
  • 5.
    ALBERT MAYER’S PLAN • ALBERT MAYER’S PLAN WAS FAN SHAPED AND SPREAD GENTLY BETWEEN THE TWO RIVERS SUKHNA AND PATIALI RAO. • IT CONSISTED OF SUPERBLOCKS WHICH WERE MARKED BY THE CURVED ROADS. • TWO LINEAR PARK LANDS CAN ALSO BE SEEN RUNNING FROM ONE END TO OTHER IN THE PLAN. • AT THE HEAD OF THE PLAN WAS THE CAPITOL (SEAT OF STATE GOVERNMENT ) AND THE CITY CENTRE WAS AT THE MIDDLE.
  • 6.
    ALBERT MAYER’S PLAN CAPITOL CITY CENTRE SUPERBLOCK PARKLANDS
  • 7.
    LE CORBUSIER •THERE WERE FOUR PEOPLE INCLUDING CORBUSIER WORKING IN THE PROJECT: PIERRE JEANNERET, MAXWELL FRY AND JANE DREW. ALONG WITH 20 YOUNG ARCHITECTS FROM INDIA. • THE INDIAN ARCHITECTS WERE ASSIGNED TO DETAILED PLAN WHILE CORBUSIER HAD TO CONCENTRATE ON MAJOR BUILDINGS AND PIERRE JEANNERET,MAXWELL FRY AND JANE DREW WERE CHARGED WITH THE TASK OF DEVELOPING THE NEIGHBOURHOOD SECTORS WITH THEIR SCHOOLS,SHOPPING BAZAARS,AND THE TRACTS OF GOVERNMENT HOUSING.
  • 8.
    THREE DISCIPLINES •CORBUSIER NOTICED THREE QUALITIES IN INDIA • THE DISCIPLINE OF MONEY- AS IT WAS THE PERIOD OF POST INDEPENDENCE THE PROJECT COUDNT BE MADE TO A GRAND LEVEL AND HAD TO BE MADE IN A IDEAL BUDGET. • THE DISCIPLINE OF TECHNOLOGY-EVEN WITH VAST AMOUNTS OF CLAY STONE , SAND CORBUSIER WENT FOR USAGE OF ROUGH CONCRETE IN CAPITOL AND CENTRAL BUSINESS DISTRICT. • THE DISCIPLINE OF CLIMATE- BESIDES THE ADMINISTRATIVE AND FINANCIAL REGULATONS THERE WAS A LAW OF THE SUN IN INDIA. THE ARCHITECTURAL PROBLEM CONSISTS;FIRST TO MAKE SHADE,SECOND TO MAKE A CURRENT OF AIR[TO VENTILATE], THIRD TO CONTROL HYDRAULICS.
  • 9.
  • 10.
    CORBUSIER’S PLAN •HIS PLAN WAS IN GRID-IRON PATTERN SURROUNDED BY THE TWO RIVERS IN BOTH THE SIDES. • THE UNIT WAS A SECTOR INSTEAD OF A SUPERBLOCK.(NEARLY 3 SECTORS MADE A SUPERBLOCK) • THE BASIC FRAMEWORK OF ALBERT MAYER’S PLAN WERE RETAINED- CAPITOL, CITY CENTRE,INDUSTRIAL AREA, PARKLAND • THE CITY CENTRE AND RAILWAY STATIONS REMAINED IN THE SAME LOCATIONS THE CAPITOL WAS SHIFTED FROM THE NORTH-EASTERN TIP THE TO NORTH-WESTERN TIP
  • 11.
    HUMAN ANALOGY •LE CORBUSIER CONCEIVED THE MASTER PLAN OF CHANDIGARH AS ANALOGOUS TO HUMAN BODY, WITH A CLEARLY DEFINED • HEAD (THE CAPITOL COMPLEX, SECTOR 1), • HEART (THE CITY CENTRE SECTOR-17), • LUNGS (THE LEISURE VALLEY, INNUMERABLE OPEN SPACES AND SECTOR GREENS), • INTELLECT (THE CULTURAL AND EDUCATIONAL INSTITUTIONS), • CIRCULATORY SYSTEM (THE NETWORK OF ROADS, THE 7VS) • VISCERA (THE INDUSTRIAL AREA).
