Tesco Extra
• Owned by Tesco Stores (Malaysia) Sdn Bhd
• Over 50 hypermarkets all across Peninsular
Malaysia
• The purpose of Tesco Extra is to provide
customers with a destination to shop for their
needs with everything ranging from fresh
foods to groceries, and even including
apparels
Four systems
• Mechanical and Air-conditioning system
• Fire Protection System
• Electrical Supply
• Vertical Transportation
6/26/2015
Mechanical and Air Conditioning
System
Air Conditioning Design
Consideration
• heating and/or cooling load
• Range of suitable units with
the required capacity
• positioning
• Sizing the Air Conditioning
Systems
6/26/2015
Tesco Air Conditioning System
Compressor
• Motorize machine that circulates coolant though a
vapour compressor system. Refrigerant will enter to
compressor in vapour state. Compressor will compress
the refrigeration to a high pressure and followed by
increasing of the temperature.
Condenser
• Change the pressure of refrigeration from hot to cool it
and include changing of vapour to liquid form. Hot gas
from compressor will be emitted the heat and
condensed the refrigeration through the coil.
6/26/2015
Expansion valve
• Ensure that there are changing of pressure liquid
from high to low pressure. The liquid automatically
becomes cool because of the variations of pressure.
Evaporator
• Occurs when cold refrigerant is filled and produced
by a system of coil that fills out and cools air around
it. The hot liquid refrigeration will be absorbed by
evaporator coil to produce cool gas. Evaporator will
change the state of the liquid to gas form.
6/26/2015
• Refrigeration system
6/26/2015
Centralized system
6/26/2015
• Space is provided to house compressor,
condenser, expansion valve and evaporator.
• The cold air is produced by evaporator.
Chilled air will flow through ducting system
to all rooms needed.
• Air duct and diffuser are needed for ducting
system.
6/26/2015
Cooling Tower
• Cooling tower is needed to cool hot water.
Hot water will be delivered to cooling
tower and sprayed by sprinkler and cooled
by air in cooling tower.
6/26/2015
What are the advantages of
centralized system ?
• To achieve safety, energy efficiency and cost
efficiency.
• Allow for better management and system
operation.
• Require either a mechanical room
• High capacity air so that all customers of Tesco
can receive the cold air continuously and
throughout the daily operations and services.
6/26/2015
Extraction grill
6/26/2015
SUPPLY DUCT
DIFFUSER
6/26/2015
Zoning
• Zoning is required to divide a space into
different zones that have variety cooling needs.
• Required to achieve high comfort and control
humidity within the area .
• include thermostats that is connected through it
and controlled by control a panel.
• Zoning will operate the damper to control the
temperature in case for high or low temperature
by control panel.
6/26/2015
4 way louvered
bladed diffuser
Linear diffuser
6/26/2015
Advantages of zoning
• control over the cooling
and heating system for
control over temperature
• Most places don’t get the
same amount of sun or
shade all day,
• Therefore the same type
of cooling or heating is
not the same throughout
the day.
6/26/2015
Control
• Control is achieved when a signal is sent to the air
conditioning system and causes different results
as desired by the individual.
• It can be manual or automatic
• provide comfort, safety and energy efficiency.
6/26/2015
COMFORT BY ZONING CAN BE
ACHEIVED BY ADJUSTING....
• Temperature
• Humidity of air,
• Speed of air condition,
• Pressure of air,
• Turn the control on or off.
6/26/2015
• Multi Zones Variable Air Volume
6/26/2015
• Air handling unit is used to supply chilled air
through ducting and distribute it throughout
the whole building of Tesco.
• individual comfort to adjust them through
control panel.
• This can be observed easily in the separate
retail areas and corridors in Tesco.
6/26/2015
Requires installation of:
• motorized damper
• sensors
• controller
A Thermostat is required to control each pair of
zone dampers.
Mixing is done at the AHU and connected to
control panel.
Variable Air Volume is used to save more energy
because the speed can be controlled
depending on the demand.
What is Fire Protection?
Why do we need Fire Protection?
• Protect ourselves from fire
• Protect the goods and properties
• Feeling of security
Fire protection in Tesco Damansara
• Fire Extinguisher
• HoseReel
• Breakglass and Fire Alarm
• Fire Escape Exit
• Smoke Detector
• Sprinklers system
• Co2 System
Fire extinguisher
Colour Type Solid Flammabl
e Liquids
Flammabl
e Gasses
Electrical
Equipmen
t
Cooking
Oil and
Fats
Red Water  × × × ×
Yellow Foam   × × 
Blue Dry
Powder
    ×
Black Co2 ×  ×  
The type use in Tesco are Dry powder and Co2 fire extinguisher
• Fire extinguisher for initial outbreak of fire.
• Minimal gross weight.
• Locate at potential fire hazard area.
• 5 number of Co2 fire extinguisher and 40 number of Dry powder fire extinguisher.
• Co2 fire extinguisher at Kitchen, Bakery Room, Genset room, Switch room and
computer room.
• Dry Powder fire extinguisher separated evenly throughout the building.
Hosereel
• 2 types swinging and fixed type.
• Tesco uses the fixed type of hosereel.
• 9 nos of hosereel.
• Easily spotted area painted in RED.
• Normally place with fire extinguisher,
breakglass, and fire alarm.
• Consist hosereel pump, hosereel tank,
pipework, and valves.
Breakglass & Fire Alarm
• Best partner like Batman and Robin.
• 1.2 meter height easily break material to trigger an alarm.
• Fire Alarm is required to be 65 dB(a) or +5dB(a).
• It last more than 30secs after trigger.
