The document summarizes a community meeting to discuss the conceptual design for the Huntington Levee project. The meeting covered the project background and flooding issues facing the community. It then reviewed the conceptual design features being considered, including the use of collection drains versus a cutoff wall, different locations for a pump station, options for stormwater diversion, and use of an earthen levee alone or in combination with an I-wall. The design aims to meet FEMA accreditation standards to reduce flooding and received feedback from the community.
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Franklin Park Chesterbrook Neighborhood Project HighlightsFairfax County
This project included 3,000 linear feet of stormwater improvements that promote infiltration, improve water quality, and safely convey stormwater through the neighborhood to a stream.
2015 Land Conservation and Tree Preservation Awards Fairfax County
A public ceremony was held in the Fairfax County Government Center board auditorium on January 29, 2016, to recognize the winners of the 2015 Land Conservation and Tree Preservation Awards. Organizations and individuals were acknowledged for demonstrating best practices in preserving the county’s soil and water resources and protecting trees during development projects. The annual awards program is sponsored by the Fairfax County Department of Public Works and Environmental Services in cooperation with the Northern Virginia Soil and Water Conservation District and the Fairfax Tree Commission.
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Franklin Park Chesterbrook Neighborhood Project HighlightsFairfax County
This project included 3,000 linear feet of stormwater improvements that promote infiltration, improve water quality, and safely convey stormwater through the neighborhood to a stream.
2015 Land Conservation and Tree Preservation Awards Fairfax County
A public ceremony was held in the Fairfax County Government Center board auditorium on January 29, 2016, to recognize the winners of the 2015 Land Conservation and Tree Preservation Awards. Organizations and individuals were acknowledged for demonstrating best practices in preserving the county’s soil and water resources and protecting trees during development projects. The annual awards program is sponsored by the Fairfax County Department of Public Works and Environmental Services in cooperation with the Northern Virginia Soil and Water Conservation District and the Fairfax Tree Commission.
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use innovative & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
Restore streambed and banks, ~4,500 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
The virtual community meeting held on Sept 29, 2020 advised residents about the proposed stream restoration in a Pimmit Run tributary at the George Marshall High School in Fairfax County, VA.
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Fairfax County
A section of Crook Branch will be restored to accomplish the following goals:
Stabilize stream
Reduce excess sediment from being transported downstream
Reduce excess nutrients from entering the waterway
Improve aesthetics
Reduce hazards (steep, eroding banks)
Reconnect stream to floodplain
Improve Riparian Buffers
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
Chesterbrook Road Emergency Project – Summer 2019
Final Scoping Technical Memorandum – January 2020
Professional Services Contract Execution – April 2021
Community Meeting on stream restoration Pre-design/Channel alignments – April 2021
Final Preliminary Engineering Report – October 2021
Community Meeting on Sanitary Realignment Preliminary Engineering Report – October 2021
Value Engineering Study completed – November 2021
One joint study for both projects
Community Meeting with Board of Supervisor – December 2021
Community meeting – January 2022
Design Contract Development – (We are at this step)
Land Acquisition – (We are at this step)
Complete Design
Construction
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
Restoration of approximately 1,800 linear feet of headwater tributaries of Paul Spring Branch that flow through Charles Goodman Park and Brickelmaier Park, and adjacent private properties.
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
Restore up to 7,500 feet of stream channel and tributaries
Reduce erosion and sediment transport
Install new sanitary sewers serving over 500 single family homes
Improve watershed conditions and reduce downstream impacts
Improve and protect public infrastructure
Prevent costly emergency repairs
Reduce risk to public health and the environment
Maintain close coordination with stakeholders and community
Build partnerships with local organizations
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use innovative & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
Restore streambed and banks, ~4,500 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
The virtual community meeting held on Sept 29, 2020 advised residents about the proposed stream restoration in a Pimmit Run tributary at the George Marshall High School in Fairfax County, VA.
