The document discusses the City of College Station's public debt management strategy and plans for fiscal year 2021 debt issuance. It outlines a 4-step process for establishing debt policies, gathering community needs, evaluating resources, and reviewing the strategy. General government and enterprise projects funded by debt since 2015 are shown, with the new police station requiring a 2.5 cent tax rate increase. The anticipated terms and amounts of FY21 debt issuance are provided for various funds. Current planning for a potential 2022 general obligation bond election is also outlined.
This presentation was shared on Feb. 20 and 24 with volunteer groups participating in the Envision Silicon Valley effort (http://www.vta.org/envision-silicon-valley/envision-silicon-valley).
Information for Cuyahoga County applicants to the State Capital Improvement Program
This presentation was shown at workshops on August 15 and 16, 2017.
http://www.countyplanning.us/services/grant-programs/state-capital-improvement-program/
Paul O’Day, Part 1: Vision for Highways Maintenance and Management in BirminghamLandorLINKS
Paul's presentation focused on the client’s perspective on the contract, exploring what the model requires of them in terms of ways of working and organisational change
Current Condition of Santa Clara County's Transportation SystemSCVTA
This presentation from Santa Clara Valley Transportation Authority provides an overview of the current condition of the county's transportation system, including roadways, highways, transit, bicycle and pedestrian facilities. This was developed as part of VTA's Envision Silicon Valley effort (http://www.vta.org/envision).
VTA's Preliminary Envision Silicon Valley Project EvaluationSCVTA
This presentation contains the preliminary results of the project analysis for Envision Silicon Valley. This preliminary project evaluation may be updated as the results are further analyzed, and some additional projects will be added to the document. Learn more at http://www.vta.org/envision-silicon-valley/project-evaluation. Revised April 2016.
Final 12 01 community mtg phase ii presentationSCVTA
This is the presentation shared at VTA's BART Silicon Valley Phase II Dec 1, 2014 community meeting at the Mexican Heritage Plaza. One minor typo was corrected on slide 15 (2010 environmental clearance was for 10 miles, not 16 as stated in previous version).
Joint workshop on Enhancing efficiency and sustainability of Water Supply and...OECD Environment
Joint workshop on Enhancing efficiency and sustainability of Water Supply and Sanitation presentation - Gheorghe Constantin, How to implement the EU water acquis has triggered the change of WSS provision, Romania
Joint workshop on Enhancing efficiency and sustainability of Water Supply and...OECD Environment
Joint workshop on Enhancing efficiency and sustainability of Water Supply and Sanitation presentation - Boryana Georgieva, Challenges to ensure sustainable wastewater treatment in rural Bulgaria
City Manager's Recommended 2015 Investment PlanCity of Dayton
During a work session in early 2015, Dayton City Manager Warren Price and staff reviewed the organization's 2014 investments and outlined recommended investments and projects for 2015.
This presentation was shared on Feb. 20 and 24 with volunteer groups participating in the Envision Silicon Valley effort (http://www.vta.org/envision-silicon-valley/envision-silicon-valley).
Information for Cuyahoga County applicants to the State Capital Improvement Program
This presentation was shown at workshops on August 15 and 16, 2017.
http://www.countyplanning.us/services/grant-programs/state-capital-improvement-program/
Paul O’Day, Part 1: Vision for Highways Maintenance and Management in BirminghamLandorLINKS
Paul's presentation focused on the client’s perspective on the contract, exploring what the model requires of them in terms of ways of working and organisational change
Current Condition of Santa Clara County's Transportation SystemSCVTA
This presentation from Santa Clara Valley Transportation Authority provides an overview of the current condition of the county's transportation system, including roadways, highways, transit, bicycle and pedestrian facilities. This was developed as part of VTA's Envision Silicon Valley effort (http://www.vta.org/envision).
VTA's Preliminary Envision Silicon Valley Project EvaluationSCVTA
This presentation contains the preliminary results of the project analysis for Envision Silicon Valley. This preliminary project evaluation may be updated as the results are further analyzed, and some additional projects will be added to the document. Learn more at http://www.vta.org/envision-silicon-valley/project-evaluation. Revised April 2016.
Final 12 01 community mtg phase ii presentationSCVTA
This is the presentation shared at VTA's BART Silicon Valley Phase II Dec 1, 2014 community meeting at the Mexican Heritage Plaza. One minor typo was corrected on slide 15 (2010 environmental clearance was for 10 miles, not 16 as stated in previous version).
Joint workshop on Enhancing efficiency and sustainability of Water Supply and...OECD Environment
Joint workshop on Enhancing efficiency and sustainability of Water Supply and Sanitation presentation - Gheorghe Constantin, How to implement the EU water acquis has triggered the change of WSS provision, Romania
Joint workshop on Enhancing efficiency and sustainability of Water Supply and...OECD Environment
Joint workshop on Enhancing efficiency and sustainability of Water Supply and Sanitation presentation - Boryana Georgieva, Challenges to ensure sustainable wastewater treatment in rural Bulgaria
City Manager's Recommended 2015 Investment PlanCity of Dayton
During a work session in early 2015, Dayton City Manager Warren Price and staff reviewed the organization's 2014 investments and outlined recommended investments and projects for 2015.
