BUILDING CONSTRUCTION II
BLD67303
BUILDING CONSTRUCTION II
BLD67303
OW XUN CONG 0321997
NG ZHIANG HAN 0331394
TERENCE THIA 0327661
TAN YOW HUE 0327550
GRACE WONG 0324575
NG YU JIE FREDERICK 0327607
PROJECT 1 : SKELETAL
STRUCTURES (TEMPORARY
BUS SHELTER)
CONTENTS
Introduction 01
1 1 Conclusion
02
03 Massing
05 Orthographic Drawings
06 Exploded Axonometric
Design Consideration
07Construction Process
08Construction Details
09Design Analysis
1 0Final Model And Rendering
1 2 Reference
04 Design Development
01INTRODUCTION
THIS PROJECT AIMS ARE TO CREATE AN UNDERSTANDING OF SKELETAL STRUCTURAL
AND ITS RELEVANT STRUCTURAL COMPONENTS TO LET USER EXPERIENCE AND
IMPROVE OUR UNDERSTANDING ABOUT SKELETAL CONSTRUCTIONS AS ONE OF THE
MOST IMPORTANT WIDELY USED STRUCTURE FOR BUILDING SUPPORT.
IN A GROUP OF SIX PEOPLE, WE WERE REQUIRED TO CONSTRUCT A TEMPORARY BUS
SHELTER WITH THE SCALE OF 1:5 BY FOCUSING ON THE STRENGTH AND FLEXIBILITY
OF THE MATERIALS AND THE STABILITY OF THE STRUCTURE ITSELF WOULD BE TESTED
TO SEE HOW IT COULD ENDURE LATERAL FORCE.
THE OBJECTIVES OF THIS PROJECT ARE AS FOLLOWS:
● TO CREATE AN UNDERSTANDING OF SKELETAL STRUCTURE AND ITS
RELEVANT STRUCTURAL COMPONENTS
● TO UNDERSTAND HOW A SKELETAL STRUCTURE REACTS UNDER LOADING.
● TO DEMONSTRATE A CONVINCING UNDERSTANDING OF HOW SKELETAL
CONSTRUCTION WORKS.
● TO BE ABLE TO MANIPULATE SKELETAL CONSTRUCTION TO SOLVE AN
OBLIQUE DESIGN PROBLEM
LEARNING OUTCOMES ASSESSED IN THIS PROJECT INCLUDE :
● APPLY CONSTRUCTION SYSTEM IN DESIGN.
● RECOGNIZE THE IMPLICATION OF CONSTRUCTION SYSTEM IN DESIGN.
● ANALYZE THE ISSUES OF STRENGTH, STIFFNESS AND STABILITY OF
STRUCTURES INCLUDING MODES OF STRUCTURAL SYSTEMS, FORCES,
STRESS AND STRAIN AND LAWS OF STATIC.
1
WEATHER RESISTANT
USAGE OF MATERIALS THAT IS ABLE TO
WITHSTAND HOT AND HUMID MALAYSIAN
CLIMATE WHILE PROVIDING PROTECTION FROM
RAINS
02DESIGN
CONSIDERATION
2
SUNLIGHT
USAGE OF POLYCARBONATE ROOF TO ALLOW
DIRECT NATURAL SUNLIGHT TO BE PENETRATED
THROUGH BUT STILL PROTECTING THE USERS FROM
UV LIGHT AS IT IS UV RESISTANT. THE RAFTERS OF
THE ROOF ALSO ACT AS SHADING DEVICES FOR THE
SHELTER.
VENTILATION
OPENINGS TO ENCOURAGE GOOD AIR FLOW
THROUGH THE BUS SHELTER WHILE PROVIDING
AIR VENTILATION TO MEET USER’S THERMAL
COMFORTABILITY
RAIN
WATER FLOW
SUN PATH
AIR FLOW
STABILITY
SKELETAL STRUCTURE THAT IS ABLE TO RESIST
VERTICAL AND HORIZONTAL LOADS WHICH PREVENTS
THE BUS SHELTER FROM COLLAPSING, AND ABLE TO
RESIST UPLIFT AND OVERTURNING FROM WIND LOADS
MATERIALITY
SELECTION OF THE MATERIAL FOR THE BUS SHELTER
ARE BASED ON STURDINESS, WORKABILITY,
AVAILABILITY AND LEAST ENVIRONMENTAL IMPACT
ACCESSIBILITY AND VIEWABILITY
EASILY ACCESSIBLE FROM IN AND OUT OF THE BUS SHELTER,
MAXIMUM VISIBILITY TO ALLOW VIEWINGS OF TRAFFIC
CONDITION AND SURROUNDING. TAKES INTO CONSIDERATION
OF HUMAN ERGONOMICS AND ANTHROPOMETRY TO ALLOW
CONVENIENCE OF USE.
3
POLYCARBONATE
ROOF
CONCRETE PAD
FOOTING
MERBAU WOOD
ACCESSIBILITY
LOADS
03
THE TWO BASIC FORMS CHOSEN FOR OUR FINAL
DESIGN INCLUDE A CUBOID AND A TRIANGULAR PRISM.
THE FORM CUBOID ARE CHOSEN FOR THE BASE OF THE
BUS SHELTER BECAUSE IT PROVIDES GREAT STABILITY
WHILE GIVING MORE UTILIZATION OF SPACE DUE TO ITS
LARGE BASE. THE FORM TRIANGULAR PRISM ARE
CHOSEN AS DESIGN FOR THE ROOF AS IT HAS A
SLANTED CHARACTERISTIC WHICH HELPS IN DIRECTING
THE RAINWATER AWAY AND AN EFFECTIVE SHED
DEVICES.
MASSING
4
Initially, the design of the bus shelter was to have a
double roof design with polycarbonate and
perforated metal sheet because it provide shading
while still allowing sunlight penetrate through. The
form of the shelter was originated from a cuboid as
it is stable and rigid.
To enhance the user experience of the bus
shelter, we developed the design of the bus
shelter into two connected cuboid. Which
allows for more openings to allow better
circulation.
Before designing our bus shelter, we started
with selecting two basic forms for our
inspiration. At first we wanted to have a
basic design that is firm and rigid, so we
choose the form cuboid as our base
because it has a stable base.
The final design of our model is different from our previous
designs as we wanted to create a more challenging design
so we added a slanted roof which prompted changes in
method of joineries, as we also changed our materials to
timber because it is more local adapted. We also added