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Fairfax County
A section of Crook Branch will be restored to accomplish the following goals:
Stabilize stream
Reduce excess sediment from being transported downstream
Reduce excess nutrients from entering the waterway
Improve aesthetics
Reduce hazards (steep, eroding banks)
Reconnect stream to floodplain
Improve Riparian Buffers
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
Chesterbrook Road Emergency Project – Summer 2019
Final Scoping Technical Memorandum – January 2020
Professional Services Contract Execution – April 2021
Community Meeting on stream restoration Pre-design/Channel alignments – April 2021
Final Preliminary Engineering Report – October 2021
Community Meeting on Sanitary Realignment Preliminary Engineering Report – October 2021
Value Engineering Study completed – November 2021
One joint study for both projects
Community Meeting with Board of Supervisor – December 2021
Community meeting – January 2022
Design Contract Development – (We are at this step)
Land Acquisition – (We are at this step)
Complete Design
Construction
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
Restoration of approximately 1,800 linear feet of headwater tributaries of Paul Spring Branch that flow through Charles Goodman Park and Brickelmaier Park, and adjacent private properties.
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
Restore up to 7,500 feet of stream channel and tributaries
Reduce erosion and sediment transport
Install new sanitary sewers serving over 500 single family homes
Improve watershed conditions and reduce downstream impacts
Improve and protect public infrastructure
Prevent costly emergency repairs
Reduce risk to public health and the environment
Maintain close coordination with stakeholders and community
Build partnerships with local organizations
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
This presentation shows the results of a class project analyzing transportation alternatives to ease congestion at a Ohio major intersection. My group was assigned the roundabout alternative, and our analysis included site analysis using GIS, stakeholder concerns, environmental issues, feasibility of a roundabout, and final recommendations.
Overview of the Fairhill/MLK green infrastructure ambassador project taking shape in Cleveland. Includes details on project history, improvements, Project Clean Lake, traffic patterns and impacts during construction, and more.
Doug Leitch and Dominic Turner for ‘Armtec Engineering’s Top Picks! – Case Studies & Design Review!’ the exciting conclusion to our 2016 webinar program! This will be an in depth look at the design and installation challenges and solutions of major drainage projects.
The projects discussed will feature both Engineered Steel and Surface Trench drainage products and will review the design theory behind the designs as well as the selection criteria and final installation challenges and procedures. Hosted by Professional Engineers, join us to learn why the owners and consultants of the featured projects used the solutions they did!
About the Department of General Services:
The mission of the Department of General Services (DGS) is to elevate the quality of life for the District with superior construction, first-rate maintenance and expert real estate management. By building and maintaining safe and green state-of-the-art facilities which foster economic growth and elevate educational environments, our trusted and skillful employees create modern and vibrant communities across all of the District of Columbia.
###
Follow DGS on Twitter, Facebook, and Visit Our Website!
Follow DGS on Twitter at @DCDGS - Facebook at facebook.com/dcdgs
Visit DGS at dgs.dc.gov
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Suggested fine-tuning of bridge and park designs to best activate the Provide...Barnaby Evans
A review of the planned I-195 pedestrian bridge and park designs with suggestions for improvements by Barnaby Evans. These are fine-tunings of the current planned designs focused on maximizing net benefit for the community
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Black & Veatch
The Ozark Beach Hydroelectric Project, owned and operated by The Empire District Electric Company, is a FERC-licensed, 16 MW run-of-river project located on the White River in south central Missouri. As part of project relicensing, EDEC revised the project boundary to exclude land that is no longer required for project operation to streamline the process and save on administrative costs.