Tim Broeder
Marcie Nolan
Jo Sesodia
Bob Daniels
The Sunshine State will always experience growth, whether rapid or slow. This growth will continue to drain the cheap and easy water resources of the State. This session will provide an overview of how three local governments have completely redesigned their long range planning program to incorporate potable water issues into their comprehensive and current plans. The
determination of demand, the single utility provider structure, and the costs of these infrastructure projects will be discussed. For local planners, the need and ability to implement long range plans through collaboration between the utility engineer and the planner will be stressed.
Information for Cuyahoga County applicants to the State Infrastructure Programs
This presentation was shown at workshops on July 23 and 24, 2018.
http://www.countyplanning.us/services/grant-programs/infrastructure-programs/
Information for Cuyahoga County applicants to the State Infrastructure Programs
This presentation was shown at workshops on July 18 and 25, 2019.
http://www.countyplanning.us/services/grant-programs/infrastructure-programs/
Charles River Pollution Control District - Presentation 2/5/09Franklin Matters
The presentation by the Charles River Pollution Control District to the Franklin (MA) Town Council on 2/5/09. The presentation provides an overview on the capital improvement plan, the reasons why it is needed, and the budget required to support it.
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
This document presents a comprehensive study on water and wastewater rates for Winter Springs, covering the scope of projects, historical trends, comparisons with surrounding municipalities, and leveraging additional funding sources. It includes detailed forecasts, assumptions, capital improvement program funding, existing and proposed rate adjustments, monthly utility bill projections, revenue sufficiency analysis, and comparisons of local rates. The study concludes with findings and recommendations for rate adjustments over the next five fiscal years to ensure revenue sufficiency and account for capital improvement needs and inflationary impacts.
Winter Springs 2023 Water and Wastewater Rate StudyVictoriaColangelo
The City requested a comprehensive review of the sufficiency of water, sewer, and reclaimed water user rates to provide revenue for operations and capital improvements. As the City is engaging in a significant sewer capital upgrade and reinvestment program over the next few years which will require a focus on obtaining funding for the projects and setting the rates to support the capital program and potential new debt service payments. Raftelis Financial Consultants conducted the study with close support and cooperation by the City’s staff and engineering consultants. This presentation will discuss the development of the study, results and recommendations to the City and Commission.
Up the Ratios Bylaws - a Comprehensive Process of Our Organizationuptheratios
Up the Ratios is a non-profit organization dedicated to bridging the gap in STEM education for underprivileged students by providing free, high-quality learning opportunities in robotics and other STEM fields. Our mission is to empower the next generation of innovators, thinkers, and problem-solvers by offering a range of educational programs that foster curiosity, creativity, and critical thinking.
At Up the Ratios, we believe that every student, regardless of their socio-economic background, should have access to the tools and knowledge needed to succeed in today's technology-driven world. To achieve this, we host a variety of free classes, workshops, summer camps, and live lectures tailored to students from underserved communities. Our programs are designed to be engaging and hands-on, allowing students to explore the exciting world of robotics and STEM through practical, real-world applications.
Our free classes cover fundamental concepts in robotics, coding, and engineering, providing students with a strong foundation in these critical areas. Through our interactive workshops, students can dive deeper into specific topics, working on projects that challenge them to apply what they've learned and think creatively. Our summer camps offer an immersive experience where students can collaborate on larger projects, develop their teamwork skills, and gain confidence in their abilities.
In addition to our local programs, Up the Ratios is committed to making a global impact. We take donations of new and gently used robotics parts, which we then distribute to students and educational institutions in other countries. These donations help ensure that young learners worldwide have the resources they need to explore and excel in STEM fields. By supporting education in this way, we aim to nurture a global community of future leaders and innovators.
Our live lectures feature guest speakers from various STEM disciplines, including engineers, scientists, and industry professionals who share their knowledge and experiences with our students. These lectures provide valuable insights into potential career paths and inspire students to pursue their passions in STEM.
Up the Ratios relies on the generosity of donors and volunteers to continue our work. Contributions of time, expertise, and financial support are crucial to sustaining our programs and expanding our reach. Whether you're an individual passionate about education, a professional in the STEM field, or a company looking to give back to the community, there are many ways to get involved and make a difference.
We are proud of the positive impact we've had on the lives of countless students, many of whom have gone on to pursue higher education and careers in STEM. By providing these young minds with the tools and opportunities they need to succeed, we are not only changing their futures but also contributing to the advancement of technology and innovation on a broader scale.
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
Canadian Immigration Tracker March 2024 - Key SlidesAndrew Griffith
Highlights
Permanent Residents decrease along with percentage of TR2PR decline to 52 percent of all Permanent Residents.
March asylum claim data not issued as of May 27 (unusually late). Irregular arrivals remain very small.