• Installed evenly throughout the whole building.
Fire Escape Exit
• Consist of a KELUAR sign at each exit it light up
when the power of the building is cut off.
• Walls are fire resistance wall as it allows the wall
to resist fire for some time for the occupant to
escape
Smoke Detector
• Smoke detector is selected because the nature of
smoke which rise upward to the detector as the
roof of the building is high.
• 2 types Ionized smoke detector and light
scattering smoke detector.
• Ionized smoke detector is used by Tesco.
• Constantly ionized air by radiation, and when
smoke enter it reduce current and trigger an
alarm.
• It is installed evenly throughout the whole
building.
Sprinklers System
• There are 2 types which are wet and dry
system.
• Tesco uses wet system which the sprinkler is
constantly filled with liquid.
• Wet system is not recommended when the
building has a risk of freezing.
• When temperature rises the sprinkler head
break and water is release.
• Get water supply from a water tank.
Automatic Co2 System
• Purpose to protect electrical equipment.
• Installed in the Genset room and Switch room.
• During event of fire, it automatically activated.
• With a delay of 30 to 60sec, the room is
flooded with Co2 gas.
• Human is to evacuate from the room as they
are not able to breath. We need oxygen.
Electrical Supply
How is electricity supplied to Tesco?
Distribution Grid System
Substation/Transformer
• Commonly located near
the building
• An electrical device that
transfers electrical
energy between two or
more circuits
through electromagnetic
induction.
• To increase or decrease
the voltages of
alternating current in
electric power
applications.
Main Switchboard
• Located near the
elevator at the point of
the incoming power
supply
• To distribution power
to each unit
• Protection is provided
by tripping the
breakers when the
current overloads or
short circuits
Distribution Panel
• Located in strategic
locations that is easily
accessible
• Used to distribute
power even more to
electrical appliances
• Circuit breaker is
installed for each circuit
for protection
• Will trip the circuit
when it detects an
overload in the circuit
or a short circuit.
Uniform Building By Law
• UBBL MS1525, 7.5, power factor should be
low loss type not more than 0.35W at upper
temperature limit.
• To reduce the loss of energy through the
cables and capacitors
• 7.6, electrical meters should be installed at
strategic load centre to identify consumption
• To record and control the electrical usage
effectively
Vertical Transportation
PLAN VIEW IN TESCO
The one and only elevator !!!!
PURPOSE OF THE ELEVATOR :
• TO CARRY PEOPLE TO THE FLOOR THEY
WANTED TO GO
• TO CARRY LOADS (GOODS) BOUGHT BY THE
CUSTOMERS
• TO MINIMIZE TRAVEL TIME
• TO MAXIMIZE PASSENGER COMFORT BY
PROVIDING A SMOOTH RIDE
ESCALATORS
What are escalators?
• Conveyor transport for moving people
between floors of building
• Installed when elevator placements would be
impractical
• Steps are constantly rotated for continuous
flights
Main components of an escalator
1. Electric control
2. Drive
3. Main shaft
4. Handrail drive
5. Balustrade
6. Main truss
7. Steps
8. Step chains
9. Handrail compensation
10. Chain tensioning device
11. Comb plates
12. Handrail return
Main components of escalators
Arrangement of escalators
One-way traffic, interrupted
arrangement
One-way traffic, continuous
arrangement
Two-way traffic, parallel, interrupted
arrangement
Two-way traffic, crisscross, continuous
arrangement
Tesco Extra Mutiara Damansara
Types of vertical transport used
• Ground – First Floor = inclined moving
walkway/travelators
• First Floor – Mezzanine Floor = escalator
Layout Plan of Tesco Extra
Two-way traffic, interrupted
arrangement (moving walkway)
Two-way traffic, interrupted
arrangement (escalator)
RECOMMENDATION
Vertical Transportation
Fire Protection System
Recommendation
• Adjust the arrangement of escalators
• Use one-way traffic at each end
• Help boost sales among retailers
• Customers are obliged into walking all around
the building
PROBLEM:
-Not easily spotted
-Small car lift, unable
to carry too much
loads or people
-Only 1 elevator is
provided at the
entrance
Vertical Transportation
• Should add more elevators
• Provide more vertical transportation
• Save in waiting time
FIRE PROTECTION
Top 5 reasons sprinklers fail
1. System shut off (38%)
2. Inappropriate system for the type of fire
(18%)
3. Water discharged did not reach fire (12%)
4. Lack of maintenance (12%)
5. Problem with water supply or not enough
water discharged (9%)
Regulation
Hong Kong's Code of Practice for minimum Fire
Service Installations and Equipment and
Inspection, Testing and Maintenance of
Installations and Equipment
Part 4.14 - low rise commercial buildings are
required to install ‘Automatic Actuating Devices’
Automatic actuating devices
• Building components such as doors, shutters,
dampers, fire curtains, roof vents, etc., and
the devices for automatically controlling their
movement in the event of fire.
• Modernised fire shutter can now close at a
controlled speed (typically 10 centimetres per
second).
• With a combination of a Fire Detection
Interface (FDI) panel it is now possible for a
fire roller shutter to initially deploy to a pre-
determined safe height, (normally just above
head height) to act as a smoke barrier while
allowing people to escape
• The fire shutter is fully closed after a pre-
determined time (following fire protocol for
the building) to create a fire resistant barrier.
• The FDI panel can also act as a visual and
acoustic alarm, alerting occupants that the fire
shutter is about to close
Building Service 2 Presentation