some structural support to allow our shelter to be more
1 2 3
4
04 DESIGN
DEVELOPMENT
5
05ORTHOGRAPHIC
DRAWINGS
6
FRONT ELEVATION
Scale 1:25
RIGHT ELEVATION
Scale 1:25
4150 2350
32003200
7
REAR ELEVATION
Scale 1:25
LEFT ELEVATION
Scale 1:25
2500
4150 2350
2500
3200
ROOFTOP PLAN
Scale 1 : 25
FLOOR PLAN
Scale 1 : 25
8
4150
2350
4150
2000
06EXPLODED
AXONOMETRIC
9
Solid Timber Post
Spaced Timber Post
Dado Joint
Roof Beam
Angular Woodseat Piece
Timber Deck
Floor Joist
Base plate - Through Bolt
Steel plate
Main Ground Beam
Pad Footing B
Polycarbonate Sheet
Wood Screw
Roof Rafter
Seat Plank
Sub Ground Beam
Cross Halving Joint
Pad Footing A
Tee-Half Joint
Wood is measured and cut
accordingly to the
dimension. Skeletal joint for
the base are formed after
joining the wood with the
joints.
Wooden blocks are built and
represent to the foundation
footing for the bus stop.
Joists are combined on the
skeletal wood base frame
after measured and cut out.
Columns and the roof beam
are cut out together with the
joint
Columns are fixed on the
foundation and the base
structure. Roof beam are joint
together with the main
column.
Rafter are cut out and screwed
on the roof beam
L bracket are added between
the main column and the roof
beam to make it more stable
Plywood are measured before
proceed to the cutting process
as well as the opening for the
columns
1 2 3 4
5 6 87
07CONSTRUCTION
PROCESS
10
The cut plywood are now
fixed on the wood base
structure
Completion of the main
structure of the bus stop
Wood are customized to
pieces for the fixing of the
benches in between the main
columns
Completion of the benches
for the bus stop
The wood surface of the bus
stop are clean and smooth
Wood preserver and
shellac are spray on it and
leave it dry
Grey concrete color are spray
on each wooden foundation
which representing the
concrete material
Polycarbonate roof are
measured and cut out by the
cutting machine
9 10 11 12
11
13 13 14 15
The polycarbonate roof are
attached on to the rafters by
screwing mechanically
Customized steel plates are added
between the columns and the base
structure to make the whole
structure become more stable
12
16 17
Composed of large
stumps of concrete, the
concrete pad footing
are used as the
foundation of the bus
shelter. The pad
footings receives
vertical forces and loads
from the shelter and
transfer it to the ground
which helps in
supporting the
structure.
08CONSTRUCTION
DETAILS
13
FOUNDATION DETAILS
A
B
FRONT
BACK
PAD FOOTING A
Connectivity of Column
to Footing B
Threaded steel rod
A threaded steel rod is epoxied into
concrete and drilled into the bottom
of the post. The rod extends up to a
mortise, and is bolted to a plate
washer.
Steel angle bracket, bolt, nut
Steel angle brackets mounted through
with anchor bolts are used to secure
the column with footing at the side.
Connectivity of Column
to Footing B
PAD FOOTING B
CONNECTIONS
Connectivity of Beams
to Footing A
Steel plate, Anchor bolts
Anchor bolts are first mounted on
top of footings and are then
connected through the beams. A
steel base plate is then used to
secure the bolts together with nuts.
Smaller in size, the pad footings
of our bus shelter serves as
foundation to support the loads.
It has a total of 6 small pad
footings with two at each side
and two in the middle to provide
efficient support for the whole
shelter.
The size of the footings at the
back are bigger compared to
other footings to accommodate
for the area usage of columns
and to counterbalance the load of
overhanging roof.
BASE DETAILS
Connectivity of Main
beam to Sub beam
Connectivity of Main
beam to Sub beam
Halving joint, Steel plate
Using a type of halving joint known as
Tee Halving Joint, It is used to connect
the end of the main ground beam
together to the sub ground beam. After
attaching both beams together
Cross halving joint, Steel plate
Known as a Cross halving joint, it is
used to connect the main beam
intersecting the sub beam in the middle
which is then secured using a steel
plate.
The halving joint works when a
section with half of its thickness is
removed from the end of the
secondary beam and half of its
thickness are removed from the
primary beam and are connected
together.
Connectivity of Column
to Ground Beam
Steel Plates
Steel plates are used in the connections
between the columns and the ground