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
The project consists of a new 17,400 square feet, two-story, four-bay fire station facility and associated improvements to the one-acre site including stormwater detention, landscaping, and parking. The scope also included the demolition of the existing two and a half bay facility, and construction of a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements include:
Apparatus Bays, Control Room and Offices
Battalion Chief Suite
Kitchen, Dayroom, and Dining Room
Bunk Rooms
Showers and Locker Rooms
Exercise Room
Ready Gear Room
Reston Arts Center Community Meeting 02-28-22Fairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Lakevale Estates Collection Improvements Community MeetingFairfax County
Short-term: Install Backflow Devices
Devices installed
Regular system maintenance is ongoing
Mid-term: Temporary modifications to the Lakevale Pump Station
Updated pump operating strategy
Replaced pump impeller to reduce pump station capacity
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
हम आग्रह करते हैं कि जो भी सत्ता में आए, वह संविधान का पालन करे, उसकी रक्षा करे और उसे बनाए रखे।" प्रस्ताव में कुल तीन प्रमुख हस्तक्षेप और उनके तंत्र भी प्रस्तुत किए गए। पहला हस्तक्षेप स्वतंत्र मीडिया को प्रोत्साहित करके, वास्तविकता पर आधारित काउंटर नैरेटिव का निर्माण करके और सत्तारूढ़ सरकार द्वारा नियोजित मनोवैज्ञानिक हेरफेर की रणनीति का मुकाबला करके लोगों द्वारा निर्धारित कथा को बनाए रखना और उस पर कार्यकरना था।
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
role of women and girls in various terror groupssadiakorobi2
Women have three distinct types of involvement: direct involvement in terrorist acts; enabling of others to commit such acts; and facilitating the disengagement of others from violent or extremist groups.
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
In a May 9, 2024 paper, Juri Opitz from the University of Zurich, along with Shira Wein and Nathan Schneider form Georgetown University, discussed the importance of linguistic expertise in natural language processing (NLP) in an era dominated by large language models (LLMs).
The authors explained that while machine translation (MT) previously relied heavily on linguists, the landscape has shifted. “Linguistics is no longer front and center in the way we build NLP systems,” they said. With the emergence of LLMs, which can generate fluent text without the need for specialized modules to handle grammar or semantic coherence, the need for linguistic expertise in NLP is being questioned.
2. Purpose of Meeting
• Review levee conceptual design features and
recommendations
• Receive feedback from the community on project
features before moving forward with final design
Building Design Branch
2
4. Project Background
• June 2006 -160 homes
were flooded from a
storm event
• 2009 – US Army Corps
of Engineers (USACE)
completed a study to
evaluate flood
damage reduction
measures in the
Huntington
Community
Building Design Branch
4
4
5. Project Background
• September 2011- Tropical Storm Lee caused
damage to 160 homes in the Huntington Community
• November 6, 2012 – Fairfax County voters approved
stormwater bond referendum to fund design and
construction of flood damage reduction measurers
• November 9, 2012 – Fairfax County advertised for
consultant design services
• June 2013 – Fairfax County awarded the levee
design contract to ARCADIS
Building Design Branch
5
5
7. Project Background
• November 2013 – ARCADIS submitted the Phase I
design package to Fairfax County
• Survey – 300 acre of aerial survey, 80 acre field survey, 26
field run cross sections of Cameron Run, utility survey
• Geotechnical Investigation – collection and analysis of 13
additional soil borings
• Wetland delineation
• Conceptual Design
• Review USACE 2009 study and conceptual design
• Evaluate potential refinements/alternatives
Building Design Branch
7
7
8. Project Background
• Phase II (January 2014-Winter 2017)
•
•
•
•
•
•
Schematic Design (30%)
Design Development (60%)
Permitting
Land Acquisition
Construction Documents (100%)
Bidding
• Phase III (Winter 2017-Spring 2019)
