The document provides information on a proposed oil and gas drilling permit for the Bistonte Unit Well #3H. It discusses the background regulations from the Texas Railroad Commission and College Station ordinances. The proposed well site is classified as high impact due to its proximity to residential uses. As a high impact well, additional requirements include fencing, landscaping, and retaining an environmental consultant. The project review committee recommended approval with conditions around securing waivers, fire access, and consultant recommendations. The applicant relocated the well site to meet distance requirements and avoid the need for waivers. The draft permit also includes truck routing, bonding, emergency response plans, fencing, landscaping, and sound walls to mitigate impacts.
The City of Toronto is in the final stages of detailed design for the new pedestrian / cycling bridge to be constructed over the Metrolinx Union Station Rail Corridor, from Douro Street to the western leg of Western Battery Road.
We invite you to view the latest drawings and information on our recently updated web page:
www.toronto.ca/king-liberty-bridge
The City of Toronto is in the final stages of detailed design for the new pedestrian / cycling bridge to be constructed over the Metrolinx Union Station Rail Corridor, from Douro Street to the western leg of Western Battery Road.
We invite you to view the latest drawings and information on our recently updated web page:
www.toronto.ca/king-liberty-bridge
VBHC Palmhaven launching his new project at Bangalore, this project consist of 2 bhk apartments with area 750 sq ft. so buy your dream homes in Bangalore.
http://www.vbhcpalmhaven.com/
Asphalt Contractors Los Angeles. Joe Weber Equipment & Excavating Inc. is the most reputed asphalt paving contractor Los Angeles Company. We are Asphalt
VBHC Palmhaven launching his new project at Bangalore, this project consist of 2 bhk apartments with area 750 sq ft. so buy your dream homes in Bangalore.
http://www.vbhcpalmhaven.com/
Asphalt Contractors Los Angeles. Joe Weber Equipment & Excavating Inc. is the most reputed asphalt paving contractor Los Angeles Company. We are Asphalt
Fulton Market Streetscape Meeting - CDOT discussed recommended improvements to Fulton Market between Halsted Street to Ogden Avenue. Gateway Arch Update and project timeline.
Overview of the Fairhill/MLK green infrastructure ambassador project taking shape in Cleveland. Includes details on project history, improvements, Project Clean Lake, traffic patterns and impacts during construction, and more.
Subdivision Design covers different phases of the land development process. We study Florida subdivision laws, site evaluation, boundaries, topographic and control surveys, and environmental and cultural considerations. Students design lot and building arrangements, all streets, and drainage channels and detention basins.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
Canadian Immigration Tracker March 2024 - Key SlidesAndrew Griffith
Highlights
Permanent Residents decrease along with percentage of TR2PR decline to 52 percent of all Permanent Residents.
March asylum claim data not issued as of May 27 (unusually late). Irregular arrivals remain very small.
Study permit applications experiencing sharp decrease as a result of announced caps over 50 percent compared to February.
Citizenship numbers remain stable.
Slide 3 has the overall numbers and change.
2. Background
• Texas Railroad Commission
• Primary Regulator of Oil and Gas Industry
• Drilling Permit
• Protecting Ground Water
• College Station Oil and Gas Regulations
Chapter 4, Section 13
• Additional Regulations
• Location / Buffering
• Truck Routes / Surety
• Road Access
3. Location Rules
• No Drill Site may be located or operated:
• Within 50 ft of Street, ROW, Alley, or PUE
• Within 600 ft of Cemetery, Park, or
Residential Unit (Unless Waived by the Owner
and Tenant)
• Within 1000 ft of a School or Hospital
4.
5. Classification
• Well Area Classified as High Impact
• Uses within 1000 ft of the Well Site
• High Impact Well Classification Uses
• Residential *
• Administrative
• Professional
• Commercial Neighborhood
• High Impact Well Additional Requirements
• Screened with a fence with 30 days of Completion
• Landscaping Required
• Retain a Consultant
6. Consultant
• Required as a High Impact Well
• 3rd Party
• Consultant is to be retained by City
• At Applicant Cost
• To Evaluate and Prepare an Environmental
Impact Analysis Report (EIA)
• City Retained CME Testing and Engineering
• M. Frederick (Rick) Conlin, P.E.
7. PRC
• Project Review Committee - Required by
Ordinance to make a Recommendation to
City Council
• Committee Members
• P&Z Chair
• PDS Director
• Fire Marshall
• City Engineer
• Met and Recommended Approval Sept 19th
with the Conditions:
• All Waivers being secured
• 10 ft wide earthen fire access around pad
• All EIA recommendations from Consultant
8. Updated Well Site Location
• Applicant was not able to secure All Required
Waivers
• Applicant relocated Well Site to the NW such
that no Residences, Cemeteries, or Parks are
within 600 ft
• Therefore, per the Ordinance, no Waivers are
required
• All other Application Items remained identical
12. Draft Permit Requirements
• Site Fire Fighting - Boots and Coots
• Halcon Emergency Preparedness and
Response Plan
• Halcon Spill Prevention Control and
Countermeasure Plan
• 8 ft Wooden Fence
• Landscaping – Wax Myrtles and Pampas
Grass
• Sound Walls – Noise Mitigation