beam. Ensuring maximum stability, it is
placed at the side locking both the beam
and columns together.
Main Ground Beam
Sub Ground Beam
The main ground beam is the main support of the base.
It is responsible of transferring load from the decking to
the foundation and to the ground
The sub ground beam transfer any excess load from
the decking to the main beam then to the
foundation.
HALVING JOINT
14
CONNECTIONS
FLOOR JOIST
DECKING
Timber floor joist is the secondary floor structure of the
bus shelter. The floor joist rest directly on top of the
ground beam. The timber are arranged accordingly to
transfer load to the ground beam. The joist are connected
to the ground beam. To further secure the joist and beam
together, L Bracket are used to keep the joist in place.
15
FLOORING DETAILS
The decking is placed directly on top of the floor joist.
The decking is then nailed into the floor joist to secure the
flooring of the bus shelter. The choice of decking over
panels is because it provide a flat surface for users.
TIMBER FRAME - The columns are intersected and tilted in
angles bilaterally to support the cantilevered roof beams and to
create a pitched roof.
PERSPECTIVE OF TIMBER FRAME
Bolt, angle bracket, L bracket
The beam rests on top of the solid
timber post and is fastened with an
anchor bolt. The connection is secured
with an angle bracket. L brackets are
also installed at a 90 degree angle to
further secured the beam to the post.
Lap Joint, through bolt
The beam rests upon the half lap of the
spaced post and is secured by a
through bolt.
Dado Joint, through bolt
Solid timber post intersects through the
dado joints of spaced post. Connections
are secured with through bolts.
Connectivity of Posts
Connectivity of Beam to
Spaced Post
Connectivity of Beam to
Post
Through bolt
TIMBER FRAME DETAILS
16
CONNECTIONS
Dado Joint on posts
Lap Joint on the
spaced post
5°
5°
15°
Connectivity of Seat
Backing with Column
Mortise and tenon joint
The tenon from the timber plank of seat
backing joins into mortise cut out in main
column at a 90° angle. It supports the seat
securely by conjoining the seat backing with
the main column.
PERSPECTIVES OF SEATING AREA
Connectivity of Seat with
Column
Bolt and nut
The seating is supported by an angular
wood piece which is bolted onto the main
column, transferring most load to the main
supporting member.
The angular woodpiece spans the seats
width and rests on the decking, which is
supported by joists and then beams.
17
SEATING DETAILS
CONNECTIONS
A
A
B
B
The roof of the bus shelter is
tilted to a 5 degree angle. The
reason behind that is to allow
rainwater to flow to the back
of the bus shelter and prevent
stagnation of water on the
roof. The roof consist of 3
layer which is the
polycarbonate roofing, the
rafter and the roof beam.
ROOF DETAILS
18
The roof rafter sits atop the roof beam, it acts as a
support for the polycarbonate sheets. It is connected
with screws onto the beam as it supports only a
lightweight polycarbonate sheet. The proximity of
arrangement also provides slight filtering of sunlight.
Connectivity of Roof Rafter
Polycarbonate roof
Rafters
Perspective view of roof structure
Perspective view of roof structure Exploded axonometric of roof structure
Wood screw
Floor Joist
The excellent properties of polycarbonate panels make
them the preferred material for building greenhouses.
These panels are resistant to heat, sunlight, snow, and
rain, which enable them to last for many years without
fading or discolouring.
Fixing Buttons
Connectivity of Polycarbonate Roof to Rafter
The fixing buttons are designed to connect the rafter and
roof sheet together. The cap creates a larger surface of
contact for the screw and the polycarbonate sheet. The
cap also prevents rusting of the screw as it prevents
rainwater from getting contact with the screw. A silicon
sealant is applied to prevent any water from entering the
screw
Polycarbonate roof is tightened in place by fixing buttons
which secures the sheet onto the roof rafters
19
DEAD LOAD/ STATIC LOAD
09DESIGN
ANALYSIS
20
LOAD AND FORCES
LIVE LOAD
FORCE TRANSFERRED FROM THE STRUCTURE’S PERMANENT
ELEMENTS THROUGHOUT THE LIFESPAN. ELEMENTS SUCH AS
THE ROOF, BENCH AND THE BEAMS TRANSFER THEIR LOAD
DOWNWARDS THROUGHOUT THE COLUMNS TO THE PAD
FOOTINGS.
FORCE APPLIED BY NON PERMANENT OBJECTS SUCH AS HUMANS,