• Construction
• Original schedule condensed by 7 months
Building Design Branch
8
8
9. Conceptual Design Features
Key Design Considerations
•
•
•
•
Collection Drains vs. Cut Off Wall
Pump Station Location
Stormwater Diversion
Earthen Levee vs. Earthen Levee/I-Wall Combination
Building Design Branch
9
9
10. Collection Drains vs. Cutoff Wall
Collection Drain
(Recommendation)
Pros
• Lower cost
• Ease of
construction
Cut Off Wall
Cons
• Maintenance of toe
drainage pipe
Pros
• No maintenance
of toe drainage
• Higher risk of piping
thru levee due to
clogging of toe drain
• Reduced risk of
piping thru levee
• Additional pumping
capacity required
(6,700 gpm)
Cons
• Higher cost
• Specialized
construction
• Concern that it
could raise
groundwater
levels and flood
basements
Building Design Branch
10
10
11. Potential Pump Station Locations
Central SWPS
Location
Westside SWPS
Location
Eastside SWPS
Location
Building Design Branch
11
11
12. Potential Pump Station Locations
Center of Levee
Western End
Property requirements
Property requirements
• Fairfax owned park property
• Adjacent commercial parcel is
ideal, but prohibitively costly
• Would occupy space otherwise
available for the excavated
ponding area or park recreation
area
Permanent Access
• From Liberty Dr. over raised road
through excavated ponding area
- Very exposed during storm
events, safety concern
Neighbor concerns / buffering
• In center of neighborhood park
recreation area
• Very visible from neighborhood
Drainage
Permanent Access
• Easy access off Fenwick Dr. or
new access road from Metroview
Pkwy.
Neighbor concerns / buffering
• Very close to homes at Fenwick
Dr.
Drainage
Eastern End
(Recommendation)
Property requirements
• Fairfax owned park property
Permanent Access
• New access road from Hunting
Creek Rd.
Neighbor concerns / buffering
• Far from residential properties in
Huntington Neighborhood
• Buffered by wooded area
• Divert all flow to Western end
• Backs up to apartment complex
recreation area
• Slightly smaller diversion channel
than Eastern option
Drainage
• Divert all flow to Eastern end
• Slightly larger diversion channel
than Western option
• Requires a third channel to
Cameron run with additional
wetlands impacts and
maintenance
Building Design Branch
12
12
14. Stormwater Diversion Options
Grass Lined Drainage Ditch
Concrete Drainage Ditch
Precast Concrete Box Culvert
• Erosion concern from high
flow velocities
• Not as wide due to steeper
side slopes (1:1 = 15’-20’ or
vertical = 10’)
• Fence to prevent access
• High construction cost for cast
in place
• Less maintenance than grass
lined
*Recommendation
• 30’ wide @ 2:1 side slopes
• Maintenance concerns and
mowing
• Standing water concerns due
to flat grades
• Lowest installation cost
• Limited access points – security
bars to prevent entry
• Buried – any potential standing
water is not exposed
• Precast construction – culvert
segments trucked to site
• Maintenance - confined space
entry
Building Design Branch
14
14
15. Earthen Levee vs. Earthen Levee/Wall Combination
Earthen Levee
Earthen Levee / I-Wall Combination
(Recommendation)
Pros
• More natural aesthetic
Pros
• Reduced construction traffic
• Clear access to Cameron Run
• Lower cost
Cons
• Higher cost
• Smaller overall levee mass, width reduced by 17’
• Reduced backwater impacts
• Generates greater construction traffic
• Reduced impact to trees
• Greater overall levee mass, width varies
from 60 feet – 85 feet
Cons
• Maintenance of wall
• Access thru wall
Building Design Branch
15
15
20. Accreditation
• Levee will be designed to meet FEMA accreditation
standards
• Fairfax County will submit an accreditation package
to FEMA for their consideration
Building Design Branch
20
22
21. Questions
Contact Information – Huntington Levee Project
Phone #: 703-324-5800
Email address: HuntingtonLevee@fairfaxcounty.gov
Contact Information – Stormwater Questions
Phone #: 703-324-5821
Email address: SWPDmail@fairfaxcounty.gov
Huntington Levee Website:
www.fairfaxcounty.gov/dpwes/huntingtonlevee
To request this document in an alternate format call 703-324-5800, TTY 711.