  • 12.
    CAPITOL (HEAD) •THE AREA OF THE GREATEST SYMBOLIC SIGNIFICANCE IN CHANDIGARH WAS THE CAPITOL COMPLEX. • THE MOST IMPORTANT GROUP OF THE BUILDINGS CONSTITUTING THE CAPITOL- THE PARLIAMENT, THE SECRETARIAT THE POOL OF THE PALACE OF JUSTICE. • THE ARTIFICIAL HILLS IN THE FRONT OF THE SECRETARIAT HAVE NOT BEEN CREATED AND LAID OUT IN ACCORDANCE WITH CORBUSIERS CONCEPTIONS
  • 13.
    CAPITOL COMPLEX PLAN Open hand Governor's place Assembly secretariat High court
  • 14.
    THE CITY CENTRE(HEART) • The Central Sector of the city, Sector 17, is the main Public Congregation area of the city. It houses all major Shopping Complexes, Sports Facilities and Congregation Spaces.
  • 15.
    LANDSCAPES(LUNGS) • AHIERARCHY OF GREEN SPACES CAN BE OBSERVED RANGING FROM PUBLIC GREENS AT CITY LEVEL TO SEMI-PRIVATE TO PRIVATE GREEN AREAS. • CITY LEVEL PUBLIC GREEN SPACE WITH ARTIFICIAL WATER BODY • FREE- FLOWING GREEN SPACE, CONNECTING THE ENTIRE SITE • SEMI-PRIVATE GREEN AREAS FOR NEIGHBORHOOD POCKETS • PRIVATE GREEN AREAS FOR RESIDENTIAL UNITS
  • 16.
    OPEN SPACES •SOME 800 HECTARES OF GREEN OPEN SPACE ARE SPREAD OVER THE APPROXIMATELY 114 SQUARE KILOMETERS OF THE CAPITAL PROJECT AREA. MAJOR OPEN AREAS INCLUDE THE LEISURE VALLEY, SUKHNA LAKE, ROCK GARDEN AND MANY OTHER SPECIAL GARDENS.
  • 17.
    THE LIESURE VALLEY • THE LEISURE VALLEY IS A GREEN SPRAWLING SPACE EXTENDING NORTH-EAST TO SOUTH-WEST ALONG A SEASONAL RIVERLET GRADIENT AND WAS CONCEIVED BY LE CORBUSIER AS THE LUNGS OF THE CITY. • APART FROM LARGE PUBLIC PARKS AND SPECIAL BOTANICAL GARDENS, IT HOUSES SERIES OF FITNESS TRAILS, AMPHITHEATRES AND SPACES FOR OPEN-AIR EXHIBITIONS.
  • 19.
    ROAD NETWORK (7V’S-CIRCULATORYSYSTEM) • V1 CONNECTS CHANDIGARH TO OTHER CITIES • V2 ARE THE MAJOR AVENUES OF THE CITY E.G MADHYA MARG ETC • V3 ARE THE CORRIDORS STREETS FOR VEHICULAR TRAFFIC ONLY • V4…..V7 ARE THE ROADS WITHIN THE SECTORS
  • 20.
    PRINCIPLES OF URBANPLANNING • CONVENIENT WALKING DISTANCE FOR SOCIAL SERVICES LIKE SCHOOLS AND SHOPPING CENTRES. • STREET SYSTEM MAJOR ROADS SHOULD NOT PASS THROUGH RESIDENTIAL NEIGHBOURHOOD. • INTERNAL ROAD PATTERN SHOULD ENCOURAGE QUITE , SAFE , LOW VOLUME TRAFFIC MOVEMENT. • FACILITIES • ORDERLY ARRANGEMENT OF FACILITIES WHICH WOULD BE SHARED COMMON BY THE RESIDENTS . • A UNIT HAVING SHOPS, SCHOOL, HEALTH CENTRES AND PLACES OF RECREATIONS AND WORSHIPS. • BLOCKS ARE DIVIDED IN SECTORS. • EACH SECTOR IS SELF SUFFICIENT UNIT HAVING ALL FACILITIES . • THESE SECTORS VARIES DEPENDING UPON THE SIZE AND THE TOPOGRAPHY OF THE AREA.