More Related Content

What's hot

Building Services 2
Building Services 2 Building Services 2
Building Services 2 Jeanne Hoo
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf杉 江紫
 
H.V.A.C building service in b.arch ciriculam
H.V.A.C building service in  b.arch ciriculamH.V.A.C building service in  b.arch ciriculam
H.V.A.C building service in b.arch ciriculamKethees Waran
 
Building Service Chapter 5
Building Service Chapter 5Building Service Chapter 5
Building Service Chapter 5Izam Lukman
 
Building Services
Building Services Building Services
Building Services Joshua Lee
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case StudyBolin Loong
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
Smoke extraction in buildings
Smoke extraction in buildingsSmoke extraction in buildings
Smoke extraction in buildingsvysakhmanohar
 
Building services- telecommunications for high rise building
Building services- telecommunications for high rise buildingBuilding services- telecommunications for high rise building
Building services- telecommunications for high rise buildingChiam Jiane
 
B.services case-study
B.services case-studyB.services case-study
B.services case-studyClement Seong
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportJoyeeLee0131
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalatorsKethees Waran
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection systemgauravashist
 
HVAC System Analysis of two-storey hospital building
HVAC System Analysis of two-storey hospital buildingHVAC System Analysis of two-storey hospital building
HVAC System Analysis of two-storey hospital buildingAsifAkram18
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise buildingJäkê Čhŷį Śêrñ
 
Building Service Chapter 2
Building Service Chapter 2Building Service Chapter 2
Building Service Chapter 2Izam Lukman
 
Building services 2 final (final)
Building services 2 final (final)Building services 2 final (final)
Building services 2 final (final)fareezsham
 
Building services report
Building services report Building services report
Building services report Soh Shing
 

What's hot (20)

Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf
 
H.V.A.C building service in b.arch ciriculam
H.V.A.C building service in  b.arch ciriculamH.V.A.C building service in  b.arch ciriculam
H.V.A.C building service in b.arch ciriculam
 
Building Service Chapter 5
Building Service Chapter 5Building Service Chapter 5
Building Service Chapter 5
 
Fire protection
Fire protectionFire protection
Fire protection
 
Building Services
Building Services Building Services
Building Services
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Smoke extraction in buildings
Smoke extraction in buildingsSmoke extraction in buildings
Smoke extraction in buildings
 
Building services- telecommunications for high rise building
Building services- telecommunications for high rise buildingBuilding services- telecommunications for high rise building
Building services- telecommunications for high rise building
 
Intelligent buildings
Intelligent buildingsIntelligent buildings
Intelligent buildings
 
B.services case-study
B.services case-studyB.services case-study
B.services case-study
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study Report
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalators
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
HVAC System Analysis of two-storey hospital building
HVAC System Analysis of two-storey hospital buildingHVAC System Analysis of two-storey hospital building
HVAC System Analysis of two-storey hospital building
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise building
 
Building Service Chapter 2
Building Service Chapter 2Building Service Chapter 2
Building Service Chapter 2
 
Building services 2 final (final)
Building services 2 final (final)Building services 2 final (final)
Building services 2 final (final)
 
Building services report
Building services report Building services report
Building services report
 

Viewers also liked (17)

Presentation enbe final projects 1
Presentation enbe final projects 1Presentation enbe final projects 1
Presentation enbe final projects 1
 
Business charity driveeee
Business charity driveeeeBusiness charity driveeee
Business charity driveeee
 
Psychology presentation
Psychology presentationPsychology presentation
Psychology presentation
 
Group Component
Group ComponentGroup Component
Group Component
 
Journal2
Journal2Journal2
Journal2
 
ENBE- Future City
ENBE- Future CityENBE- Future City
ENBE- Future City
 
Journal1
Journal1Journal1
Journal1
 
Psychology report
Psychology reportPsychology report
Psychology report
 
Telecommunication for high rise building presentation
Telecommunication for high rise building presentationTelecommunication for high rise building presentation
Telecommunication for high rise building presentation
 
Site surveying
Site surveying Site surveying
Site surveying
 
Building Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco ExtraBuilding Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco Extra
 
Assign 2
Assign 2Assign 2
Assign 2
 
Magazine about QS
Magazine about QSMagazine about QS
Magazine about QS
 
Accounts project
Accounts projectAccounts project
Accounts project
 
The sponge
The spongeThe sponge
The sponge
 
Game Tournament
Game TournamentGame Tournament
Game Tournament
 
Company profile
Company profileCompany profile
Company profile
 

Similar to Building Service 2 Presentation

Building services systems in sri lanka ac
Building services systems in sri lanka acBuilding services systems in sri lanka ac
Building services systems in sri lanka acArunali Dhelika
 
Air Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow WormAir Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow WormEuro Energy Services
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234KRISHAN KUMAR
 
Central heating level 3
Central heating level 3Central heating level 3
Central heating level 3Barry Everard
 
HVAC - by Anoushka Aggarwal
HVAC - by Anoushka AggarwalHVAC - by Anoushka Aggarwal
HVAC - by Anoushka AggarwalANOUSHKAAggarwal
 
Bs ii presentation slides
Bs ii   presentation slidesBs ii   presentation slides
Bs ii presentation slidesArissa Loh
 
Air_Conditioning_final (1).pptxhiykf9tccu
Air_Conditioning_final (1).pptxhiykf9tccuAir_Conditioning_final (1).pptxhiykf9tccu
Air_Conditioning_final (1).pptxhiykf9tccuMuskanK15
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finaleTee Joanne
 
bs slides
bs slidesbs slides
bs slideskellyxc
 
Energy efficient construction and training practices - 8 Energy efficiency of...
Energy efficient construction and training practices - 8 Energy efficiency of...Energy efficient construction and training practices - 8 Energy efficiency of...
Energy efficient construction and training practices - 8 Energy efficiency of...Motiva
 
HVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideHVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideFordly
 
Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System SilkThreadJewellery
 

Similar to Building Service 2 Presentation (20)

Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Building services systems in sri lanka ac
Building services systems in sri lanka acBuilding services systems in sri lanka ac
Building services systems in sri lanka ac
 
Air Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow WormAir Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow Worm
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234
 
Hvac introduction
Hvac introductionHvac introduction
Hvac introduction
 
Central heating level 3
Central heating level 3Central heating level 3
Central heating level 3
 
CHAP 4 HVAC.pdf
CHAP 4 HVAC.pdfCHAP 4 HVAC.pdf
CHAP 4 HVAC.pdf
 
HVAC - by Anoushka Aggarwal
HVAC - by Anoushka AggarwalHVAC - by Anoushka Aggarwal
HVAC - by Anoushka Aggarwal
 
Bs ii presentation slides
Bs ii   presentation slidesBs ii   presentation slides
Bs ii presentation slides
 
fire fighting System
fire fighting Systemfire fighting System
fire fighting System
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plant
 
Air_Conditioning_final (1).pptxhiykf9tccu
Air_Conditioning_final (1).pptxhiykf9tccuAir_Conditioning_final (1).pptxhiykf9tccu
Air_Conditioning_final (1).pptxhiykf9tccu
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
 
WSS_ENG
WSS_ENGWSS_ENG
WSS_ENG
 
Ceu simplified 2015
Ceu simplified 2015Ceu simplified 2015
Ceu simplified 2015
 
bs slides
bs slidesbs slides
bs slides
 
Energy efficient construction and training practices - 8 Energy efficiency of...
Energy efficient construction and training practices - 8 Energy efficiency of...Energy efficient construction and training practices - 8 Energy efficiency of...
Energy efficient construction and training practices - 8 Energy efficiency of...
 
HVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideHVAC Systems- A Complete Guide
HVAC Systems- A Complete Guide
 
Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System
 

Recently uploaded

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 

Building Service 2 Presentation

  • 1. Building Services 2 Tesco Extra at Mutiara Damansara Abang Azrin Bin Abang Affandi 0319073 Chua Jia Cheng 0315160 Goh Jeng Jhieh 0315080 Jake Sia Chyi Sern 0314396 Kellyann Hiew Yau Mei 0319532 Muhammad Aiman Bin Zainul Abidin 0321832 Rachel Emma Betty Ernesta 0317966
  • 2. Tesco Extra • Owned by Tesco Stores (Malaysia) Sdn Bhd • Over 50 hypermarkets all across Peninsular Malaysia • The purpose of Tesco Extra is to provide customers with a destination to shop for their needs with everything ranging from fresh foods to groceries, and even including apparels
  • 3. Four systems • Mechanical and Air-conditioning system • Fire Protection System • Electrical Supply • Vertical Transportation
  • 4. 6/26/2015 Mechanical and Air Conditioning System Air Conditioning Design Consideration • heating and/or cooling load • Range of suitable units with the required capacity • positioning • Sizing the Air Conditioning Systems
  • 5. 6/26/2015 Tesco Air Conditioning System Compressor • Motorize machine that circulates coolant though a vapour compressor system. Refrigerant will enter to compressor in vapour state. Compressor will compress the refrigeration to a high pressure and followed by increasing of the temperature. Condenser • Change the pressure of refrigeration from hot to cool it and include changing of vapour to liquid form. Hot gas from compressor will be emitted the heat and condensed the refrigeration through the coil.
  • 6. 6/26/2015 Expansion valve • Ensure that there are changing of pressure liquid from high to low pressure. The liquid automatically becomes cool because of the variations of pressure. Evaporator • Occurs when cold refrigerant is filled and produced by a system of coil that fills out and cools air around it. The hot liquid refrigeration will be absorbed by evaporator coil to produce cool gas. Evaporator will change the state of the liquid to gas form.
  • 9. 6/26/2015 • Space is provided to house compressor, condenser, expansion valve and evaporator. • The cold air is produced by evaporator. Chilled air will flow through ducting system to all rooms needed. • Air duct and diffuser are needed for ducting system.
  • 10. 6/26/2015 Cooling Tower • Cooling tower is needed to cool hot water. Hot water will be delivered to cooling tower and sprayed by sprinkler and cooled by air in cooling tower.
  • 11. 6/26/2015 What are the advantages of centralized system ? • To achieve safety, energy efficiency and cost efficiency. • Allow for better management and system operation. • Require either a mechanical room • High capacity air so that all customers of Tesco can receive the cold air continuously and throughout the daily operations and services.
  • 14. 6/26/2015 Zoning • Zoning is required to divide a space into different zones that have variety cooling needs. • Required to achieve high comfort and control humidity within the area . • include thermostats that is connected through it and controlled by control a panel. • Zoning will operate the damper to control the temperature in case for high or low temperature by control panel.
  • 15. 6/26/2015 4 way louvered bladed diffuser Linear diffuser
  • 16. 6/26/2015 Advantages of zoning • control over the cooling and heating system for control over temperature • Most places don’t get the same amount of sun or shade all day, • Therefore the same type of cooling or heating is not the same throughout the day.
  • 17. 6/26/2015 Control • Control is achieved when a signal is sent to the air conditioning system and causes different results as desired by the individual. • It can be manual or automatic • provide comfort, safety and energy efficiency.
  • 18. 6/26/2015 COMFORT BY ZONING CAN BE ACHEIVED BY ADJUSTING.... • Temperature • Humidity of air, • Speed of air condition, • Pressure of air, • Turn the control on or off.
  • 19. 6/26/2015 • Multi Zones Variable Air Volume
  • 20. 6/26/2015 • Air handling unit is used to supply chilled air through ducting and distribute it throughout the whole building of Tesco. • individual comfort to adjust them through control panel. • This can be observed easily in the separate retail areas and corridors in Tesco.
  • 21. 6/26/2015 Requires installation of: • motorized damper • sensors • controller A Thermostat is required to control each pair of zone dampers. Mixing is done at the AHU and connected to control panel. Variable Air Volume is used to save more energy because the speed can be controlled depending on the demand.
  • 22. What is Fire Protection?
  • 23. Why do we need Fire Protection? • Protect ourselves from fire • Protect the goods and properties • Feeling of security
  • 24.
  • 25. Fire protection in Tesco Damansara • Fire Extinguisher • HoseReel • Breakglass and Fire Alarm • Fire Escape Exit • Smoke Detector • Sprinklers system • Co2 System
  • 26.
  • 27. Fire extinguisher Colour Type Solid Flammabl e Liquids Flammabl e Gasses Electrical Equipmen t Cooking Oil and Fats Red Water  × × × × Yellow Foam   × ×  Blue Dry Powder     × Black Co2 ×  ×   The type use in Tesco are Dry powder and Co2 fire extinguisher • Fire extinguisher for initial outbreak of fire. • Minimal gross weight. • Locate at potential fire hazard area. • 5 number of Co2 fire extinguisher and 40 number of Dry powder fire extinguisher. • Co2 fire extinguisher at Kitchen, Bakery Room, Genset room, Switch room and computer room. • Dry Powder fire extinguisher separated evenly throughout the building.
  • 28.
  • 29. Hosereel • 2 types swinging and fixed type. • Tesco uses the fixed type of hosereel. • 9 nos of hosereel. • Easily spotted area painted in RED. • Normally place with fire extinguisher, breakglass, and fire alarm. • Consist hosereel pump, hosereel tank, pipework, and valves.