Study permit applications experiencing sharp decrease as a result of announced caps over 50 percent compared to February.
Citizenship numbers remain stable.
Slide 3 has the overall numbers and change.
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
2. 22
PUBLICDEBTMANAGEMENT STRATEGY
FUNDAMENTAL COMPONENT OF PUBLIC POLICY
Budget and Finance Policy reviewed and approved
by Council during Budget annually
Including:
Minimize risks and borrowing costs
Maintain maximum borrowing period
Maintain high rating
Consistent debt tax rate unless directed by Council
ESTABLISH POLICIES-STEP 1
Maintain long-term forecast (10+ years)
Adjust schedule for changes in needs and timing
projections
EVALUATE STRATEGY - STEP 4
Maintain comprehensive list of community
needs
Schedule projects to meet existing
resources
Review needs on a regular basis
GATHER NEEDS - STEP2
One penny on debt rate finances $12-$13M of
capital needs
Know timing of debt repayments
Evaluate refinancing at each availability
EVALUATE RESOURCES - STEP 3
1
2
3
4
3. 33
GENERAL GOVERNMENT DEBT FUNDED PROJECTS SINCE 2015
GENERAL GOV
Police Station (known
2.5 cent increase in
tax rate)
Fire Station #7 Land
STREETS
3 RR Crossing Projects
Greens Prairie Road / Trail
Royder Road
Traffic Signals
Sidewalks
PARKS
System-Wide Park
Improvements
Public Safety Radios
Fire Breathing Apparatus
City Hall
Library Improvements
Francis Dr Rehab
Munson Rehab
Lincoln Rehab Design
Aquatics Improvements
Central Park Pavilion,
Restrooms, & Parking Lot
Bee Creek Restroom &
Concessions
0%
10%
20%
30%
40%
50%
60%
70%
Additional 2015 CAC
GENERAL GOV
STREETS
PARKS
$100M ADDITIONAL PROJECTS
Intelligent
Transportation System
$82M in 2015 CAC PROJECTS
COMMUNITY INVESTMENTS
Fiber Infrastructure
Fuel System Upgrades
Video Surveillance
Veteran’s Improvements
Southeast Park Design
Thomas Park Improvements
Lincoln Center Improvements
Holleman
Widening
Holick, Park
Place, Anna,
and Glade
Rehabs
4. 4
GENERAL GOVERNMENTPERCAPITACOSTOF INVESTMENT
NEW PD DEBT OF 2.5 CENTS
The 2015 Citizen’s Committee rating the
construction of a new PD as its top priority
knowing there may be up to a 2.8 cent
increase in the debt side of the tax rate to
achieve.
EXISTING
2011 & PRIOR DEBT
In 2011, the City had $104M of debt
outstanding or $1,078 per capita.
The amount currently outstanding is
$886 per capita
2015 CITIZEN PRIORITIES
The 2015 Citizen’s Committee rating of
other priorities including the RR
crossing upgrades, and Green’s Prairie
improvements have been issued
beginning in 2016
2011 thru 2020
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Est.
$
/
capita
Year
General Government Per Capital Debt
Debt at 2011 2015 CAC New PD
5. 5
FY21DEBT ISSUANCEANTICIPATED TERMS
GENERAL GOVERNMENT AND ENTERPRISE
TOTAL ISSUANCE
$62.443M
STREETS
WASTEWATER
FACILITIES& TECHNOLOGY
WATER
ELECTRIC
$16.0MM for Underground and Overhead Distribution and
Transmission projects
$3.063M including the equipment due for replacement and
debt issuance costs
$1.750M including Facilities Maintenance relocation, and the
Technology revolver
$8.840M including RPR Elevated Storage Tank, and Greens
Prairie Water Tank rehab
$11.650 including the LCWWTP Expansion, Northeast Sewer
Trunkline and Woodson Village Rehab
$21.140M This amount increased by the $10M of Future Projects shown in March. We
received word from Union Pacific that the Capstone Barron Alignment project should proceed.
We also are fully funding the Greens Prairie Rd – Arrington from City Limits West of WS
Phillips project. – both are Citizen Committee 2015 projects
EQUIPMENT &OTHER
$36.490M Utility
$25.953M Gen Gov
6. 66
GENERAL GOVERNMENTGO BONDELECTION PLANNING
CURRENTLY IN PROCESS
2021 2022 BUDGET DEVELOPMENT 2022
2021
Staff Meeting with Operational
Departments, CMO and other
possible stakeholders to develop
listing of capital needs
Council appoints Citizens Advisory
Committee to review capital needs.
2022 BUDGET DEVELOPMENT
Capital Plan segregated into funded
and “approved projects with
expected future debt”
Recommending phased approach
to GO funding as existing projects
underway have planned issuances
(e.g. RR projects)
2022
CAC project recommendations and
estimates will be further refined as
directed by Council for a GO
Election.
Consideration of GO Election is
projects cannot proceed unless
cash funded for 3 years if voted
down