ANIMALS AND PRECIPITATION. THE INTENSITY OF THE FORCE
VARIES ACCORDING TO THE NUMBER AND WEIGHT OF NON
PERMANENT OBJECTS ON THE BUS SHELTER. THE DECKING ARE
DESIGNED TO CARRY LIVE LOADS AND RELIEVE THE STRESS OF THE
LOADS PLACED ON THE STRUCTURES.
PRECIPITATION
HUMAN LOAD
LOAD
LOAD
LOAD OF PERMANENT
STRUCTURE
21
WIND LOAD
AIR MOVEMENT CAUSES UPLIFTING UPON THE ROOF, AND
POTENTIALLY OVERTURNING OF STRUCTURE. THIS FORCE IS
COUNTERBALANCED BY THE TENSION AND VERTICAL SUPPORT
OF THE COLUMNS, AND FURTHER ANCHORED DOWN BY PAD
FOOTINGS.
WIND ACTING UPWARDS ON
ROOF
WIND PASSES
THROUGH
WIND PASSES
THROUGH
WIND FORCE ACTING UPON THE MAIN STRUCTURE AND THE
POLYCARBONATE ROOF
THE STRUCTURE OPTIMIZES ON NATURAL VENTILATION WHILE
REDUCING WIND LOADS ACTING UPON THE STRUCTURE BY
EMBRACING OPENNESS THROUGH ITS SKELETAL DESIGN
MATERIAL ANALYSIS
MERBAU
Used as overall material for the
temporary bus shelter. Merbau is
a local building material that
offers superior performance in
withstanding harsh environmental
conditions, making it optimal for
outdoor construction
Characteristics: High tensile
strength, good strength to weight
ratio, weather resistant, minimal
maintenance
POLYCARBONATE SHEET
Used as material for roof of the
temporary bus shelter, it allows
direct sunlight to brighten the
interior while providing suitable
thermal comfort for the users.
Characteristics: Resilient,
extremely lightweight, UV
protection, light permeability
CONCRETE
Simplest and most cost-effective material
option for footing for vertical support while
transferring load downwards
23
22
LOAD TESTS
To test out the bus shelter structural capabilities. We initiated with a
6 liter water bottle. We placed the bottle on every horizontal flat
surface to simulate live loads imposed on the structure.
We placed it on the decking to test the ground beam structure.
Then we placed it on the seating to test the seating joints and the
column structure. Finally we placed it on the roof to test its load
transfer from roof to the ground. From the test we could tell that no
damage or cracks have happened, and that the structure is
successful at withstanding the loads.
To wrap it up, we decided to let one of our teammate to sit on top
of the roof. Grace weighs 45 kilograms. Still, no damage have
happened to the bus shelter. With proper structural and joint
system, The strength of the bus shelters skeletal structure in
withstanding forces and stresses while maintaining stability is
confirmed.
10FINAL MODEL &
RENDERING
24
11CONCLUSION
25
THROUGHOUT THIS ASSIGNMENT, WE LEARN TO COMMUNICATE WELL AMONG EACH OTHER AS WE WORK
TOGETHER AS A TEAM. WE TOGETHER AS A TEAM LEARN AND UNDERSTAND HOW A SKELETAL CONSTRUCTION
FUNCTION AND CONSTRUCTED. WE LEARN TO CONSTRUCT OUR OWN DESIGN BASED ON THESE
UNDERSTANDING TO RECREATE A STRUCTURE OF A BUS SHELTER THAT IS ABLE TO OVERCOME ITS STRESS
AND LOADS WITH ITS SKELETAL STRUCTURE. NOT ONLY THAT, WE HAVE LEARNT TO TAKE INTO ACCOUNT THE
DESIGN CONSIDERATIONS ON OUR BUS SHELTER SO THAT IT HAS THE ABILITY TO OVERCOME OUR LOCAL
CLIMATE WHILE MAINTAINING STRUCTURAL INTEGRITY. TO CONSTRUCT OUR OWN BUS SHELTER THAT
FEATURED ITS OWN CONSTRUCTION SKELETAL STRUCTURE AND IN THE END WRITE DOWN OUR
UNDERSTANDING OF JOINTS.
12REFERENCE
26
BOOK SOURCE
1 ) Ching, F. and Adams, C. (2008). Building construction illustrated. New York: Van Nostrand Reinhold.
2 ) Volz, M., Herzog, T., Natterer, J., Schweitzer, R. and Winter, W. (2012). Timber Construction Manual. Basel: De
Gruyter.
3 ) Chudley, R. and Greeno, R. (1999). Construction technology. Harlow: Longman.
INTERNET SOURCE
1) JOINTS METHOD : Chestofbooks.com. (2010). The Halved Joint. [online] Available at:
http://chestofbooks.com/home-improvement/woodworking/Woodwork-Joints/The-Halved-Joint.html [Accessed 15 May
2018].
2) TIMBER FRAMEWORK : Vermonttimberworks.com. (2018). Post Bases for Timber Frames and Post and Beam
Buildings. [online] Available at: http://www.vermonttimberworks.com/learn/timber-frame-joinery/post-bases/ [Accessed
15 May 2018].
3) DEAD LOAD AND LIVE LOAD : Pieglobal.com. (2018). Live Loads vs. Dead Loads: Determining Building Design Loads
for Structural Claims | Pie Consulting & Engineering. [online] Available at:
http://www.pieglobal.com/live-loads-vs-dead-loads-determining-building-design-loads-for-structural-claims/ [Accessed
15 May 2018].
4)