  • 30.
  • 31.
  • 32. Breakglass & Fire Alarm • Best partner like Batman and Robin. • 1.2 meter height easily break material to trigger an alarm. • Fire Alarm is required to be 65 dB(a) or +5dB(a). • It last more than 30secs after trigger. • Installed evenly throughout the whole building. Fire Escape Exit • Consist of a KELUAR sign at each exit it light up when the power of the building is cut off. • Walls are fire resistance wall as it allows the wall to resist fire for some time for the occupant to escape
  • 33.
  • 34. Smoke Detector • Smoke detector is selected because the nature of smoke which rise upward to the detector as the roof of the building is high. • 2 types Ionized smoke detector and light scattering smoke detector. • Ionized smoke detector is used by Tesco. • Constantly ionized air by radiation, and when smoke enter it reduce current and trigger an alarm. • It is installed evenly throughout the whole building.
  • 35.
  • 36. Sprinklers System • There are 2 types which are wet and dry system. • Tesco uses wet system which the sprinkler is constantly filled with liquid. • Wet system is not recommended when the building has a risk of freezing. • When temperature rises the sprinkler head break and water is release. • Get water supply from a water tank.
  • 37. Automatic Co2 System • Purpose to protect electrical equipment. • Installed in the Genset room and Switch room. • During event of fire, it automatically activated. • With a delay of 30 to 60sec, the room is flooded with Co2 gas. • Human is to evacuate from the room as they are not able to breath. We need oxygen.
  • 39. How is electricity supplied to Tesco?
  • 41. Substation/Transformer • Commonly located near the building • An electrical device that transfers electrical energy between two or more circuits through electromagnetic induction. • To increase or decrease the voltages of alternating current in electric power applications.
  • 42. Main Switchboard • Located near the elevator at the point of the incoming power supply • To distribution power to each unit • Protection is provided by tripping the breakers when the current overloads or short circuits
  • 43. Distribution Panel • Located in strategic locations that is easily accessible • Used to distribute power even more to electrical appliances • Circuit breaker is installed for each circuit for protection • Will trip the circuit when it detects an overload in the circuit or a short circuit.
  • 44. Uniform Building By Law • UBBL MS1525, 7.5, power factor should be low loss type not more than 0.35W at upper temperature limit. • To reduce the loss of energy through the cables and capacitors • 7.6, electrical meters should be installed at strategic load centre to identify consumption • To record and control the electrical usage effectively
  • 46. PLAN VIEW IN TESCO
  • 47. The one and only elevator !!!!
  • 48. PURPOSE OF THE ELEVATOR : • TO CARRY PEOPLE TO THE FLOOR THEY WANTED TO GO • TO CARRY LOADS (GOODS) BOUGHT BY THE CUSTOMERS • TO MINIMIZE TRAVEL TIME • TO MAXIMIZE PASSENGER COMFORT BY PROVIDING A SMOOTH RIDE
  • 50. What are escalators? • Conveyor transport for moving people between floors of building • Installed when elevator placements would be impractical • Steps are constantly rotated for continuous flights
  • 51. Main components of an escalator 1. Electric control 2. Drive 3. Main shaft 4. Handrail drive 5. Balustrade 6. Main truss 7. Steps 8. Step chains 9. Handrail compensation 10. Chain tensioning device 11. Comb plates 12. Handrail return
  • 52. Main components of escalators
  • 53. Arrangement of escalators One-way traffic, interrupted arrangement One-way traffic, continuous arrangement Two-way traffic, parallel, interrupted arrangement Two-way traffic, crisscross, continuous arrangement
  • 54. Tesco Extra Mutiara Damansara
  • 55. Types of vertical transport used • Ground – First Floor = inclined moving walkway/travelators • First Floor – Mezzanine Floor = escalator
  • 56. Layout Plan of Tesco Extra
  • 60. Recommendation • Adjust the arrangement of escalators • Use one-way traffic at each end • Help boost sales among retailers • Customers are obliged into walking all around the building
  • 61. PROBLEM: -Not easily spotted -Small car lift, unable to carry too much loads or people -Only 1 elevator is provided at the entrance
  • 62. Vertical Transportation • Should add more elevators • Provide more vertical transportation • Save in waiting time
  • 64.
  • 65.
  • 66. Top 5 reasons sprinklers fail 1. System shut off (38%) 2. Inappropriate system for the type of fire (18%) 3. Water discharged did not reach fire (12%) 4. Lack of maintenance (12%) 5. Problem with water supply or not enough water discharged (9%)
  • 67. Regulation Hong Kong's Code of Practice for minimum Fire Service Installations and Equipment and Inspection, Testing and Maintenance of Installations and Equipment Part 4.14 - low rise commercial buildings are required to install ‘Automatic Actuating Devices’
  • 68. Automatic actuating devices • Building components such as doors, shutters, dampers, fire curtains, roof vents, etc., and the devices for automatically controlling their movement in the event of fire.
  • 69. • Modernised fire shutter can now close at a controlled speed (typically 10 centimetres per second). • With a combination of a Fire Detection Interface (FDI) panel it is now possible for a fire roller shutter to initially deploy to a pre- determined safe height, (normally just above head height) to act as a smoke barrier while allowing people to escape
  • 70. • The fire shutter is fully closed after a pre- determined time (following fire protocol for the building) to create a fire resistant barrier. • The FDI panel can also act as a visual and acoustic alarm, alerting occupants that the fire shutter is about to close