  • 21.
  • 22.
    THE SECTOR •LE CORBUSIER AND HIS TEAM REPLACED SUPERBLOCKS WITNEIGHBOURHOOD UNITS, ”SECTORS”. IT IS THE PRIMARY MODULE OF CITY’S DESIGN, A NEIGHBOURHOOD UNIT OF SIZE 800 METERS X 1200 METERS. • EACH SECTOR IS A SELF-SUFFICIENT UNIT HAVING SHOPS, SCHOOL, HEALTH CENTRES AND PLACES OF RECREATIONS AND WORSHIP. • H A GEOMETRIC MATRIX OF GENERIC THE POPULATION OF A SECTOR VARIES BETWEEN 3000 AND 20000 DEPENDING UPON THE SIZES OF PLOTS AND THE TOPOGRAPHY OF THE AREA.
  • 23.
    • HOWEVER, THECITY WAS PLANNED TO HOUSE A NUMBER OF 150 000 INHABITANTS IN ITS FIRST PHASE, REALIZED BETWEEN 1951-66, AND 500 000 IN ITS” FINAL STAGE”. • THE NEIGHBOURHOOD ITSELF IS SURROUNDED BY THE FAST-TRAFFIC ROAD CALLED V3 INTERSECTING AT THE JUNCTIONS OF THE NEIGHBOURHOOD UNIT CALLED SECTOR WITH A DIMENSION OF 800 METERS BY 1200 METERS. • THE ENTRANCE OF CARS INTO THE SECTORS OF 800 METERS BY 1200M, WHICH ARE EXCLUSIVELY RESERVED TO FAMILY LIFE, CAN TAKE PLACE ON FOUR POINTS ONLY; IN THE MIDDLE OF THE 1200 M. IN THE MIDDLE OF THE 800 METERS. • ALL STOPPAGE OF CIRCULATION SHALL BE PROHIBITED AT THE FOUR CIRCUSES, AT THE ANGLES OF THE SECTORS.
  • 24.
    • THE BUSSTOPS ARE PROVIDED EACH TIME AT 200 METERS FROM THE CORNER SO AS TO SERVE THE FOUR PEDESTRIAN ENTRANCES INTO A SECTOR. • THUS, THE TRANSIT TRAFFIC TAKES PLACE OUT OF THE SECTORS: THE SECTORS BEING SURROUNDED BY FOUR WALL-BOUND CAR ROADS WITHOUT OPENINGS (THE V3S). • AND THIS (A NOVELTY IN TOWN-PLANNING AND DECISIVE) WAS APPLIED AT CHANDIGARH: NO HOUSE (OR BUILDING) DOOR OPENS ON THE THOROUGHFARE OF RAPID TRAFFIC. • THERE ARE 30 SECTORS IN CHANDIGARH,OF WHICH 24 ARE RESIDENTIAL.
  • 25.
    HOUSING • LOWERCATEGORY RESIDENTIAL BUILDINGS ARE GOVERNED BY A MECHANISM KNOWN AS “FRAME CONTROL” TO CONTROL THEIR FACADES. • THIS FIXES THE BUILDING LINE AND HEIGHT AND THE USE OF BUILDING MATERIALS. • CERTAIN STANDARD SIZES OF DOORS AND WINDOWS ARE SPECIFIED AND ALL THE GATES AND BOUNDARY WALLS MUST CONFORM TO STANDARD DESIGN. • THIS PARTICULARLY APPLIES TO HOUSES BUILT ON SMALL PLOTS OF 250 SQUARE METRES OR LESS.
  • 26.
    BUILDING TYPOLOGY •The basic typology is extremely rectilinear with similar proportions. • Residential units are arranged around central common green spaces with different shapes.