More Related Content

What's hot

BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTDarshiini Vig
 
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportTan Jaden
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelterJoe Onn Lim
 
Building construction-ii
Building construction-iiBuilding construction-ii
Building construction-iijinlieww
 
Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal reportConor Meaney
 
Building construction ii
Building construction iiBuilding construction ii
Building construction iiJia Xin Chee
 
High rise buildings for architects by Dr.-Eng. Moaid subh
High rise buildings for architects   by Dr.-Eng. Moaid subhHigh rise buildings for architects   by Dr.-Eng. Moaid subh
High rise buildings for architects by Dr.-Eng. Moaid subhmoaidsubh
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsGrace Henry
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structuresAnupama Krishnan
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4amCeline Tan
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionRamin Vaghei
 
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)Dimple Poddar
 

What's hot (18)

Bcon report
Bcon reportBcon report
Bcon report
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
 
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
 
Building construction-ii
Building construction-iiBuilding construction-ii
Building construction-ii
 
Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal report
 
Building construction ii
Building construction iiBuilding construction ii
Building construction ii
 
kkr 2
kkr 2kkr 2
kkr 2
 
High rise buildings for architects by Dr.-Eng. Moaid subh
High rise buildings for architects   by Dr.-Eng. Moaid subhHigh rise buildings for architects   by Dr.-Eng. Moaid subh
High rise buildings for architects by Dr.-Eng. Moaid subh
 
Post lintel structre
Post lintel structrePost lintel structre
Post lintel structre
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structures
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4am
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
B con 2
B con 2B con 2
B con 2
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 

Similar to Bcon

BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1Yen Min Khor
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)Lek Yuen
 
Building construction ii (1)
Building construction ii (1)Building construction ii (1)
Building construction ii (1)杉 江紫
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT Eric Lo
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstopchuenmin
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1Carlson Ko
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop reportAmelisa Collins
 
Skeletal Structure
Skeletal StructureSkeletal Structure
Skeletal StructureChevally Lo
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressedAlexis Wei
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf reportAnderson Wong
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13Minhal Haider
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportWilden How
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...IRJET Journal
 

Similar to Bcon (20)

BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)
 
Building construction ii (1)
Building construction ii (1)Building construction ii (1)
Building construction ii (1)
 
Bconreport
BconreportBconreport
Bconreport
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstop
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
 
Skeletal Structure
Skeletal StructureSkeletal Structure
Skeletal Structure
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressed
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf report
 
BCON II PROJECT 1
BCON II PROJECT 1BCON II PROJECT 1
BCON II PROJECT 1
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
Long Span Structures
Long Span StructuresLong Span Structures
Long Span Structures
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
 

Recently uploaded

Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

Bcon

  • 1. BUILDING CONSTRUCTION II BLD67303 BUILDING CONSTRUCTION II BLD67303 OW XUN CONG 0321997 NG ZHIANG HAN 0331394 TERENCE THIA 0327661 TAN YOW HUE 0327550 GRACE WONG 0324575 NG YU JIE FREDERICK 0327607 PROJECT 1 : SKELETAL STRUCTURES (TEMPORARY BUS SHELTER)
  • 2. CONTENTS Introduction 01 1 1 Conclusion 02 03 Massing 05 Orthographic Drawings 06 Exploded Axonometric Design Consideration 07Construction Process 08Construction Details 09Design Analysis 1 0Final Model And Rendering 1 2 Reference 04 Design Development
  • 3. 01INTRODUCTION THIS PROJECT AIMS ARE TO CREATE AN UNDERSTANDING OF SKELETAL STRUCTURAL AND ITS RELEVANT STRUCTURAL COMPONENTS TO LET USER EXPERIENCE AND IMPROVE OUR UNDERSTANDING ABOUT SKELETAL CONSTRUCTIONS AS ONE OF THE MOST IMPORTANT WIDELY USED STRUCTURE FOR BUILDING SUPPORT. IN A GROUP OF SIX PEOPLE, WE WERE REQUIRED TO CONSTRUCT A TEMPORARY BUS SHELTER WITH THE SCALE OF 1:5 BY FOCUSING ON THE STRENGTH AND FLEXIBILITY OF THE MATERIALS AND THE STABILITY OF THE STRUCTURE ITSELF WOULD BE TESTED TO SEE HOW IT COULD ENDURE LATERAL FORCE. THE OBJECTIVES OF THIS PROJECT ARE AS FOLLOWS: ● TO CREATE AN UNDERSTANDING OF SKELETAL STRUCTURE AND ITS RELEVANT STRUCTURAL COMPONENTS ● TO UNDERSTAND HOW A SKELETAL STRUCTURE REACTS UNDER LOADING. ● TO DEMONSTRATE A CONVINCING UNDERSTANDING OF HOW SKELETAL CONSTRUCTION WORKS. ● TO BE ABLE TO MANIPULATE SKELETAL CONSTRUCTION TO SOLVE AN OBLIQUE DESIGN PROBLEM LEARNING OUTCOMES ASSESSED IN THIS PROJECT INCLUDE : ● APPLY CONSTRUCTION SYSTEM IN DESIGN. ● RECOGNIZE THE IMPLICATION OF CONSTRUCTION SYSTEM IN DESIGN. ● ANALYZE THE ISSUES OF STRENGTH, STIFFNESS AND STABILITY OF STRUCTURES INCLUDING MODES OF STRUCTURAL SYSTEMS, FORCES, STRESS AND STRAIN AND LAWS OF STATIC. 1
  • 4. WEATHER RESISTANT USAGE OF MATERIALS THAT IS ABLE TO WITHSTAND HOT AND HUMID MALAYSIAN CLIMATE WHILE PROVIDING PROTECTION FROM RAINS 02DESIGN CONSIDERATION 2 SUNLIGHT USAGE OF POLYCARBONATE ROOF TO ALLOW DIRECT NATURAL SUNLIGHT TO BE PENETRATED THROUGH BUT STILL PROTECTING THE USERS FROM UV LIGHT AS IT IS UV RESISTANT. THE RAFTERS OF THE ROOF ALSO ACT AS SHADING DEVICES FOR THE SHELTER. VENTILATION OPENINGS TO ENCOURAGE GOOD AIR FLOW THROUGH THE BUS SHELTER WHILE PROVIDING AIR VENTILATION TO MEET USER’S THERMAL COMFORTABILITY RAIN WATER FLOW SUN PATH AIR FLOW
  • 5. STABILITY SKELETAL STRUCTURE THAT IS ABLE TO RESIST VERTICAL AND HORIZONTAL LOADS WHICH PREVENTS THE BUS SHELTER FROM COLLAPSING, AND ABLE TO RESIST UPLIFT AND OVERTURNING FROM WIND LOADS MATERIALITY SELECTION OF THE MATERIAL FOR THE BUS SHELTER ARE BASED ON STURDINESS, WORKABILITY, AVAILABILITY AND LEAST ENVIRONMENTAL IMPACT ACCESSIBILITY AND VIEWABILITY EASILY ACCESSIBLE FROM IN AND OUT OF THE BUS SHELTER, MAXIMUM VISIBILITY TO ALLOW VIEWINGS OF TRAFFIC CONDITION AND SURROUNDING. TAKES INTO CONSIDERATION OF HUMAN ERGONOMICS AND ANTHROPOMETRY TO ALLOW CONVENIENCE OF USE. 3 POLYCARBONATE ROOF CONCRETE PAD FOOTING MERBAU WOOD ACCESSIBILITY LOADS
  • 6. 03 THE TWO BASIC FORMS CHOSEN FOR OUR FINAL DESIGN INCLUDE A CUBOID AND A TRIANGULAR PRISM. THE FORM CUBOID ARE CHOSEN FOR THE BASE OF THE BUS SHELTER BECAUSE IT PROVIDES GREAT STABILITY WHILE GIVING MORE UTILIZATION OF SPACE DUE TO ITS LARGE BASE. THE FORM TRIANGULAR PRISM ARE CHOSEN AS DESIGN FOR THE ROOF AS IT HAS A SLANTED CHARACTERISTIC WHICH HELPS IN DIRECTING THE RAINWATER AWAY AND AN EFFECTIVE SHED DEVICES. MASSING 4
  • 7. Initially, the design of the bus shelter was to have a double roof design with polycarbonate and perforated metal sheet because it provide shading while still allowing sunlight penetrate through. The form of the shelter was originated from a cuboid as it is stable and rigid. To enhance the user experience of the bus shelter, we developed the design of the bus shelter into two connected cuboid. Which allows for more openings to allow better circulation. Before designing our bus shelter, we started with selecting two basic forms for our inspiration. At first we wanted to have a basic design that is firm and rigid, so we choose the form cuboid as our base because it has a stable base. The final design of our model is different from our previous designs as we wanted to create a more challenging design so we added a slanted roof which prompted changes in method of joineries, as we also changed our materials to timber because it is more local adapted. We also added some structural support to allow our shelter to be more 1 2 3 4 04 DESIGN DEVELOPMENT 5
  • 8. 05ORTHOGRAPHIC DRAWINGS 6 FRONT ELEVATION Scale 1:25 RIGHT ELEVATION Scale 1:25 4150 2350 32003200
  • 9. 7 REAR ELEVATION Scale 1:25 LEFT ELEVATION Scale 1:25 2500 4150 2350 2500 3200
  • 10. ROOFTOP PLAN Scale 1 : 25 FLOOR PLAN Scale 1 : 25 8 4150 2350 4150 2000
  • 11. 06EXPLODED AXONOMETRIC 9 Solid Timber Post Spaced Timber Post Dado Joint Roof Beam Angular Woodseat Piece Timber Deck Floor Joist Base plate - Through Bolt Steel plate Main Ground Beam Pad Footing B Polycarbonate Sheet Wood Screw Roof Rafter Seat Plank Sub Ground Beam Cross Halving Joint Pad Footing A Tee-Half Joint
  • 12. Wood is measured and cut accordingly to the dimension. Skeletal joint for the base are formed after joining the wood with the joints. Wooden blocks are built and represent to the foundation footing for the bus stop. Joists are combined on the skeletal wood base frame after measured and cut out. Columns and the roof beam are cut out together with the joint Columns are fixed on the foundation and the base structure. Roof beam are joint together with the main column. Rafter are cut out and screwed on the roof beam L bracket are added between the main column and the roof beam to make it more stable Plywood are measured before proceed to the cutting process as well as the opening for the columns 1 2 3 4 5 6 87 07CONSTRUCTION PROCESS 10
  • 13. The cut plywood are now fixed on the wood base structure Completion of the main structure of the bus stop Wood are customized to pieces for the fixing of the benches in between the main columns Completion of the benches for the bus stop The wood surface of the bus stop are clean and smooth Wood preserver and shellac are spray on it and leave it dry Grey concrete color are spray on each wooden foundation which representing the concrete material Polycarbonate roof are measured and cut out by the cutting machine 9 10 11 12 11 13 13 14 15
  • 14. The polycarbonate roof are attached on to the rafters by screwing mechanically Customized steel plates are added between the columns and the base structure to make the whole structure become more stable 12 16 17
  • 15. Composed of large stumps of concrete, the concrete pad footing are used as the foundation of the bus shelter. The pad footings receives vertical forces and loads from the shelter and transfer it to the ground which helps in supporting the structure. 08CONSTRUCTION DETAILS 13 FOUNDATION DETAILS A B FRONT BACK PAD FOOTING A Connectivity of Column to Footing B Threaded steel rod A threaded steel rod is epoxied into concrete and drilled into the bottom of the post. The rod extends up to a mortise, and is bolted to a plate washer. Steel angle bracket, bolt, nut Steel angle brackets mounted through with anchor bolts are used to secure the column with footing at the side. Connectivity of Column to Footing B PAD FOOTING B CONNECTIONS Connectivity of Beams to Footing A Steel plate, Anchor bolts Anchor bolts are first mounted on top of footings and are then connected through the beams. A steel base plate is then used to secure the bolts together with nuts. Smaller in size, the pad footings of our bus shelter serves as foundation to support the loads. It has a total of 6 small pad footings with two at each side and two in the middle to provide efficient support for the whole shelter. The size of the footings at the back are bigger compared to other footings to accommodate for the area usage of columns and to counterbalance the load of overhanging roof.
  • 16. BASE DETAILS Connectivity of Main beam to Sub beam Connectivity of Main beam to Sub beam Halving joint, Steel plate Using a type of halving joint known as Tee Halving Joint, It is used to connect the end of the main ground beam together to the sub ground beam. After attaching both beams together Cross halving joint, Steel plate Known as a Cross halving joint, it is used to connect the main beam intersecting the sub beam in the middle which is then secured using a steel plate. The halving joint works when a section with half of its thickness is removed from the end of the secondary beam and half of its thickness are removed from the primary beam and are connected together. Connectivity of Column to Ground Beam Steel Plates Steel plates are used in the connections between the columns and the ground beam. Ensuring maximum stability, it is placed at the side locking both the beam and columns together. Main Ground Beam Sub Ground Beam The main ground beam is the main support of the base. It is responsible of transferring load from the decking to the foundation and to the ground The sub ground beam transfer any excess load from the decking to the main beam then to the foundation. HALVING JOINT 14 CONNECTIONS
  • 17. FLOOR JOIST DECKING Timber floor joist is the secondary floor structure of the bus shelter. The floor joist rest directly on top of the ground beam. The timber are arranged accordingly to transfer load to the ground beam. The joist are connected to the ground beam. To further secure the joist and beam together, L Bracket are used to keep the joist in place. 15 FLOORING DETAILS The decking is placed directly on top of the floor joist. The decking is then nailed into the floor joist to secure the flooring of the bus shelter. The choice of decking over panels is because it provide a flat surface for users.
  • 18. TIMBER FRAME - The columns are intersected and tilted in angles bilaterally to support the cantilevered roof beams and to create a pitched roof. PERSPECTIVE OF TIMBER FRAME Bolt, angle bracket, L bracket The beam rests on top of the solid timber post and is fastened with an anchor bolt. The connection is secured with an angle bracket. L brackets are also installed at a 90 degree angle to further secured the beam to the post. Lap Joint, through bolt The beam rests upon the half lap of the spaced post and is secured by a through bolt. Dado Joint, through bolt Solid timber post intersects through the dado joints of spaced post. Connections are secured with through bolts. Connectivity of Posts Connectivity of Beam to Spaced Post Connectivity of Beam to Post Through bolt TIMBER FRAME DETAILS 16 CONNECTIONS Dado Joint on posts Lap Joint on the spaced post 5° 5° 15°
  • 19. Connectivity of Seat Backing with Column Mortise and tenon joint The tenon from the timber plank of seat backing joins into mortise cut out in main column at a 90° angle. It supports the seat securely by conjoining the seat backing with the main column. PERSPECTIVES OF SEATING AREA Connectivity of Seat with Column Bolt and nut The seating is supported by an angular wood piece which is bolted onto the main column, transferring most load to the main supporting member. The angular woodpiece spans the seats width and rests on the decking, which is supported by joists and then beams. 17 SEATING DETAILS CONNECTIONS A A B B
  • 20. The roof of the bus shelter is tilted to a 5 degree angle. The reason behind that is to allow rainwater to flow to the back of the bus shelter and prevent stagnation of water on the roof. The roof consist of 3 layer which is the polycarbonate roofing, the rafter and the roof beam. ROOF DETAILS 18 The roof rafter sits atop the roof beam, it acts as a support for the polycarbonate sheets. It is connected with screws onto the beam as it supports only a lightweight polycarbonate sheet. The proximity of arrangement also provides slight filtering of sunlight. Connectivity of Roof Rafter Polycarbonate roof Rafters Perspective view of roof structure Perspective view of roof structure Exploded axonometric of roof structure Wood screw Floor Joist
  • 21. The excellent properties of polycarbonate panels make them the preferred material for building greenhouses. These panels are resistant to heat, sunlight, snow, and rain, which enable them to last for many years without fading or discolouring. Fixing Buttons Connectivity of Polycarbonate Roof to Rafter The fixing buttons are designed to connect the rafter and roof sheet together. The cap creates a larger surface of contact for the screw and the polycarbonate sheet. The cap also prevents rusting of the screw as it prevents rainwater from getting contact with the screw. A silicon sealant is applied to prevent any water from entering the screw Polycarbonate roof is tightened in place by fixing buttons which secures the sheet onto the roof rafters 19
  • 22. DEAD LOAD/ STATIC LOAD 09DESIGN ANALYSIS 20 LOAD AND FORCES LIVE LOAD FORCE TRANSFERRED FROM THE STRUCTURE’S PERMANENT ELEMENTS THROUGHOUT THE LIFESPAN. ELEMENTS SUCH AS THE ROOF, BENCH AND THE BEAMS TRANSFER THEIR LOAD DOWNWARDS THROUGHOUT THE COLUMNS TO THE PAD FOOTINGS. FORCE APPLIED BY NON PERMANENT OBJECTS SUCH AS HUMANS, ANIMALS AND PRECIPITATION. THE INTENSITY OF THE FORCE VARIES ACCORDING TO THE NUMBER AND WEIGHT OF NON PERMANENT OBJECTS ON THE BUS SHELTER. THE DECKING ARE DESIGNED TO CARRY LIVE LOADS AND RELIEVE THE STRESS OF THE LOADS PLACED ON THE STRUCTURES. PRECIPITATION HUMAN LOAD LOAD LOAD LOAD OF PERMANENT STRUCTURE
  • 23. 21 WIND LOAD AIR MOVEMENT CAUSES UPLIFTING UPON THE ROOF, AND POTENTIALLY OVERTURNING OF STRUCTURE. THIS FORCE IS COUNTERBALANCED BY THE TENSION AND VERTICAL SUPPORT OF THE COLUMNS, AND FURTHER ANCHORED DOWN BY PAD FOOTINGS. WIND ACTING UPWARDS ON ROOF WIND PASSES THROUGH WIND PASSES THROUGH WIND FORCE ACTING UPON THE MAIN STRUCTURE AND THE POLYCARBONATE ROOF THE STRUCTURE OPTIMIZES ON NATURAL VENTILATION WHILE REDUCING WIND LOADS ACTING UPON THE STRUCTURE BY EMBRACING OPENNESS THROUGH ITS SKELETAL DESIGN
  • 24. MATERIAL ANALYSIS MERBAU Used as overall material for the temporary bus shelter. Merbau is a local building material that offers superior performance in withstanding harsh environmental conditions, making it optimal for outdoor construction Characteristics: High tensile strength, good strength to weight ratio, weather resistant, minimal maintenance POLYCARBONATE SHEET Used as material for roof of the temporary bus shelter, it allows direct sunlight to brighten the interior while providing suitable thermal comfort for the users. Characteristics: Resilient, extremely lightweight, UV protection, light permeability CONCRETE Simplest and most cost-effective material option for footing for vertical support while transferring load downwards 23
  • 25. 22 LOAD TESTS To test out the bus shelter structural capabilities. We initiated with a 6 liter water bottle. We placed the bottle on every horizontal flat surface to simulate live loads imposed on the structure. We placed it on the decking to test the ground beam structure. Then we placed it on the seating to test the seating joints and the column structure. Finally we placed it on the roof to test its load transfer from roof to the ground. From the test we could tell that no damage or cracks have happened, and that the structure is successful at withstanding the loads. To wrap it up, we decided to let one of our teammate to sit on top of the roof. Grace weighs 45 kilograms. Still, no damage have happened to the bus shelter. With proper structural and joint system, The strength of the bus shelters skeletal structure in withstanding forces and stresses while maintaining stability is confirmed.
  • 27. 11CONCLUSION 25 THROUGHOUT THIS ASSIGNMENT, WE LEARN TO COMMUNICATE WELL AMONG EACH OTHER AS WE WORK TOGETHER AS A TEAM. WE TOGETHER AS A TEAM LEARN AND UNDERSTAND HOW A SKELETAL CONSTRUCTION FUNCTION AND CONSTRUCTED. WE LEARN TO CONSTRUCT OUR OWN DESIGN BASED ON THESE UNDERSTANDING TO RECREATE A STRUCTURE OF A BUS SHELTER THAT IS ABLE TO OVERCOME ITS STRESS AND LOADS WITH ITS SKELETAL STRUCTURE. NOT ONLY THAT, WE HAVE LEARNT TO TAKE INTO ACCOUNT THE DESIGN CONSIDERATIONS ON OUR BUS SHELTER SO THAT IT HAS THE ABILITY TO OVERCOME OUR LOCAL CLIMATE WHILE MAINTAINING STRUCTURAL INTEGRITY. TO CONSTRUCT OUR OWN BUS SHELTER THAT FEATURED ITS OWN CONSTRUCTION SKELETAL STRUCTURE AND IN THE END WRITE DOWN OUR UNDERSTANDING OF JOINTS.
  • 28. 12REFERENCE 26 BOOK SOURCE 1 ) Ching, F. and Adams, C. (2008). Building construction illustrated. New York: Van Nostrand Reinhold. 2 ) Volz, M., Herzog, T., Natterer, J., Schweitzer, R. and Winter, W. (2012). Timber Construction Manual. Basel: De Gruyter. 3 ) Chudley, R. and Greeno, R. (1999). Construction technology. Harlow: Longman. INTERNET SOURCE 1) JOINTS METHOD : Chestofbooks.com. (2010). The Halved Joint. [online] Available at: http://chestofbooks.com/home-improvement/woodworking/Woodwork-Joints/The-Halved-Joint.html [Accessed 15 May 2018]. 2) TIMBER FRAMEWORK : Vermonttimberworks.com. (2018). Post Bases for Timber Frames and Post and Beam Buildings. [online] Available at: http://www.vermonttimberworks.com/learn/timber-frame-joinery/post-bases/ [Accessed 15 May 2018]. 3) DEAD LOAD AND LIVE LOAD : Pieglobal.com. (2018). Live Loads vs. Dead Loads: Determining Building Design Loads for Structural Claims | Pie Consulting & Engineering. [online] Available at: http://www.pieglobal.com/live-loads-vs-dead-loads-determining-building-design-loads-for-structural-claims/ [Accessed 15 May 2018]. 4)